CN105625420A - Extension type manual hole digging pile support structure and construction method thereof - Google Patents

Extension type manual hole digging pile support structure and construction method thereof Download PDF

Info

Publication number
CN105625420A
CN105625420A CN201610136595.2A CN201610136595A CN105625420A CN 105625420 A CN105625420 A CN 105625420A CN 201610136595 A CN201610136595 A CN 201610136595A CN 105625420 A CN105625420 A CN 105625420A
Authority
CN
China
Prior art keywords
steel plate
connection section
bolt
pile casting
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610136595.2A
Other languages
Chinese (zh)
Other versions
CN105625420B (en
Inventor
谭新平
徐张建
燕建龙
赵云刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN
Original Assignee
NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN filed Critical NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN
Priority to CN201610136595.2A priority Critical patent/CN105625420B/en
Publication of CN105625420A publication Critical patent/CN105625420A/en
Application granted granted Critical
Publication of CN105625420B publication Critical patent/CN105625420B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides an extension type manual hole digging pile support structure and a construction method thereof. The extension type manual hole digging pile support structure comprises a steel plate, a bolt, a first connection part and a second connection part, wherein the first connection part and the second connection part are formed on the two opposite sides of the steel plate; the first connection part is provided with a bolt hole, and the second connection part is provided with a sliding groove; the first connection part and the second connection part are overlapped, so that the steel plate is rolled into a round pipe, the bolt hole and the sliding groove correspond in position, the bolt is inserted into the bolt hole and the sliding groove, and accordingly the first connection part and the second connection part are fixedly connected. By means of the extension type manual hole digging pile support structure and the construction method thereof, the operation of continuous excavation and support of artificial piles is achieved, hoisting of a protective barrel is not affected by the small pore diameter of an upper support body after the protective barrel extends, and the protective barrel can be put into a substratum directly; the excavation volume of earthwork is reduced since a support layer is thin.

