CN206553853U - Filled-up ground on a kind of subway line - Google Patents
Filled-up ground on a kind of subway line Download PDFInfo
- Publication number
- CN206553853U CN206553853U CN201720206608.9U CN201720206608U CN206553853U CN 206553853 U CN206553853 U CN 206553853U CN 201720206608 U CN201720206608 U CN 201720206608U CN 206553853 U CN206553853 U CN 206553853U
- Authority
- CN
- China
- Prior art keywords
- layer
- filled
- eps
- reinforced concrete
- light fillers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000945 filler Substances 0.000 claims abstract description 41
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 25
- 239000004576 sand Substances 0.000 claims abstract description 21
- 239000003351 stiffener Substances 0.000 claims description 5
- 238000012856 packing Methods 0.000 claims 2
- 230000002262 irrigation Effects 0.000 abstract 1
- 238000003973 irrigation Methods 0.000 abstract 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses filled-up ground on a kind of subway line, belong to roadbed field, it is intended to which the increment of load that can largely limit subway tunnel structure top is excessive.Its drip irrigation device is:Including present situation pavement of road, dug on the present situation pavement of road and filled out hole, the hole bottom of filling out is provided with medium coarse sand bed course, provided with EPS light fillers layer above the medium coarse sand bed course, the EPS light fillers layer top is provided with reinforced concrete slab, and the reinforced concrete slab is provided with new road surface structare layer away from EPS light fillers layer side.
Description
Technical field
The utility model is related to roadbed field, filled-up ground on more particularly to a kind of subway line.
Background technology
The filled-up ground of Ordinary Rd, only need to carry out clear table to earth's surface, remove earth's surface debris, and substrate reaches that construction machinery grinds
After pressure request, so that it may which successively placement grinding shapes.For high-fill roadbed or soft soil roadbed, to avoid subgrade settlement excessive, city
City's subway is generally located on below town road, it is necessary to be adjusted to road elevation during existing town road transformation, is needed sometimes
1 ~ 5 meter is raised on the basis of original grade elevation, but subway tunnel structure is sensitive to top increment of load, can produce moderate finite deformation, shadow
Subway traffic safety is rung, therefore it is excessive to limit the increment of load on subway tunnel structure top.
Utility model content
The purpose of this utility model is to provide filled-up ground on a kind of subway line, and it can largely limit subway tunnel
The increment of load of structure upper is excessive.
Above-mentioned technical purpose of the present utility model technical scheme is that:Embankment on a kind of subway line
Dug on roadbed, including present situation pavement of road, the present situation pavement of road and filled out hole, the hole bottom of filling out is provided with medium coarse sand pad
Provided with EPS light fillers layer above layer, the medium coarse sand bed course, the EPS light fillers layer top is provided with reinforced concrete slab, described
Reinforced concrete slab is provided with new road surface structare layer away from EPS light fillers layer side.
By such scheme, dug on present situation pavement of road and fill out hole, medium coarse sand bed course is arranged on the bottom for filling out hole, can
The fastness of hole bottom is filled out in increase, and provided with EPS light fillers layer above medium coarse sand bed course, its filling that can either relatively stablize is filled out
Hole, it is light that material compares again, and larger increment of load will not be formed above subway, and reinforced concrete slab is arranged on EPS light fillers layer
Side, for compressing EPS light fillers layer, makes EPS light fillers layer relatively stablize, new road surface structare layer is arranged on reinforced concrete flaggy
Thus top, the stabilization that can compare just forms roadbed above subway line, and roadbed is by medium coarse sand bed course, EPS light fillers
Layer and reinforced concrete slab are constituted, and load is smaller, can largely be limited largely close to the deep native load of hole digging is filled out
Increment of load on subway tunnel structure top.
Further, the medium coarse sand cushion thickness is 30cm.
By such scheme, the bottom for filling out hole so can either be preferably reinforced, subway will not be influenceed due to blocked up again
The structural stability of roadbed above line.
Further, the reinforced concrete slab thickness is 15cm.
By such scheme, the compression EPS light fillers layer that reinforced concrete slab thick 15cm both can relatively stablize again can be compared with
Stable supports new road surface structare layer.
