CN105591405A - 一种基于向量移位运算的配电网络快速重构方法 - Google Patents

一种基于向量移位运算的配电网络快速重构方法 Download PDF

Info

Publication number
CN105591405A
CN105591405A CN201610124738.8A CN201610124738A CN105591405A CN 105591405 A CN105591405 A CN 105591405A CN 201610124738 A CN201610124738 A CN 201610124738A CN 105591405 A CN105591405 A CN 105591405A
Authority
CN
China
Prior art keywords
power
vector
branch road
loop
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610124738.8A
Other languages
English (en)
Other versions
CN105591405B (zh
Inventor
吉兴全
刘琪
吉明阳
于永进
李可军
樊淑娴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201610124738.8A priority Critical patent/CN105591405B/zh
Publication of CN105591405A publication Critical patent/CN105591405A/zh
Application granted granted Critical
Publication of CN105591405B publication Critical patent/CN105591405B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

本发明公开了一种基于向量移位运算的配电网快速重构算法,以网损最小为寻优的目标函数,根据配电网的简化模型,以环路为单位,以网损降低为目标,依次进行支路交换操作,构造初始网络结构中断开支路及其两端节点的功率向量和电阻向量,通过向量移位操作得到支路交换后新断开支路及其节点的功率向量和电阻向量,并利用向量运算代替潮流计算得到支路交换前后配电网的网损变化,所有环路处理完毕后完成一次迭代,然后从第一个环路开始进行下一次迭代,直至所有环路在支路交换前后的断开支路不变为止,从而获得符合网络拓扑约束的最优重构结果,所提出的配网重构方法计算量小,计算时间短,具有良好的实用性。

Description

一种基于向量移位运算的配电网络快速重构方法
技术领域
本发明涉及一种基于向量移位运算的配电网络快速重构方法。
背景技术
分布式电源是安装在用户侧的小型发电装置,因具有良好的经济效益和环境效益而得到快速的发展,大量分布式电源的接入改变了配电网络的结构,影响配电网络的运行方式。
配网重构是配电网络中一种以降低网络损耗、均衡负荷、提高供电可靠性为目的的配网运行优化手段。对正常运行状态下含有分布式电源的配电网进行重构可以提高配电网运行的经济性和稳定性,提高分布式电源的利用率,发挥分布式电源的经济效益和环保效益。
目前国内外对含有分布式电源的配电网重构的研究中通常通过建立目标函数,利用智能优化方法获得重构的优化解。但采用智能优化方法进行配网重构需要的潮流计算次数较多,且含有分布式电源的配电网潮流计算的计算量较大,因此获得优化结果耗费的时间较长,难以满足电网实际运行中对重构快速性的需要。
发明内容
本发明为了解决上述问题,提出了一种基于向量移位运算的配电网快速重构算法,本方法以网损最小为寻优的目标函数,通过对配电网络的拓扑分析构造功率向量和电阻向量,通过简单的向量移位操作,快速计算支路交换过程中网络损耗的变化量,避免了繁琐的潮流计算过程,从而在较短时间内获取最优的重构方案,能够解决现有的配电网络重构方法需要反复计算潮流、耗费时间长,从而导致工程实用性差的问题。
为了实现上述目的,本发明采用如下技术方案:
一种基于向量移位运算的配电网络快速重构方法,包括以下步骤:
(1)采集配电网络的网络参数和分布式电源参数,置迭代次数为1;
(2)将配电网的当前网络结构作为本次迭代的初始网络结构,对配电网中所有处于断开状态的支路进行编号,取第一个断开支路为当前断开支路;
(3)通过拓扑分析得到当前断开支路所在回路的所有节点和支路,所述节点和支路构成一个环路,取此环路为当前环路,同时构造当前环路中断开支路的功率向量和电阻向量,以及断开支路两端节点的电阻向量;
(4)以配电网络的网损最小为优化目标,通过向量运算获取当前环路内的最优断开支路;
(5)判断是否已对配电网中所有已编号的支路完成步骤(3)-(4)的操作,若是,则输出重构结果,否则,转入步骤(3)将下一个编号的支路作为当前断开支路进行处理;
(6)判断得到的网络结构与本次迭代的初始网络结构是否相同,若是,则输出重构结果;否则,将重构后的网络结构作为新的网络结构,并将迭代次数加1,转入步骤(2),基于新的网络结构继续进行支路交换。
所述步骤(3)中,构造当前环路中断开支路的功率向量和电阻向量,以及断开支路两端节点的电阻向量的具体步骤包括:
(3-1)将分布式电源所在节点视为PQ节点,分布式电源的出力作为负的负荷功率,表示分布式电源所在节点的等效有功负荷功率和等效无功负荷功率,对无分布式电源连接的节点,其等效负荷功率就等于负荷本身吸收的功率;
(3-2)根据配电网网络结构与参数,确定当前环路内断开支路及断开支路两端节点的电阻向量,以及断开支路的功率向量。
进一步的,所述步骤(3-1)具体为:将分布式电源所在节点视为PQ节点,将分布式电源的出力作为负的负荷功率处理,设分布式电源k所在节点为Nk,则节点Nk的等效负荷有功功率可表示分布式电源所在节点Nk的有功负荷与分布式电源k输出的有功功率之差,节点Nk的等效负荷无功功率可表示分布式电源所在节点Nk的无功负荷与分布式电源k输出的无功功率之差。
进一步表示为:将分布式电源所在节点视为PQ节点,将分布式电源的出力作为负的负荷功率处理,设分布式电源k所在节点为Nk,则节点Nk的等效负荷功率可表示为
P E . N k = P L , N k - P G , k Q E . N k = Q L , N k - Q G , k - - - ( 1 )
式中,PG,k和QG,k分别为分布式电源k输出的有功功率和无功功率,分别为分布式电源所在节点Nk的有功负荷和无功负荷,分别为分布式电源所在节点Nk的等效有功负荷功率和等效无功负荷功率。
进一步的,所述步骤(3-1)中,对无分布式电源连接的节点,其等效负荷功率就等于负荷本身吸收的功率。
所述步骤(3-2)中,在计算流过各条支路上的功率时,将各节点的电压视为额定值,同时先不计支路功率损耗,则流经任一支路Bi的功率可表示为:
P B i + jQ B i = Σ N j ∈ L b a c k . B i ( P N j + jQ N j ) - - - ( 2 )
式中,分别为流经支路Bi的有功功率和无功功率;为在正常运行状态下,从支路Bi沿着功率流动的方向到达支路Bi所在环路的末端节点Nend所经过的节点集合;分别为节点Nj的等效环路负荷有功功率和等效环路负荷无功功率,对于无T接支路的一般节点,其等效环路负荷功率即为节点等效负荷功率,对于有T接支路的节点,其等效环路负荷功率为该节点与其T接支路上所有节点的功率之和。
定义环路内支路Bi的顺时针支路集合和逆时针支路集合分别为从支路Bi沿顺时针方向和逆时针方向到达所在环路功率的流入节点Ns所经过的支路集合。定义环路内节点Nj的顺时针支路集合和逆时针支路集合分别为从节点Nj沿顺时针方向和逆时针方向到达所在环路功率的流入节点Ns所经过的支路集合。
利用向量存储集合中支路的电阻,利用向量存储集合中支路的电阻,利用向量存储集合中支路的电阻,利用向量存储集合中各支路的电阻,利用向量存储集合中各支路上的有功功率,利用向量存储集合中各支路上的无功功率,利用向量存储集合中各支路上的有功功率,利用向量存储集合中各支路上的无功功率。将支路或节点的顺时针电阻向量和逆时针电阻向量统称为支路或节点的电阻向量,将支路的顺时针功率向量和逆时针功率向量统称为支路的功率向量。
所述步骤(4)中,通过向量运算获取当前环路内的最优断开支路,具体包括:
(4-1)载入当前环路中处于断开状态的初始支路的电阻向量、两端节点的电阻向量、以及功率向量;
(4-2)闭合该初始支路,从该初始支路出发断开环路内逆时针方向的下一个支路,通过向量移位运算构造支路交换后新断开支路的功率向量和电阻向量,计算网损的变化量,确定支路交换的操作方向;
(4-3)闭合步骤(4-2)操作后当前环路中处于断开状态的支路,断开沿着该环路操作方向的下一条相邻支路,通过向量移位运算构造所述下一条相邻支路的功率向量、电阻向量、以及本步骤中两条交换支路公共节点的电阻向量,计算网损的变化量,若网损增加,则之前断开的支路即为该环路的最优断开支路,闭合新断开支路,断开之前闭合的支路,步骤(4)停止,若网损减小或不变,则转入步骤(4-4);
(4-4)判断是否已处理完该环路中沿操作方向的所有支路,若是,则停止,当前处于断开状态的支路即为该环路的最优断开支路;否则转步骤(4-3)继续进行支路交换。
进一步的,所述步骤(4-2)中,若网损减小,则说明使网损最小的最优断开支路位于初始断开支路的逆时针方向,将逆时针方向作为支路交换的操作方向;若网损增加,则重新闭合下一个支路,并从初始支路出发断开环路内顺时针方向的下一个支路,通过向量移位运算构造支路交换后该断开支路的功率向量和电阻向量,计算网损的变化量,若网损减小,则说明使网损最小的最优断开支路位于初始支路的顺时针方向,将顺时针方向作为支路交换的操作方向,若网损增加,则说明初始支路即为最优断开支路。
所述步骤(4-2)中通过向量移位运算构造支路交换后新断开支路的功率向量和电阻向量,计算支路交换后网损的变化量。
具体包括:
闭合当前环路中处于断开状态的支路Bn,m的开关,同时从支路Bn,m出发沿着逆时针方向断开与支路Bn,m连接的相邻支路Bac,n的开关。由环路的拓扑结构可知,当闭合支路Bn,m,断开支路Bac,n后,将向量的列数加1,然后将向量的所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入闭合支路Bn,m的电阻即可得到支路Bac,n的顺时针支路集合电阻向量 M B a c , n , c R = [ r B n , m , r B c , m , ... ... , r B c , 2 , r B c , 1 ] .
同理,将向量的第一列元素置空,其余元素按从左至右的顺序依次左移1位,即可得到支路Bac,n的逆时针支路集合电阻向量
由环路的拓扑结构可知,当闭合支路Bn,m,断开支路Bac,n后,将向量所有元素在数值上减去两交换支路的公共节点Nac.n的等效环路负荷有功功率再将的第一列元素置空,其余元素按从左至右的顺序依次左移1位得到支路Bac,n的逆时针支路集合有功功率向量支路Bac,n的逆时针支路集合无功功率向量可以通过相同的方式得到,即 M B a c , n , a c Q = [ Q B a c , n - 1 , ... ... , Q B a c , 2 , Q B a c , 1 ] .
同理,将向量的所有元素在数值上增加两交换支路的公共节点Nac.n的等效环路负荷有功功率再将向量的列数加1,然后将所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入支路Bn,m上的有功功率即可得到支路Bac,n的顺时针支路集合有功功率 M B a c , n , c P = [ P B n , m , P B c , m , ... ... , P B c , 2 , P B c , 1 ] . 支路Bac,n的顺时针支路集合无功功率向量可以通过相同的方式得到,即 M B a c , n , c Q = [ Q B n , m , Q B c , m , ... ... , Q B c , 2 , Q B c , 1 ] .
支路交换后网损增加量的向量表达形式为:
ΔP B n , m , B a c , n = ( P N a c . n 2 + Q N a c . n 2 ) ( M N a c , n , c R U N a c , n , c - M N a c , n , a c R U N a c , n , a c ) + 2 P N a c . n ( M B n , m , c R ( M B n , m , c P ) T - M B a c , n , a c R ( M B a c , n , a c P ) T ) + 2 Q N a c . n ( M B n , m , c R ( M B n , m , c Q ) T - M B a c , n , a c R ( M B a c , n , a c Q ) T )
式中,Bn,m为当前环路中处于断开状态的支路,Bac,n为从支路Bn,m出发沿着逆时针方向与支路Bn,m连接的相邻支路,式中,为两交换支路的公共节点Nac.n的等效环路负荷有功功率和等效环路负荷无功功率;为行数与列数相同的单位列向量;为行数与列数相同的单位列向量;MT表示向量M的转置。
同理,闭合环路中当前处于断开状态的支路,从该支路出发沿着顺时针方向断开下一个满足配电网络辐射状拓扑约束的支路,构造支路交换后新的配电网的功率向量和电阻向量,支路交换后网损增加量的向量表达形式为:
ΔP B n , m , B c , m = ( P N c . m 2 + Q N c . m 2 ) ( M N c , m , a c R U N c , m , a c - M N c , m , c R U N c , m , c ) + 2 P N c . m ( M B n , m , a c R ( M B n , m , a c P ) T - M B c , m , c R ( M B c , m , c P ) T ) + 2 Q N c . m ( M B n , m , a c R ( M B n , m , a c Q ) T - M B c , m , c R ( M B c , m , c Q ) T ) - - - ( 4 )
式中,Bn,m为当前环路中处于断开状态的支路,Bc,m为从支路Bn,m出发沿着顺时针方向与支路Bn,m连接的相邻支路,式中,为两交换支路的公共节点Nc.m的等效环路负荷有功功率和等效环路负荷无功功率;为节点Nc.m的逆时针支路集合电阻向量;为行数与列数相同的单位列向量;为节点Nc.m的顺时针支路集合电阻向量;为行数与列数相同的单位列向量;为支路Bn,m的逆时针支路集合电阻向量;为支路Bn,m的逆时针支路集合有功功率向量;为支路Bc,m的逆时针支路集合电阻向量;为支路Bc,m的顺时针支路集合有功向量功率;为支路Bn,m的逆时针支路集合无功功率向量;为支路Bc,m的顺时针支路集合无功功率向量;MT表示向量M的转置。
所述步骤(4-3)中,通过向量移位运算构造支路交换后新断开支路的功率向量和电阻向量,计算支路交换后网损的变化量,分别沿逆时针、顺时针方向继续进行支路交换操作,构建逆时针、顺时针的支路集合电阻向量,构建逆时针支路集合有功、无功功率向量和顺时针支路集合有功、无功功率向量。
具体包括:
沿逆时针方向继续进行支路交换操作,即闭合当前断开的支路Bac,n,并从支路Bac,n出发沿着逆时针方向断开与支路Bac,n连接的支路Bac,n-1。设Nac.n-1为支路Bac,n和支路Bac,n-1的公共节点。
由环路的拓扑结构可知,当闭合支路Bac,n,断开支路Bac,n-1后,将向量的列数加1,然后将向量的所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入新断开支路Bac,n的电阻即可得到节点Nac.n-1的顺时针支路集合电阻向量 M N a c , n - 1 , a c R = [ r B a c , n , r B n , m , r B c , m ... ... , r B c , 2 , r B c , 1 ] .
同理,将向量的第一列元素置空,其余元素按从左至右的顺序依次左移1位,即可得到节点Nac.n-1的逆时针支路集合电阻向量
同理,将向量所有元素在数值上减去两交换支路的公共节点Nac.n-1的等效环路负荷有功功率再将的第一列元素置空,其余元素按从左至右的顺序依次左移1位得到支路Bac,n-1的逆时针支路集合有功功率向量 M B a c , n - 1 , a c P = [ P B a c , n - 2 , ... ... , P B a c , 2 , P B a c , 1 ] . 支路Bac,n的逆时针支路集合无功功率向量可以通过相同的方式得到,即
M B a c , n - 1 , c Q = [ Q B a c , n - 2 , ... ... , Q B a c , 2 , Q B a c , 1 ] .
同理,将向量的所有元素在数值上增加两交换支路的公共节点Nac.n-1的等效环路负荷有功功率再将向量的列数加1,然后将所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入支路Bac,n上的有功功率即可得到支路Bac,n-1的顺时针支路集合有功功率 M B a c , n - 1 , c P = [ P B a c , n , P B n , m , P B c , m , ... ... , P B c , 2 , P B c , 1 ] . 支路Bac,n的顺时针支路集合无功功率向量可以通过相同的方式得到,即 M B a c , n - 1 , c Q = [ Q B a c , n , Q B n , m , Q B c , m , ... ... , Q B c , 2 , Q B c , 1 ] .
因此只需要通过对相应的功率向量和电阻向量进行相应的移位操作,就能利用公式(3)计算每一次开关操作产生的网损变化。闭合支路Bac,n的开关,同时断开支路Bac,n-1的开关后,环路有功网损的变化量标幺值为:
ΔP B a c , n , B a c , n - 1 = ( P N a c . n - 1 2 + Q N a c . n - 1 2 ) ( M N a c , n - 1 , c R U N a c , n - 1 , c - M N a c , n - 1 , a c R U N a c , n - 1 , a c ) + 2 P N a c . n - 1 ( M B a c , n , c R ( M B a c , n , c P ) T - M B a c , n - 1 , a c R ( M B a c , n - 1 , a c P ) T ) + 2 Q N a c . n - 1 ( M B a c , n , c R ( M B a c , n , c Q ) T - M B a c , n - 1 , a c R ( M B a c , n - 1 , a c Q ) T ) - - - ( 5 )
式中,为两交换支路的公共节点Nac.n-1的等效环路负荷有功功率和等效环路负荷无功功率;为行数与列数相同的单位列向量;为行数与列数相同的单位列向量;MT表示向量M的转置。
同理,可得沿着顺时针方向进行支路交换操作时环路有功损耗的变化量。
本发明的工作原理为:以网损最小为寻优的目标函数,根据配电网的简化模型,以环路为单位,以网损降低为目标,依次进行支路交换操作,构造初始网络结构中断开支路及其两端节点的功率向量和电阻向量,通过向量移位操作得到支路交换后新断开支路及其节点的功率向量和电阻向量,并利用向量运算代替潮流计算得到支路交换前后配电网的网损变化,所有环路处理完毕后完成一次迭代,然后从第一个环路开始进行下一次迭代,直至所有环路在支路交换前后的断开支路不变为止,从而获得符合网络拓扑约束的最优重构结果。
本发明的有益效果为:
(1)本发明借助向量的移位操作获得最优重构结果,计算量小,计算时间短,具有良好的实用性;
(2)本发明以环路作为支路交换的范围,减小了支路组合的数目,降低了方法寻优的难度;
(3)本发明对含有分布式电源的配电网进行重构可以提高分布式电源的利用率,发挥分布式电源的经济效益和环保效益;
(4)同时该方法能够计及分布式电源的影响,为智能电网环境下快速高效地实现配网重构提供了理论支持和方法参考。
附图说明
图1为本发明的配电网示意图;
图2为本发明的基于向量移位运算的配电网快速重构方法流程图。
具体实施方式:
下面结合附图与实例对本发明作进一步说明。
如图2所示,一种基于向量移位运算的配电网快速重构方法,具体包括:
步骤1,采集配电网络的网络参数和分布式电源参数,置迭代次数为1;
步骤2,将配电网的当前网络结构作为本次迭代的初始网络结构,对配电网中所有处于断开状态的支路进行编号,取第一个断开支路为当前断开支路;
步骤3,通过拓扑分析得到闭合当前断开支路所形成回路的所有节点和支路,这些节点和支路构成一个环路,取此环路为当前环路,同时构造当前环路中断开支路的功率向量和电阻向量,以及断开支路两端节点的电阻向量;
步骤4,以配电网络的网损最小为优化目标,通过向量运算获取当前环路内的最优断开支路;
步骤5,判断是否已对配电网中所有已编号的支路完成步骤3-4的操作,若是,则输出重构结果;否则,转入步骤3将下一个编号的支路作为当前断开支路进行处理;
步骤6,判断得到的网络结构与本次迭代的初始网络结构是否相同,若是,则输出重构结果,否则,将重构后的网络结构作为新的网络结构,并将迭代次数加1,转入步骤(2)在新的网络结构的基础上继续进行支路交换。
步骤3中,构造当前环路中断开支路的功率向量和电阻向量,以及断开支路两端节点的电阻向量的步骤为:
(1),将分布式电源所在节点视为PQ节点,将分布式电源的出力作为负的负荷功率处理,设分布式电源k所在节点为Nk,则节点Nk的等效负荷功率可表示为
P E . N k = P L , N k - P G , k Q E . N k = Q L , N k - Q G , k - - - ( 1 )
式中,PG,k和QG,k分别为分布式电源k输出的有功功率和无功功率,分别为分布式电源所在节点Nk的有功负荷和无功负荷,分别为分布式电源所在节点Nk的等效有功负荷功率和等效无功负荷功率。对无分布式电源连接的节点,其等效负荷功率就等于负荷本身吸收的功率。
(2),在计算流过各条支路上的功率时,将各节点的电压视为额定值,同时先不计支路功率损耗,则流经任一支路Bi的功率可表示为:
P B i + jQ B i = Σ N j ∈ L b a c k . B i ( P N j + jQ N j ) - - - ( 2 )
式中,分别为流经支路Bi的有功功率和无功功率;为在正常运行状态下,从支路Bi沿着功率流动的方向到达支路Bi所在环路的末端节点Nend所经过的节点集合;分别为节点Nj的等效环路负荷有功功率和等效环路负荷无功功率,对于无T接支路的一般节点,其等效环路负荷功率即为等效负荷功率,如对节点Nc.m-1,有:
P N c . m - 1 = P E . N c . m - 1 Q N c . m - 1 = Q E . N c . m - 1 - - - ( 3 )
对于有T接支路的节点,其等效环路负荷功率为该节点与其T接支路上所有节点的功率之和,如对节点Nc.1,有:
P N c . m - 1 = P E . N c .1 + P E . N o .1 + P E . N o .2 Q N c . m - 1 = Q E . N c .1 + Q E . N o .1 + Q E . N o .2 - - - ( 4 )
(3),定义环路内支路Bi的顺时针支路集合和逆时针支路集合分别为从支路Bi沿顺时针方向和逆时针方向到达所在环路功率的流入节点Ni所经过的支路集合。以图1所示的简单配电网的部分结构示意图为例。图1中支路Bn,m的顺时针支路集合和逆时针支路集合可表示为 L B n , m , c = { B c , m , B c , m - 1 , ... ... , B c , 2 , B c , 1 } , L B n , m , a c = { B a c , n , B a c , n - 1 , ... ... , B a c , 2 , B a c , 1 } . 定义环路内节点Nj的顺时针支路集合和逆时针支路集合分别为从节点Nj沿顺时针方向和逆时针方向到达所在环路功率的流入节点Ni所经过的支路集合。图1中节点Nac,n的顺时针支路集合和逆时针支路集合可表示为 L N a c , n , c = { B n , m , B c , m , ... ... , B c , 2 , B c , 1 } , L N a c , n , a c = { B a c , n , B a c , n - 1 , ... ... , B a c , 2 , B a c , 1 } .
(4),令各节点电压标幺值为1.0,则支路Bn,m断开时,其所在环路的近似有功损耗为:
P l o o p , B n , m = Σ B i ∈ L B n , m , c ( P B i 2 + Q B i 2 ) r B i + Σ B i ∈ L B n , m , a c ( P B i 2 + Q B i 2 ) r B i - - - ( 5 )
式中,为支路Bi的电阻。
(5),假设闭合当前环路中处于断开状态的支路Bn,m的开关,同时从支路Bn,m出发沿着逆时针方向断开与支路Bn,m连接的相邻支路Bac,n的开关,从而完成一次逆时针支路交换操作。则支路交换后当前环路的有功损耗可表示为:
P l o o p , B a c , n = Σ B i ∈ L B n , m , c [ ( P B i + P N a c . n ) 2 + ( Q B i + Q N a c . n ) 2 ] r B i + Σ B i ∈ L B n , m , a c [ ( P B i + P N a c . n ) 2 + ( Q B i + Q N a c . n ) 2 ] r B i + ( P N a c . n 2 + Q N a c . n 2 ) r B n , m - - - ( 6 )
则支路交换后网损的增加量为:
ΔP B n , m , B a c , n = P l o o p , B a c , n - P l o o p , B n , m - - - ( 7 )
将式(3)和式(4)代入式(5),并化简后得:
ΔP B n , m , B a c , n = ( P N a c . n 2 + Q N a c . n 2 ) ( Σ B i ∈ L N a c , n , c r B i - Σ B i ∈ L N a c , n , a c r B i ) + 2 P N a c . n ( Σ B i ∈ L B n , m , c P B i r B i - Σ B i ∈ L B a c , n , a c P B i r B i ) + 2 Q N a c . n ( Σ B i ∈ L B n , m , c Q B i r B i - Σ B i ∈ L B a c , n , a c Q B i r B i ) - - - ( 8 )
利用向量存储集合中支路的电阻,利用向量存储集合中支路的电阻,利用向量存储集合中支路的电阻,利用向量存储集合中各支路的电阻,利用向量存储集合中各支路上的有功功率,利用向量存储集合中各支路上的无功功率,利用向量存储集合中各支路上的有功功率,利用向量存储集合中各支路上的无功功率。将支路或节点顺时针电阻向量和逆时针电阻向量统称为支路或节点的电阻向量,将支路的顺时针功率向量和逆时针功率向量统称为支路的功率向量。图1中节点Nac,n的顺时针支路集合电阻向量逆时针支路集合电阻向量可分别表示为:
M N a c , n , c R = [ r B n , m , r B c , m , ... ... , r B c , 2 , r B c , 1 ] - - - ( 9 )
M N a c , n , a c R = [ r B a c , n , r B a c , n - 1 , ... ... , r B a c , 2 , r B a c , 1 ] - - - ( 10 )
支路Bn,m的顺时针支路集合电阻向量逆时针支路集合电阻向量可表示为:
M B n , m , c R = [ r B c , m , r B c , m - 1 , ... ... , r B c , 2 , r B c , 1 ] - - - ( 11 )
M B n , m , a c R = [ r B a c , n , r B a c , n - 1 , ... ... , r B a c , 2 , r B a c , 1 ] - - - ( 12 )
支路Bn,m的顺时针支路集合的有功功率向量无功功率向量逆时针支路集合的有功功率无功功率可表示为:
M B n , m , c P = [ P B c , n , P B c , m - 1 , ... ... , P B c , 2 , P B c , 1 ] - - - ( 13 )
M B n , m , c Q = [ Q B c , m , Q B c , m - 1 , ... ... , Q B c , 2 , Q B c , 1 ] - - - ( 14 )
M B n , m , a c P = [ P B a c , n , P B a c , n - 1 , ... ... , P B a c , 2 , P B a c , 1 ] - - - ( 15 )
M B n , m , a c Q = [ Q B a c , n , Q B a c , n - 1 , ... ... , Q B a c , 2 , Q B a c , 1 ] - - - ( 16 )
所述步骤4中,通过向量运算获取当前环路内的最优断开支路,具体包括:
(4-1)用Bn,m代表当前环路中处于断开状态的支路,载入支路Bn,m的电阻向量、Bn,m两端节点的电阻向量、以及Bn,m的功率向量;
(4-2)闭合支路Bn,m,从该支路出发断开环路内逆时针方向的下一个支路Bac,n,通过向量移位运算构造支路交换后新断开支路Bac,n的功率向量和电阻向量,计算网损的变化量,若网损减小,则说明使网损最小的最优断开支路位于初始断开支路的逆时针方向,将逆时针方向作为支路交换的操作方向(记为);若网损增加,则重新闭合支路Bac,n,并从支路Bn,m出发断开环路内顺时针方向的下一个支路Bc.m,通过向量移位运算构造支路交换后断开支路Bc.m的功率向量和电阻向量,计算网损的变化量,若网损减小,则说明使网损最小的最优断开支路位于支路Bn,m的顺时针方向,将顺时针方向作为支路交换的操作方向若网损增加,则说明支路Bn,m即为最优断开支路。
(4-3)用BO代表经操作后当前环路中处于断开状态的支路,用B″O代表沿着该环路操作方向的下一条相邻支路。闭合BO,断开B″O,通过向量移位运算构造支路B″O的功率向量、电阻向量、以及支路BO和B″O公共节点的电阻向量,计算网损的变化量,若网损增加,则闭合B″O,断开BO,步骤(4)停止,支路BO即为该环路的最优断开支路,若网损减小或不变,则转入步骤(4-4)。
(4-4)判断是否已处理完该环路中沿方向的所有支路,若是,则步骤(4)停止,当前处于断开状态的支路即为该环路的最优断开支路;否则转步骤(4-3)继续进行支路交换。
进一步的,所述步骤(4-2)中通过向量移位运算构造支路交换后新断开支路的功率向量和电阻向量,计算支路交换后网损的变化量,具体包括:
闭合当前环路中处于断开状态的支路Bn,m的开关,同时从支路Bn,m出发沿着逆时针方向断开与支路Bn,m连接的相邻支路Bac,n的开关。由环路的拓扑结构可知,当闭合支路Bn,m,断开支路Bac,n后,将向量的列数加1,然后将向量的所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入闭合支路Bn,m的电阻即可得到支路Bac,n的顺时针支路集合电阻向量 M B a c , n , c R = [ r B n , m , r B c , m , ... ... , r B c , 2 , r B c , 1 ] .
同理,将向量的第一列元素置空,其余元素按从左至右的顺序依次左移1位,即可得到支路Bac,n的逆时针支路集合电阻向量
由环路的拓扑结构可知,当闭合支路Bn,m,断开支路Bac,n后,将向量所有元素在数值上减去两交换支路的公共节点Nac.n的等效环路负荷有功功率再将的第一列元素置空,其余元素按从左至右的顺序依次左移1位得到支路Bac,n的逆时针支路集合有功功率向量支路Bac,n的逆时针支路集合无功功率向量可以通过相同的方式得到,即 M B a c , n , a c Q = [ Q B a c , n - 1 , ... ... , Q B a c , 2 , Q B a c , 1 ] .
同理,将向量的所有元素在数值上增加两交换支路的公共节点Nac.n的等效环路负荷有功功率再将向量的列数加1,然后将所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入支路Bn,m上的有功功率即可得到支路Bac,n的顺时针支路集合有功功率 M B a c , n , c P = [ P B n , m , P B c , m , ... ... , P B c , 2 , P B c , 1 ] . 支路Bac,n的顺时针支路集合无功功率向量可以通过相同的方式得到,即 M B a c , n , c Q = [ Q B n , m , Q B c , m , ... ... , Q B c , 2 , Q B c , 1 ] .
支路交换后网损增加量的向量表达形式为:
ΔP B n , m , B a c , n = ( P N a c . n 2 + Q N a c . n 2 ) ( M N a c , n , c R U N a c , n , c - M N a c , n , c R U N a c , n , a c ) + 2 P N a c . n ( M B n , m , c R ( M B n , m , c P ) T - M B a c , n , a c R ( M B a c , n , a c P ) T ) + 2 Q N a c . n ( M B n , m , c R ( M B n , m , c Q ) T - M B a c , n , a c R ( M B a c , n , a c Q ) T ) - - - ( 17 )
式中,Bn,m为当前环路中处于断开状态的支路,Bac,n为从支路Bn,m出发沿着逆时针方向与支路Bn,m连接的相邻支路,式中,为两交换支路的公共节点Nac.n的等效环路负荷有功功率和等效环路负荷无功功率;为行数与列数相同的单位列向量;为行数与列数相同的单位列向量;MT表示向量M的转置。
同理,闭合环路中当前处于断开状态的支路,从该支路出发沿着顺时针方向断开下一个满足配电网络辐射状拓扑约束的支路,构造支路交换后新的配电网的功率向量和电阻向量,支路交换后网损增加量的向量表达形式为:
ΔP B n , m , B c , m = ( P N c . m 2 + Q N c . m 2 ) ( M N c , m , a c R U N c , m , a c - M N c , m , c R U N c , m , c ) + 2 P N c . m ( M B n , m , a c R ( M B n , m , a c P ) T - M B c , m , c R ( M B c , m , c P ) T ) + 2 Q N c . m ( M B n , m , a c R ( M B n , m , a c Q ) T - M B c , m , c R ( M B c , m , c Q ) T ) - - - ( 18 )
式中,Bn,m为当前环路中处于断开状态的支路,Bc,m为从支路Bn,m出发沿着顺时针方向与支路Bn,m连接的相邻支路,式中,为两交换支路的公共节点Nc.m的等效环路负荷有功功率和等效环路负荷无功功率;为节点Nc.m的逆时针支路集合电阻向量;为行数与列数相同的单位列向量;为节点Nc.m的顺时针支路集合电阻向量;为行数与列数相同的单位列向量;为支路Bn,m的逆时针支路集合电阻向量;为支路Bn,m的逆时针支路集合有功功率向量;为支路Bc,m的逆时针支路集合电阻向量;为支路Bc,m的顺时针支路集合有功向量功率;为支路Bn,m的逆时针支路集合无功功率向量;为支路Bc,m的顺时针支路集合无功功率向量,MT表示向量M的转置。
所述步骤(4-3)中,通过向量移位运算构造支路交换后新断开支路的功率向量和电阻向量,计算支路交换后网损的变化量,具体包括:
若沿逆时针方向继续进行支路交换操作,即闭合当前断开的支路Bac,n,并从支路Bac,n出发沿着逆时针方向断开与支路Bac,n连接的支路Bac,n-1。设Nac.n-1为支路Bac,n和支路Bac,n-1的公共节点。
由环路的拓扑结构可知,当闭合支路Bac,n,断开支路Bac,n-1后,将向量的列数加1,然后将向量的所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入新断开支路Bac,n的电阻即可得到节点Nac.n-1的顺时针支路集合电阻向量
M N a c , n - 1 , c R = [ r B a c , n , r B n , m , r B c , m , ... ... , r B c , 2 , r B c , 1 ] .
同理,将向量的第一列元素置空,其余元素按从左至右的顺序依次左移1位,即可得到节点Nac.n-1的逆时针支路集合电阻向量
同理,将向量所有元素在数值上减去两交换支路的公共节点Nac.n-1的等效环路负荷有功功率再将的第一列元素置空,其余元素按从左至右的顺序依次左移1位得到支路Bac,n-1的逆时针支路集合有功功率向量 M B a c , n - 1 , a c P = [ P B a c , n - 2 , ... ... , P B a c , 2 , P B a c , 1 ] . 支路Bac,n的逆时针支路集合无功功率向量可以通过相同的方式得到,即
M B a c , n - 1 , a c Q = [ Q B a c , n - 2 , ... ... , Q B a c , 2 , Q B a c , 1 ] .
同理,将向量的所有元素在数值上增加两交换支路的公共节点Nac.n-1的等效环路负荷有功功率再将向量的列数加1,然后将所有元素按从右至左的顺序依次右移1位,最后在第1列的位置补入支路Bac,n上的有功功率即可得到支路Bac,n-1的顺时针支路集合有功功率 M B a c , n - 1 , c P = [ P B a c , n , P B n , m , P B c , m , ... ... , P B c , 2 , P B c , 1 ] . 支路Bac,n的顺时针支路集合无功功率向量可以通过相同的方式得到,即 M B a c , n - 1 , c Q = [ Q B a c , n , Q B n , m , Q B c , m , ... ... , Q B c , 2 , Q B c , 1 ] .
因此只需要通过对相应的功率向量和电阻向量进行相应的移位操作,就能利用公式(17)计算每一次开关操作产生的网损变化。闭合支路Bac,n的开关,同时断开支路Bac,n-1的开关后,环路有功网损的变化量为::
ΔP B a c , n , B a c , n - 1 = ( P N a c . n - 1 2 + Q N a c . n - 1 2 ) ( M N a c , n - 1 , c R U N a c , n - 1 , c - M N a c , n - 1 , a c R U N a c , n - 1 , a c ) + 2 P N a c . n - 1 ( M B a c , n , c R ( M B a c , n , c P ) T - M B a c , n - 1 , a c R ( M B a c , n - 1 , a c P ) T ) + 2 Q N a c . n - 1 ( M B a c , n , c R ( M B a c , n , c Q ) T - M B a c , n - 1 , a c R ( M B a c , n - 1 , a c Q ) T ) - - - ( 19 )
式中,为两交换支路的公共节点Nac.n-1的等效环路负荷有功功率和等效环路负荷无功功率;为行数与列数相同的单位列向量;为行数与列数相同的单位列向量;MT表示向量M的转置。
同理,可得沿着顺时针方向进行支路交换操作时环路有功损耗的变化量。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。

Claims (8)

1.一种基于向量移位运算的配电网络快速重构方法,其特征是:包括以下步骤:
(1)采集配电网络的网络参数和分布式电源参数,置迭代次数为1;
(2)将配电网的当前网络结构作为本次迭代的初始网络结构,对配电网中所有处于断开状态的支路进行编号,取第一个断开支路为当前断开支路;
(3)通过拓扑分析得到当前断开支路所在回路的所有节点和支路,所述节点和支路构成一个环路,取此环路为当前环路,同时构造当前环路中断开支路的功率向量和电阻向量,以及断开支路两端节点的电阻向量;
(4)以配电网络的网损最小为优化目标,通过向量运算获取当前环路内的最优断开支路;
(5)判断是否已对配电网中所有已编号的支路完成步骤(3)-(4)的操作,若是,则输出重构结果,否则,转入步骤(3)将下一个编号的支路作为当前断开支路进行处理;
(6)判断得到的网络结构与本次迭代的初始网络结构是否相同,若是,则输出重构结果;否则,将重构后的网络结构作为新的网络结构,并将迭代次数加1,转入步骤(2),基于新的网络结构继续进行支路交换。
2.如权利要求1所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:所述步骤(3)中,构造当前环路中断开支路的功率向量和电阻向量,以及断开支路两端节点的电阻向量的具体步骤包括:
(3-1)将分布式电源所在节点视为PQ节点,分布式电源的出力作为负的负荷功率,表示分布式电源所在节点的等效有功负荷功率和等效无功负荷功率;
(3-2)根据配电网网络结构与参数,确定当前环路内断开支路及断开支路两端节点的电阻向量,以及断开支路的功率向量。
3.如权利要求2所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:所述步骤(3-1)具体为:
将分布式电源所在节点视为PQ节点,将分布式电源的出力作为负的负荷功率处理,设分布式电源k所在节点为Nk,则节点Nk的等效负荷有功功率可表示分布式电源所在节点Nk的有功负荷与分布式电源k输出的有功功率之差,节点Nk的等效负荷无功功率可表示分布式电源所在节点Nk的无功负荷与分布式电源k输出的无功功率之差。
4.如权利要求3所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:所述步骤(3-1)中,对无分布式电源连接的节点,其等效负荷功率就等于负荷本身吸收的功率。
5.如权利要求1所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:所述步骤(3-2)中,在计算流过各条支路上的功率时,将各节点的电压视为额定值,同时先不计支路功率损耗,则流经任一支路Bi的功率可表示为正常运行状态下,从支路Bi沿着功率流动的方向到达支路Bi所在环路的末端节点Nend所经过的节点集合中节点的等效环路负荷有功功率和等效环路负荷无功功率之和。
6.如权利要求1所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:所述步骤(4)中,通过向量运算获取当前环路内的最优断开支路,具体包括:
(4-1)载入当前环路中处于断开状态的初始支路的电阻向量、两端节点的电阻向量、以及功率向量;
(4-2)闭合该初始支路,从该初始支路出发断开环路内逆时针方向的下一个支路,通过向量移位运算构造支路交换后新断开支路的功率向量和电阻向量,计算网损的变化量,确定支路交换的操作方向;
(4-3)闭合步骤(4-2)操作后当前环路中处于断开状态的支路,断开沿着该环路操作方向的下一条相邻支路,通过向量移位运算构造所述下一条相邻支路的功率向量、电阻向量、以及本步骤中两条交换支路公共节点的电阻向量,计算网损的变化量,若网损增加,则之前断开的支路即为该环路的最优断开支路,闭合新断开支路,断开之前闭合的支路,步骤(4)停止,若网损减小或不变,则转入步骤(4-4);
(4-4)判断是否已处理完该环路中沿操作方向的所有支路,若是,则停止,当前处于断开状态的支路即为该环路的最优断开支路;否则转步骤(4-3)继续进行支路交换。
7.如权利要求6所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:所述步骤(4-2)中,若网损减小,则说明使网损最小的最优断开支路位于初始断开支路的逆时针方向,将逆时针方向作为支路交换的操作方向;若网损增加,则重新闭合下一个支路,并从初始支路出发断开环路内顺时针方向的下一个支路,通过向量移位运算构造支路交换后该断开支路的功率向量和电阻向量,计算网损的变化量,若网损减小,则说明使网损最小的最优断开支路位于初始支路的顺时针方向,将顺时针方向作为支路交换的操作方向,若网损增加,则说明初始支路即为最优断开支路。
8.如权利要求7所述的一种基于向量移位运算的配电网络快速重构方法,其特征是:只需要通过对相应的功率向量和电阻向量进行相应的移位操作,就能计算每一次开关操作产生的网损变化。
CN201610124738.8A 2016-03-04 2016-03-04 一种基于向量移位运算的配电网络快速重构方法 Expired - Fee Related CN105591405B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610124738.8A CN105591405B (zh) 2016-03-04 2016-03-04 一种基于向量移位运算的配电网络快速重构方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610124738.8A CN105591405B (zh) 2016-03-04 2016-03-04 一种基于向量移位运算的配电网络快速重构方法

Publications (2)

Publication Number Publication Date
CN105591405A true CN105591405A (zh) 2016-05-18
CN105591405B CN105591405B (zh) 2017-10-24

Family

ID=55930741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610124738.8A Expired - Fee Related CN105591405B (zh) 2016-03-04 2016-03-04 一种基于向量移位运算的配电网络快速重构方法

Country Status (1)

Country Link
CN (1) CN105591405B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111401660A (zh) * 2020-04-10 2020-07-10 国网上海市电力公司 一种在配电系统恢复过程中确定辐射状拓扑的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820648A (zh) * 2012-08-03 2012-12-12 冶金自动化研究设计院 一种钢铁企业配电网重构的方法
CN104123684A (zh) * 2014-08-04 2014-10-29 国家电网公司 一种计及网损和可靠性的配电网经济性重构方法
US20150039141A1 (en) * 2013-07-30 2015-02-05 Wayne State University System and method using fuzzy logic for resource conservation
CN104659812A (zh) * 2015-01-31 2015-05-27 华南理工大学 一种基于预测控制的多微网协调控制方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820648A (zh) * 2012-08-03 2012-12-12 冶金自动化研究设计院 一种钢铁企业配电网重构的方法
US20150039141A1 (en) * 2013-07-30 2015-02-05 Wayne State University System and method using fuzzy logic for resource conservation
CN104123684A (zh) * 2014-08-04 2014-10-29 国家电网公司 一种计及网损和可靠性的配电网经济性重构方法
CN104659812A (zh) * 2015-01-31 2015-05-27 华南理工大学 一种基于预测控制的多微网协调控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张栋: "配电网络重构的快速支路交换算法", 《电网技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111401660A (zh) * 2020-04-10 2020-07-10 国网上海市电力公司 一种在配电系统恢复过程中确定辐射状拓扑的方法
CN111401660B (zh) * 2020-04-10 2024-04-26 国网上海市电力公司 一种在配电系统恢复过程中确定辐射状拓扑的方法

Also Published As

Publication number Publication date
CN105591405B (zh) 2017-10-24

Similar Documents

Publication Publication Date Title
CN103825267B (zh) 一种mmc-mtdc直流侧短路电流的计算方法
Beerten et al. Generalized steady-state VSC MTDC model for sequential AC/DC power flow algorithms
CN103683284B (zh) 一种含分布式电源的配电网三相不平衡潮流计算方法
CN103280821B (zh) 智能配电系统多时段动态无功优化方法
CN103353918B (zh) 一种配电网三相牛顿拉夫逊法潮流计算初值选取方法
CN103236691B (zh) 基于复仿射数学理论的三相不平衡潮流计算方法
CN103208818B (zh) 一种计及分布式电源的配网合环电流计算方法
CN102403720B (zh) 一种基于暂态电压安全裕度的超实时重合时序整定方法
CN102545252B (zh) 基于三阶收敛牛顿法vsc-hvdc潮流计算方法
CN105260516A (zh) 一种含开关特性子网络的电磁暂态仿真方法
CN104361413A (zh) 一种含分布式电源的配电网重构方法
CN106026169A (zh) 一种基于多微电网并入配电网的分解协调优化方法
CN103077268A (zh) 面向电力系统电磁暂态仿真的状态空间自动建模方法
CN104113061A (zh) 一种含分布式电源的配电网三相潮流计算方法
Zhang et al. Network topology identification algorithm based on adjacency matrix
CN116361603A (zh) 一种电力系统碳排放流计算方法
CN109980651B (zh) 一种环网型配电系统潮流计算方法
CN103544359A (zh) 用于变电站仿真培训系统的二次回路仿真方法
CN105591405A (zh) 一种基于向量移位运算的配电网络快速重构方法
CN105787604A (zh) 一种输配协同的配网态势快速感知方法
CN105896558B (zh) 一种基于vsc的upfc机电暂态模块化建模方法
CN109980650B (zh) 一种辐射型配电系统潮流计算方法
CN105514996A (zh) 一种主配网协同潮流计算的方法和系统
CN107465195B (zh) 一种基于微电网结合潮流计算的最优潮流双层迭代方法
CN103390890B (zh) 基于电流分布系数的配电网潮流分析方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

CF01 Termination of patent right due to non-payment of annual fee