CN102433814A - Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof - Google Patents

Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof Download PDF

Info

Publication number
CN102433814A
CN102433814A CN201110448828XA CN201110448828A CN102433814A CN 102433814 A CN102433814 A CN 102433814A CN 201110448828X A CN201110448828X A CN 201110448828XA CN 201110448828 A CN201110448828 A CN 201110448828A CN 102433814 A CN102433814 A CN 102433814A
Authority
CN
China
Prior art keywords
gravel
sheet piece
roadbed
layer
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110448828XA
Other languages
Chinese (zh)
Inventor
朱东鹏
刘戈
樊凯
李金平
符进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Consultants Co Ltd
Original Assignee
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Consultants Co Ltd filed Critical CCCC First Highway Consultants Co Ltd
Priority to CN201110448828XA priority Critical patent/CN102433814A/en
Publication of CN102433814A publication Critical patent/CN102433814A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a permafrost region expressway flaky and blocky stone ventilation roadbed and a construction method thereof. The construction safety and the service life are severely influenced caused by the lengthways cracking of the roadbed, the roadbed size effect under the asphaltpavement and the like because of the hot melting and the sinking of the permafrost roadbed. The construction method comprises the following steps of: impacting, laminating and filling 30cm of lower gravel cushion layer at a soil arching base; impacting and laminating the lower gravel cushion layer under the ground line; building a flaky and blocky stone layer with the thickness of 0.9m-1.5m on the lower gravel cushion layer; flattening the upper part of the flaky and blocky stone layer by a macadam transition layer with the thickness of 20cm; filling an upper gravel cushion layer with the thickness of 30cm; paving a water-permeable geotextile between the upper gravel cushion layer and the macadam transition layer; distributing a geogrid which is made from the plastic steel at the upper part of the upper gravel cushion layer; and compacting by a heavy type vibratory roller layer by layer. Therefore, the melting of the permafrost roadbed and the uneven deforming of the permafrost roadbed can be reduced, the influence of the climate warming and the human engineering activity to the permafrost roadbed characteristic can be reduced, and the safety and the flaky and blocky stone stability of the roadbed structure can be improved.

