CN103979880A - Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof - Google Patents

Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof Download PDF

Info

Publication number
CN103979880A
CN103979880A CN201410238236.9A CN201410238236A CN103979880A CN 103979880 A CN103979880 A CN 103979880A CN 201410238236 A CN201410238236 A CN 201410238236A CN 103979880 A CN103979880 A CN 103979880A
Authority
CN
China
Prior art keywords
mixture
compound
cement
soil
accounts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410238236.9A
Other languages
Chinese (zh)
Other versions
CN103979880B (en
Inventor
孙杰
李峤玲
刘锋
王显根
李晓东
房立红
杨爱民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201410238236.9A priority Critical patent/CN103979880B/en
Publication of CN103979880A publication Critical patent/CN103979880A/en
Application granted granted Critical
Publication of CN103979880B publication Critical patent/CN103979880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a building material, particularly a pipeline engineering trench backfill material cement all-in-one mixture and a preparation method thereof. The mixture is mainly composed of a construction waste crushed mixture and soil and also composed of a small amount of cement as an auxiliary material, wherein the cement accounts for 3-10% of the mixture, the soil accounts for 35-45% of the mixture, the plasticity index of the soil is 10-20, and the water accounts for 10-16% of the mixture. The mixture has favorable workability, so such backfill mode can not leave dead corners at the pipeline axil angles, and the mixture can uniformly and compactly fill every corner and is safe and reliable. Compared with the traditional construction technique, the construction technique provided by the invention saves abundant human resources and material resources, greatly shortens the construction period, and is very worthy of popularization. In the aspect of material composition, the construction waste is utilized and changed into valuable substances to regenerate value, thereby implementing the ideas of energy saving and environment-friendly production.

Description

A kind of pipework trench backfill material cement closes compound and preparation method more
(1) technical field
The present invention relates to material of construction, be specifically related to a kind of pipework trench backfill material cement and close compound and preparation method more.
(2) background technology
The municipal pipeline engineering trench backfill material of China is generally element soil at present, dirt, yellow ground, stone flour and aggregate chips be mix by a certain percentage, cement, stone flour and aggregate chips be mix, broken (gravel) stone of grating and cement stabilizing broken (gravel) stone material etc. by a certain percentage, most compacting or rolling methods of adopting, this back-filling way exists a problem for a long time always, be that place, pipeline armpit angle is not difficult to grinding compacting or compacting because ballast consolidating machine has enough working faces, backfilling material degree of compactness does not reach design requirements, and voidage is larger.Due to the outside seepage of water in the immersion of surface water and the activity of underground water and pipeline or underground structure, cause producing to contact between backfilling material and pipeline or structures washing away, the fine grained soil in backfill soil is moved with the activity of underground water.Along with passing and the loss of underground fine grained soil, soil is emptied, and underground meeting produces cavity, and the situation that pipeline can be subjected to displacement in space, causes ground to subside, and people's life security is impacted.
(3) summary of the invention
The present invention is in order to make up the deficiencies in the prior art, provide a kind of pipework trench backfill material cement to close compound and preparation method more, because the use of this compound can not be subjected to displacement pipeline in groove, thereby avoid the generation of surface collapse, safe and reliable.
The present invention is achieved through the following technical solutions:
A kind of pipework trench backfill material cement closes compound more, its special character is: it is main composition material that this compound be take construction waste crushing compound and soil, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount, soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, and its amount of water accounts for the 10%-16% of compound.
The preparation method that pipework trench backfill material cement closes compound more, comprises the following steps:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount;
(2) blunge: soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for the 10%-16% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Beneficial effect of the present invention: because this compound has good workability, so this back-filling way can not leave dead angle at place, pipeline armpit angle, can fill uniformly densely each corner, safe and reliable; The ring stiffness that can increase backfill pipeline after this compound generation intensity, forms with it an integral body, has increased the intensity weather resistance of pipeline; For zanjon place etc. be inconvenient to down workman and mechanical backfill position especially applicable; This construction technology has been saved a large amount of manpower and materials than traditional construction technology, greatly shortens the construction period, is worthy to be popularized very much; Aspect material composition, we have used building waste, and these wastes are turned waste into wealth, and again produce and are worth, and have realized save energy, environmental protection production theory.
(4) accompanying drawing explanation
Accompanying drawing 1 is the schematic diagram of pipework groove of the present invention.
(5) embodiment
Embodiment 1:
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 3% of compound total amount;
(2) blunge: soil accounts for 35% of compound total amount, this native plasticity index is 10, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for 10% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 2
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 10% of compound total amount;
(2) blunge: soil accounts for 45% of compound total amount, this native plasticity index is 20, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for 16% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 3
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 6% of compound total amount;
(2) blunge: soil accounts for 40% of compound total amount, this native plasticity index is 15, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for 13% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 4
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 6% of compound total amount;
(2) blunge: according to the plasticity index of soil used, instruct amount of water, to the soil of plasticity index in 15 scopes, its amount of water accounts for 11% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 5
Compound 1d ultimate compression strength in above-described embodiment can reach 450KPa, and 3d can surpass 1000KPa, and 7d can surpass 1500KPa left and right, and 28d intensity can surpass 2000KPa, and under sealed maintenance, retraction does not occur 56d intensity.
Test section backfill data presentation, adopts light-duty feeler inspection to test its bearing capacity, and 1d bearing capacity reaches 412KPa, and 3d reaches 660KPa, and 7d reaches 780KPa, and during 28d, light-duty feeler inspection cannot be measured (exceeding light-duty feeler inspection test specification).

