CN203212966U - Excavation subgrade of expressway in section with less/more ice - Google Patents

Excavation subgrade of expressway in section with less/more ice Download PDF

Info

Publication number
CN203212966U
CN203212966U CN2013201994782U CN201320199478U CN203212966U CN 203212966 U CN203212966 U CN 203212966U CN 2013201994782 U CN2013201994782 U CN 2013201994782U CN 201320199478 U CN201320199478 U CN 201320199478U CN 203212966 U CN203212966 U CN 203212966U
Authority
CN
China
Prior art keywords
excavation
ice
subgrade
gravel bed
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013201994782U
Other languages
Chinese (zh)
Inventor
朱东鹏
刘戈
章金钊
符进
李金平
樊凯
袁堃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Consultants Co Ltd
Original Assignee
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Consultants Co Ltd filed Critical CCCC First Highway Consultants Co Ltd
Priority to CN2013201994782U priority Critical patent/CN203212966U/en
Application granted granted Critical
Publication of CN203212966U publication Critical patent/CN203212966U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to an excavation subgrade of an expressway in a section with less/more ice. The excavation construction in a perennial frozen soil area can lead to temperature rise of the foundation soil mass, decrease of upper limit and impact on the stability of a subgrade. The excavation subgrade is characterized in that a waterproof geotextile is arranged at the base of a deep-excavation cut; a replacement gravel bed is arranged on the waterproof geotextile and provided with a side slope and a bottom cross slope; a pavement structural layer is arranged above the replacement gravel bed; the replacement gravel bed is 80cm in thickness; the slope is at a gradient of 1:0.5; the bottom cross slope is at the gradient of 2%. The subgrade structure provided by the utility model is low in construction cost, long in service life, and high in bearing capacity and waterproofness, and can be used for effectively solving the problems of temperature rise of the subgrade soil mass, decrease of upper limit and reduction of subgrade stability occurring in the deep-excavation cut construction process of the section with less/more ice in the perennial frozen soil area.

Description

A kind of few highway section speedway excavation roadbed of icing, ice more
Technical field
The utility model relates to a kind of road structure, is specifically related to a kind of few ice, ices highway section speedway excavation roadbed more.
Background technology
Ever-frozen ground district roadbed design should adopt the principle of " rather do not fill out and dig ", as far as possible based on filled-up ground, and the design principles of adopt protection frozen soil, initiatively lowering the temperature and allowing frozen soil to melt.Cutting is the roadbed of making by the excavation natural ground.The stratum that cutting passes through in long-term generation and evolution process, generally has complicated geologic structure.Cut slope is in veneer of crust, after excavation exposes, is subjected to the effect of various conditions and natural cause, deforms easily and destroys, and should treat cautiously.Particularly in the ever-frozen ground district, the excavation of natural surface can make ever-frozen ground be directly exposed in the atmosphere, causes the hot thaw collapse in summer to fall into, the hot slump that melts of side slope, winter the subgrade and pavement frost heave.When underground water exists, also can side slope hang diseases such as ice.
Several important highways that enter into Tibet such as existing Qinghai-Tibet Highway, blue or green Kanggong road, after all previous maintenance, reconstruction, reconstruction, at ever-frozen ground, particularly high ice content ever-frozen ground district all is to pass through with embankment basically.But, along with further going deep into of development of the West Regions, the further upgrading of country's road network, perfect, the area, Qinghai-Tibet Platean is because of demands such as national defense construction, economic development and tourism developments, need transform, upgrade original low-grade highway, in the build process of new highway, in some highway sections with a varied topography, particularly the cutting roadbed will inevitably appear deep-cutting in the bealock section of mountain ridge hilling terrain.
Carry out the excavation construction in Permafrost Area, the heat of bringing in the heat that the Excavating Construction of Roadbed process is brought into and the excavation face put procedure, the capital impacts ever-frozen ground under the roadbed, also may cause rainwater to enter the soil body under the roadbed in the construction, water and heat enter lower floor's soil body, will cause the acute variation of ever-frozen ground, cause the subgrade soil temperature to raise, the upper limit descends, and influences subgrade stability.The general requirement of the roadbed side slope of Permafrost Area slowed down side slope, and the side slope after slowing down just means bigger excavated section, the side slope behind the excavation inevitable some be on the ever-frozen ground layer, as deal with improperly with the heat that causes side slope melt, serious plant disease such as slump.Therefore, for ever-frozen ground district cutting roadbed, also there are not corresponding treatment measures.
Summary of the invention
The purpose of this utility model provides a kind of few ice, ices highway section speedway excavation roadbed more, overcomes the ever-frozen ground district and ices, ices more the highway section less and deep-cut the problem that the subgrade soil temperature raises, the upper limit descends, subgrade stability reduces that occurs in the construction of road cutting process.
The technical scheme that the utility model adopts is:
A kind of few ice, ice highway section speedway excavation roadbed more, it is characterized in that:
Deep-cut the cutting substrate water proof geotextiles is set, arrange on the water proof geotextiles and change the back-up sand gravel bed, change the back-up sand gravel bed side slope and bottom surface horizontal wall inscription are set, change back-up sand gravel bed top road surface structare layer is set.
The described thickness that changes the back-up sand gravel bed is 80cm, and grade of side slope is 1:0.5, and the bottom surface horizontal wall inscription gradient is 2%.
The described back-up sand gravel bed bottom surface horizontal wall inscription toe that changes is provided with gutter, and gutter is 25 pvc pipes with holes.
Deep-cut cutting above-ground route upward slope and be provided with the dash sth. made by twisting.
The gradient of the cut slope that road surface structare layer is above is 1:2-3.
The utlity model has following advantage:
The road structure that the utility model is related, construction cost is low, long service life, and bearing capacity is strong, good waterproof performance has solved the ever-frozen ground district effectively and has iced, ices more the highway section less and deep-cut the problem that the subgrade soil temperature raises, the upper limit descends, subgrade stability reduces that occurs in the construction of road cutting process.
Description of drawings
Fig. 1 is the utility model structure chart.
Among the figure, the 1-dash is twisted with the fingers, 2-water proof geotextiles, and 3-road surface structare layer, 4-change the back-up sand gravel bed, 5-gutter, 6-above-ground route.
The specific embodiment
Below in conjunction with the specific embodiment the utility model is described in detail.
A kind of few highway section speedway excavation roadbed of icing, ice more described in the utility model, water proof geotextiles 2 is set deep-cutting the cutting substrate, arrange on the water proof geotextiles 2 and change back-up sand gravel bed 4, change back-up sand gravel bed 4 side slope and bottom surface horizontal wall inscription are set, change back-up sand gravel bed 4 tops road surface structare layer 3 is set.Wherein, the thickness that changes back-up sand gravel bed 4 is 80cm, and grade of side slope is 1:0.5, and the bottom surface horizontal wall inscription gradient is 2%.Change back-up sand gravel bed 4 bottom surface horizontal wall inscription toes and be provided with gutter 5, gutter 5 is 25 pvc pipes with holes.Deep-cut cutting above-ground route upward slope and be provided with dash sth. made by twisting 1.
Concrete construction sequence is:
According to the roadbed design principle, backbreak under the road structure layer and change the back-up sand gravel behind the 80cm, grade of side slope excavates into 1:0.5 when changing the back-up sand gravel, cutting depth is 80cm under the road surface structare layer, the bottom surface becomes 2% horizontal wall inscription, its underpart arranges one deck water proof geotextiles, and toe arranges 25 pvc pipes with holes, and gutter and drainage system are along connecing.The back back-filling in layers of substrate excavation.During construction, excavate again when preliminary preparation is made adequate preparation to change and fill out operation, should in time construct behind the excavation, forbid airing, stop to excavate excavation hole, back ponding.When the excavation degree of depth during less than 4m, adopt 1:2~1:3 grade of side slope, when excavation height during greater than 4m, adopt the 1:2 grade of side slope.For big excavation construction of road cutting, should excavate operation in the winter time, want the thawing situation of close supervision excavation face frozen soil in the work progress, and take necessary cooling provision, prevent that the excavation face from melting.During the roadbed backfill accumulated snow can not be arranged, side slope will be carried out covered protection with former turf after construction was finished.
It is cited that content of the present utility model is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solutions of the utility model by reading the utility model manual is claim of the present utility model and contains.

Claims (5)

  1. Few ice, ice highway section speedway excavation roadbed more, it is characterized in that:
    Deep-cut the cutting substrate water proof geotextiles (2) is set, water proof geotextiles (2) goes up to arrange changes back-up sand gravel bed (4), changes back-up sand gravel bed (4) side slope and bottom surface horizontal wall inscription are set, and changes back-up sand gravel bed (4) top road surface structare layer (3) is set.
  2. A kind of few ice according to claim 1, ice highway section speedway excavation roadbed more, it is characterized in that:
    The described thickness that changes back-up sand gravel bed (4) is 80cm, and grade of side slope is 1:0.5, and the bottom surface horizontal wall inscription gradient is 2%.
  3. A kind of few ice according to claim 1 and 2, ice highway section speedway excavation roadbed more, it is characterized in that:
    Described back-up sand gravel bed (4) the bottom surface horizontal wall inscription toe that changes is provided with gutter (5), and gutter (5) is 25 pvc pipes with holes.
  4. A kind of few ice according to claim 3, ice highway section speedway excavation roadbed more, it is characterized in that:
    Deep-cut cutting above-ground route upward slope and be provided with dash sth. made by twisting (1).
  5. A kind of few ice according to claim 4, ice highway section speedway excavation roadbed more, it is characterized in that:
    The gradient of the cut slope that road surface structare layer (3) is above is 1:2-3.
CN2013201994782U 2013-04-19 2013-04-19 Excavation subgrade of expressway in section with less/more ice Expired - Fee Related CN203212966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013201994782U CN203212966U (en) 2013-04-19 2013-04-19 Excavation subgrade of expressway in section with less/more ice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013201994782U CN203212966U (en) 2013-04-19 2013-04-19 Excavation subgrade of expressway in section with less/more ice

Publications (1)

Publication Number Publication Date
CN203212966U true CN203212966U (en) 2013-09-25

Family

ID=49202515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013201994782U Expired - Fee Related CN203212966U (en) 2013-04-19 2013-04-19 Excavation subgrade of expressway in section with less/more ice

Country Status (1)

Country Link
CN (1) CN203212966U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468255A (en) * 2018-03-21 2018-08-31 中铁二院(成都)建设发展有限责任公司 The determination method of high-speed railway subgrade cutting location bedding replacement thickness
CN112160208A (en) * 2020-08-13 2021-01-01 北京市政路桥股份有限公司 Filling roadbed construction method suitable for water-rich low-lying permafrost region

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468255A (en) * 2018-03-21 2018-08-31 中铁二院(成都)建设发展有限责任公司 The determination method of high-speed railway subgrade cutting location bedding replacement thickness
CN108468255B (en) * 2018-03-21 2019-08-16 中铁二院(成都)建设发展有限责任公司 The determination method of high-speed railway subgrade cutting location bedding replacement thickness
CN112160208A (en) * 2020-08-13 2021-01-01 北京市政路桥股份有限公司 Filling roadbed construction method suitable for water-rich low-lying permafrost region

Similar Documents

Publication Publication Date Title
CN101956355B (en) Subgrade structure for preventing and controlling road damage in seasonal frozen regions
CN203212964U (en) Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN1851162A (en) Structural water resource recovery method
CN106149625B (en) A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method
CN105714759B (en) The row that liquefaction collapse is taken precautions against in urban dregs blends reinforcement means
CN203212962U (en) Expressway cut and fill subgrade on segment with less ice or more ice
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN201738208U (en) Roadbed structure for preventing road damage in seasonally frozen ground area
CN106065656A (en) Guard system and construction method is oozed under the regularization of Collapsible Loess District rainwater
CN203229849U (en) Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer
CN103015283A (en) Novel roadbed structure for phreatic high inland sulphate salty soil
CN203212963U (en) High subgrade type expressway steep slope subgrade on ice-rich, ice-saturated and soil-containing ice layer segment
CN102888849B (en) A kind of large outdoors colliery refuse dump, loess area micro-slope reconstruction method
CN203212966U (en) Excavation subgrade of expressway in section with less/more ice
CN101418565A (en) Qinghai-tibet railway permafrost wetland ground treatment technique
CN106759778A (en) For the scattered collection mating type waterproof and water drainage system of highway median strip
CN106761771A (en) A kind of construction method for crossing native shallow tunnel on rock under the location of mountain valley
CN207033489U (en) Water rich strata tunnel bottom discharge structure
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN105735328B (en) Ventilation embankment step mortar flag stone completely spreads the construction method of bank protection
CN203212972U (en) Expressway cut and fill subgrade on ice-rich, ice-saturated and soil-containing ice layer segment
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN205875176U (en) Ventilation embankment step grouts slabstone and completely spreads slope protection structure
CN203212967U (en) Thermal probe type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN203229848U (en) Shallowly-excavated roadbed for less-ice and multi-ice road section highway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

CF01 Termination of patent right due to non-payment of annual fee