CN103979880A - Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof - Google Patents
Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof Download PDFInfo
- Publication number
- CN103979880A CN103979880A CN201410238236.9A CN201410238236A CN103979880A CN 103979880 A CN103979880 A CN 103979880A CN 201410238236 A CN201410238236 A CN 201410238236A CN 103979880 A CN103979880 A CN 103979880A
- Authority
- CN
- China
- Prior art keywords
- mixture
- compound
- cement
- soil
- accounts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004568 cement Substances 0.000 title claims abstract description 33
- 239000000203 mixture Substances 0.000 title claims abstract description 25
- 239000000463 material Substances 0.000 title claims abstract description 23
- 238000002360 preparation method Methods 0.000 title claims abstract description 11
- 239000002689 soil Substances 0.000 claims abstract description 30
- 238000010276 construction Methods 0.000 claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 18
- 239000002699 waste material Substances 0.000 claims abstract description 13
- 150000001875 compounds Chemical class 0.000 claims description 47
- 239000002131 composite material Substances 0.000 claims description 8
- 238000007667 floating Methods 0.000 claims description 6
- 238000002156 mixing Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- UUTKICFRNVKFRG-WDSKDSINSA-N (4R)-3-[oxo-[(2S)-5-oxo-2-pyrrolidinyl]methyl]-4-thiazolidinecarboxylic acid Chemical compound OC(=O)[C@@H]1CSCN1C(=O)[C@H]1NC(=O)CC1 UUTKICFRNVKFRG-WDSKDSINSA-N 0.000 abstract 1
- 239000004566 building material Substances 0.000 abstract 1
- 230000002349 favourable effect Effects 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 239000004575 stone Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 235000013312 flour Nutrition 0.000 description 2
- HIHOEGPXVVKJPP-JTQLQIEISA-N 5-fluoro-2-[[(1s)-1-(5-fluoropyridin-2-yl)ethyl]amino]-6-[(5-methyl-1h-pyrazol-3-yl)amino]pyridine-3-carbonitrile Chemical compound N([C@@H](C)C=1N=CC(F)=CC=1)C(C(=CC=1F)C#N)=NC=1NC=1C=C(C)NN=1 HIHOEGPXVVKJPP-JTQLQIEISA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000000227 grinding Methods 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention relates to a building material, particularly a pipeline engineering trench backfill material cement all-in-one mixture and a preparation method thereof. The mixture is mainly composed of a construction waste crushed mixture and soil and also composed of a small amount of cement as an auxiliary material, wherein the cement accounts for 3-10% of the mixture, the soil accounts for 35-45% of the mixture, the plasticity index of the soil is 10-20, and the water accounts for 10-16% of the mixture. The mixture has favorable workability, so such backfill mode can not leave dead corners at the pipeline axil angles, and the mixture can uniformly and compactly fill every corner and is safe and reliable. Compared with the traditional construction technique, the construction technique provided by the invention saves abundant human resources and material resources, greatly shortens the construction period, and is very worthy of popularization. In the aspect of material composition, the construction waste is utilized and changed into valuable substances to regenerate value, thereby implementing the ideas of energy saving and environment-friendly production.
Description
(1) technical field
The present invention relates to material of construction, be specifically related to a kind of pipework trench backfill material cement and close compound and preparation method more.
(2) background technology
The municipal pipeline engineering trench backfill material of China is generally element soil at present, dirt, yellow ground, stone flour and aggregate chips be mix by a certain percentage, cement, stone flour and aggregate chips be mix, broken (gravel) stone of grating and cement stabilizing broken (gravel) stone material etc. by a certain percentage, most compacting or rolling methods of adopting, this back-filling way exists a problem for a long time always, be that place, pipeline armpit angle is not difficult to grinding compacting or compacting because ballast consolidating machine has enough working faces, backfilling material degree of compactness does not reach design requirements, and voidage is larger.Due to the outside seepage of water in the immersion of surface water and the activity of underground water and pipeline or underground structure, cause producing to contact between backfilling material and pipeline or structures washing away, the fine grained soil in backfill soil is moved with the activity of underground water.Along with passing and the loss of underground fine grained soil, soil is emptied, and underground meeting produces cavity, and the situation that pipeline can be subjected to displacement in space, causes ground to subside, and people's life security is impacted.
(3) summary of the invention
The present invention is in order to make up the deficiencies in the prior art, provide a kind of pipework trench backfill material cement to close compound and preparation method more, because the use of this compound can not be subjected to displacement pipeline in groove, thereby avoid the generation of surface collapse, safe and reliable.
The present invention is achieved through the following technical solutions:
A kind of pipework trench backfill material cement closes compound more, its special character is: it is main composition material that this compound be take construction waste crushing compound and soil, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount, soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, and its amount of water accounts for the 10%-16% of compound.
The preparation method that pipework trench backfill material cement closes compound more, comprises the following steps:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount;
(2) blunge: soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for the 10%-16% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Beneficial effect of the present invention: because this compound has good workability, so this back-filling way can not leave dead angle at place, pipeline armpit angle, can fill uniformly densely each corner, safe and reliable; The ring stiffness that can increase backfill pipeline after this compound generation intensity, forms with it an integral body, has increased the intensity weather resistance of pipeline; For zanjon place etc. be inconvenient to down workman and mechanical backfill position especially applicable; This construction technology has been saved a large amount of manpower and materials than traditional construction technology, greatly shortens the construction period, is worthy to be popularized very much; Aspect material composition, we have used building waste, and these wastes are turned waste into wealth, and again produce and are worth, and have realized save energy, environmental protection production theory.
(4) accompanying drawing explanation
Accompanying drawing 1 is the schematic diagram of pipework groove of the present invention.
(5) embodiment
Embodiment 1:
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 3% of compound total amount;
(2) blunge: soil accounts for 35% of compound total amount, this native plasticity index is 10, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for 10% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 2
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 10% of compound total amount;
(2) blunge: soil accounts for 45% of compound total amount, this native plasticity index is 20, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for 16% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 3
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 6% of compound total amount;
(2) blunge: soil accounts for 40% of compound total amount, this native plasticity index is 15, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for 13% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 4
The preparation method that the pipework trench backfill material cement of the present embodiment closes compound more, the steps include:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for 6% of compound total amount;
(2) blunge: according to the plasticity index of soil used, instruct amount of water, to the soil of plasticity index in 15 scopes, its amount of water accounts for 11% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Embodiment 5
Compound 1d ultimate compression strength in above-described embodiment can reach 450KPa, and 3d can surpass 1000KPa, and 7d can surpass 1500KPa left and right, and 28d intensity can surpass 2000KPa, and under sealed maintenance, retraction does not occur 56d intensity.
Test section backfill data presentation, adopts light-duty feeler inspection to test its bearing capacity, and 1d bearing capacity reaches 412KPa, and 3d reaches 660KPa, and 7d reaches 780KPa, and during 28d, light-duty feeler inspection cannot be measured (exceeding light-duty feeler inspection test specification).
Claims (2)
1. a pipework trench backfill material cement closes compound more, it is characterized in that: it is main composition material that this compound be take construction waste crushing compound and soil, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount, soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, and its amount of water accounts for the 10%-16% of compound.
2. the preparation method that pipework trench backfill material cement according to claim 1 closes compound more, is characterized in that: comprise the following steps:
(1) selection: take construction waste crushing compound and soil as main composition material, and be aided with a small amount of cement, cement accounts for the 3%-10% of compound total amount;
(2) blunge: soil accounts for the 35%-45% of compound total amount, this native plasticity index is 10-20, according to the plasticity index of soil used, instructs amount of water, its amount of water accounts for the 10%-16% of compound, forms the good mixture of a kind of workability;
(3) pipeline backfill: in pipeline backfill construction, the good mixture of mixing is poured directly in backfill groove, is vibrated again floating with vibrating spear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410238236.9A CN103979880B (en) | 2014-05-30 | 2014-05-30 | A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410238236.9A CN103979880B (en) | 2014-05-30 | 2014-05-30 | A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103979880A true CN103979880A (en) | 2014-08-13 |
CN103979880B CN103979880B (en) | 2016-06-22 |
Family