Claims (2)

1. a pipework trench backfill material cement closes compound more, it is characterized in that: it is main composition material that this compound be take construction waste crushing compound and soil, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount, soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, and its amount of water accounts for the 10%-16% of compound.
2. the preparation method that pipework trench backfill material cement according to claim 1 closes compound more, is characterized in that: comprise the following steps:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount;
(2) blunge: soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for the 10%-16% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
CN201410238236.9A 2014-05-30 2014-05-30 A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method Active CN103979880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410238236.9A CN103979880B (en) 2014-05-30 2014-05-30 A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410238236.9A CN103979880B (en) 2014-05-30 2014-05-30 A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method

Publications (2)

Publication Number Publication Date
CN103979880A true CN103979880A (en) 2014-08-13
CN103979880B CN103979880B (en) 2016-06-22

Family

ID=51272085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410238236.9A Active CN103979880B (en) 2014-05-30 2014-05-30 A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method

Country Status (1)

Country Link
CN (1) CN103979880B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110776286A (en) * 2019-09-24 2020-02-11 中电建生态环境集团有限公司 Spoil regeneration backfill material and preparation method thereof
CN111779887A (en) * 2020-07-14 2020-10-16 浙江昊阳建设有限公司 Underground pipeline maintenance method
CN111807782A (en) * 2020-07-03 2020-10-23 北京城建华晟交通建设有限公司 Fluid-state solidification regeneration mixture, preparation method and application thereof in pit backfill
CN112159160A (en) * 2020-09-12 2021-01-01 北京综建科技有限公司 Energy-saving environment-friendly backfill material and construction process thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1060469A (en) * 1996-08-21 1998-03-03 Mitsubishi Materials Corp Composition for one powder type slow-hardening back-filling material
KR100579420B1 (en) * 2005-11-02 2006-05-12 상원개발산업주식회사 Rectal Structure Using Block and Its Composition
CN1840504A (en) * 2005-04-01 2006-10-04 杜绍安 Normal temperature consolidation materials for construction
CN102173682A (en) * 2011-01-27 2011-09-07 湖南有色冶金劳动保护研究院 Loess bonding high-pressure pumping cemented filling material and preparation method thereof
CN103319121A (en) * 2013-06-09 2013-09-25 北京工业大学 Fluidic backfill material produced by building garbage fines and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1060469A (en) * 1996-08-21 1998-03-03 Mitsubishi Materials Corp Composition for one powder type slow-hardening back-filling material
CN1840504A (en) * 2005-04-01 2006-10-04 杜绍安 Normal temperature consolidation materials for construction
KR100579420B1 (en) * 2005-11-02 2006-05-12 상원개발산업주식회사 Rectal Structure Using Block and Its Composition
CN102173682A (en) * 2011-01-27 2011-09-07 湖南有色冶金劳动保护研究院 Loess bonding high-pressure pumping cemented filling material and preparation method thereof
CN103319121A (en) * 2013-06-09 2013-09-25 北京工业大学 Fluidic backfill material produced by building garbage fines and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110776286A (en) * 2019-09-24 2020-02-11 中电建生态环境集团有限公司 Spoil regeneration backfill material and preparation method thereof
CN111807782A (en) * 2020-07-03 2020-10-23 北京城建华晟交通建设有限公司 Fluid-state solidification regeneration mixture, preparation method and application thereof in pit backfill
CN111807782B (en) * 2020-07-03 2021-12-28 北京城建华晟交通建设有限公司 Fluid-state solidification regeneration mixture, preparation method and application thereof in pit backfill
CN111779887A (en) * 2020-07-14 2020-10-16 浙江昊阳建设有限公司 Underground pipeline maintenance method
CN112159160A (en) * 2020-09-12 2021-01-01 北京综建科技有限公司 Energy-saving environment-friendly backfill material and construction process thereof

Also Published As

Publication number Publication date
CN103979880B (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN103216239B (en) Backfill handling method for activity subsidence area of mine
CN104177015B (en) Non-burning brick and the natural curing preparation method that lake, a kind of river dredging bed mud is major ingredient
CN102155012A (en) Foundation reinforcing construction method employing powder high-pressure injection grouting
CN103979880A (en) Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof
CN104711974A (en) Steel tube recycled concrete composite bearing base pile and manufacturing method thereof
CN105294003A (en) Method for preparing cement mortar with gangue particles
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN204412325U (en) A kind of Weight type concrete pulverizer
CN204266221U (en) grouting structure suitable for karst region
CN104652404A (en) Method for carrying out resource utilization on caustic slag after physical dehydrating
CN110734266A (en) soda residue soil regeneration backfill material and preparation method thereof
CN201943060U (en) Reinforcing structure for gate dam foundation of deep riverbed covering layer
CN104878768A (en) Revetment of freshwater aquaculture pond and construction method of revetment
CN201635765U (en) Sand throwing device for gob under highway
CN204982866U (en) Mesopore catchments special -shaped and round hole mould that adopts thereof
CN106587850A (en) Light rolling-free abutment backfilling material and preparation method thereof
CN108756143A (en) A kind of embossing concrete ground construction method of high-resistance wear-resistant
CN203145028U (en) Corrugated pipe water-collecting well
CN203247604U (en) Composite foundation of mixture of port engineering riprap foundation bed and underwater non-dispersion concrete
CN203848836U (en) Column type marking pier
CN204773037U (en) Concrete mixer for building
CN108978693A (en) Base pit engineering soft soil foundation dewatering construction structure
Seher Lightweight aggregates made from construction and demolition waste-Application in lightweight concrete and mortars
CN202989941U (en) Water gate structure built on junction foundation of soft and hard foundations
CN205975562U (en) Silt solidification treatment's equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant