CN103898824B - The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board - Google Patents

The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board Download PDF

Info

Publication number
CN103898824B
CN103898824B CN201410170456.2A CN201410170456A CN103898824B CN 103898824 B CN103898824 B CN 103898824B CN 201410170456 A CN201410170456 A CN 201410170456A CN 103898824 B CN103898824 B CN 103898824B
Authority
CN
China
Prior art keywords
soil
frozen
roadbed
draining board
plastic draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410170456.2A
Other languages
Chinese (zh)
Other versions
CN103898824A (en
Inventor
孙洪志
杨琳
邢启军
李金杰
陈玉波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heiolongjiang Longjian Road & Bridge Of Third Branch Co Ltd
Original Assignee
Heiolongjiang Longjian Road & Bridge Of Third Branch Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heiolongjiang Longjian Road & Bridge Of Third Branch Co Ltd filed Critical Heiolongjiang Longjian Road & Bridge Of Third Branch Co Ltd
Priority to CN201410170456.2A priority Critical patent/CN103898824B/en
Publication of CN103898824A publication Critical patent/CN103898824A/en
Application granted granted Critical
Publication of CN103898824B publication Critical patent/CN103898824B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board.Highway is carried out on extremely frigid zones ever-frozen ground to build, change the water and heat condition of original permafrost soil geology, cause the redistribution of hydro-thermal, so as to cause roadbed thaw collapse, collapse, the disease such as pavement crack, traffic normally travel or cannot suspend traffic, and influence highway service life.The method of the present invention includes:Permafrost Area embankment substrate table soil is removed to frozen soil layer, change and fill out graded broken stone, graded broken stone roller-compaction, the road camber higher than 3% is flattened and made, horizontal plastic draining board is laid, high-order plate pushes down low level plate during overlap joint, horizontal plastic draining board extends into longitudinal french drain, then drain bar is fixed, the thick flour fillers with good water penetration of 20CM is filled on drain bar, embankment sets the banket wide more than 4m outside side slope of embankment using clear table soil and spoir simultaneously.The present invention is used for Cold And Frozen-soil Regions roadbed base treatment.

Description

The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
Technical field:
The present invention relates to a kind of method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board.
Background technology:
Highway is carried out on extremely frigid zones ever-frozen ground to build, the water and heat condition of original permafrost soil geology is changed, and is caused The redistribution of hydro-thermal, so as to cause roadbed thaw collapse, collapse, the disease such as pavement crack, traffic cannot normally travel or in break off a friendship It is logical, influence highway service life.
The content of the invention:
It is an object of the invention to provide a kind of method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board.
The object of the present invention is achieved like this:
A kind of method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board, by Permafrost Area embankment substrate table Soil is removed to frozen soil layer, is changed and is filled out graded broken stone, and thickness is equal to thickness is excavated, graded broken stone roller-compaction, flattens and make height In 3% road camber, beneficial to transverse drainage, horizontal plastic draining board is laid, high-order plate pushes down low level plate, horizontal plastic row during overlap joint Water plate extends into longitudinal french drain, then fixes drain bar, and the thick flour fillers with good water penetration of 20CM are filled on drain bar, Play cushioning effect, moisture is discharged to both sides, longitudinal french drain thickness be replacement thickness with filled slope on plate and, embankment The banket wide more than 4m, longitudinal blind ditch construction are set using clear table soil and spoir outside side slope of embankment simultaneously, french drain thickness is It is being banketed on replacement thickness and plate and, according to design requirement using technical measures such as GSZs, increase roadbed globality and by force Degree, weeper drain will set reasonable longitudinal slope.
Beneficial effect:
1. the present invention is effectively guaranteed roadbed substrate construction quality, it is to avoid thaw collapse, frost heave, collapse, pavement crack etc. The generation of disease.
Easy construction of the present invention, is all versatile material using material, is readily available.The present invention is applied to extremely frigid zones for many years Roadbed substrate construction under frozen soil geological conditions.
The present invention relative to Composite foundation constructions such as " interface heights ", " excavate frozen soil change fill out " and " Dense Broken Stone Peg ", Save substantial amounts of Load materials, such as reinforcing bar, rubble, cement, in(Slightly)Sand, graded gravel etc., energy saving have deep to environmental protection Remote meaning.The present invention implements to have saved the duration, considerably reduces construction cost, and construction cost can at least be reduced 30%.Achieve preferable economic benefit.
Present invention efficiently solves the protection problem of permafrost soil, the resistance to overturning of Permafrost Area roadbed is improved, subtracted Overhaul number of times is lacked, operation cost reduction extends the service life of highway, and social benefit is notable.
Brief description of the drawings:
Fig. 1 is construction flow chart of the invention.
Specific embodiment:
Embodiment 1:
A kind of method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board, by Permafrost Area embankment substrate table Soil is removed to frozen soil layer, is changed and is filled out graded broken stone, and thickness is equal to thickness is excavated, graded broken stone roller-compaction, flattens and make height In 3% road camber, beneficial to transverse drainage, horizontal plastic draining board is laid, high-order plate pushes down low level plate, horizontal plastic row during overlap joint Water plate extends into longitudinal french drain, then fixes drain bar, and the thick flour fillers with good water penetration of 20CM are filled on drain bar, Play cushioning effect, moisture is discharged to both sides, longitudinal french drain thickness be replacement thickness with filled slope on plate and, embankment The banket wide more than 4m, longitudinal blind ditch construction are set using clear table soil and spoir outside side slope of embankment simultaneously, french drain thickness is It is being banketed on replacement thickness and plate and, according to design requirement using technical measures such as GSZs, increase roadbed globality and by force Degree, weeper drain will set reasonable longitudinal slope.
Embodiment 2:
The method that Cold And Frozen-soil Regions roadbed according to embodiment 1 processes substrate with plastic draining board, according to for many years Situations such as engineering geology of Frozen earth section, weather conditions and construction manpower each road working procedure of reasonable arrangement, maximum possible reduces The open-assembly time of ever-frozen ground, reduce the artificial disturbance to frozen soil.
Permafrost Area embankment substrate table soil is removed to frozen soil layer, change fill out graded broken stone class material be beneficial to it is permeable, it is whole Equal and make the road camber more than 3% and be beneficial to transverse drainage.
Lay horizontal plastic draining board, the heat exchange of cut-off Roadbed Soil and substrate frozen soil.20CM is filled on drain bar Thick flour filler, plays cushioning effect, and moisture is discharged to both sides.Embankment both sides set longitudinal french drain.
The banket wide more than 4m is set using clear table soil and spoir outside side slope of embankment.
Embodiment 3:
The method that Cold And Frozen-soil Regions roadbed according to embodiment 1 or 2 processes substrate with plastic draining board, operation will Point is as follows:
Excavate table soil, net non-applicability soil should be dug and disturb frozen soil less as far as possible again.
Change and fill out graded broken stone, thickness will be equal to thickness is excavated.
Graded broken stone roller-compaction, it is ensured that the road camber more than 3%.
Horizontal plastic draining board laying, wants high-order plate to push down low level plate during overlap joint.
Horizontal plastic draining board will extend into longitudinal french drain.
Fixed drain bar.
The fine grained soil of good water permeability is filled on plate.
Longitudinal blind ditch construction, french drain thickness be replacement thickness with plate on banket and.
Embankment carries out banket construction simultaneously.Detect water content, it is ensured that the water content that fine grained soil is filled is optimal Water content is interval.
Embodiment 4:
The method that Cold And Frozen-soil Regions roadbed according to embodiment 1 or 2 or 3 processes substrate with plastic draining board, material Material is with equipment as shown in table 1, table 2:
Table 1
Table 2.
Embodiment 5:
The method that Cold And Frozen-soil Regions roadbed according to embodiment 1 or 2 or 3 or 4 processes substrate with plastic draining board, GPRS good engineering time when excavating table soil, to be constructed when melting in the spring.In work progress, should take measures keep roadbed and Surrounding frozen soil is in frozen state.During using cohesive soil or the bad native railway embankment of water penetration, the water content of soil should be controlled, rolled When water content control in the range of optimum moisture content ± 2%.According to design requirement using technical measures such as GSZs, increase road Base globality and intensity.Underground water develops location, and roadbed gutter should have seepage control measure.The construction of the structures such as overfall should be by design It is required that taking reinforcement measure.To ensure drain bar not movement and deformation when being banketed on drain bar.The graded broken stone fines for filling is certain Control clay content.Strictly to be constructed more than 4m bankets wide to what embankment both sides were set, construction is also adopted by layered rolling, Compactness detection is carried out layer by layer.Weeper drain will set reasonable longitudinal slope.The laying of composite geo-membrane, should note its in construction It is smooth, prevent occurring folding in construction, play good antiseepage effect.

Claims (1)

1. a kind of method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board, it is characterized in that:When excavating table soil, in the spring Constructed when melting, in work progress, take measures to keep roadbed and surrounding frozen soil to be in frozen state, by Permafrost Area road Levee foundation bottom table soil is removed to frozen soil layer, is changed and is filled out graded broken stone, and thickness is equal to thickness is excavated, graded broken stone roller-compaction, leveling And road camber higher than 3% is made, and beneficial to transverse drainage, horizontal plastic draining board is laid, high-order plate pushes down low level plate, water during overlap joint Flat plastic draining board extends into longitudinal french drain, then fixes drain bar, 20CM is filled on drain bar thick with good water penetration Flour filler, play cushioning effect, moisture is discharged to both sides, and longitudinal french drain thickness is replacement thickness and filled slope on plate With, embankment is set using clear table soil and spoir outside side slope of embankment and is more than 4m bankets wide simultaneously, longitudinal blind ditch construction, Increase roadbed globality and intensity, weeper drain will set reasonable longitudinal slope, using the bad native railway embankment of cohesive soil or water penetration, The water content of soil is controlled, in the range of optimum moisture content ± 2%, roadbed gutter has seepage control measure to water content control, applies when rolling Work uses layered rolling, and compactness detection is carried out layer by layer.
CN201410170456.2A 2014-04-25 2014-04-25 The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board Active CN103898824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410170456.2A CN103898824B (en) 2014-04-25 2014-04-25 The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410170456.2A CN103898824B (en) 2014-04-25 2014-04-25 The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board

Publications (2)

Publication Number Publication Date
CN103898824A CN103898824A (en) 2014-07-02
CN103898824B true CN103898824B (en) 2017-05-31

Family

ID=50990379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410170456.2A Active CN103898824B (en) 2014-04-25 2014-04-25 The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board

Country Status (1)

Country Link
CN (1) CN103898824B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105200881B (en) * 2015-10-21 2017-07-14 正平路桥建设股份有限公司 The construction method of High-cold regions roadbed freeze-harm Comprehensive Treatment structure
CN114855518A (en) * 2021-11-18 2022-08-05 中国铁道科学研究院集团有限公司铁道建筑研究所 Permafrost region hydrothermal protection roadbed structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004278228A (en) * 2003-03-18 2004-10-07 Cognis Japan Ltd Waterproof pavement construction method of floor slab
JP4685534B2 (en) * 2005-07-19 2011-05-18 ダウ化工株式会社 Anti-freezing structure
CN101307586A (en) * 2008-05-29 2008-11-19 中国科学院寒区旱区环境与工程研究所 Broken stone slope protector and air-duct composite roadbed
CN203212971U (en) * 2013-04-19 2013-09-25 中交第一公路勘察设计研究院有限公司 Thermal probe insulation board type expressway subgrade widening structure on soil-containing ice layer segment

Also Published As

Publication number Publication date
CN103898824A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN203188065U (en) Ballastless track railway expansion soil cutting bedding and slope protection structure
CN204356594U (en) Non-fragment orbit expensive soil cutting-bedding construction
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN101956355A (en) Subgrade structure for preventing and controlling road damage in seasonal frozen regions
CN104264680B (en) The method for processing foundation of Tian Wa joint portion, a kind of collapsible loess slope
CN110924254A (en) Construction process for filling carbonaceous shale roadbed
CN106676993B (en) Reinforced broken stone frame structure roadbed reinforcing system and reinforcing method thereof
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN201738208U (en) Roadbed structure for preventing road damage in seasonally frozen ground area
CN105002916A (en) Immerseable embankment high slope interlocked ecological brick flexible protection structure and construction method
CN113250025A (en) Island-shaped frozen soil roadbed structure of high-latitude forest area and construction method
CN206625096U (en) A kind of reinforced rubble frame structure subgrade strengthening system
CN102817298B (en) Construction method on permafrost
CN101418565A (en) Qinghai-tibet railway permafrost wetland ground treatment technique
CN212405094U (en) High water content clay fill foundation drainage system
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
CN210529400U (en) Solidified building residue soil road structure
CN202925538U (en) Rammer used in construction on frozen earth
CN205875176U (en) Ventilation embankment step grouts slabstone and completely spreads slope protection structure
CN101892675B (en) Flexible retaining wall with rigid support
CN210561967U (en) Channel structure for improving flood control standard of existing river levee
CN207227880U (en) A kind of cheuch phase weak soil combined type, which is changed, fills out structure and cheuch is mutually soft soil roadbed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant