CN103255772A - Construction method optimizing deep foundation pit changing supporting construction sequences - Google Patents

Construction method optimizing deep foundation pit changing supporting construction sequences Download PDF

Info

Publication number
CN103255772A
CN103255772A CN2013102000016A CN201310200001A CN103255772A CN 103255772 A CN103255772 A CN 103255772A CN 2013102000016 A CN2013102000016 A CN 2013102000016A CN 201310200001 A CN201310200001 A CN 201310200001A CN 103255772 A CN103255772 A CN 103255772A
Authority
CN
China
Prior art keywords
construction
foundation pit
foundation ditch
supporting structure
support replacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102000016A
Other languages
Chinese (zh)
Inventor
陈印桥
赵迎斌
张永贤
刘宇
郑兴国
臧柳
阎子君
张铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd filed Critical TIANJIN SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2013102000016A priority Critical patent/CN103255772A/en
Publication of CN103255772A publication Critical patent/CN103255772A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a construction method optimizing deep foundation pit changing supporting construction sequences. Top-down method sequence construction is adopted, and a supporting structural system of a foundation pit is formed by a drill hole potting supporting pile and a waterproof curtain. When foundation pit grooving is carried out, an original soil layer below a changing supporting structure is reserved, after the foundation pit grooving and construction of foundation brick dies are completed, the changing supporting structure and a cushion layer are poured simultaneously, the changing supporting structure and the foundation brick dies are utilized at the same time to serve as a bottom plate outer die, pouring of a foundation mat is carried out when waterproof construction is finished, and an upper part horizontal supporting structure can be dismantled when both strength of the changing supporting structure and strength of concrete of the foundation mat reach strength when the horizontal supporting structure can be dismantled. The construction method optimizing the deep foundation pit changing supporting construction sequences has the advantages of eliminating cleaning of sundries and back-fill consolidation soil operation construction, shortening a construction period, and reducing risks of the foundation pit.

Description

Optimize the job practices of deep foundation ditch support replacement sequence of construction
?
Technical field
The present invention relates to a kind of deep foundation ditch support replacement job practices, relate in particular to a kind of job practices of optimizing deep foundation ditch support replacement sequence of construction, belong to technical field of building construction.
Background technology
Along with the quickening of China's urbanization construction speed, land resources demand growing tension, in order to take full advantage of land use area, building is developed in depth and breadth to underground, thereby enters the deep foundation ditch job execution.Need to accelerate the construction speed of deep foundation ditch in the work progress of deep foundation ditch, reduce the foundation ditch risk.
Support replacement in the base pit engineering, it is the inner supporting structure system of taking certain technical measures progressively to replace under given conditions to bring into play interim supporting role, thereby after guaranteeing provisional interior supporting removal, engineering construction can continue safety and successfully carry out, and its essence is safe and orderly adjustment, transfer and the reallocation of stress.
When deep foundation ditch was nearer apart from existing building, the supporting braced structures system of foundation ditch adopted the supporting braced structures system of the composition that water-stop curtain+drill-pouring soldier pile+concrete horizontal supports usually.In the support replacement work progress in the above-mentioned supporting braced structures system, after the foundation ditch fluting finishes, for preventing that the resilience of the deep foundation ditch shoveling back substrate soil body is excessive and reduce the foundation ditch rebound deformation, its effective measures that prevent are to reduce the variation of effective stress in the soil body and reduce open-assembly time., dig to design foundation ditch substrate absolute altitude in the foundation ditch substrate for this reason, build bed course and sole plate as early as possible, carry out the support replacement construction after sole plate is built and finished.In this construction technology process, the sequence of construction of support replacement and progress thereof are determining the time started of upper level supporting removal and the construction of post wall beam plate.This shows that the sequence of construction of support replacement and progress thereof play an important role to shortening the foundation construction progress and reducing the foundation ditch risk.
Tradition support replacement job practices, its sequence of construction comprises the support replacement structure construction of sole plate and the support replacement structure between sole plate and the supporting and protection structure, the support replacement structure construction of described sole plate, it is the support replacement structure construction that between supporting and protection structure and sole plate outward flange, installs basic stock mould after-pouring concrete floor, support replacement structure between described sole plate and the supporting and protection structure, refer to carry out after sole plate is finished the support replacement structure between sole plate and the supporting and protection structure, during comprise foreign material cleaning between sole plate and the supporting and protection structure, the backfill compacting, build the concrete support replacement above the backfill.Treat that the prescribed strength that support replacement reaches in the time of can removing braced structures carries out the dismounting of upper level braced structures and the construction of post wall beam plate again, treats that carrying out the water jacket earth backing after waterproof construction all finishes reaches safe location.
The method of tradition support replacement sequence of construction, its shortcoming is: 1, the space is little between sole plate edge and the supporting and protection structure, and cleaning foreign material and backfilling compaction soil constructing operation are all very difficult.2, the support replacement concrete strength is often lower, waits for that its time that reaches prescribed strength is longer.
Therefore, how optimizing the construction of support replacement sequence of construction, is the technical problem that those skilled in the art press for solution.
Summary of the invention
Purpose of the present invention, aim to provide a kind of job practices of optimizing deep foundation ditch support replacement sequence of construction, this job practices, can exempt and clear up foreign material and backfilling compaction geotechnique order, the support replacement concrete strength is higher, wait for that its time that reaches prescribed strength is shorter, accelerated the support replacement construction speed, thereby overcome the shortcoming that exists in the prior art.
The present invention for achieving the above object, the technical scheme that adopts is:
A kind of job practices of optimizing deep foundation ditch support replacement sequence of construction, it is characterized in that: adopt the contrary sequence method sequence construction, the supporting structure system of foundation ditch is made up of drill-pouring soldier pile and water-stop curtain, former soil layer when foundation ditch is slotted below the reservation support replacement structure, after foundation ditch fluting and basic stock mould are built by laying bricks or stones and are finished, build support replacement structure and bed course simultaneously, utilize support replacement structure and basic stock mould simultaneously as the base plate external mold, treat that carrying out sole plate after waterproof construction finishes builds, the concrete intensity of support structure to be changed and sole plate all reaches in the intensity that can remove horizontal support structure, just dismountable upper level braced structures.
Beneficial effect of the present invention
Compared with prior art, the significant beneficial effect that has of the present invention is as follows:
1, fluting is reserved former soil layer between sole plate edge and the enclosed structure, has saved the time of cleaning foreign material and the operation of backfilling compaction soil.
2, because the support replacement concrete strength is lower than underplate concrete intensity, sole plate is that concrete in mass reaches the time of requirement of strength early than the support replacement concrete, therefore insert support replacement engineering time, construction flow process in advance, saved and waited for that support replacement reaches the time of intensity, and then shifted to an earlier date insertion time of upper level supporting removal and post wall beam plate construction, shorten the duration, reduced the foundation ditch risk.
Description of drawings
Fig. 1 is the supporting structure system schematic diagram after the present invention optimizes the construction of deep foundation ditch support replacement sequence of construction;
Fig. 2 be after the construction of traditional deep foundation ditch support replacement the supporting structure system schematic diagram.
Among Fig. 1: 1 horizontal support structure; 2 braced structuress; 3 sole plates; 4 bed courses; 5 former soil layers; 6 basic stock moulds; 8 drill-pouring soldier piles; 9 water-stop curtains.
Among Fig. 2: 1 horizontal support structure; 2 braced structuress; 3 sole plates; 4 bed courses; 5 former soil layers; 6 basic stock moulds; The cleaning of 7 foreign material and tamped backfill; 8 drill-pouring soldier piles; 9 water-stop curtains.
The specific embodiment
In order to make those skilled in the art understand technical scheme of the present invention better, the present invention is described in further detail below in conjunction with accompanying drawing and most preferred embodiment.
Embodiment
Referring to Fig. 1, a kind of job practices of optimizing deep foundation ditch support replacement sequence of construction, adopt the contrary sequence method sequence construction, the supporting structure system of foundation ditch is made up of drill-pouring soldier pile 8 and water-stop curtain 9, former soil layer 5 when foundation ditch is slotted below the reservation support replacement structure 2, after foundation ditch fluting and basic stock mould 6 are built by laying bricks or stones and are finished, build support replacement structure 2 and bed course 4 simultaneously, utilize support replacement structure 2 and basic stock mould 6 simultaneously as the base plate external mold, treat that carrying out sole plate 3 after waterproof construction finishes builds, support structure 2 to be changed all reaches in the intensity that can remove horizontal support structure 1 with sole plate 3 concrete intensity, just dismountable upper level braced structures 1.
In the present invention, as shown in Figure 2, in traditional support replacement job practices, being positioned at plinth base plate 3 edges is the space 7 of clearing up foreign material and backfilling compaction soil with forming the supporting and protection structure space by drill-pouring soldier pile 8 and water-stop curtain 9.
In the present invention, described contrary sequence method (top-down method) sequence construction, be utilize the main body underground structure all or part of as supporting and protection structure, construction from top to bottom.
The above only is preferred embodiment of the present invention; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (1)

1. job practices of optimizing deep foundation ditch support replacement sequence of construction, it is characterized in that: adopt the contrary sequence method sequence construction, the supporting structure system of foundation ditch is made up of drill-pouring soldier pile (8) and water-stop curtain (9), when slotting, foundation ditch reserves the former soil layer (5) of support replacement structure (2) below, after foundation ditch fluting and basic stock mould (6) are built by laying bricks or stones and are finished, build support replacement structure (2) and bed course (4) simultaneously, utilize support replacement structure (2) and basic stock mould (6) simultaneously as the base plate external mold, treating to carry out after waterproof construction finishes sole plate (3) builds, support structure to be changed (2) all reaches in the intensity that can remove horizontal support structure (1) with the concrete intensity of sole plate (3), just dismountable upper level braced structures (1).
CN2013102000016A 2013-05-27 2013-05-27 Construction method optimizing deep foundation pit changing supporting construction sequences Pending CN103255772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102000016A CN103255772A (en) 2013-05-27 2013-05-27 Construction method optimizing deep foundation pit changing supporting construction sequences

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102000016A CN103255772A (en) 2013-05-27 2013-05-27 Construction method optimizing deep foundation pit changing supporting construction sequences

Publications (1)

Publication Number Publication Date
CN103255772A true CN103255772A (en) 2013-08-21

Family

ID=48959956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102000016A Pending CN103255772A (en) 2013-05-27 2013-05-27 Construction method optimizing deep foundation pit changing supporting construction sequences

Country Status (1)

Country Link
CN (1) CN103255772A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469798A (en) * 2013-08-28 2013-12-25 中国建筑第七工程局有限公司 Pit support structure and construction method thereof
CN103590405A (en) * 2013-10-25 2014-02-19 上海建工四建集团有限公司 Foundation pit construction method
CN103603360A (en) * 2013-11-27 2014-02-26 上海建工七建集团有限公司 Foundation pit enveloping method
CN103711128A (en) * 2013-12-31 2014-04-09 上海建工七建集团有限公司 Construction method for shallow foundation structural beam slab
CN104234082A (en) * 2014-08-29 2014-12-24 中国电建集团华东勘测设计研究院有限公司 Jump-layer reversed construction method for deep foundation pit
CN104328789A (en) * 2014-10-31 2015-02-04 天津三建建筑工程有限公司 Overhanging type support changing construction method for reinforced concrete horizontal inner support
CN104631467A (en) * 2015-03-11 2015-05-20 中国建筑第八工程局有限公司 Method for erecting L-shaped support replacement plate for foundation pit excavation project
CN105821886A (en) * 2015-01-04 2016-08-03 中天建设集团有限公司 Method using box mold to serve as uneven-bottom support beam system moulding bed
CN106193047A (en) * 2015-04-07 2016-12-07 罗海军 Big width base pit stand construction
CN109371982A (en) * 2018-12-07 2019-02-22 武汉丰达地质工程有限公司 A kind of construction method of basement bottom board support replacement
CN110485432A (en) * 2019-07-30 2019-11-22 中建三局第一建设工程有限责任公司 A kind of foundation pit tears support body system optimization method and its system open
CN112726624A (en) * 2020-12-15 2021-04-30 上海建工集团股份有限公司 Efficient excavation construction method for deep foundation pit
CN115787672A (en) * 2023-02-10 2023-03-14 中国建筑一局(集团)有限公司 Asynchronous support changing construction method for ultra-large area deep foundation pit in complex environment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040052587A1 (en) * 2002-09-17 2004-03-18 Kulchin Steven A. Soil nailing system
CN102444143A (en) * 2011-11-14 2012-05-09 成都新艺防水材料工程有限公司 Construction method for cancelling operation channel for facades of basement
CN202247904U (en) * 2011-10-20 2012-05-30 中建六局第三建筑工程有限公司 Quick support changing structure for ultra-deep and oversized foundation pit construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040052587A1 (en) * 2002-09-17 2004-03-18 Kulchin Steven A. Soil nailing system
CN202247904U (en) * 2011-10-20 2012-05-30 中建六局第三建筑工程有限公司 Quick support changing structure for ultra-deep and oversized foundation pit construction
CN102444143A (en) * 2011-11-14 2012-05-09 成都新艺防水材料工程有限公司 Construction method for cancelling operation channel for facades of basement

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
成关锋: "深基坑工程中换撑技术的应用", 《建筑技术》 *
朱小军: "软土深基坑工程控制拆撑变形的换撑设计方法", 《岩土工程学报》 *
郑永超等: "基坑混凝土内支撑局部拆换设计与施工", 《施工技术》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469798B (en) * 2013-08-28 2016-01-20 中国建筑第七工程局有限公司 A kind of foundation pit supporting construction and construction method thereof
CN103469798A (en) * 2013-08-28 2013-12-25 中国建筑第七工程局有限公司 Pit support structure and construction method thereof
CN103590405A (en) * 2013-10-25 2014-02-19 上海建工四建集团有限公司 Foundation pit construction method
CN103603360A (en) * 2013-11-27 2014-02-26 上海建工七建集团有限公司 Foundation pit enveloping method
CN103711128A (en) * 2013-12-31 2014-04-09 上海建工七建集团有限公司 Construction method for shallow foundation structural beam slab
CN104234082A (en) * 2014-08-29 2014-12-24 中国电建集团华东勘测设计研究院有限公司 Jump-layer reversed construction method for deep foundation pit
CN104328789B (en) * 2014-10-31 2016-04-13 天津三建建筑工程有限公司 The overhanging type support replacement construction method of the horizontal inner support of a kind of steel concrete
CN104328789A (en) * 2014-10-31 2015-02-04 天津三建建筑工程有限公司 Overhanging type support changing construction method for reinforced concrete horizontal inner support
CN105821886A (en) * 2015-01-04 2016-08-03 中天建设集团有限公司 Method using box mold to serve as uneven-bottom support beam system moulding bed
CN104631467A (en) * 2015-03-11 2015-05-20 中国建筑第八工程局有限公司 Method for erecting L-shaped support replacement plate for foundation pit excavation project
CN106193047A (en) * 2015-04-07 2016-12-07 罗海军 Big width base pit stand construction
CN106193047B (en) * 2015-04-07 2018-04-03 罗海军 Big width base pit stand construction
CN109371982A (en) * 2018-12-07 2019-02-22 武汉丰达地质工程有限公司 A kind of construction method of basement bottom board support replacement
CN110485432A (en) * 2019-07-30 2019-11-22 中建三局第一建设工程有限责任公司 A kind of foundation pit tears support body system optimization method and its system open
CN110485432B (en) * 2019-07-30 2022-03-15 中建三局第一建设工程有限责任公司 Foundation pit support removing system optimization method and system
CN112726624A (en) * 2020-12-15 2021-04-30 上海建工集团股份有限公司 Efficient excavation construction method for deep foundation pit
CN112726624B (en) * 2020-12-15 2023-03-31 上海建工集团股份有限公司 Efficient excavation construction method for deep foundation pit
CN115787672A (en) * 2023-02-10 2023-03-14 中国建筑一局(集团)有限公司 Asynchronous support changing construction method for ultra-large area deep foundation pit in complex environment

Similar Documents

Publication Publication Date Title
CN103255772A (en) Construction method optimizing deep foundation pit changing supporting construction sequences
CN104213565B (en) A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method
CN107201908B (en) Construction method for deep-buried central ditch of tunnel in severe cold region
CN203320532U (en) Protection device of nearby pile foundation close to deep foundation pit
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN104563131B (en) Rectangular enclosure pile, and construction method using rectangular enclosure pile as main structure
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN102444130B (en) Support replacing construction method in deep foundation pit project
CN102383628A (en) Construction device and construction method for post construction of depressing cone of silo structure
CN108035354A (en) A kind of construction method of GRC cement plates brick mold
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN101289866A (en) Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation
CN104120736A (en) Construction method of reinforced concrete retaining wall
CN102002953A (en) Method for changing support of foundation pit enclosing rib plates
CN104775439B (en) A kind of pattern foundation pit supporting structure sealing integral structure and its construction method
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN203160254U (en) Pit support structure
CN104328790A (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN205205832U (en) Structure is propped in trading of underground building
CN103334450A (en) Construction method of pile precast slab retaining wall with drainage ditch
CN203049588U (en) Pit-in-pit cylindrical mould
CN103741651A (en) Concrete tooth groove stilling pool and construction method thereof
CN207760803U (en) A kind of prefabricated amphistyly armour steel form
CN207211176U (en) A kind of big open caisson of superelevation
CN204199298U (en) A kind of formwork system being applicable to large-scale deep trouth hole sty bed course

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130821