Description

Permafrost region speedway sheet piece stone ventilated embankment and job practices thereof
Technical field
The invention belongs to the traffic engineering technical field, be specifically related to a kind of permafrost region speedway sheet piece stone ventilated embankment and job practices thereof.
Background technology
Frozen soil is as a kind of special soil body, and its composition, group structure, hot physics and physico-mechanical properties all are different from the general soil body.Seasonal freezing and thawing are all taking place in every year in the mobile layer of permafrost region, and association has various frozen soil phenomenons, have brought an a series of engineering difficult problem therefore for the constructing highway technology of permafrost region.At present; Under the background of intensification and human activity effect enhancing; Ever-frozen ground response manifests gradually, and it is unusual complicated and have polytropy that ever-frozen ground district frozen soil engineering geology becomes, and typical problem such as frozen earth roadbed hot thaw collapse fall into, frozen soils temperature field anisotropy causes roadbed dimensional effect or the like under roadbed longitudinal cracking that the asymmetric variation of the artificial upper limit causes, the flexible pavement under the roadbed; This has not only improved construction engineering cost greatly, and has a strong impact on the result of use and the life-span of engineering.
Summary of the invention
The purpose of this invention is to provide a kind of permafrost region speedway sheet piece stone ventilated embankment and the job practices thereof that can effectively alleviate ever-frozen ground thawing and frozen earth roadbed inhomogeneous deformation.
The technical scheme that the present invention adopted is:
Permafrost region speedway sheet piece stone ventilated embankment is characterized in that:
Described permafrost region speedway sheet piece stone ventilated embankment is followed successively by bed course and GSZ on gravel underlayer, sheet block stone layer, rubble transition zone, permeable geotextiles, the gravel from bottom to top;
Wherein gravel underlayer part impact-rolling is below above-ground route.
The thickness of described gravel underlayer is 30cm;
The thickness of described block stone layer is 0.9m~1.5m;
The thickness of described rubble transition zone is 20cm;
The thickness of bed course is 30cm on the described gravel.
The sheet piece stone particle diameter of described block stone layer is 15~30cm, and slenderness ratio is less than 3, and sheet piece stone intensity is greater than 30MPa, and void content is not less than 25%;
The ballast grain sizes of described rubble transition zone is 5~10cm.
One side of described permafrost region speedway sheet piece stone ventilated embankment is provided with the banket of level, banket arranged outside gutter.
The job practices of permafrost region speedway sheet piece stone ventilated embankment is characterized in that:
Realize by following steps:
Step 1: measure unwrapping wire according to construction design drawing, mark the sideline of route, fill scope, carry out permanent and interim drainage works;
Step 2: carry out the broken screening of building stones, the sheet piece stone particle diameter of sheet block stone layer is 15~30cm, and slenderness ratio is less than 3, and sheet piece stone intensity is greater than 30MPa, and void content is not less than 25%; The ballast grain sizes of rubble transition zone is 5~10cm;
Step 3: filling one deck soil arch on ground, from the roadbed center is 2% draining horizontal wall inscription to the peripheral hardware gradient;
Step 4: at the substrate impact-rolling and the gravel underlayer that fills 30cm of soil arch; Gravel underlayer part impact-rolling fills the thick sheet block stone layer of 0.9m~1.5m above the gravel underlayer below the ground line, sheet block stone layer top is with the thick rubble transition zone leveling of 20cm; Fill bed course on the thick gravel of 30cm on it again; Lay permeable geotextiles on the gravel between bed course and rubble transition zone, the GSZ of plastic-steel material is laid on bed course top on the gravel, adopts heavy vibratory roller compacting at last.
In the step 3, the soil arch was one-way slope when ground was the slope, and the soil arch was open roof when ground was flat slope.
In the step 4, take low earlier back high during sheet block stone layer filler, the feeding mode of two rear flank central authorities carries out earlier.
In the step 4, heavy vibratory roller is adopted in the compacting of sheet piece stone roadbed, in the middle of straight line highway section elder generation two rear flank; Roll repeatedly in the outside, the earlier interior rear flank of curved section, and number of rolling is no less than 6~8 times; Overlapping 0.5m between vertical row that rolls and the row is more than the overlapping 2m of front and back adjacent sections.
The present invention has the following advantages:
Of the present invention piece stone ventilated embankment structure utilizes flowing of air to change the roadbed heat transfer type; Can reduce that frozen soil under the subgrade in permafrost soil zone melts and the inhomogeneous deformation of frozen earth roadbed generation; Reduce climate warming and of the influence of artificial engineering activity, improve the safety and the stability of road structure the subgrade in permafrost soil zone characteristic.
Description of drawings
Fig. 1 is the structure chart of sheet piece stone ventilated embankment.
Fig. 2 is sheet piece stone ventilated embankment construction process figure.
Among the figure, the 1-GSZ, bed course on the 2-gravel, the permeable geotextiles of 3-, 4-rubble transition zone, 5-gravel underlayer, the 6-above-ground route, the 7-banket, the 8-gutter, 9-sheet block stone layer, 10-bankets, 11-soil arch.
The specific embodiment
Below in conjunction with the specific embodiment the present invention is carried out detailed explanation.
Sheet piece stone road structure is the engineering measure of a most typical cooling roadbed, is to utilize flowing of air to change a kind of ventilated embankment of roadbed heat transfer type, and air can flow in roadbed sheet block stone layer.Under open state, be that the recombination process of main forced convection effect and more weak sheet block stone layer side direction air free convection is the mechanism of action of sheet piece stone cooling roadbed winter with the draught effect, and this recombination process is main relevant with wind speed and direction.When wind speed is big, produce the forced ventilation effect in the sheet block stone layer; But wind speed hour, in Schattenseite lateral plate block stone layer certain thickness, produces free convection effect.Summer, the sheet block stone layer was main with heat transfer process mainly because of the wind speed and direction condition, but summer, the wind speed and direction condition helped the certain heat-blocking action of the inner generation of sheet piece stone structure layer.Under closed state, because blocking-up or significantly weakened the influence of wind, the sheet block stone layer road structure forced convection process that weakened; Simultaneously because the influence of banketing in sheet block stone layer roadbed top; The sheet block stone layer roof and floor temperature difference is not enough to drive the free convection process; Therefore, sheet block stone layer inside is main with heat transfer process mainly under closed state, and the effect of certain heat-insulation and heat-preservation has been played in the space in the sheet block stone layer.
Permafrost region speedway sheet piece stone ventilated embankment of the present invention is followed successively by bed course 2 and plastic-steel geotechnical grid 1 on gravel underlayer 5, sheet block stone layer 9, rubble transition zone 4, permeable geotextiles 3, the gravel from bottom to top, and wherein gravel underlayer 5 part impact-rollings are below above-ground route.The thickness of gravel underlayer 5 is 30cm; The thickness of sheet block stone layer 9 is 0.9m~1.5m; The thickness of rubble transition zone 4 is 20cm; The thickness of bed course 2 is 30cm on the gravel.The sheet piece stone particle diameter of sheet block stone layer 9 is 15~30cm, and slenderness ratio is less than 3, and sheet piece stone intensity is greater than 30MPa, and void content is not less than 25%; The ballast grain sizes of rubble transition zone 4 is 5~10cm.One side of permafrost region speedway sheet piece stone ventilated embankment is provided with the banket 7 of level, banket 7 arranged outside gutters 8.
According to the heat conduction of sheet piece stone roadbed, forced-convection heat transfer and these three kinds of mechanism of heat transfer free convection, satisfying under the prerequisite of mechanics, the making thickness of sheet block stone layer 9 is preferably 0.9~1.5m.Consider that from the angle of strengthening free convection heat transfer mechanism the position that sheet block stone layer 9 is laid should satisfied under the prerequisite of mechanics in embankment, lean on roadbed top as far as possible, to reduce the thickness of going up overburden layer; But consider to the efficient of ground transmission from cold, should be near the bottom of roadbed body.In the middle of concrete design, should take all factors into consideration the factor aspect two, sheet block stone layer 9 is being laid in the optimum position of roadbed body, be generally the following 30~50cm of road surface structare layer.Collateral security sheet piece stone roadbed reaches the void content and the sheet piece stone space of design and can consider with the good UNICOM of atmosphere two aspects; Be recommended in sheet block stone layer bottom and lay gravel underlayer 5; Bed course 2 on permeable geotextiles 3 and the gravel is laid at the top, and the thickness of bed course 2 is generally 30cm on gravel underlayer 5 and the gravel.
Embodiment one:
The ice-rich permafrost section; When roadbed height during greater than 2.5m and less than 2.8m; At the substrate impact-rolling and the gravel underlayer 5 that fills 30cm of soil arch, gravel underlayer 5 part impact-rollings fill the thick sheet block stone layer 9 of 0.9m above gravel underlayer 5 below above-ground route; Sheet block stone layer 9 tops are with thick rubble transition zone 4 levelings of 20cm; Fill bed course 2 on the thick gravel of 30cm on it again, 4 of bed course 2 and rubble transition zones are laid permeable geotextiles 3 on the gravel, and the GSZ 1 of plastic-steel material is laid on bed course 2 tops on the gravel.
Embodiment two:
The ice-rich permafrost section; When roadbed height during greater than 2.8m; At the substrate impact-rolling and the gravel underlayer 5 that fills 30cm of soil arch, gravel underlayer 5 part impact-rollings fill the thick sheet block stone layer 9 of 1.2m above gravel underlayer 5 below above-ground route; Sheet block stone layer 9 tops are with thick rubble transition zone 4 levelings of 20cm; Fill bed course 2 on the thick gravel of 30cm on it again, 4 of bed course 2 and rubble transition zones are laid permeable geotextiles 3 on the gravel, and the GSZ 1 of plastic-steel material is laid on bed course 2 tops on the gravel.
Embodiment three:
Full freezing soil section; When roadbed height during greater than 2.5m and less than 3.1m; At the substrate impact-rolling and the gravel underlayer 5 that fills 30cm of soil arch, gravel underlayer 5 part impact-rollings fill the thick sheet block stone layer 9 of 0.9m above gravel underlayer 5 below above-ground route; Sheet block stone layer 9 tops are with thick rubble transition zone 4 levelings of 20cm; Fill bed course 2 on the thick gravel of 30cm on it again, 4 of bed course 2 and rubble transition zones are laid permeable geotextiles 3 on the gravel, and the GSZ 1 of plastic-steel material is laid on bed course 2 tops on the gravel.
Embodiment four:
Full freezing soil section; When roadbed height during greater than 3.1m; At the substrate impact-rolling and the gravel underlayer 5 that fills 30cm of soil arch, gravel underlayer 5 part impact-rollings fill the thick sheet block stone layer 9 of 1.5m above gravel underlayer 5 below above-ground route; Sheet block stone layer 9 tops are with thick rubble transition zone 4 levelings of 20cm; Fill bed course 2 on the thick gravel of 30cm on it again, 4 of bed course 2 and rubble transition zones are laid permeable geotextiles 3 on the gravel, and the GSZ 1 of plastic-steel material is laid on bed course 2 tops on the gravel.
The job practices of permafrost region speedway sheet piece stone ventilated embankment of the present invention, realized by following steps:
Step 1: measure unwrapping wire according to construction design drawing, mark the sideline of route, fill scope.Carry out permanent and interim work such as draining.Prepare construction machinery, transportation, loading and unloading, leveling, each operation of compacting of guaranteeing to satisfy material closely are connected, and form continuous processing line.The method of the full section construction of employing full width in the assurance subgrade construction must design build guarantor excrement channel to the logical highway section of highway that requires of guarantor is arranged, and public vehicles must not pass through before the roadbed unshaped.
Step 2: building stones require clean, no weathering, scale, crackle, and anti-freezing, no grating, undesirable building stones must not get into the job site, and qualified building stones are carried out fragmentation by the requirement to particle diameter in the design document.Screen after the fragmentation again, painstakingly do not select single particle size, adhering to specification gets final product, and undesirable small crushed stone as the levelling filler on the sheet block stone layer, is utilized to greatest extent, reduces discarded amount.Carry out the broken screening of building stones, the sheet piece stone particle diameter of sheet block stone layer 9 is 15~30cm, and slenderness ratio is less than 3, and sheet piece stone intensity is greater than 30MPa, and void content is not less than 25%; The ballast grain sizes of rubble transition zone 4 is 5~10cm.
Step 3: filling one deck soil arch 11 on ground, from the roadbed center is 2% draining horizontal wall inscription to the peripheral hardware gradient, and soil arch 11 was one-way slope when ground was the slope, and soil arch 11 was open roof when ground was flat slope.Toe place lift thickness ≮ 0.3 m, compactness is by the following filler requirement control of bedding, and planeness is controlled by the roadbed requirement.
Step 4: at the substrate impact-rolling and the gravel underlayer 5 that fills 30cm of soil arch; Gravel underlayer 5 part impact-rollings are below above-ground route; Above gravel underlayer 5, fill the thick sheet block stone layer 9 of 0.9m~1.5m; Bed course 2 on the thick gravel of 30cm is filled again with thick rubble transition zone 4 levelings of 20cm in sheet block stone layer 9 tops on it, 4 of bed course 2 and rubble transition zones are laid permeable geotextiles 3 on the gravel; The GSZ 1 of plastic-steel material is laid on bed course 2 tops on the gravel, adopts heavy vibratory roller compacting at last.Sheet piece stone roadbed side slope carries out necessary protection, and guarantees that roadbed both sides draining is smooth and easy and do not produce alluvial.
Fill the embankment formula of inclining that adopts, self-unloading truck, bulldozer, excavator cooperate and carry out operation, and once fill design height, and side slope adopts the artificial sign indicating number of sheet piece stone to build, and building stones are with the machinery leveling, and indivedual positions are artificial uses the finger stone levelling.Must not damage the limit portion building stones of sign indicating number block when feeding intake, will in time repair for what damage.Take low earlier back high during filler, the feeding mode of two rear flank central authorities carries out earlier.
Heavy vibratory roller is adopted in the compacting of sheet piece stone roadbed, in the middle of straight line highway section elder generation two rear flank, and the outside, the earlier interior rear flank of curved section; Roll repeatedly; Number of rolling is no less than 6~8 times, and overlapping 0.5m between vertical row that rolls and the row is more than the overlapping 2m of front and back adjacent sections.Compacting should be even, by designing requirement control compactness, guarantees its planeness and stability.The linear pressure of road roller should be complementary with the compressive strength limit of slabstone, avoids making the broken and squeeze and destroy cage construction of slabstone.
The linear pressure of road roller is meant its unit line load, and for sheet piece stone, its compressive strength limit can only allow certain linear pressure, otherwise fragmentation and extruding can appear in sheet piece stone, destroys cage construction.The compressive strength limit of several kinds of building stones commonly used and the linear load of permission are seen table 1.
The compressive strength limit of several kinds of building stones of table 1
Figure 201110448828X100002DEST_PATH_IMAGE002
The unit line LOAD FOR formula of road roller is:
q=G/b
Q one unit line load (N/cm);
The steel wheel of G one vibratory roller heavy (N);
B one takes turns wide (cm)
For avoiding sheet piece stone surface because of the static pressure of being born causes the top layer to destroy greater than its compressive strength, crackle occurs or press unreal phenomenon, the maximum contact stress of selected road roller must meet the permissible value of sheet piece stone, sees table 2.
Generally bringing formula into by unit line load calculates:
Figure 201110448828X100002DEST_PATH_IMAGE004
The maximum contact stress (MPa) of
Figure 201110448828X100002DEST_PATH_IMAGE006
-permission;
Q one unit line load (N/m);
The modulus of deformation (MPa) of
Figure 201110448828X100002DEST_PATH_IMAGE008
-compacted lift;
R-rolling wheel radius (m).
Table 2 a piece stone allows maximum contact stress
Figure 201110448828X100002DEST_PATH_IMAGE010
Geotextiles unavoidably can receive the effect of external force in construction and in the operating period, therefore, require it to have certain intensity.The geotextiles performance indications that contrast China produces, the product of most of producer are worked as mass area ratio and are reached 300g/m 2~500g/m 2The time, can satisfy requirement in the table.Comparison film piece stone roadbed geotextiles environmental aspect of living in, the geotextiles performance indications adopt 1 grade in the table 3, mass area ratio 350 g/m 2
Table 3 geotextiles performance indications
With the geotextiles horizontal positioned, when getting rid of the fixed current of foundation soil or other current, require its drainability qc to be not less than the discharge q that must discharge, promptly satisfy the requirement of formula (1-1).
qc?≥?q (1-1)
In the formula: the discharge butene-1 copolymer ㎡ that q-vertical water seepage direction, every linear meter(lin.m.) need discharge/s);
The drainability of qc-every linear meter(lin.m.) of geotextiles water outlet section is calculated by formula (1-2)
qc?=?
Figure 201110448828X100002DEST_PATH_IMAGE014
Figure 201110448828X100002DEST_PATH_IMAGE016
(1-2)
Figure 923413DEST_PATH_IMAGE016
In the formula: the laying mode coefficient of β-geotextiles, the width of laying on promptly every linear meter(lin.m.), when completely spreading, β=1; When being strip-type.β=(Σ Bi)/1.0, (Σ Bi) is the summation of strip width on every linear meter(lin.m.);
The hydraulic conductivity of θ-geosynthetics (m3/s) should carry out flushing test according to actual pressurized situation and measure;
L-water (flow) direction geosynthetics length (m);
Δ h-along the first terminal head difference (m) of drainage blanket length L;
The safety stock coefficient that F-consideration is become silted up and blocked up is got Fd=10, when having ready conditions, can be confirmed by the ratio of the stifled front and back hydraulic conductivity that becomes silted up according to result of the test.

Claims (8)

1. permafrost region speedway sheet piece stone ventilated embankment is characterized in that:
Described permafrost region speedway sheet piece stone ventilated embankment is followed successively by bed course (2) and GSZ (1) on gravel underlayer (5), sheet block stone layer (9), rubble transition zone (4), permeable geotextiles (3), the gravel from bottom to top;
Wherein gravel underlayer (5) part impact-rolling is below above-ground route.
2. permafrost region speedway sheet piece stone ventilated embankment according to claim 1 is characterized in that:
The thickness of described gravel underlayer (5) is 30cm;
The thickness of described block stone layer (9) is 0.9m~1.5m;
The thickness of described rubble transition zone (4) is 20cm;
The thickness of bed course on the described gravel (2) is 30cm.
3. permafrost region speedway sheet piece stone ventilated embankment according to claim 1 and 2 is characterized in that:
The sheet piece stone particle diameter of described block stone layer (9) is 15~30cm, and slenderness ratio is less than 3, and sheet piece stone intensity is greater than 30MPa, and void content is not less than 25%;
The ballast grain sizes of described rubble transition zone (4) is 5~10cm.
4. permafrost region speedway sheet piece stone ventilated embankment according to claim 3 is characterized in that:
One side of described permafrost region speedway sheet piece stone ventilated embankment is provided with the banket (7) of level, banket (7) arranged outside gutter (8).
5. the job practices of permafrost region speedway sheet piece stone ventilated embankment is characterized in that:
Realize by following steps:
Step 1: measure unwrapping wire according to construction design drawing, mark the sideline of route, fill scope, carry out permanent and interim drainage works;
Step 2: carry out the broken screening of building stones, the sheet piece stone particle diameter of sheet block stone layer (9) is 15~30cm, and slenderness ratio is less than 3, and sheet piece stone intensity is greater than 30MPa, and void content is not less than 25%; The ballast grain sizes of rubble transition zone (4) is 5~10cm;
Step 3: filling one deck soil arch (11) on ground, from the roadbed center is 2% draining horizontal wall inscription to the peripheral hardware gradient;
Step 4: at the substrate impact-rolling and the gravel underlayer (5) that fills 30cm of soil arch; Gravel underlayer (5) part impact-rolling is below the ground line; Fill the thick sheet block stone layer (9) of 0.9m~1.5m in gravel underlayer (5) top; Bed course (2) on the thick gravel of 30cm is filled again with thick rubble transition zone (4) leveling of 20cm in sheet block stone layer (9) top on it, lay permeable geotextiles (3) between bed course on the gravel (2) and rubble transition zone (4); The GSZ (1) that the plastic-steel material is laid on bed course on the gravel (2) top adopts heavy vibratory roller compacting at last.
6. the job practices of permafrost region speedway sheet piece stone ventilated embankment according to claim 5 is characterized in that:
In the step 3, soil arch (11) was an one-way slope when ground was the slope, and soil arch (11) was an open roof when ground was flat slope.
7. the job practices of permafrost region speedway sheet piece stone ventilated embankment according to claim 6 is characterized in that:
In the step 4, take low earlier back high during sheet block stone layer (9) filler, the feeding mode of two rear flank central authorities carries out earlier.
8. the job practices of permafrost region speedway sheet piece stone ventilated embankment according to claim 7 is characterized in that:
In the step 4, heavy vibratory roller is adopted in the compacting of sheet piece stone roadbed, in the middle of straight line highway section elder generation two rear flank; Roll repeatedly in the outside, the earlier interior rear flank of curved section, and number of rolling is no less than 6~8 times; Overlapping 0.5m between vertical row that rolls and the row is more than the overlapping 2m of front and back adjacent sections.
CN201110448828XA 2011-12-29 2011-12-29 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof Pending CN102433814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110448828XA CN102433814A (en) 2011-12-29 2011-12-29 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110448828XA CN102433814A (en) 2011-12-29 2011-12-29 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof

Publications (1)

Publication Number Publication Date
CN102433814A true CN102433814A (en) 2012-05-02

Family

ID=45982148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110448828XA Pending CN102433814A (en) 2011-12-29 2011-12-29 Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof

Country Status (1)

Country Link
CN (1) CN102433814A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350417A (en) * 2015-10-10 2016-02-24 青海一达交通科技有限公司 High-cold roadbed frozen soil heat insulation construction method
CN109024123A (en) * 2018-06-05 2018-12-18 南京天印科技股份有限公司 A kind of roadbed construction method
CN110055900A (en) * 2019-05-13 2019-07-26 李来宾 A kind of bridgehead structures and its construction technology of hard and soft interspersion
CN110080173A (en) * 2019-05-15 2019-08-02 长江勘测规划设计研究有限责任公司 A kind of face dam anti-filter structure
CN111335095A (en) * 2020-04-10 2020-06-26 沈阳农业大学 Farmland operation road with drainage function and construction method thereof
CN111501466A (en) * 2020-05-13 2020-08-07 中建八局第二建设有限公司 Method for paving full-asphalt pavement of large-particle-size stone-filling roadbed
CN112160208A (en) * 2020-08-13 2021-01-01 北京市政路桥股份有限公司 Filling roadbed construction method suitable for water-rich low-lying permafrost region
CN113250025A (en) * 2021-05-07 2021-08-13 北京市政路桥股份有限公司 Island-shaped frozen soil roadbed structure of high-latitude forest area and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1730821A (en) * 2005-08-12 2006-02-08 中国科学院寒区旱区环境与工程研究所 A kind of U type of natural cold energy that utilizes is cold energy gathering roadbed
CN1730822A (en) * 2005-08-23 2006-02-08 中国科学院寒区旱区环境与工程研究所 Composite ventilating and cold energy gathering roadbed
CN101012632A (en) * 2007-01-12 2007-08-08 中国科学院寒区旱区环境与工程研究所 Reinforced ventilating heat-proof foundation
CN201891055U (en) * 2010-11-12 2011-07-06 中国路桥工程有限责任公司 Highway structure for frozen soil environment
CN202401363U (en) * 2011-12-29 2012-08-29 中交第一公路勘察设计研究院有限公司 Flaky or blocky stone ventilated roadbed of expressway in frozen soil region

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1730821A (en) * 2005-08-12 2006-02-08 中国科学院寒区旱区环境与工程研究所 A kind of U type of natural cold energy that utilizes is cold energy gathering roadbed
CN1730822A (en) * 2005-08-23 2006-02-08 中国科学院寒区旱区环境与工程研究所 Composite ventilating and cold energy gathering roadbed
CN101012632A (en) * 2007-01-12 2007-08-08 中国科学院寒区旱区环境与工程研究所 Reinforced ventilating heat-proof foundation
CN201891055U (en) * 2010-11-12 2011-07-06 中国路桥工程有限责任公司 Highway structure for frozen soil environment
CN202401363U (en) * 2011-12-29 2012-08-29 中交第一公路勘察设计研究院有限公司 Flaky or blocky stone ventilated roadbed of expressway in frozen soil region

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘戈,樊凯,朱东鹏,章金钊: "多年冻土区路基调控措施的设计方法及适用性", 《公路交通科技》 *
朱东鹏,贾志裕,赵永国: "青藏公路多年冻土区片、块石路基试验过程及应用研究", 《公路》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350417A (en) * 2015-10-10 2016-02-24 青海一达交通科技有限公司 High-cold roadbed frozen soil heat insulation construction method
CN105350417B (en) * 2015-10-10 2019-02-12 青海一达交通科技有限公司 A kind of high and cold roadbed frozen soil thermal-insulation construction method
CN109024123A (en) * 2018-06-05 2018-12-18 南京天印科技股份有限公司 A kind of roadbed construction method
CN110055900A (en) * 2019-05-13 2019-07-26 李来宾 A kind of bridgehead structures and its construction technology of hard and soft interspersion
CN110080173A (en) * 2019-05-15 2019-08-02 长江勘测规划设计研究有限责任公司 A kind of face dam anti-filter structure
CN110080173B (en) * 2019-05-15 2024-04-12 长江勘测规划设计研究有限责任公司 Reverse filtering structure of panel dam
CN111335095A (en) * 2020-04-10 2020-06-26 沈阳农业大学 Farmland operation road with drainage function and construction method thereof
CN111501466A (en) * 2020-05-13 2020-08-07 中建八局第二建设有限公司 Method for paving full-asphalt pavement of large-particle-size stone-filling roadbed
CN112160208A (en) * 2020-08-13 2021-01-01 北京市政路桥股份有限公司 Filling roadbed construction method suitable for water-rich low-lying permafrost region
CN113250025A (en) * 2021-05-07 2021-08-13 北京市政路桥股份有限公司 Island-shaped frozen soil roadbed structure of high-latitude forest area and construction method

Similar Documents

Publication Publication Date Title
CN102433814A (en) Permafrost region expressway flaky and blocky stone ventilation roadbed and construction method thereof
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
KR20160108299A (en) Pavement Systems with Geocell and Geogrid
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN113250025A (en) Island-shaped frozen soil roadbed structure of high-latitude forest area and construction method
CN202401363U (en) Flaky or blocky stone ventilated roadbed of expressway in frozen soil region
CN214992786U (en) Municipal administration road design road surface domatic structure
CN114045714A (en) Construction process suitable for improving weathered soft rock roadbed filler as roadbed reinforcing layer
Emersleben et al. The use of recycled glass for the construction of pavements
CN210529400U (en) Solidified building residue soil road structure
CN112160208A (en) Filling roadbed construction method suitable for water-rich low-lying permafrost region
CN113481777B (en) Fast bus traveling roadbed
RU2394959C1 (en) Road surface structure
CN200952106Y (en) Express way utilizing powder coal ash on roadbed
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board
RU2516408C1 (en) Road structure
CN213896585U (en) Fill roadbed structure suitable for water-rich low-lying permafrost region
KR20140114711A (en) Improvement Method for Base Ground of Pavement Block using Light-Weighted Foam Soil
CN109706810B (en) Construction method of highway subgrade filled with expansive soil
CN201473848U (en) Paving stone stabilizer
CN211395209U (en) Tunnel antiseep combined type road surface
CN102561368A (en) Pre-compacted reinforced soil block flexible supporting structure
CN203128966U (en) Cushion layer composite foundation of CFG (cement fly-ash gravel) pile for transition section
CN109763388B (en) Roadbed structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120502