ID=51272085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410238236.9A Active CN103979880B (en) | 2014-05-30 | 2014-05-30 | A kind of pipeline engineering trench backfill material cement many conjunctions compound and preparation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103979880B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110776286A (en) * | 2019-09-24 | 2020-02-11 | 中电建生态环境集团有限公司 | Spoil regeneration backfill material and preparation method thereof |
CN111779887A (en) * | 2020-07-14 | 2020-10-16 | 浙江昊阳建设有限公司 | Underground pipeline maintenance method |
CN111807782A (en) * | 2020-07-03 | 2020-10-23 | 北京城建华晟交通建设有限公司 | Fluid-state solidification regeneration mixture, preparation method and application thereof in pit backfill |
CN112159160A (en) * | 2020-09-12 | 2021-01-01 | 北京综建科技有限公司 | Energy-saving environment-friendly backfill material and construction process thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1060469A (en) * | 1996-08-21 | 1998-03-03 | Mitsubishi Materials Corp | Composition for one powder type slow-hardening back-filling material |
KR100579420B1 (en) * | 2005-11-02 | 2006-05-12 | 상원개발산업주식회사 | Rectal Structure Using Block and Its Composition |
CN1840504A (en) * | 2005-04-01 | 2006-10-04 | 杜绍安 | Normal temperature consolidation materials for construction |
CN102173682A (en) * | 2011-01-27 | 2011-09-07 | 湖南有色冶金劳动保护研究院 | Loess bonding high-pressure pumping cemented filling material and preparation method thereof |
CN103319121A (en) * | 2013-06-09 | 2013-09-25 | 北京工业大学 | Fluidic backfill material produced by building garbage fines and construction method |
-
2014
- 2014-05-30 CN CN201410238236.9A patent/CN103979880B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1060469A (en) * | 1996-08-21 | 1998-03-03 | Mitsubishi Materials Corp | Composition for one powder type slow-hardening back-filling material |
CN1840504A (en) * | 2005-04-01 | 2006-10-04 | 杜绍安 | Normal temperature consolidation materials for construction |
KR100579420B1 (en) * | 2005-11-02 | 2006-05-12 | 상원개발산업주식회사 | Rectal Structure Using Block and Its Composition |
CN102173682A (en) * | 2011-01-27 | 2011-09-07 | 湖南有色冶金劳动保护研究院 | Loess bonding high-pressure pumping cemented filling material and preparation method thereof |
CN103319121A (en) * | 2013-06-09 | 2013-09-25 | 北京工业大学 | Fluidic backfill material produced by building garbage fines and construction method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110776286A (en) * | 2019-09-24 | 2020-02-11 | 中电建生态环境集团有限公司 | Spoil regeneration backfill material and preparation method thereof |
CN111807782A (en) * | 2020-07-03 | 2020-10-23 | 北京城建华晟交通建设有限公司 | Fluid-state solidification regeneration mixture, preparation method and application thereof in pit backfill |
CN111807782B (en) * | 2020-07-03 | 2021-12-28 | 北京城建华晟交通建设有限公司 | Fluid-state solidification regeneration mixture, preparation method and application thereof in pit backfill |
CN111779887A (en) * | 2020-07-14 | 2020-10-16 | 浙江昊阳建设有限公司 | Underground pipeline maintenance method |
CN112159160A (en) * | 2020-09-12 | 2021-01-01 | 北京综建科技有限公司 | Energy-saving environment-friendly backfill material and construction process thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103979880B (en) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103216239B (en) | Backfill handling method for activity subsidence area of mine | |
CN104177015B (en) | Non-burning brick and the natural curing preparation method that lake, a kind of river dredging bed mud is major ingredient | |
CN102155012A (en) | Foundation reinforcing construction method employing powder high-pressure injection grouting | |
CN103979880A (en) | Pipeline engineering trench backfill material cement all-in-one mixture and preparation method thereof | |
CN104711974A (en) | Steel tube recycled concrete composite bearing base pile and manufacturing method thereof | |
CN105294003A (en) | Method for preparing cement mortar with gangue particles | |
CN204456058U (en) | A kind of constructing structure reducing building base subsidence speed | |
CN204412325U (en) | A kind of Weight type concrete pulverizer | |
CN204266221U (en) | grouting structure suitable for karst region | |
CN104652404A (en) | Method for carrying out resource utilization on caustic slag after physical dehydrating | |
CN110734266A (en) | soda residue soil regeneration backfill material and preparation method thereof | |
CN201943060U (en) | Reinforcing structure for gate dam foundation of deep riverbed covering layer | |
CN104878768A (en) | Revetment of freshwater aquaculture pond and construction method of revetment | |
CN201635765U (en) | Sand throwing device for gob under highway | |
CN204982866U (en) | Mesopore catchments special -shaped and round hole mould that adopts thereof | |
CN106587850A (en) | Light rolling-free abutment backfilling material and preparation method thereof | |
CN108756143A (en) | A kind of embossing concrete ground construction method of high-resistance wear-resistant | |
CN203145028U (en) | Corrugated pipe water-collecting well | |
CN203247604U (en) | Composite foundation of mixture of port engineering riprap foundation bed and underwater non-dispersion concrete | |
CN203848836U (en) | Column type marking pier | |
CN204773037U (en) | Concrete mixer for building | |
CN108978693A (en) | Base pit engineering soft soil foundation dewatering construction structure | |
Seher | Lightweight aggregates made from construction and demolition waste-Application in lightweight concrete and mortars | |
CN202989941U (en) | Water gate structure built on junction foundation of soft and hard foundations | |
CN205975562U (en) | Silt solidification treatment's equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |