CN105350417A - High-cold roadbed frozen soil heat insulation construction method - Google Patents

High-cold roadbed frozen soil heat insulation construction method Download PDF

Info

Publication number
CN105350417A
CN105350417A CN201510649896.0A CN201510649896A CN105350417A CN 105350417 A CN105350417 A CN 105350417A CN 201510649896 A CN201510649896 A CN 201510649896A CN 105350417 A CN105350417 A CN 105350417A
Authority
CN
China
Prior art keywords
roadbed
ice
height
subgrade
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510649896.0A
Other languages
Chinese (zh)
Other versions
CN105350417B (en
Inventor
徐安花
李元洪
刘磊
任罗英
钟通道
袁铁军
武年勇
朱磊
韩进财
张楠
任芳兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengping Road And Bridge Construction Co Ltd
Qinghai One Reaches Transport Science And Techonologies Co Ltd
Original Assignee
Zhengping Road And Bridge Construction Co Ltd
Qinghai One Reaches Transport Science And Techonologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengping Road And Bridge Construction Co Ltd, Qinghai One Reaches Transport Science And Techonologies Co Ltd filed Critical Zhengping Road And Bridge Construction Co Ltd
Priority to CN201510649896.0A priority Critical patent/CN105350417B/en
Publication of CN105350417A publication Critical patent/CN105350417A/en
Application granted granted Critical
Publication of CN105350417B publication Critical patent/CN105350417B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The present invention discloses a high-cold roadbed frozen soil heat insulation construction method comprising the following steps: (1) according to whole-line frozen soil exploration data, a whole-line frozen soil roadbed is divided into three sections, namely, a less-ice and much-ice frozen soil area, a rich-ice and full-ice frozen soil area and a soil-containing ice layer road section, (2) the less-ice and much-ice frozen soil area is constructed, (3) the rich-ice and full-ice frozen soil area is constructed, and (4) the soil-containing ice layer road section is constructed. By control of the key technology, the problem of discharge of water in the slope toe of a roadbed with large ground lateral slope, and a frozen layer on the top of a cutting slope can be well solved, water sources can be effectively led away from the roadbed bottom to ensure the permafrost roadbed and the cutting slope are not eroded by overground water, permafrost region roadbed frost heaving and thaw collapse damage can be effectively prevented, permafrost region roadbed and road construction is normalized and standardized, the mechanistic organization is reasonable, and by sectional parallel operation and in-section assembly line operation, work efficiency is improved, construction quality is ensured, and the benefits are more prominent.

Description

A kind of high and cold roadbed frozen soil thermal-insulation construction method
Technical field
The present invention relates to a kind of high and cold roadbed frozen soil thermal-insulation construction method.
Background technology
Along with the fast development of highway in China building cause, high latitude in recent years, extremely frigid zones starts to build highway successively, because highway alignment permafrost distribution is wider, complicated hydrogeological conditions, when highway is implemented, generally only implement roadbed, bridges and culverts, the engineering such as draining and protection, road pavement is not implemented temporarily, all the other sections equal makings asphalt concrete pavement, through runing for many years, above section major part roadbed situation is better, but due to the non-making in road surface, roadbed end face is uneven, and there is the diseases such as frost boiling in various degree in local roadbed, govern the resource transport traffic capacity, the present invention is in conjunction with the disease conditions of existing highway and hydrogeological characteristics, Disease Treatment process is carried out to above section, unimpeded to ensure the transport of highway completely, improve highway capacity along the line.
Summary of the invention
The present invention is exactly for the problems referred to above, provides a kind of high and cold roadbed frozen soil thermal-insulation construction method, can ensure subgrade in permafrost soil zone and cutting not by the erosion of ground water, effectively can prevent and treat the generation of permafrost area embankment frost heave, thaw collapse disease.
For realizing above-mentioned purpose of the present invention, the present invention adopts following technical scheme, and the heat insulation construction of a kind of high and cold roadbed frozen soil, is characterized in that, comprise the following steps:
(1) according to all fronts frozen soil prospecting data, be divided into three section by frozen earth roadbed completely, be respectively few ice, many ice permafrost region, Fu Bing, full ice permafrost region and contain native ice sheet section;
(2) few ice, many ice permafrost region are constructed: by adding elevated formation level analysis to former Subgrade of old road height and this, section is high-end is all greater than 2.0m for major part, and according to field investigation, roadbed filling fills with boulder and cobble soil, gravelly soil substantially, and roadbed situation is better, therefore this no longer carries out specially treated, by general subgrade process, only strengthen draining, preventive works, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affects subgrade stability;
(3) rich ice, full ice permafrost region are constructed: by adding elevated formation level analysis to former Subgrade of old road height and this, major part section is high-end is all greater than rational height of roadbed as calculated and critical height of subgrade, therefore for ensureing subgrade stability, take roadbed both sides that insulation banket is set, banket width and height, when roadbed height is greater than 3.0m, banket width 3.0m, height 1.5m; When roadbed height is less than 3.0m, banket width 3.0m, height 1.2m, and strengthen roadbed both sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affects subgrade stability;
(4) construct to containing native ice sheet section:
A () is less than the embankment of 1.8m for roadbed raising, partly fill out and partly dig and cut subgrade, consider in Permafrost Area, grit Pavement Improvement is after flexible pavement, ever-frozen ground will occur significantly to degenerate, frozen earth roadbed heat stability constantly worsens, therefore for ensureing roadbed temperature, this design 50cm place below bed course arranges thick layer 6cmXSP warming plate isolation layer, with the subgrade defect that protection of permafrost steady change causes, and strengthen roadbed both sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affect subgrade stability, simultaneously according to roadbed height, topographic features is provided with wide 3.0m, high 1.2 ~ 1.5m is incubated banket,
B () is for the filled-up ground of roadbed raising 1.8 < H≤2.5m, for ensureing subgrade stability, this adopts the existing old road of cutouts and arranges sheet, block stone ventilated embankment, sheet, block stone ventilation thickness 0.8m, on it thick macadam of making 20cm levelling after carry out heavy type and roll, then making 20cm grit leveling, loaded filter, the levelling size controlling of rubble is at 5 ~ 10cm;
C () is for roadbed raising H > 2.5m, this considers that roadbed height is higher, and old road based filler is better, and existing old road base resistance to overturning is better, therefore take to arrange insulation banket in roadbed both sides, the wide 3.0m of banket, high 1.2 ~ 1.5m;
D () is for section of bursting and become muddy when a thaw sets in along the line, take according to roadbed raising and topographic features: 1.8m section is greater than for roadbed raising, after taking to excavate old road frost boiling part to stabilized zone position, rubble ventilation embankment is set, sheet, block stone ventilation thickness 0.8m, it carries out heavy type after thick macadam leveling layer of making 20cm roll, then making 20cm grit leveling, loaded filter, the levelling size controlling of rubble is at 5 ~ 10cm; Roadbed raising is less than to embankment and the excavation section of 1.8m, after taking to excavate old road part, roadbed scope (80cm) is changed and fills out grit process, and thick layer 6cmXSP warming plate isolation layer is set at 50cm place, bottom surface, road surface.
The invention has the beneficial effects as follows: this high and cold roadbed frozen soil thermal-insulation construction method, by the control of key technology, solve the roadbed toe that lateral slope of ground is larger preferably, the rafting problem of cutting top suprapermafrost water, effectively water source is deflected from the bottom of roadbed, ensure subgrade in permafrost soil zone and cutting not by the erosion of ground water, can effectively prevent and treat permafrost area embankment frost heave, the generation of thaw collapse disease, permafrost area embankment, pavement construction standardizes, standardization, mechanization tissue is reasonable, by piecewise-parallel operation, continuous productive process in section, increase work efficiency, ensure construction quality, its benefit is more outstanding.
Detailed description of the invention
A kind of method utilizing earthworm to raise chickens of the present invention:
(1) according to all fronts frozen soil prospecting data, be divided into three section by frozen earth roadbed completely, be respectively few ice, many ice permafrost region, Fu Bing, full ice permafrost region and contain native ice sheet section;
(2) few ice, many ice permafrost region are constructed: by adding elevated formation level analysis to former Subgrade of old road height and this, section is high-end is all greater than 2.0m for major part, and according to field investigation, roadbed filling fills with boulder and cobble soil, gravelly soil substantially, and roadbed situation is better, therefore this no longer carries out specially treated, by general subgrade process, only strengthen draining, preventive works, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affects subgrade stability;
(3) rich ice, full ice permafrost region are constructed: by adding elevated formation level analysis to former Subgrade of old road height and this, major part section is high-end is all greater than rational height of roadbed as calculated and critical height of subgrade, therefore for ensureing subgrade stability, take roadbed both sides that insulation banket is set, banket width and height, when roadbed height is greater than 3.0m, banket width 3.0m, height 1.5m; When roadbed height is less than 3.0m, banket width 3.0m, height 1.2m, and strengthen roadbed both sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affects subgrade stability;
(4) construct to containing native ice sheet section:
A () is less than the embankment of 1.8m for roadbed raising, partly fill out and partly dig and cut subgrade, consider in Permafrost Area, grit Pavement Improvement is after flexible pavement, ever-frozen ground will occur significantly to degenerate, frozen earth roadbed heat stability constantly worsens, therefore for ensureing roadbed temperature, this design 50cm place below bed course arranges thick layer 6cmXSP warming plate isolation layer, with the subgrade defect that protection of permafrost steady change causes, and strengthen roadbed both sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affect subgrade stability, simultaneously according to roadbed height, topographic features is provided with wide 3.0m, high 1.2 ~ 1.5m is incubated banket,
B () is for the filled-up ground of roadbed raising 1.8 < H≤2.5m, for ensureing subgrade stability, this adopts the existing old road of cutouts and arranges sheet, block stone ventilated embankment, sheet, block stone ventilation thickness 0.8m, on it thick macadam of making 20cm levelling after carry out heavy type and roll, then making 20cm grit leveling, loaded filter, the levelling size controlling of rubble is at 5 ~ 10cm;
C () is for roadbed raising H > 2.5m, this considers that roadbed height is higher, and old road based filler is better, and existing old road base resistance to overturning is better, therefore take to arrange insulation banket in roadbed both sides, the wide 3.0m of banket, high 1.2 ~ 1.5m;
D () is for section of bursting and become muddy when a thaw sets in along the line, take according to roadbed raising and topographic features: 1.8m section is greater than for roadbed raising, after taking to excavate old road frost boiling part to stabilized zone position, rubble ventilation embankment is set, sheet, block stone ventilation thickness 0.8m, it carries out heavy type after thick macadam leveling layer of making 20cm roll, then making 20cm grit leveling, loaded filter, the levelling size controlling of rubble is at 5 ~ 10cm; Roadbed raising is less than to embankment and the excavation section of 1.8m, after taking to excavate old road part, roadbed scope (80cm) is changed and fills out grit process, and thick layer 6cmXSP warming plate isolation layer is set at 50cm place, bottom surface, road surface.
To those skilled in the art, obviously the invention is not restricted to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present invention or essential characteristic, the present invention can be realized in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present invention is limited by claims instead of above-mentioned explanation, therefore all changes be intended in the implication of the equivalency by dropping on claim and scope are included in the present invention, any Reference numeral in claim should be considered as the claim involved by limiting.
The above; be only the present invention's preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (1)

1. a high and cold roadbed frozen soil thermal-insulation construction method, is characterized in that, comprise the following steps:
(1) according to all fronts frozen soil prospecting data, be divided into three section by frozen earth roadbed completely, be respectively few ice, many ice permafrost region, Fu Bing, full ice permafrost region and contain native ice sheet section;
(2) few ice, many ice permafrost region are constructed: by adding elevated formation level analysis to former Subgrade of old road height and this, section is high-end is all greater than 2.0m for major part, and according to field investigation, roadbed filling fills with boulder and cobble soil, gravelly soil substantially, and roadbed situation is better, therefore this no longer carries out specially treated, by general subgrade process, only strengthen draining, preventive works, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affects subgrade stability;
(3) rich ice, full ice permafrost region are constructed: by adding elevated formation level analysis to former Subgrade of old road height and this, major part section is high-end is all greater than rational height of roadbed as calculated and critical height of subgrade, therefore for ensureing subgrade stability, take roadbed both sides that insulation banket is set, banket width and height, when roadbed height is greater than 3.0m, banket width 3.0m, height 1.5m; When roadbed height is less than 3.0m, banket width 3.0m, height 1.2m, and strengthen roadbed both sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affects subgrade stability;
(4) construct to containing native ice sheet section:
A () is less than the embankment of 1.8m for roadbed raising, partly fill out and partly dig and cut subgrade, consider in Permafrost Area, grit Pavement Improvement is after flexible pavement, ever-frozen ground will occur significantly to degenerate, frozen earth roadbed heat stability constantly worsens, therefore for ensureing roadbed temperature, this design 50cm place below bed course arranges thick layer 6cmXSP warming plate isolation layer, with the subgrade defect that protection of permafrost steady change causes, and strengthen roadbed both sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, anti-sealing infiltrates roadbed, affect subgrade stability, simultaneously according to roadbed height, topographic features is provided with wide 3.0m, high 1.2 ~ 1.5m is incubated banket,
B () is for the filled-up ground of roadbed raising 1.8 < H≤2.5m, for ensureing subgrade stability, this adopts the existing old road of cutouts and arranges sheet, block stone ventilated embankment, sheet, block stone ventilation thickness 0.8m, on it thick macadam of making 20cm levelling after carry out heavy type and roll, then making 20cm grit leveling, loaded filter, the levelling size controlling of rubble is at 5 ~ 10cm;
C () is for roadbed raising H > 2.5m, this considers that roadbed height is higher, and old road based filler is better, and existing old road base resistance to overturning is better, therefore take to arrange insulation banket in roadbed both sides, the wide 3.0m of banket, high 1.2 ~ 1.5m;
D () is for section of bursting and become muddy when a thaw sets in along the line, take according to roadbed raising and topographic features: 1.8m section is greater than for roadbed raising, after taking to excavate old road frost boiling part to stabilized zone position, rubble ventilation embankment is set, sheet, block stone ventilation thickness 0.8m, it carries out heavy type after thick macadam leveling layer of making 20cm roll, then making 20cm grit leveling, loaded filter, the levelling size controlling of rubble is at 5 ~ 10cm; Roadbed raising is less than to embankment and the excavation section of 1.8m, after taking to excavate old road part, roadbed scope (80cm) is changed and fills out grit process, and thick layer 6cmXSP warming plate isolation layer is set at 50cm place, bottom surface, road surface.
CN201510649896.0A 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method Expired - Fee Related CN105350417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510649896.0A CN105350417B (en) 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510649896.0A CN105350417B (en) 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method

Publications (2)

Publication Number Publication Date
CN105350417A true CN105350417A (en) 2016-02-24
CN105350417B CN105350417B (en) 2019-02-12

Family

ID=55326471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510649896.0A Expired - Fee Related CN105350417B (en) 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method

Country Status (1)

Country Link
CN (1) CN105350417B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112342858A (en) * 2020-10-27 2021-02-09 东南大学 Permafrost region precast hollow slab base pavement structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2006110433A (en) * 2006-03-31 2007-10-10 Александр Владимирович Конюхов (RU) ROAD DESIGN
CN102433814A (en) * 2011-12-29 2012-05-02 中交第一公路勘察设计研究院有限公司 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof
CN203229849U (en) * 2013-04-19 2013-10-09 中交第一公路勘察设计研究院有限公司 Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2006110433A (en) * 2006-03-31 2007-10-10 Александр Владимирович Конюхов (RU) ROAD DESIGN
CN102433814A (en) * 2011-12-29 2012-05-02 中交第一公路勘察设计研究院有限公司 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof
CN203229849U (en) * 2013-04-19 2013-10-09 中交第一公路勘察设计研究院有限公司 Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王福明等: "高纬度多年冻土地区公路路基施工技术", 《道路工程》 *
章金钊等: "新藏公路新疆段多年冻土的分布特征与路基设计对策", 《公路交通科技》 *
陈家忠: "多年冻土路基施工技术", 《铁道道路》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112342858A (en) * 2020-10-27 2021-02-09 东南大学 Permafrost region precast hollow slab base pavement structure

Also Published As

Publication number Publication date
CN105350417B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN104264557B (en) One is partly filled out and is partly dug ecological road structure and construction method
CN103510441A (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN102383413A (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN105887606B (en) Alpine meadow region heavy cut insulation infiltration combined type underdrain and its construction method
CN109736141A (en) The anti-freeze expansion structural body and paving method of Railway Roadbed in Permafrost Regions
CN110924254A (en) Construction process for filling carbonaceous shale roadbed
CN203741666U (en) Roadbed structure for preventing cut-fill section of highway in cold region from frost boiling
CN109811748B (en) Freeway roadbed processing method in frozen soil area
CN203212962U (en) Expressway cut and fill subgrade on segment with less ice or more ice
CN107152012A (en) Sluice construction technique
CN205775687U (en) Alpine meadow region heavy cut insulation infiltration combined type covered conduit
CN113250211A (en) Construction method for highway cutting slope in permafrost region
CN103015283A (en) Novel roadbed structure for phreatic high inland sulphate salty soil
CN105350417A (en) High-cold roadbed frozen soil heat insulation construction method
CN203229849U (en) Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer
CN205875176U (en) Ventilation embankment step grouts slabstone and completely spreads slope protection structure
CN105178133B (en) Permafrost region dish Demonstration for Ecological Sanitation facility and its construction process
CN203212966U (en) Excavation subgrade of expressway in section with less/more ice
CN105525551B (en) To the remodeling method and grass planting pavement structure of Wind Power Stations temporary construction road
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
CN208167421U (en) A kind of underground water cutting location Ballast track high-speed railway anti-freeze expansion road structure
CN105735328B (en) Ventilation embankment step mortar flag stone completely spreads the construction method of bank protection
CN207700204U (en) A kind of french drain structure for Slope Prevention
CN207227880U (en) A kind of cheuch phase weak soil combined type, which is changed, fills out structure and cheuch is mutually soft soil roadbed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212