CN105113490A - Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile - Google Patents
Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile Download PDFInfo
- Publication number
- CN105113490A CN105113490A CN201510602426.9A CN201510602426A CN105113490A CN 105113490 A CN105113490 A CN 105113490A CN 201510602426 A CN201510602426 A CN 201510602426A CN 105113490 A CN105113490 A CN 105113490A
- Authority
- CN
- China
- Prior art keywords
- pile
- mould
- water collecting
- special
- circular hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a special-shaped mesopore water collecting pile and a round hole mold adopted in the same and a construction process of the special-shaped mesopore water collecting pile and aims at providing a special-shaped mesopore water collecting pile which is simple in structure, convenient to construct and low in cost, a round hole mold adopted in the special-shaped mesopore water collecting pile and a construction process of the special-shaped mesopore water collecting pile. The construction efficiency of a soft foundation treatment process can be improved. According to the technical scheme, the special-shaped mesopore water collecting pile is characterized in that a pile body is included, a water collecting hole which is concentric and coaxial with the pile body is formed in the center of the pile body, an opening of the water collecting hole is formed in the top face of the pile body, and the pile body is formed by pouring water-permeable concrete. The round hole mold is characterized in that the round hole mold is used for forming the water collecting hole of the special-shaped mesopore water collecting pile, and comprises a cylindrical drum rolled by an elastic steel plate and a support which is arranged in the drum and supports the drum into a cylinder. The special-shaped mesopore water collecting pile and the round hole mold adopted in the same and the construction process of the special-shaped mesopore water collecting pile are suitable for the field of soft foundation treatment.
Description
Technical field
The present invention relates to a kind of mesopore to catchment shaped pile, its circular hole mould adopted and construction technology thereof.Be applicable to treatment of soft foundation field.
Background technology
If ground is firm not before building, for preventing the accidents such as building groundwork sinking drawing crack causes building unstable, need to process subgrade, its sedimentation is made to become enough firm, the degree of consolidation of raising subgrade and stability are to the requirement designed, this process is called treatment of soft foundation, is soft foundation processing again.
Engineering method and feature thereof are commonly used in treatment of soft foundation:
1, compound foundation method: cement mixing method, powder spray piling, broken stone pile etc.; Shortcoming: cost is higher.
2, consolidation:
(1) plastic draining board combined stack-load: long in time limit, effect is undesirable
(2) plastic draining board combined vacuum precompressed: after 90 days durations, effect easily controls, and cost is low.
Summary of the invention
The technical problem to be solved in the present invention is: for above-mentioned Problems existing, provides that a kind of structure is simple, easy construction, lower-cost mesopore catchment shaped pile, its circular hole mould adopted and construction technology thereof, to improve the efficiency of construction of soft foundation treatment process.
The technical solution adopted in the present invention is: a kind of mesopore catchments shaped pile, it is characterized in that: have pile body, and pile body center is provided with concentric coaxial and at the gully-hole of pile body end face opening, described pile body is built by pervious concrete and formed with pile body.
The composition of described pervious concrete comprises cement, water and stone, cement: water: stone weight ratio is 1:0.3:5.6-6.
Described gully-hole is circular hole.
Described pile body is X-type stake or the stake of Y type.
A kind of circular hole mould, is characterized in that: this circular hole mould is used for described mesopore and catchments gully-hole shaping of shaped pile, and circular hole mould comprises and is rolled into by one piece of spring steel plate reel that cylinder formed and is placed in the support in reel, roll support being become cylinder.
Mesopore catchments the construction technology of shaped pile, it is characterized in that step is as follows:
1, stake mould is squeezed into stratum;
2, configuration reinforcement in stake mould, and the center in stake mould arranges circular hole mould according to claim 5;
3, between stake mould and circular hole mould, pervious concrete is poured into;
4, a mould is extracted after filling pervious concrete between stake mould and circular hole mould;
5, after pervious concrete solidification, extracted by the support in the middle of circular hole mould, wind-up drum under the effect of external force and reel its own resilient, reduces drum diameter, then extracts reel.
The invention has the beneficial effects as follows: the present invention adopts X-type stake or Y type stake pile body, uniform section periphery expands, and the comparable cylindrical, massive stake of pile body side surface area expands more than 1-2 times, and for the friction pile of power of rubbing based on side, cost greatly reduces.The present invention takes out hole (gully-hole) decrement at pile body center concrete, reduces material cost.Material of body of a pile adopts pervious concrete, after having built of pile body, water in the soil of pile body periphery waters through pervious concrete the pile body built up and collects in gully-hole, form draining well point, by dewatering installation, the water collected in gully-hole is discharged, contribute to accelerating foundation soil secondary consolidation, improve inter-pile soil bearing capacity of foundation soil, improve the efficiency of construction of soft foundation treatment process, reduce settlement after construction.In the present invention, gully-hole adopts the circular hole mould be made up of reel and support, and installation, convenient disassembly, provide efficiency of construction.
Accompanying drawing explanation
Fig. 1 is that in embodiment 1, mesopore catchments the top view of shaped pile.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the top view of circular hole mould in embodiment 1.
Fig. 4 is the lateral view of reel in embodiment 1.
Fig. 5 is the lateral view of embodiment 1 medium-height trestle.
Fig. 6 is the die-filling structural representation with circular hole mould in embodiment 1.
Fig. 7 is reel action schematic diagram in embodiment 1.
Fig. 8 is that in embodiment 2, mesopore catchments the top view of shaped pile.
Detailed description of the invention
Embodiment 1: as shown in Figure 1 and Figure 2, a kind of mesopore of the present embodiment catchments shaped pile, and have the pile body 1 of Y type stake, pile body 1 center is provided with circular gully-hole 11, this gully-hole coaxial arrangement concentric on pile body 1, and gully-hole 11 is at pile body 1 end face opening.
In this example, pile body 1 adopts pervious concrete to build to form, and the composition of this pervious concrete generally comprises cement, water and stone, cement: water: stone ratio is 1:0.3:5.6-6.Stone consumption is 1400 ~ 1600kg/m3.Cement amount wraps tightly stone with the cement paste of preparation, does not form slurry again, ensures that concrete permeable is as the criterion.The cement consumption of general non-fine concrete is 300 ~ 350kg/m3, and intensity is high suitable increase cement consumption again.
In the present embodiment, the catchment construction technology of shaped pile of mesopore is as follows:
1, utilize vibrating hammer that stake mould 4 is squeezed into stratum.
2, configuration reinforcement in stake mould 4, and the center in stake mould 4 arranges circular hole mould, sees Fig. 6.As shown in Figure 3, in this example, circular hole mould is made up of reel 2 and cross support 3, and wherein reel 2 (Fig. 4) is rolled into cylinder by one piece of spring steel plate and is formed, and reel 2 has the elasticity trend inwardly rolled tightly; Support 3 (Fig. 5) is placed in reel 2, supports reel 2, reel 2 is supported to the cylinder of pre-sizing.
3, between stake mould 4 and circular hole mould, pervious concrete is poured into.
4, vibrating hammer is utilized to be extracted by stake mould 4 after filling pervious concrete between stake mould 4 and circular hole mould.
5, after pervious concrete solidification, extracted by the support 3 in the middle of circular hole mould, wind-up drum 2 (see Fig. 7) under the effect of external force and reel 2 its own resilient, reduces reel 2 diameter, then extracts reel 2, completes mesopore and to catchment the construction of shaped pile.
Embodiment 2: the structure of the present embodiment is substantially the same manner as Example 1, difference is only that in the present embodiment, pile body 1 is X-type stake, sees Fig. 8.
Certainly, above-mentioned explanation is not limitation of the present invention, and the present invention is also not limited to above-mentioned citing, those skilled in the art, within the scope of the invention, the change made, change add or replace, all should belong to protection scope of the present invention.
Claims (6)
1. a mesopore catchments shaped pile, it is characterized in that: there is pile body (1), pile body (1) center is provided with concentric coaxial and at the gully-hole (11) of pile body (1) end face opening, described pile body (1) is built by pervious concrete and formed with pile body (1).
2. mesopore according to claim 1 catchments shaped pile, it is characterized in that: the composition of described pervious concrete comprises cement, water and stone, cement: water: stone weight ratio is 1:0.3:5.6-6.
3. mesopore according to claim 1 catchments shaped pile, it is characterized in that: described gully-hole (11) is circular hole.
4. mesopore according to claim 1 catchments shaped pile, it is characterized in that: described pile body (1) is X-type stake or the stake of Y type.
5. a circular hole mould, it is characterized in that: this circular hole mould is used for mesopore described in claim 3 and catchments gully-hole (11) shaping of shaped pile, circular hole mould comprises and is rolled into by one piece of spring steel plate reel (2) that cylinder formed and is placed in the interior support (3) roll support being become cylinder of reel (2).
6. mesopore catchments a construction technology for shaped pile, it is characterized in that step is as follows:
6.1, stake mould (4) is squeezed into stratum;
6.2, configuration reinforcement in stake mould (4), and the center in stake mould (4) arranges circular hole mould according to claim 5;
6.3, between stake mould (4) and circular hole mould, pervious concrete is poured into;
6.4, a mould (4) is extracted after filling pervious concrete between stake mould (4) and circular hole mould;
6.5, after pervious concrete solidification, support (3) in the middle of circular hole mould is extracted, wind-up drum (2) under the effect of external force and reel (2) its own resilient, reduces reel (2) diameter, then extracts reel (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510602426.9A CN105113490A (en) | 2015-09-21 | 2015-09-21 | Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510602426.9A CN105113490A (en) | 2015-09-21 | 2015-09-21 | Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105113490A true CN105113490A (en) | 2015-12-02 |
Family
ID=54661582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510602426.9A Pending CN105113490A (en) | 2015-09-21 | 2015-09-21 | Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105113490A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625420A (en) * | 2016-03-10 | 2016-06-01 | 西北综合勘察设计研究院 | Extension type manual hole digging pile support structure and construction method thereof |
CN111733830A (en) * | 2020-07-07 | 2020-10-02 | 北京启顺京腾科技有限责任公司 | Super high-rise building foundation pit bearing and enclosing system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2077880U (en) * | 1990-11-15 | 1991-05-29 | 南京市第三建筑工程公司304工程处 | Adjustable steel model for concrete hollow perfusion pile |
CN101190833A (en) * | 2006-11-28 | 2008-06-04 | 上海恒方防腐工程有限公司 | Water permeable concrete and manufacturing method thereof |
CN102400459A (en) * | 2011-11-09 | 2012-04-04 | 河南理工大学 | Cast-in-place concrete hollow five-star shaped pile with large diameter and construction method and special device thereof |
CN102587357A (en) * | 2012-03-27 | 2012-07-18 | 河海大学 | Construction method for electro-osmosis aided driving of cast-in-place X-shaped pile |
CN104314072A (en) * | 2014-10-28 | 2015-01-28 | 中国化学工程第一岩土工程有限公司 | Construction method of special-shaped cast-in-situ concrete pile |
CN204982866U (en) * | 2015-09-21 | 2016-01-20 | 陆见华 | Mesopore catchments special -shaped and round hole mould that adopts thereof |
-
2015
- 2015-09-21 CN CN201510602426.9A patent/CN105113490A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2077880U (en) * | 1990-11-15 | 1991-05-29 | 南京市第三建筑工程公司304工程处 | Adjustable steel model for concrete hollow perfusion pile |
CN101190833A (en) * | 2006-11-28 | 2008-06-04 | 上海恒方防腐工程有限公司 | Water permeable concrete and manufacturing method thereof |
CN102400459A (en) * | 2011-11-09 | 2012-04-04 | 河南理工大学 | Cast-in-place concrete hollow five-star shaped pile with large diameter and construction method and special device thereof |
CN102587357A (en) * | 2012-03-27 | 2012-07-18 | 河海大学 | Construction method for electro-osmosis aided driving of cast-in-place X-shaped pile |
CN104314072A (en) * | 2014-10-28 | 2015-01-28 | 中国化学工程第一岩土工程有限公司 | Construction method of special-shaped cast-in-situ concrete pile |
CN204982866U (en) * | 2015-09-21 | 2016-01-20 | 陆见华 | Mesopore catchments special -shaped and round hole mould that adopts thereof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625420A (en) * | 2016-03-10 | 2016-06-01 | 西北综合勘察设计研究院 | Extension type manual hole digging pile support structure and construction method thereof |
CN111733830A (en) * | 2020-07-07 | 2020-10-02 | 北京启顺京腾科技有限责任公司 | Super high-rise building foundation pit bearing and enclosing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210766804U (en) | Silt foundation strutting arrangement is used in civil engineering construction | |
CN103255772A (en) | Construction method optimizing deep foundation pit changing supporting construction sequences | |
CN105200879A (en) | Water-permeable foam concrete pile compound foundation | |
CN204982866U (en) | Mesopore catchments special -shaped and round hole mould that adopts thereof | |
CN203066056U (en) | Post-grouting gravel pile with sand wall wing plates, and special immersed pipe for post-grouting gravel pile | |
CN105113490A (en) | Special-shaped mesopore water collecting pile and round hole mold adopted in same and construction process of special-shaped mesopore water collecting pile | |
CN103936355B (en) | Anti-dispersion Large stone cellular concrete and preparation method thereof under water | |
CN106812129A (en) | A kind for the treatment of technology of the rigid pile composite foundation with discharging consolidation function | |
CN205591212U (en) | Multi -functional precast tubular pile | |
CN103979880A (en) | Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof | |
CN207959202U (en) | A kind of CFG bracing means | |
CN212835477U (en) | Collapsible loess foundation structure | |
CN202023185U (en) | Concrete tubular pile | |
CN204530685U (en) | A kind of cement-soil stiff composite pile | |
CN202202318U (en) | Soft soil foundation long-concrete short-gravel pile and preloading combination processing apparatus | |
CN204898645U (en) | Building rubbish regeneration drainage CFG stake ground | |
CN204139190U (en) | A kind of Liftable preformed bricks fetal membrane | |
CN204080820U (en) | A kind of concrete structure foundation ditch support replacement device | |
CN203947472U (en) | A kind of recyclable pattern foundation pit supporting structure anchor cable structure | |
CN101037003B (en) | Method and device for forecasting concrete anti-leaking U-shaped groove by using permeability formwork gasket | |
CN206873400U (en) | Porous grass-planting ecological building block for shore protection | |
CN104746507A (en) | Construction waste recycling drainage CFG pile foundation and construction method thereof | |
CN205501991U (en) | Prevent blockking up multi -functional precast tubular pile | |
CN204825868U (en) | Building rubbish regeneration drainage CFG rammed bulb pile ground | |
CN206319314U (en) | A kind of additional cuff back-up sand building stones prefabricated pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151202 |