CN105421859A - 一种电力电网电线杆架设装置及施工方法 - Google Patents
一种电力电网电线杆架设装置及施工方法 Download PDFInfo
- Publication number
- CN105421859A CN105421859A CN201510773984.1A CN201510773984A CN105421859A CN 105421859 A CN105421859 A CN 105421859A CN 201510773984 A CN201510773984 A CN 201510773984A CN 105421859 A CN105421859 A CN 105421859A
- Authority
- CN
- China
- Prior art keywords
- electric pole
- car body
- gathering sill
- power network
- mobile fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 230000005611 electricity Effects 0.000 title abstract description 6
- 239000000725 suspension Substances 0.000 claims description 8
- 230000032258 transport Effects 0.000 claims description 5
- 239000004677 Nylon Substances 0.000 claims description 3
- 210000002421 cell wall Anatomy 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 229920001778 nylon Polymers 0.000 claims description 3
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 241000209202 Bromus secalinus Species 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000004922 lacquer Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510773984.1A CN105421859B (zh) | 2015-11-13 | 2015-11-13 | 一种电力电网电线杆架设装置及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510773984.1A CN105421859B (zh) | 2015-11-13 | 2015-11-13 | 一种电力电网电线杆架设装置及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421859A true CN105421859A (zh) | 2016-03-23 |
CN105421859B CN105421859B (zh) | 2017-09-15 |
Family
ID=55500364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510773984.1A Active CN105421859B (zh) | 2015-11-13 | 2015-11-13 | 一种电力电网电线杆架设装置及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421859B (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368498A (zh) * | 2016-09-28 | 2017-02-01 | 国网山东省电力公司章丘市供电公司 | 野外电线杆智能架设装置 |
CN107675695A (zh) * | 2017-10-23 | 2018-02-09 | 周军美 | 一种通信网络连接装置 |
CN107687165A (zh) * | 2017-09-29 | 2018-02-13 | 董岳良 | 一种电缆架设装置 |
CN107806082A (zh) * | 2017-10-25 | 2018-03-16 | 胡小多 | 一种线缆架设装置 |
CN108019089A (zh) * | 2017-12-21 | 2018-05-11 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆自动架设设备及施工方法 |
CN108049698A (zh) * | 2017-12-21 | 2018-05-18 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆自动架设装置及施工方法 |
CN108104577A (zh) * | 2017-12-21 | 2018-06-01 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆架设装置及施工方法 |
CN108221935A (zh) * | 2017-10-13 | 2018-06-29 | 莫业进 | 一种固定稳定的电线电缆设备 |
CN109403708A (zh) * | 2018-12-06 | 2019-03-01 | 国网辽宁省电力有限公司锦州供电公司 | 用于山地架设电线杆的施工方法 |
CN110886531A (zh) * | 2019-12-05 | 2020-03-17 | 陈小雨 | 一种架空输电线路电力杆塔安装施工方法 |
CN112647753A (zh) * | 2020-12-18 | 2021-04-13 | 潘春燕 | 一种电网架设混凝土电线杆安装施工方法 |
CN114508259A (zh) * | 2022-03-11 | 2022-05-17 | 国网山东省电力公司沂水县供电公司 | 一种电力施工用辅助电线杆快速安装的运输装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724372A (zh) * | 2017-10-13 | 2018-02-23 | 柴玲飞 | 一种稳定的电线电缆设备 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1402643A (en) * | 1971-07-06 | 1975-08-13 | Roche T | Equipment for use in handling and erecting poles |
CN2362744Y (zh) * | 1999-04-14 | 2000-02-09 | 李传模 | 自走式简易液压立杆机 |
CN201512983U (zh) * | 2009-09-15 | 2010-06-23 | 湖北省电力公司咸宁供电公司 | 双三角架立杆装置 |
CN202023404U (zh) * | 2011-04-02 | 2011-11-02 | 刘云峰 | 多功能立杆器 |
CN104088501A (zh) * | 2014-06-28 | 2014-10-08 | 国家电网公司 | 一种水泥电线杆架设车 |
CN203879092U (zh) * | 2014-05-16 | 2014-10-15 | 国家电网公司 | 电线杆起吊装置 |
CN203961423U (zh) * | 2014-06-28 | 2014-11-26 | 国家电网公司 | 一种架设电线杆的工具车 |
CN204126358U (zh) * | 2014-07-08 | 2015-01-28 | 国家电网公司 | 一种安全性高的电线杆载设装置 |
-
2015
- 2015-11-13 CN CN201510773984.1A patent/CN105421859B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1402643A (en) * | 1971-07-06 | 1975-08-13 | Roche T | Equipment for use in handling and erecting poles |
CN2362744Y (zh) * | 1999-04-14 | 2000-02-09 | 李传模 | 自走式简易液压立杆机 |
CN201512983U (zh) * | 2009-09-15 | 2010-06-23 | 湖北省电力公司咸宁供电公司 | 双三角架立杆装置 |
CN202023404U (zh) * | 2011-04-02 | 2011-11-02 | 刘云峰 | 多功能立杆器 |
CN203879092U (zh) * | 2014-05-16 | 2014-10-15 | 国家电网公司 | 电线杆起吊装置 |
CN104088501A (zh) * | 2014-06-28 | 2014-10-08 | 国家电网公司 | 一种水泥电线杆架设车 |
CN203961423U (zh) * | 2014-06-28 | 2014-11-26 | 国家电网公司 | 一种架设电线杆的工具车 |
CN204126358U (zh) * | 2014-07-08 | 2015-01-28 | 国家电网公司 | 一种安全性高的电线杆载设装置 |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368498A (zh) * | 2016-09-28 | 2017-02-01 | 国网山东省电力公司章丘市供电公司 | 野外电线杆智能架设装置 |
CN106368498B (zh) * | 2016-09-28 | 2018-08-07 | 国网山东省电力公司章丘市供电公司 | 野外电线杆智能架设装置 |
CN107687165A (zh) * | 2017-09-29 | 2018-02-13 | 董岳良 | 一种电缆架设装置 |
CN108221935A (zh) * | 2017-10-13 | 2018-06-29 | 莫业进 | 一种固定稳定的电线电缆设备 |
CN107675695A (zh) * | 2017-10-23 | 2018-02-09 | 周军美 | 一种通信网络连接装置 |
CN107806082A (zh) * | 2017-10-25 | 2018-03-16 | 胡小多 | 一种线缆架设装置 |
CN107806082B (zh) * | 2017-10-25 | 2018-12-04 | 江苏源清环保科技有限公司 | 一种线缆架设装置 |
CN108019089A (zh) * | 2017-12-21 | 2018-05-11 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆自动架设设备及施工方法 |
CN108104577A (zh) * | 2017-12-21 | 2018-06-01 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆架设装置及施工方法 |
CN108049698A (zh) * | 2017-12-21 | 2018-05-18 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆自动架设装置及施工方法 |
CN108104577B (zh) * | 2017-12-21 | 2021-02-23 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆架设装置及施工方法 |
CN108019089B (zh) * | 2017-12-21 | 2021-03-30 | 国网江苏省电力公司泰州供电公司 | 一种电力电网电线杆自动架设设备及施工方法 |
CN109403708A (zh) * | 2018-12-06 | 2019-03-01 | 国网辽宁省电力有限公司锦州供电公司 | 用于山地架设电线杆的施工方法 |
CN110886531A (zh) * | 2019-12-05 | 2020-03-17 | 陈小雨 | 一种架空输电线路电力杆塔安装施工方法 |
CN110886531B (zh) * | 2019-12-05 | 2020-11-27 | 盛隆电气集团电力工程有限公司 | 一种架空输电线路电力杆塔安装施工方法 |
CN112647753A (zh) * | 2020-12-18 | 2021-04-13 | 潘春燕 | 一种电网架设混凝土电线杆安装施工方法 |
CN114508259A (zh) * | 2022-03-11 | 2022-05-17 | 国网山东省电力公司沂水县供电公司 | 一种电力施工用辅助电线杆快速安装的运输装置 |
CN114508259B (zh) * | 2022-03-11 | 2022-09-16 | 国网山东省电力公司沂水县供电公司 | 一种电力施工用辅助电线杆快速安装的运输装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105421859B (zh) | 2017-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421859A (zh) | 一种电力电网电线杆架设装置及施工方法 | |
CN105421860A (zh) | 一种电网电线杆架设装置及施工方法 | |
CN105442932A (zh) | 一种电网电线杆埋设装置及施工方法 | |
CN105529648B (zh) | 液压装配式跨越架 | |
CN102359302B (zh) | 特高压大跨越铁塔组立方法 | |
CN106638185B (zh) | 一种行进过程自动变跨铺轨机及使用方法 | |
CN105442933A (zh) | 电网电线杆架设工具车及其施工方法 | |
CN102359303A (zh) | 特高压普通线路铁塔组立方法 | |
CN105298207A (zh) | 电网电线杆架设自装卸工具车及其施工方法 | |
CN109610922B (zh) | 一种典型地形铁塔组立施工装备 | |
CN202322008U (zh) | 可移动、可调节式多功能起重架 | |
CN102535939B (zh) | 拉v塔倒装组立工艺 | |
CN202544476U (zh) | 塔吊式抱杆 | |
CN204738520U (zh) | 刚体滑触线安装移动平台 | |
CN204277336U (zh) | 人字杆组立用支撑架 | |
CN202785387U (zh) | 一种室内悬臂起重机 | |
CN208631793U (zh) | 一种电缆放线装置 | |
CN209554495U (zh) | 一种电力安装放线装置 | |
CN105421861B (zh) | 一种电网电线杆架设装置及施工方法 | |
CN205846663U (zh) | 一种可调节高度的线路杆塔 | |
CN212612488U (zh) | 一种可移动的水下混凝土灌注导管台车 | |
CN209702022U (zh) | 一种液压放线架 | |
CN202899720U (zh) | 一种带脚踏板的高压输电线路铁塔用钢杆 | |
CN203754287U (zh) | 一种小型间隔二用起吊装置 | |
CN104746865A (zh) | 刚体滑触线安装移动平台及其安装刚体滑触线方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Ren Xucen Inventor before: Gao Shilong |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20170809 Address after: 226601 Jiangsu city of Nantong province high tech Industrial Development Zone (Haian County Temple Zhenxing Road, No. 11) Applicant after: NANTONG XINTONG INTELLIGENT ENGINEERING Co.,Ltd. Address before: Eight Township village of Yongchang County in Gansu province 737200 Yubao six No. 22 dam in Jinchang City Applicant before: Gao Shilong |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 226600 Haian high tech Industrial Development Zone, Nantong, Jiangsu (11) Patentee after: JIANGSU XINBAI CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 226601 Jiangsu city of Nantong province high tech Industrial Development Zone (Haian County Temple Zhenxing Road, No. 11) Patentee before: NANTONG XINTONG INTELLIGENT ENGINEERING Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A power grid pole erection device and construction method Effective date of registration: 20220301 Granted publication date: 20170915 Pledgee: Postal Savings Bank of China Limited Hai'an sub branch Pledgor: JIANGSU XINBAI CONSTRUCTION ENGINEERING Co.,Ltd. Registration number: Y2022980001985 |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 226600 Hai'an high tech Industrial Development Zone, Nantong City, Jiangsu Province (No. 11, Zhenxing Road, zushimiao) Patentee after: Jiangsu Xinbai Construction Group Co.,Ltd. Address before: 226600 Hai'an high tech Industrial Development Zone, Nantong City, Jiangsu Province (No. 11, Zhenxing Road, zushimiao) Patentee before: JIANGSU XINBAI CONSTRUCTION ENGINEERING Co.,Ltd. |