Description

A kind of telescoping support with manually dug piles structure and constructional method thereof
Technical field
The present invention relates to the realm of building construction, a kind of telescoping support with manually dug piles structure of specific design and constructional method thereof.
Background technology
In order to ensure construction safety in artificial digging pile process, preventing the hole wall soil body from caving in, cause personal injury accidents, conventional stake holes method for protecting support has Sheet Steel Form method, fixing steel pile casting, concrete guard ring etc. Sheet Steel Form method is digging a good Sheet Steel Form in stake holes, reinforcing mat after-pouring concrete guard wall is inserted in colligation, the supporting excavation earthwork and casting concrete amount are relatively big, can again will excavate after concrete initial set, can not operation continuously, the timed interval is long, easily causing hole prodelta clay water, the soil body north soft decrease in intensity of bubble affects again bottom supporting safety, uses and easily cause periphery ground to be out of shape in Udoll layer, owing to effect is lower, digging process easily produces stake holes and ground hidden danger; Fixing steel pile casting is only applicable to shallow-layer and is protected by the pile of stake mouth, space is often had to need between casing and soil layer fixing with anti-sinking on ground, if soil layer distortion cave in steel pile casting produce frictional resistance more energetically time again be difficult to sink, its main problem is only supporting aperture section, it is difficult to protection to deep, especially strengthening construction under basis is difficult to implement; Concrete guard ring is suitable with above-mentioned fixing steel pile casting technique, digging process sinks by deadweight, if ground soil layer wets, soft distortion concrete guard ring is just difficult to sink to continuing operation by locking, technique is heavy, soil around pile disturbance is bigger, easily seep water along gap and slip soil and draw the distortion of body prop and tilt, more deeply, slightly weak earthen foundation reinforce and pore digging be difficult to adopt, in reinforcing engineering, difficulty of construction is also bigger under the foundation. Therefore, seeking a kind of efficient, economical and practical, convenient operation, the secure support with manually dug piles method of safety becomes the technical problem being badly in need of solving.
Therefore, it is necessary to provide a kind of telescoping support with manually dug piles structure and constructional method thereof.
Summary of the invention
It is an object of the invention to provide a kind of telescoping support with manually dug piles structure and constructional method thereof.
The technical scheme of the present invention is as follows:
A constructional method for telescoping support with manually dug piles, comprises the steps:
Step (1), measuring stake position, by design position stake holes;
Step (2), according to stake holes diameter, scalable scope, supporting height calculate determine plate size, cutting steel plate;
Step (3), make bolt hole and chute in the two opposite sides of steel plate, and mark solder joint position;
Step (4), with plate bending rolls, above-mentioned roll of steel plate being shaped as steel pile casting, the diameter of steel pile casting is greater than stake holes diameter, Telescopic Fixed to meet;
Step (3), weld position place weld nut, by have chute be placed in inner side, along chute inserting bolt, check chute size, twice bolt is stretched smooth and easy along chute; Fix stand-by with the bolt of band nut after steel pile casting is first shunk;
Step (4), install in hole shrink fixing after steel pile casting: predetermined position in lifting steel pile casting to stake holes, placed in the middle vertical, unclamping bolt, steel pile casting tightens bolt after relying on its elasticity to be flared to predetermined diameter again, has fixed steel pile casting with reinforcing bar along the borehole wall;
Step (5), steel pile casting surrounding gap-fill dry sand ash, filling edge, limit steel pile casting inwall knock make dry sand ash contact closely with supporting stratum;
Step (6), along the bottom of foundation steel pile casting insert two plastic catheter, the mouth of pipe is caused ground;
Step (7), in steel pile casting casting concrete, stop when building to basis about 0.5m building and vibration compacting, after initial set, carry out second time build, concrete is real to plug in the groove of hole, by conduit discharge section air;
After step (8), exhaust are not exclusively or concrete secondary shrinks, form certain space under the foundation, slip casting is carried out along a wherein grouting pipe with slip casting machine, air is discharged from another root conduit, when namely injecting cement paste fills after flowing out, second pulp feeding again after initial set, it is ensured that closely knit between basis and casting concrete;
Step (9), on request with backfill soil ram fill out hole groove.
A kind of telescoping support with manually dug piles structure, comprise steel plate, bolt, the first connection section being formed at described steel plate two opposite sides and the 2nd connection section, described first connection section is formed with bolt hole, described 2nd connection section is formed with chute, described first connection section and folded the establishing of described 2nd connection section make described steel plate enclose volume formation circle pipe, described bolt hole and described runner position are corresponding, described bolt inserts described bolt hole and described chute, and described first connection section is fixedly connected with the 2nd connection section.
Preferably, described steel plate is rectangular steel plates, and described first connection section and described 2nd connection section lay respectively at the both sides in described steel plate length direction, and described chute is arranged along the length bearing of trend of described steel plate.
Preferably, described steel plate thickness is 2-3mm.
Preferably, also comprising conduit, described conduit is located at described steel plate and is enclosed in the circle pipe that volume formed and the length of described conduit is greater than the width of described steel plate.
Preferably, the quantity of described conduit is two.
Preferably, described conduit is plastics airway.
Preferably, described first connection section and the 2nd connection section lay respectively at outside and the inner side of described round pipe.
Preferably, also comprising nut, described nut is welded in described bolt hole.
The useful effect of the present invention is: the present invention utilizes telescoping support with manually dug piles structure and constructional method thereof, it is achieved that the artificial continuous excavation supporting operation of stake, and lifting after casing is flexible does not affect by prop aperture, top is little, can directly under enter understratum; Prop up sheath thin, decrease earth volume excavation amount; Can with the timely supporting of excavation by power, overcome that earth excavation amount is big, formwork supporting plate casting concrete amount is big, personal security hidden danger is many, presetting period length is difficult to continuous excavation supporting in hole defect, decrease the disturbance to the supporting soil body, be conducive to stake holes and ground safety; Dry sand ash is convenient to fill gap and closely knit, can absorb hole wall moisture, hardening soil property, waterproof can improve intensity again after solidifying; The method convenient operation, quick construction is efficient, and safe and reliable, comprehensive cost is cheap; In addition due to when foundation bottom casting concrete air be difficult to discharge completely, often form the hidden danger such as space, be vented slip casting again by plug in conduit, by irregular space or gap filling, reach and build closely knit good consolidation effect.
Accompanying drawing explanation
Fig. 1 is the steel plate structure figure of a kind of telescoping support with manually dug piles structure of the present invention;
Fig. 2 is be a kind of telescoping support with manually dug piles structural texture schematic diagram of the present invention;
Fig. 3 is the sectional view of Fig. 2 along line A-A.
Embodiment
Below in conjunction with drawings and embodiments, the invention will be further described.
Refer to Fig. 1 to Fig. 3, described telescoping support with manually dug piles structure comprises nut 1, conduit 2, steel plate 3, bolt 4, it is formed at the first connection section 5 and the 2nd connection section 6 of described steel plate 3 two opposite sides, described first connection section 5 is formed with bolt hole 51, described 2nd connection section 6 is formed with chute 61, described first connection section 5 and folded the establishing of described 2nd connection section 6 make described steel plate 3 enclose volume formation circle pipe, described bolt hole 51 and described chute 61 position are corresponding, described bolt 4 inserts described bolt hole 51 and described chute 61, described first connection section 5 is fixedly connected with the 2nd connection section 6, described nut 1 is welded in described bolt hole 51.
Described steel plate 3 is rectangle steel plate, and described first connection section 5 and described 2nd connection section 6 lay respectively at the both sides of described steel plate 3 length direction, and described chute 61 is arranged along the length bearing of trend of described steel plate 3.
In the present embodiment, described steel plate 3 thickness is 2-3mm.
Described conduit 2 is located at described steel plate 3 and is enclosed in the circle pipe that volume formed and the length of described conduit 2 is greater than the width of described steel plate 3, and concrete, the quantity of described conduit 2 is two; Described conduit 2 is plastics airway.
Described first connection section 5 and the 2nd connection section 6 lay respectively at outside and the inner side of described round pipe.
The present invention also provides the constructional method of a kind of telescoping support with manually dug piles, comprises the steps:
Step (1), measuring stake position, by design position stake holes;
Step (2), according to stake holes diameter, scalable scope, supporting height calculate determine steel plate 3 size, cutting steel plate 3;
Step (3), make bolt 4 hole and chute 61 in the two opposite sides of steel plate 3, and mark solder joint position;
Step (4), with plate bending rolls, above-mentioned steel plate 3 being rolled into formation steel pile casting, the diameter of steel pile casting is greater than stake holes diameter, Telescopic Fixed to meet;
Step (3), weld position place weld nut 1, by have chute 61 be placed in inner side, along chute 61 inserting bolt 4, check chute 61 size, make twice bolt 4 stretch smooth and easy along chute 61; Fix stand-by with the bolt 4 of band nut after steel pile casting is first shunk;
Step (4), install in hole shrink fixing after steel pile casting: predetermined position in lifting steel pile casting to stake holes, placed in the middle vertical, unclamping bolt 4, steel pile casting tightens bolt 4 after relying on its elasticity to be flared to predetermined diameter again, has fixed steel pile casting with reinforcing bar along the borehole wall;
Height according to described stake holes, stacking can arrange multiple described steel pile casting.
Step (5), at the gap-fill dry sand ash 8 of steel pile casting surrounding, filling edge, limit steel pile casting inwall knocks and makes dry sand ash 8 contact closely with supporting stratum 7;
Step (6), along basic 10 bottom surfaces steel pile casting insert two plastic catheter 2, the mouth of pipe is caused ground;
Step (7), in steel pile casting casting concrete 9, build and stop building and vibration compacting to during the 10 times about 0.5m in basis, after initial set, carry out second time build, concrete 9 is real to plug in the groove of hole, by conduit 2 discharge section air;
After step (8), exhaust are not exclusively or concrete shrinks for 9 two times, certain space is formed 10 times on basis, slip casting is carried out along a wherein grouting pipe 2 with slip casting machine, air is discharged from another root conduit 2, when namely injecting cement paste 11 fills after flowing out, second pulp feeding again after initial set, it is ensured that closely knit between basis 10 and casting concrete 9;
Step (9), on request with backfill soil 12 ram fill out hole groove.
Above-described is only embodiments of the present invention, and at this it is noted that for the person of ordinary skill of the art, without departing from the concept of the premise of the invention, it is also possible to make improvement, but these all belong to protection scope of the present invention.

Claims (9)

1. the constructional method of a telescoping support with manually dug piles, it is characterised in that: comprise the steps:
Step (1), measuring stake position, by design position stake holes;
Step (2), according to stake holes diameter, scalable scope, supporting height calculate determine plate size, cutting steel plate;
Step (3), make bolt hole and chute in the two opposite sides of steel plate, and mark solder joint position;
Step (4), with plate bending rolls, above-mentioned roll of steel plate being shaped as steel pile casting, the diameter of steel pile casting is greater than stake holes diameter, Telescopic Fixed to meet;
Step (3), weld position place weld nut, by have chute be placed in inner side, along chute inserting bolt, check chute size, twice bolt is stretched smooth and easy along chute; Fix stand-by with the bolt of band nut after steel pile casting is first shunk;
Step (4), install in hole shrink fixing after steel pile casting: predetermined position in lifting steel pile casting to stake holes, placed in the middle vertical, unclamping bolt, steel pile casting tightens bolt after relying on its elasticity to be flared to predetermined diameter again, has fixed steel pile casting with reinforcing bar along the borehole wall;
Step (5), steel pile casting surrounding gap-fill dry sand ash, filling edge, limit steel pile casting inwall knock make dry sand ash contact closely with supporting stratum;
Step (6), along the bottom of foundation steel pile casting insert two plastic catheter, the mouth of pipe is caused ground;
Step (7), in steel pile casting casting concrete, stop when building to basis about 0.5m building and vibration compacting, after initial set, carry out second time build, concrete is real to plug in the groove of hole, by conduit discharge section air;
After step (8), exhaust are not exclusively or concrete secondary shrinks, form certain space under the foundation, slip casting is carried out along a wherein grouting pipe with slip casting machine, air is discharged from another root conduit, when namely injecting cement paste fills after flowing out, second pulp feeding again after initial set, it is ensured that closely knit between basis and casting concrete;
Step (9), on request with backfill soil ram fill out hole groove.
2. a telescoping support with manually dug piles structure, it is characterized in that, comprise steel plate, bolt, the first connection section being formed at described steel plate two opposite sides and the 2nd connection section, described first connection section is formed with bolt hole, described 2nd connection section is formed with chute, described first connection section and folded the establishing of described 2nd connection section make described steel plate enclose volume formation circle pipe, described bolt hole and described runner position are corresponding, described bolt inserts described bolt hole and described chute, and described first connection section is fixedly connected with the 2nd connection section.
3. telescoping support with manually dug piles according to claim 2 structure, it is characterized in that: described steel plate is rectangular steel plates, described first connection section and described 2nd connection section lay respectively at the both sides in described steel plate length direction, and described chute is arranged along the length bearing of trend of described steel plate.
4. telescoping support with manually dug piles according to claim 2 structure, it is characterised in that: described steel plate thickness is 2-3mm.
5. telescoping support with manually dug piles according to claim 3 structure, it is characterised in that: also comprising conduit, described conduit is located at described steel plate and is enclosed in the circle pipe that volume formed and the length of described conduit is greater than the width of described steel plate.
6. telescoping support with manually dug piles according to claim 5 structure, it is characterised in that: the quantity of described conduit is two.
7. telescoping support with manually dug piles according to claim 5 structure, it is characterised in that: described conduit is plastics airway.
8. telescoping support with manually dug piles according to claim 2 structure, it is characterised in that: described first connection section and the 2nd connection section lay respectively at outside and the inner side of described round pipe.
9. telescoping support with manually dug piles according to claim 8 structure, it is characterised in that: also comprising nut, described nut is welded in described bolt hole.
CN201610136595.2A 2016-03-10 2016-03-10 A kind of extension type support with manually dug piles construction and its construction method Expired - Fee Related CN105625420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610136595.2A CN105625420B (en) 2016-03-10 2016-03-10 A kind of extension type support with manually dug piles construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610136595.2A CN105625420B (en) 2016-03-10 2016-03-10 A kind of extension type support with manually dug piles construction and its construction method

Publications (2)

Publication Number Publication Date
CN105625420A true CN105625420A (en) 2016-06-01
CN105625420B CN105625420B (en) 2018-02-02

Family

ID=56040730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610136595.2A Expired - Fee Related CN105625420B (en) 2016-03-10 2016-03-10 A kind of extension type support with manually dug piles construction and its construction method

Country Status (1)

Country Link
CN (1) CN105625420B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100165A (en) * 2017-06-08 2017-08-29 中交第二航务工程勘察设计院有限公司 A kind of drilled pile solution cavity leak stopping elastic steel cylinder and its operating method
CN110777787A (en) * 2019-10-18 2020-02-11 中铁十局集团第一工程有限公司 Method for preventing drilled pile from collapsing by automatically bouncing steel casing
CN111172984A (en) * 2020-02-17 2020-05-19 中冶建工集团有限公司 Manual hole digging pile dado template convenient to use
CN111733964A (en) * 2020-07-02 2020-10-02 广东茂东实业发展有限公司 Sewage draining device for sewer pipe
CN111794205A (en) * 2020-07-04 2020-10-20 四川航天建筑工程有限公司 Anti-collapse rotary digging pile construction device and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077880U (en) * 1990-11-15 1991-05-29 南京市第三建筑工程公司304工程处 Adjustable steel model for concrete hollow perfusion pile
US5079805A (en) * 1991-02-20 1992-01-14 T C Manufacturing Co., Inc. Fastener for protective sleeves
CN1295159A (en) * 1999-11-09 2001-05-16 洪礼璧 Method for forming pile and device for using the same
CN1888331A (en) * 2006-07-28 2007-01-03 谭新平 Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN201184640Y (en) * 2007-08-02 2009-01-21 李超凡 Household gas kitchen range wind screen
CN101634146A (en) * 2008-07-24 2010-01-27 邢利奥 Manually digging hole full-steel cylinder-wall protecting construction device for building pile foundation and construction method thereof
CN105113490A (en) * 2015-09-21 2015-12-02 陆见华 Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile
CN105178291A (en) * 2015-08-21 2015-12-23 中国路桥工程有限责任公司 Large pile foundation construction method
CN205421246U (en) * 2016-03-10 2016-08-03 西北综合勘察设计研究院 Retractable manual hole digging pile struts structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077880U (en) * 1990-11-15 1991-05-29 南京市第三建筑工程公司304工程处 Adjustable steel model for concrete hollow perfusion pile
US5079805A (en) * 1991-02-20 1992-01-14 T C Manufacturing Co., Inc. Fastener for protective sleeves
CN1295159A (en) * 1999-11-09 2001-05-16 洪礼璧 Method for forming pile and device for using the same
CN1888331A (en) * 2006-07-28 2007-01-03 谭新平 Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN201184640Y (en) * 2007-08-02 2009-01-21 李超凡 Household gas kitchen range wind screen
CN101634146A (en) * 2008-07-24 2010-01-27 邢利奥 Manually digging hole full-steel cylinder-wall protecting construction device for building pile foundation and construction method thereof
CN105178291A (en) * 2015-08-21 2015-12-23 中国路桥工程有限责任公司 Large pile foundation construction method
CN105113490A (en) * 2015-09-21 2015-12-02 陆见华 Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile
CN205421246U (en) * 2016-03-10 2016-08-03 西北综合勘察设计研究院 Retractable manual hole digging pile struts structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100165A (en) * 2017-06-08 2017-08-29 中交第二航务工程勘察设计院有限公司 A kind of drilled pile solution cavity leak stopping elastic steel cylinder and its operating method
CN110777787A (en) * 2019-10-18 2020-02-11 中铁十局集团第一工程有限公司 Method for preventing drilled pile from collapsing by automatically bouncing steel casing
CN111172984A (en) * 2020-02-17 2020-05-19 中冶建工集团有限公司 Manual hole digging pile dado template convenient to use
CN111733964A (en) * 2020-07-02 2020-10-02 广东茂东实业发展有限公司 Sewage draining device for sewer pipe
CN111794205A (en) * 2020-07-04 2020-10-20 四川航天建筑工程有限公司 Anti-collapse rotary digging pile construction device and construction method thereof

Also Published As

Publication number Publication date
CN105625420B (en) 2018-02-02

Similar Documents

Publication Publication Date Title
CN105625420A (en) Extension type manual hole digging pile support structure and construction method thereof
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN105525627A (en) Two-way anchorage plate retaining wall and construction method thereof
CN110847224A (en) Filling slope gravity retaining wall reinforcing structure and construction method thereof
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN206204880U (en) A kind of side slope comprehensive regulation structure of prevention river channel erosion
CN205975658U (en) Steel platform tower crane foundation
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN206768831U (en) Support, anchor cable post-tensioning HU type building enclosures before a kind of steel pipe
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN206768832U (en) Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe
CN203684215U (en) Carbon fiber cloth bag type cast-in-situ anti-arch curved surface combined special-shaped pile
CN205421246U (en) Retractable manual hole digging pile struts structure
CN102787608A (en) Gravity type foundation pit supporting system under vacuum effect and construction method
CN202830969U (en) Rectifying and reinforcing structure of cantilever retaining wall
CN206368375U (en) A kind of electric power pylon basis
RU121275U1 (en) REINFORCED GROUND-CEMENT WALL FOR PROTECTION OF BUILDINGS AND STRUCTURES FROM THE DIGGED NEAR THE CROWDED
CN206667263U (en) A kind of foundation pit supporting construction
CN206052771U (en) Gravity Retaining Wall structure with culvert
CN212983885U (en) Foundation pit structure
CN211080248U (en) Deep foundation pit supporting structure of adjacent road under complex geological condition
CN211421139U (en) Shield constructs well crown beam bearing structure
CN210049221U (en) Foundation treatment structure for deep silt
CN209538198U (en) Abnormity draining friction pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180202

Termination date: 20200310