CN203212964U - Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment - Google Patents

Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment Download PDF

Info

Publication number
CN203212964U
CN203212964U CN 201320199466 CN201320199466U CN203212964U CN 203212964 U CN203212964 U CN 203212964U CN 201320199466 CN201320199466 CN 201320199466 CN 201320199466 U CN201320199466 U CN 201320199466U CN 203212964 U CN203212964 U CN 203212964U
Authority
CN
China
Prior art keywords
roadbed
widening
ice
subgrade
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320199466
Other languages
Chinese (zh)
Inventor
章金钊
刘戈
袁堃
穆柯
樊凯
朱东鹏
张会建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Consultants Co Ltd
Original Assignee
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Consultants Co Ltd filed Critical CCCC First Highway Consultants Co Ltd
Priority to CN 201320199466 priority Critical patent/CN203212964U/en
Application granted granted Critical
Publication of CN203212964U publication Critical patent/CN203212964U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a rubble type expressway subgrade widening structure on an ice-rich and ice-saturated segment. When highways in permafrost regions are subjected to widening reconstruction, differential settlement can happen to new and old subgrades and then is reflected to pavement structure layers, so that longitudinal cracks appear between the new and old subgrades and the pavement performances are seriously affected. The structure is characterized in that a widened subgrade is arranged on the side slope of an original subgrade; a side slope cut step is arranged after an original subgrade side slope of the original subgrade is cut; a base gravel layer is arranged from the bottom edge of the side slope cut step to the slope toe of the widened subgrade on the base of the widened subgrade; a base geogrid is paved on the base gravel layer; a rubber layer, a permeable geotextile, a broken stone layer, a gravel layer and a geogrid are paved on the base geogrid in sequence; and a widened subgrade filling layer is filled in the geogrid. The structure is low in construction cost, has long service life, strong bearing capacity and good water resistance, effectively solves the engineering problem of utilizing old roads for widening in the construction process of roads in permafrost regions, and fills in the gaps in the technical field.

