CN105350417B - A kind of high and cold roadbed frozen soil thermal-insulation construction method - Google Patents

A kind of high and cold roadbed frozen soil thermal-insulation construction method Download PDF

Info

Publication number
CN105350417B
CN105350417B CN201510649896.0A CN201510649896A CN105350417B CN 105350417 B CN105350417 B CN 105350417B CN 201510649896 A CN201510649896 A CN 201510649896A CN 105350417 B CN105350417 B CN 105350417B
Authority
CN
China
Prior art keywords
roadbed
ice
height
permafrost
subgrade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510649896.0A
Other languages
Chinese (zh)
Other versions
CN105350417A (en
Inventor
徐安花
李元洪
刘磊
任罗英
钟通道
袁铁军
武年勇
朱磊
韩进财
张楠
任芳兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengping Road And Bridge Construction Co Ltd
Qinghai One Reaches Transport Science And Techonologies Co Ltd
Original Assignee
Zhengping Road And Bridge Construction Co Ltd
Qinghai One Reaches Transport Science And Techonologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengping Road And Bridge Construction Co Ltd, Qinghai One Reaches Transport Science And Techonologies Co Ltd filed Critical Zhengping Road And Bridge Construction Co Ltd
Priority to CN201510649896.0A priority Critical patent/CN105350417B/en
Publication of CN105350417A publication Critical patent/CN105350417A/en
Application granted granted Critical
Publication of CN105350417B publication Critical patent/CN105350417B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The invention discloses a kind of high and cold roadbed frozen soil thermal-insulation construction methods, the following steps are included: (1) reconnoitres data according to all fronts frozen soil, it is divided into three sections for completely frozen earth roadbed, respectively lack ice, more ice permafrost regions, Fu Bing, full ice permafrost region and the section of the ice sheet containing soil, (2) it constructs to few ice, more ice permafrost regions, (3) it constructs to rich ice, full ice permafrost region, (4) construct to the section containing native ice sheet.The control that the present invention passes through key technology, preferably solves the biggish roadbed slope foot of lateral slope of ground, the rafting problem of cutting top suprapermafrost water, water source is effectively deflected from into roadbed bottom, guarantee subgrade in permafrost soil zone and cutting not by the erosion of ground water, the generation of permafrost area embankment frost heave, thaw collapse disease can be effectively prevented, permafrost area embankment, pavement construction regulation and standardization, mechanization tissue are reasonable, pass through piecewise-parallel operation, continuous productive process in section, it improves working efficiency, guarantee that construction quality, benefit are more prominent.

Description

A kind of high and cold roadbed frozen soil thermal-insulation construction method
Technical field
The present invention relates to a kind of high and cold roadbed frozen soil thermal-insulation construction methods.
Background technique
With the fast development of highway in China building cause, high latitude, extremely frigid zones start to build highway successively in recent years, Since highway alignment permafrost distribution is relatively wide, complicated hydrogeological conditions, when highway is implemented, generally only implement roadbed, The engineerings such as bridges and culverts, draining and protection, road pavement are temporarily not carried out, remaining section equal making asphalt concrete pavement, by for many years Operation, the above section major part roadbed situation is preferable, but due to the non-making in road surface, roadbed top surface is uneven, and local roadbed There are the diseases such as different degrees of frost boiling, restrict the resource transport traffic capacity, the present invention combines the disease shape of existing highway Condition and hydrogeological characteristics carry out Disease Treatment processing to the above section, and the transport to guarantee all fronts highway is unimpeded, along improvement Highway capacity.
Summary of the invention
The present invention addresses the above problem, provides a kind of high and cold roadbed frozen soil thermal-insulation construction method, can guarantee for many years Frozen earth roadbed and cutting by the erosion of ground water, can not effectively prevent the generation of permafrost area embankment frost heave, thaw collapse disease.
Above-mentioned purpose to realize the present invention, the present invention adopt the following technical scheme that a kind of high and cold roadbed frozen soil is heat-insulated to be applied Work method, which comprises the following steps:
(1) according to all fronts frozen soil reconnoitre data, by completely it is frozen earth roadbed be divided into three sections, respectively less ice, more ice permafrost regions, Fu Bing, full ice permafrost region and the section of the ice sheet containing soil;
(2) construct to few ice, more ice permafrost regions: by former Subgrade of old road height and this increase roadbed analysis, Most of section height is all larger than 2.0m, and according to field investigation, roadbed filling is filled substantially with boulder and cobble soil, gravelly soil, road Base situation is preferable, therefore this no longer carries out specially treated, handles by general subgrade, reinforces draining, protection works, only to dredge road Primitive period side charge for remittance prevents water from penetrating into roadbed, influences subgrade stability;
(3) construct to rich ice, full ice permafrost region: by former Subgrade of old road height and this increase roadbed analysis, Most of section height is all larger than the rational height of roadbed and critical height of subgrade being computed, therefore to guarantee subgrade stability, it takes Roadbed two sides setting heat preservation banket, banket width and height, when roadbed height is greater than 3.0m, banket width 3.0m, Height 1.5m;When roadbed height is less than 3.0m, banket width 3.0m, height 1.2m, and reinforce roadbed two sides guarded drainage and set Meter prevents water from penetrating into roadbed, influences subgrade stability to dredge roadbed periphery charge for remittance;
(4) it constructs to the section containing native ice sheet:
(a) it is less than embankment, semi-filling and semi-excavating and the cut subgrade of 1.8m for roadbed raising, it is contemplated that in ever-frozen ground Area, grit Pavement Improvement for after bituminous pavement, significant degeneration will occur for ever-frozen ground, constantly dislike by frozen earth roadbed thermal stability Change, therefore, in order to ensure that roadbed temperature, a thickness 6cmXSP insulation board is arranged in this secondary design below bed course at 50cm heat-insulated Layer, with subgrade defect caused by protection of permafrost steady change, and reinforces roadbed two sides waterproof and drainage design, to dredge the remittance of roadbed periphery Water prevents water from penetrating into roadbed, influences subgrade stability, at the same according to roadbed height, topographic features be provided with wide 3.0m, it is high by 1.2~ 1.5m keeps the temperature banket;
(b) for the filled-up ground of 1.8 < H≤2.5m of roadbed raising, to guarantee subgrade stability, this uses cutouts Simultaneously piece, block stone ventilated embankment is arranged in existing old road, piece, block stone ventilation thickness 0.8m, after making 20cm thickness metalling is levelling thereon It carries out heavy type to roll, then the leveling of making 20cm grit, loaded filter, the levelling size controlling of rubble is in 5~10cm;
(c) for roadbed raising H > 2.5m, this is higher in view of roadbed height, and old road based filler is preferable, existing old road Base overall stability is preferable, therefore takes and heat preservation banket, slope protection road width 3.0m, high 1.2~1.5m is arranged in roadbed two sides;
(d) it for section of bursting and become muddy when a thaw sets in along the line, is taken according to roadbed raising and topographic features: the road 1.8m is greater than for roadbed raising Section is taken after excavating old road frost boiling part to stabilized zone position, setting rubble ventilation embankment, piece, block stone ventilation thickness 0.8m, thereon It carries out heavy type after making 20cm thickness metalling screed-coat to roll, then the leveling of making 20cm grit, loaded filter, the levelling partial size of rubble Control is in 5~10cm;Embankment and excavation section for roadbed raising less than 1.8m, take after excavating old road part, to roadbed Range 80cm thickness, which changes, fills out grit processing, and a thickness 6cmXSP insulation board thermal insulation layer is arranged at the 50cm of road surface bottom surface.
The beneficial effects of the present invention are: the high and cold roadbed frozen soil thermal-insulation construction method, by the control of key technology, preferably Ground solves the biggish roadbed slope foot of lateral slope of ground, and water source is effectively deflected from road by the rafting problem of cutting top suprapermafrost water Substrate guarantees that subgrade in permafrost soil zone and cutting not by the erosion of ground water, can effectively prevent permafrost area embankment frost heave, melt The generation of heavy disease, permafrost area embankment, pavement construction regulation and standardization, mechanization tissue are reasonable, flat by being segmented Row operation, continuous productive process in section improve working efficiency, guarantee that construction quality, benefit are more prominent.
Specific embodiment
A kind of high and cold roadbed frozen soil thermal-insulation construction method of the invention:
(1) according to all fronts frozen soil reconnoitre data, by completely it is frozen earth roadbed be divided into three sections, respectively less ice, more ice permafrost regions, Fu Bing, full ice permafrost region and the section of the ice sheet containing soil;
(2) construct to few ice, more ice permafrost regions: by former Subgrade of old road height and this increase roadbed analysis, Most of section height is all larger than 2.0m, and according to field investigation, roadbed filling is filled substantially with boulder and cobble soil, gravelly soil, road Base situation is preferable, therefore this no longer carries out specially treated, handles by general subgrade, reinforces draining, protection works, only to dredge road Primitive period side charge for remittance prevents water from penetrating into roadbed, influences subgrade stability;
(3) construct to rich ice, full ice permafrost region: by former Subgrade of old road height and this increase roadbed analysis, Most of section height is all larger than the rational height of roadbed and critical height of subgrade being computed, therefore to guarantee subgrade stability, it takes Roadbed two sides setting heat preservation banket, banket width and height, when roadbed height is greater than 3.0m, banket width 3.0m, Height 1.5m;When roadbed height is less than 3.0m, banket width 3.0m, height 1.2m, and reinforce roadbed two sides guarded drainage and set Meter prevents water from penetrating into roadbed, influences subgrade stability to dredge roadbed periphery charge for remittance;
(4) it constructs to the section containing native ice sheet:
(a) it is less than embankment, semi-filling and semi-excavating and the cut subgrade of 1.8m for roadbed raising, it is contemplated that in ever-frozen ground Area, grit Pavement Improvement for after bituminous pavement, significant degeneration will occur for ever-frozen ground, constantly dislike by frozen earth roadbed thermal stability Change, therefore, in order to ensure that roadbed temperature, a thickness 6cmXSP insulation board is arranged in this secondary design below bed course at 50cm heat-insulated Layer, with subgrade defect caused by protection of permafrost steady change, and reinforces roadbed two sides waterproof and drainage design, to dredge the remittance of roadbed periphery Water prevents water from penetrating into roadbed, influences subgrade stability, at the same according to roadbed height, topographic features be provided with wide 3.0m, it is high by 1.2~ 1.5m keeps the temperature banket;
(b) for the filled-up ground of 1.8 < H≤2.5m of roadbed raising, to guarantee subgrade stability, this uses cutouts Simultaneously piece, block stone ventilated embankment is arranged in existing old road, piece, block stone ventilation thickness 0.8m, after making 20cm thickness metalling is levelling thereon It carries out heavy type to roll, then the leveling of making 20cm grit, loaded filter, the levelling size controlling of rubble is in 5~10cm;
(c) for roadbed raising H > 2.5m, this is higher in view of roadbed height, and old road based filler is preferable, existing old road Base overall stability is preferable, therefore takes and heat preservation banket, slope protection road width 3.0m, high 1.2~1.5m is arranged in roadbed two sides;
(d) it for section of bursting and become muddy when a thaw sets in along the line, is taken according to roadbed raising and topographic features: the road 1.8m is greater than for roadbed raising Section is taken after excavating old road frost boiling part to stabilized zone position, setting rubble ventilation embankment, piece, block stone ventilation thickness 0.8m, thereon It carries out heavy type after making 20cm thickness metalling screed-coat to roll, then the leveling of making 20cm grit, loaded filter, the levelling partial size of rubble Control is in 5~10cm;Embankment and excavation section for roadbed raising less than 1.8m, take after excavating old road part, to roadbed Range 80cm thickness, which changes, fills out grit processing, and a thickness 6cmXSP insulation board thermal insulation layer is arranged at the 50cm of road surface bottom surface.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention, and any reference signs in the claims should not be construed as limiting the involved claims.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (1)

1. a kind of high and cold roadbed frozen soil thermal-insulation construction method, which comprises the following steps:
(1) data is reconnoitred according to all fronts frozen soil, is divided into three sections for completely frozen earth roadbed, respectively ice, more ice permafrost regions, richness less Ice, full ice permafrost region and the section of the ice sheet containing soil;
(2) construct to few ice, more ice permafrost regions: by former Subgrade of old road height and this increase roadbed analysis, big portion Pavement branch sections height is all larger than 2.0m, and according to field investigation, roadbed filling is filled substantially with boulder and cobble soil, gravelly soil, roadbed shape Condition is preferable, therefore this no longer carries out specially treated, handles by general subgrade, only reinforces draining, protection works, to dredge roadbed week Side charge for remittance prevents water from penetrating into roadbed, influences subgrade stability;
(3) construct to rich ice, full ice permafrost region: by former Subgrade of old road height and this increase roadbed analysis, big portion Pavement branch sections height is all larger than the rational height of roadbed and critical height of subgrade being computed, therefore to guarantee subgrade stability, take roadbed Two sides setting heat preservation banket, banket width and height, when roadbed height is greater than 3.0m, banket width 3.0m, height 1.5m;When roadbed height is less than 3.0m, banket width 3.0m, height 1.2m, and reinforce roadbed two sides waterproof and drainage design, with Roadbed periphery charge for remittance is dredged, prevents water from penetrating into roadbed, influences subgrade stability;
(4) it constructs to the section containing native ice sheet:
(a) it is less than embankment, semi-filling and semi-excavating and the cut subgrade of 1.8m for roadbed raising, it is contemplated that husky in Permafrost Area For after bituminous pavement, significant degeneration will occur for ever-frozen ground, frozen earth roadbed thermal stability constantly deteriorates gravel Pavement Improvement, because , to guarantee roadbed temperature, a thickness 6cmXSP insulation board thermal insulation layer is arranged in this secondary design below bed course at 50cm for this, with Subgrade defect caused by protection of permafrost steady change, and reinforce roadbed two sides waterproof and drainage design, to dredge roadbed periphery charge for remittance, prevent Sealing penetrates into roadbed, influences subgrade stability, while protecting provided with wide 3.0m, high 1.2~1.5m according to roadbed height, topographic features Warm banket;
(b) for the filled-up ground of 1.8 < H≤2.5m of roadbed raising, to guarantee subgrade stability, this is existing using cutouts Simultaneously piece, block stone ventilated embankment is arranged in old road, and piece, block stone ventilation thickness 0.8m carry out after making 20cm thickness metalling is levelling thereon Heavy type rolls, then the leveling of making 20cm grit, loaded filter, and the levelling size controlling of rubble is in 5~10cm;
(c) for roadbed raising H > 2.5m, this is higher in view of roadbed height, and old road based filler is preferable, and existing old road base is whole Body stability is preferable, therefore takes and heat preservation banket, slope protection road width 3.0m, high 1.2~1.5m is arranged in roadbed two sides;
(d) it for section of bursting and become muddy when a thaw sets in along the line, is taken according to roadbed raising and topographic features: the section 1.8m is greater than for roadbed raising, It takes after excavating old road frost boiling part to stabilized zone position, rubble ventilation embankment, piece, block stone ventilation thickness 0.8m, upper berth is set Progress heavy type rolls after building 20cm thickness metalling screed-coat, then the leveling of making 20cm grit, loaded filter, the levelling partial size control of rubble System is in 5~10cm;Embankment and excavation section for roadbed raising less than 1.8m, take after excavating old road part, to roadbed model It encloses in 80cm thickness, changes and fill out grit processing, and a thickness 6cmXSP insulation board thermal insulation layer is set at the 50cm of road surface bottom surface.
CN201510649896.0A 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method Expired - Fee Related CN105350417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510649896.0A CN105350417B (en) 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510649896.0A CN105350417B (en) 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method

Publications (2)

Publication Number Publication Date
CN105350417A CN105350417A (en) 2016-02-24
CN105350417B true CN105350417B (en) 2019-02-12

Family

ID=55326471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510649896.0A Expired - Fee Related CN105350417B (en) 2015-10-10 2015-10-10 A kind of high and cold roadbed frozen soil thermal-insulation construction method

Country Status (1)

Country Link
CN (1) CN105350417B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112342858A (en) * 2020-10-27 2021-02-09 东南大学 Permafrost region precast hollow slab base pavement structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2006110433A (en) * 2006-03-31 2007-10-10 Александр Владимирович Конюхов (RU) ROAD DESIGN
CN102433814A (en) * 2011-12-29 2012-05-02 中交第一公路勘察设计研究院有限公司 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof
CN203229849U (en) * 2013-04-19 2013-10-09 中交第一公路勘察设计研究院有限公司 Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2006110433A (en) * 2006-03-31 2007-10-10 Александр Владимирович Конюхов (RU) ROAD DESIGN
CN102433814A (en) * 2011-12-29 2012-05-02 中交第一公路勘察设计研究院有限公司 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof
CN203229849U (en) * 2013-04-19 2013-10-09 中交第一公路勘察设计研究院有限公司 Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
多年冻土路基施工技术;陈家忠;《铁道道路》;20080520;第249-251页
新藏公路新疆段多年冻土的分布特征与路基设计对策;章金钊等;《公路交通科技》;20080915;第25卷(第9期);第251-254页
高纬度多年冻土地区公路路基施工技术;王福明等;《道路工程》;20140623;第6-10页

Also Published As

Publication number Publication date
CN105350417A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN101956355B (en) Subgrade structure for preventing and controlling road damage in seasonal frozen regions
CN110485228A (en) The high-intensitive highway subgrade structure of the closed anti-freeze expansion frost boiling of hydro-thermal and construction method
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN104153269B (en) Ever-frozen ground guard method under a kind of wide cut road structure leading resistance combination
Mu et al. Long-term thermal and settlement characteristics of air convection embankments with and without adjacent surface water ponding in permafrost regions
CN105887606B (en) Alpine meadow region heavy cut insulation infiltration combined type underdrain and its construction method
CN109736141A (en) The anti-freeze expansion structural body and paving method of Railway Roadbed in Permafrost Regions
CN110241672A (en) A kind of cooling road structure of wide-angle low level shallow embedding equilibrium and its application
CN207749375U (en) A kind of seasonal frost region anti-freeze expansion road structure
CN105064380B (en) Harnessed the river anti-skid structure rich in diving high slope
CN204608547U (en) A kind of Permafrost Area is for spreading the ventilation curb of flexible pavement heat
CN106522244B (en) A kind of embankment combination binding structure and its construction method
CN107152012A (en) Sluice construction technique
CN109695188A (en) A kind of subgrade in permafrost soil zone structure and its construction method based on hydro-thermal Transformation Principle
CN205399440U (en) Inflation dirt road moat structure
CN105350417B (en) A kind of high and cold roadbed frozen soil thermal-insulation construction method
CN109811748A (en) A kind of express highway roadbed processing method in Frozen Ground Area
CN103243624B (en) Construction method for salty soil district railway roadbed with water content lower than liquid limit
CN113250211A (en) Construction method for highway cutting slope in permafrost region
CN205775687U (en) Alpine meadow region heavy cut insulation infiltration combined type covered conduit
CN203229849U (en) Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer
CN108589458B (en) Intensity and stability-based roadbed height control method for highway in seasonal frozen region
CN207419174U (en) A kind of subgrade in permafrost soil zone structure based on hydro-thermal Transformation Principle
CN105603842B (en) The big thickness back-up sand construction technology of embankment
CN205875176U (en) Ventilation embankment step grouts slabstone and completely spreads slope protection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212

Termination date: 20191010