Description

A kind of rich ice, the express highway roadbed structure of widening of full ice highway section sheet piece stone type
Technical field
The utility model relates to a kind of road structure, is specifically related to a kind of rich ice, the express highway roadbed structure of widening of full ice highway section sheet piece stone type.
Background technology
Build speedway in Permafrost Area, if widen reconstruction at existing ever-frozen ground region two-stage highway, then can significantly save construction investment.Because widening roadbed and the former road of haveing been friends in the past of part there are differences aspect permafrost degradation and the ground consolidation degree, after roadbed was widened, new and old roadbed can produce relative settlement, and then reflexed to road surface structare layer, cause between new and old roadbed longitudinal crack taking place, have a strong impact on pavement performance.The G214 of the Qinghai Province national highway of building at present (republicanism is to the cajaput section), in process of construction, run into the engineering problem that utilizes old road to widen, because also do not carry out the roadbed widening project in Permafrost Area before, therefore, widening problem for permafrost area embankment does not also have corresponding Disposal Measures.
Summary of the invention
The purpose of this utility model provides a kind of rich ice, the express highway roadbed structure of widening of full ice highway section sheet piece stone type, overcomes the relative settlement problem that new and old roadbed produces in the roadbed widening project.
The technical scheme that the utility model adopts is:
A kind of rich ice, the express highway roadbed structure of widening of full ice highway section sheet piece stone type include existing roadbed, it is characterized in that:
Existing roadbed side slope side is for widening roadbed;
The existing roadbed side slope of existing roadbed arranges the slope excavation step through cutting after handle on the slope;
Widen the roadbed substrate and to widening the roadbed toe substrate sandy gravel stratum is set from slope excavation step root edge, lay the substrate geo-grid on the substrate sandy gravel stratum, lay sheet block stone layer, permeable geotextiles, macadam, sandy gravel stratum and geo-grid on the substrate geo-grid successively, fill out on the geo-grid to establish and widen the roadbed filling layer.
Described existing roadbed cut the slope be treated to cut by the 1:1.0 gradient downwards from the inboard 75cm of existing roadbed curb place sloping to the toe place.
The shoulder height of described slope excavation step is 1m, and wide is 1m, and lean-in 3% the gradient.
The thickness of described substrate sandy gravel stratum is 50cm.
The sheet piece stone particle diameter of described block stone layer is 15-30cm, and bed thickness is 0.9-1.5m.
The bed thickness of described macadam is 20cm.
The bed thickness of described sandy gravel stratum is 20cm.
The utlity model has following advantage:
The utility model is related widens road structure, and construction cost is low, long service life, bearing capacity is strong, good waterproof performance has solved the engineering problem that utilizes old road to widen that runs in the Permafrost Area road construction process effectively, has filled up the blank of this technical field.
Description of drawings
Fig. 1 is the utility model structure chart.
Among the figure, the 1-existing roadbed, 2-slope excavation step, the 3-geo-grid, the 4-sandy gravel stratum, the 5-macadam, the permeable geotextiles of 6-, 7-sheet block stone layer, 8-substrate geo-grid, 9-substrate sandy gravel stratum, 10-widens the roadbed filling layer, and 11-widens roadbed.
The specific embodiment
Below in conjunction with the specific embodiment the utility model is described in detail.
A kind of rich ice described in the utility model, the express highway roadbed structure of widening of full ice highway section sheet piece stone type include existing roadbed 1, and existing roadbed 1 side slope side is for widening roadbed 11.The existing roadbed side slope 3 of existing roadbed 1 arranges slope excavation step 2 through cutting after handle on the slope.Existing roadbed 1 cut the slope be treated to cut by the 1:1.0 gradient downwards from the inboard 75cm of existing roadbed 1 curb place sloping to the toe place; The shoulder height of slope excavation step 2 is 1m, and wide is 1m, and lean-in 3% the gradient, the two-layer shoulder height in top according to roadbed raising adjust, guarantee that the uppermost steps height is 0.8 meter.Widen roadbed 11 substrates and to widening roadbed 4 toes substrate sandy gravel stratum 9 is set from slope excavation step 2 root edges, lay substrate geo-grid 8 on the substrate sandy gravel stratum 9, lay sheet block stone layer 7, permeable geotextiles 6, macadam 5, sandy gravel stratum 4 and geo-grid 3 on the substrate geo-grid 8 successively, fill out on the geo-grid 3 to establish and widen roadbed filling layer 10.Wherein, the thickness of substrate sandy gravel stratum 9 is 50cm; The sheet piece stone particle diameter of sheet block stone layer 7 is 15-30cm, and bed thickness is 0.9-1.5m; The bed thickness of macadam 5 is 20cm; The bed thickness of sandy gravel stratum 4 is 20cm.
Concrete construction sequence is:
Step 1: fill 50cm ballast or gravel at the natural surface of widening the roadbed position, carry out impact-rolling; To former roadbed side slope cleaning brush slope, eliminate surface dust, cut the slope to the toe place by 1:1.0 downwards from the inboard 75cm of earth shoulder then, successively excavate step on then to descending.The excavation single order in time fills single order, 1 meter of shoulder height, wide 1 meter and lean-in 3% slope.The two-layer shoulder height in top according to roadbed raising adjust, guarantee that the uppermost steps height is 0.8 meter, respectively lay the high-strength geo-grid of one deck in the bottom of substrate and roadbed, geo-grid is routed to from the step inner edge widens roadbed side slope.
Step 2: adopt sheet piece stone to fill and widen roadbed, piece stone particle diameter 15-30cm, bed thickness 0.9-1.5m, the 20cm rubble is filled on piece stone top, fills 20cm ballast or gravel again.
It is cited that content of the present utility model is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solutions of the utility model by reading the utility model manual is claim of the present utility model and contains.

Claims (7)

1. the rich express highway roadbed structure of widening of ice highway section sheet piece stone type of icing, satisfy includes existing roadbed (1), it is characterized in that:
Existing roadbed (1) side slope side is for widening roadbed (11);
The existing roadbed side slope (3) of existing roadbed (1) arranges slope excavation step (2) through cutting after handle on the slope;
Widen roadbed (11) substrate and to widening roadbed (4) toe substrate sandy gravel stratum (9) is set from slope excavation step (2) root edge, substrate sandy gravel stratum (9) is gone up and is laid substrate geo-grid (8), lay sheet block stone layer (7), permeable geotextiles (6), macadam (5), sandy gravel stratum (4) and geo-grid (3) on the substrate geo-grid (8) successively, fill out on the geo-grid (3) to establish and widen roadbed filling layer (10).
2. a kind of richness according to claim 1 is iced, is satisfied and ice the express highway roadbed structure of widening of highway section sheet piece stone type, it is characterized in that:
Described existing roadbed (1) cut the slope be treated to cut by the 1:1.0 gradient downwards from the inboard 75cm of existing roadbed (1) curb place sloping to the toe place.
3. a kind of richness according to claim 1 and 2 is iced, is satisfied and ice the express highway roadbed structure of widening of highway section sheet piece stone type, it is characterized in that:
The shoulder height of described slope excavation step (2) is 1m, and wide is 1m, and lean-in 3% the gradient.
4. a kind of richness according to claim 3 is iced, is satisfied and ice the express highway roadbed structure of widening of highway section sheet piece stone type, it is characterized in that:
The thickness of described substrate sandy gravel stratum (9) is 50cm.
5. a kind of richness according to claim 4 is iced, is satisfied and ice the express highway roadbed structure of widening of highway section sheet piece stone type, it is characterized in that:
The sheet piece stone particle diameter of described block stone layer (7) is 15-30cm, and bed thickness is 0.9-1.5m.
6. a kind of richness according to claim 5 is iced, is satisfied and ice the express highway roadbed structure of widening of highway section sheet piece stone type, it is characterized in that:
The bed thickness of described macadam (5) is 20cm.
7. a kind of richness according to claim 6 is iced, is satisfied and ice the express highway roadbed structure of widening of highway section sheet piece stone type, it is characterized in that:
The bed thickness of described sandy gravel stratum (4) is 20cm.
CN 201320199466 2013-04-19 2013-04-19 Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment Expired - Fee Related CN203212964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320199466 CN203212964U (en) 2013-04-19 2013-04-19 Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320199466 CN203212964U (en) 2013-04-19 2013-04-19 Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment

Publications (1)

Publication Number Publication Date
CN203212964U true CN203212964U (en) 2013-09-25

Family

ID=49202513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320199466 Expired - Fee Related CN203212964U (en) 2013-04-19 2013-04-19 Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment

Country Status (1)

Country Link
CN (1) CN203212964U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762979A (en) * 2015-03-31 2015-07-08 中铁十九局集团第三工程有限公司 Flexible revetment for railroad bed in frozen earth area and construction method of revetment
CN104818658A (en) * 2015-05-13 2015-08-05 山西省交通科学研究院 Road widening system and road widening method for collapsible yellow earth foundation layer
CN105672072A (en) * 2016-02-26 2016-06-15 青岛林川工程技术咨询有限公司 Main track traffic-keeping method used during construction period of highway reconstruction and extension
CN105926391A (en) * 2016-06-12 2016-09-07 西南交通大学 Method for widening shoulder of existing railway subgrade
CN107119522A (en) * 2017-06-22 2017-09-01 中国建筑土木建设有限公司 The structure and construction method of new-old concrete bond linking
CN107700299A (en) * 2017-10-12 2018-02-16 上海市政工程设计研究总院(集团)有限公司 A kind of elevated bridge lower floor road structure and its construction method
CN107858886A (en) * 2017-10-12 2018-03-30 上海市政工程设计研究总院(集团)有限公司 A kind of elevated bridge basal perimeter surface road and its construction method
CN108193573A (en) * 2018-01-25 2018-06-22 梁海平 For the road structure and construction method of road widening
CN111304986A (en) * 2020-02-27 2020-06-19 中交二公局第四工程有限公司 Construction method for treating soft foundation settlement in plateau frozen soil area

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762979A (en) * 2015-03-31 2015-07-08 中铁十九局集团第三工程有限公司 Flexible revetment for railroad bed in frozen earth area and construction method of revetment
CN104818658A (en) * 2015-05-13 2015-08-05 山西省交通科学研究院 Road widening system and road widening method for collapsible yellow earth foundation layer
CN105672072A (en) * 2016-02-26 2016-06-15 青岛林川工程技术咨询有限公司 Main track traffic-keeping method used during construction period of highway reconstruction and extension
CN105926391A (en) * 2016-06-12 2016-09-07 西南交通大学 Method for widening shoulder of existing railway subgrade
CN107119522B (en) * 2017-06-22 2020-03-06 中国建筑土木建设有限公司 New and old roadbed connection structure and construction method
CN107119522A (en) * 2017-06-22 2017-09-01 中国建筑土木建设有限公司 The structure and construction method of new-old concrete bond linking
CN107700299A (en) * 2017-10-12 2018-02-16 上海市政工程设计研究总院(集团)有限公司 A kind of elevated bridge lower floor road structure and its construction method
CN107858886A (en) * 2017-10-12 2018-03-30 上海市政工程设计研究总院(集团)有限公司 A kind of elevated bridge basal perimeter surface road and its construction method
CN107858886B (en) * 2017-10-12 2024-04-02 上海市政工程设计研究总院(集团)有限公司 Viaduct foundation peripheral ground road and construction method thereof
CN107700299B (en) * 2017-10-12 2024-04-02 上海市政工程设计研究总院(集团)有限公司 Overpass lower-layer ground road structure and construction method thereof
CN108193573A (en) * 2018-01-25 2018-06-22 梁海平 For the road structure and construction method of road widening
CN108193573B (en) * 2018-01-25 2019-04-26 梁海平 Road structure and construction method for road widening
CN111304986A (en) * 2020-02-27 2020-06-19 中交二公局第四工程有限公司 Construction method for treating soft foundation settlement in plateau frozen soil area

Similar Documents

Publication Publication Date Title
CN203212964U (en) Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN203212971U (en) Thermal probe insulation board type expressway subgrade widening structure on soil-containing ice layer segment
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN102797208A (en) Method for filling deep soft foundation zero additional load bubble mixed lightweight soil subgrade
CN108316089A (en) It is a kind of that road surface method is repaired using plain concrete and reinforced concrete
CN204212018U (en) A kind of road structure preventing and treating the soft soil roadbed freeze thawing disease of high and cold mountain area cheuch section
CN110080051A (en) A kind of soil engineering bag bridge-type embankment structure and its construction method
CN203212962U (en) Expressway cut and fill subgrade on segment with less ice or more ice
CN203613426U (en) Groove-shaped embankment structure
CN203212967U (en) Thermal probe type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN102817298B (en) Construction method on permafrost
CN103243624B (en) Construction method for salty soil district railway roadbed with water content lower than liquid limit
CN203034328U (en) Joint part treatment structure of reconstruction and extension project of expressway
CN203212963U (en) High subgrade type expressway steep slope subgrade on ice-rich, ice-saturated and soil-containing ice layer segment
CN105297572A (en) Permafrost fill construction method
CN202830675U (en) Deep and thick soft soil composite floating pile foundation damage reinforcement structure
CN203212972U (en) Expressway cut and fill subgrade on ice-rich, ice-saturated and soil-containing ice layer segment
CN107268373A (en) A kind of water permeability asphalt concrete road and its construction method
Yong et al. Mechanism and control of subgrade mud pumping under the cyclic load of train
CN207958885U (en) A kind of anti-settling highway subgrade
CN203212968U (en) Low subgrade type expressway steep slope subgrade on ice-rich, ice-saturated and soil-containing ice layer segment
CN215758302U (en) High liquid limit soil roadbed structure
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN206553853U (en) Filled-up ground on a kind of subway line
CN203229849U (en) Highway excavation roadbed of road segment rich in ice, full of ice and containing soil-ice layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

CF01 Termination of patent right due to non-payment of annual fee