Further, the side of the medium coarse sand bed course towards EPS light fillers layer offers some grooves, the EPS
Light filler layer is extended with stiffener into groove.
By such scheme, open up fluted on medium coarse sand bed course, and EPS is extended with stiffener in groove, can
So that EPS light fillers layer largely combines with medium coarse sand bed course, so that EPS light fillers layer is relatively stablized.
Further, the both sides of the reinforced concrete slab are equipped with some fins, the EPS light fillers layer and new road surface knot
The stopper slot coordinated with fin is offered on structure layer.
By such scheme, such reinforced concrete slab will be by the fin of both sides while relatively stablizing with EPS light fillers layer
Combine, another side can with new road surface structare layer is relatively stable combines, make whole road structure more steady
It is fixed.
In summary, the utility model has the advantages that:
1st, the roadbed being made up of EPS light fillers layer, medium coarse sand bed course reinforced concrete flaggy and new road surface structare layer, both
Stability Analysis of Structures can be made, it is small that increment of load compares again;
2nd, by the cooperation of fin and stopper slot, whole roadbed can be allowed to be in relatively stable state.
Brief description of the drawings
Fig. 1 is the structural representation that the present embodiment is used to embody EPS light fillers layer;
The enlarged drawing that Fig. 2 is A in Fig. 1;
The enlarged drawing that Fig. 3 is B in Fig. 1.
In figure, 1, present situation pavement of road;2nd, hole is filled out;3rd, medium coarse sand bed course;31st, groove;4th, EPS light fillers layer;41st, add
Strong bar;5th, reinforced concrete slab;51st, fin;6th, new road surface structare layer;7th, stopper slot.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Filled-up ground on a kind of subway line, as shown in figure 1, including present situation pavement of road 1, on present situation pavement of road 1
Dig and filled out hole 2.
As shown in figure 1, being equipped with medium coarse sand bed course 3 in the bottom for filling out hole 2, the thickness of medium coarse sand bed course 3 is 30cm, is laid on
The bottom that the bottom in hole 2 is used to strengthen filling out hole 2 is filled out, makes the bottom for filling out hole 2 more stable.
As illustrated in fig. 1 and 2, in half of the top of medium coarse sand bed course 3 provided with EPS light fillers 4, EPS of layer light fillers layer 4
Positioned at filling out in hole 2, second half, which is protruded, is filling out outside hole 2, for raising road surface, and in medium coarse sand bed course 3 towards EPS light fillers layer
4 side opens up fluted 31, and EPS light fillers layer 4 is extended with stiffener 41, stiffener 41 and EPS into groove 31
The one of light filler layer 4, is embedded in the groove 31 spacing to EPS light fillers layer 4, makes EPS light fillers layer 4 in relatively stablizing
State.
As shown in figure 1, being provided with reinforced concrete slab 5 in the top of EPS light fillers layer 4, the thickness of reinforced concrete slab 5 is 15cm, its
It is covered on EPS light fillers layer 4, for compressing EPS light fillers layer 4, EPS light fillers layer 4 is relatively stablized.
As shown in figs. 1 and 3, new road surface structare layer 6 is equipped with the top of reinforced concrete slab 5, while in the both sides of reinforced concrete slab 5
Some fins 51 are equipped with, and the limit coordinated with fin 51 is offered on EPS light fillers layer 4 and new road surface structare layer 6
Position groove 7, makes the fin 51 of the both sides of reinforced concrete slab 5 be embedded in corresponding stopper slot 7, is embedded the limit in EPS light fillers layer 4
Fin 51 in the groove 7 of position is spacing to reinforced concrete slab 5, reinforced concrete slab 5 is not easily touched, is embedded in new road surface structare layer
The new road surface structare layer 6 of 51 pairs of fin in 6 upper limit position grooves 7 is spacing, because reinforced concrete slab 5 is spacing by EPS light fillers layer 4, then
New road surface structare layer 6 is at the state relatively stablized, so that roadbed is in relatively stable state.
Additionally, due to being provided with filled-up ground, EPS light fillers 4, EPS of layer light fillers layer 4 is relatively light, but its structure ratio
Relatively stablize, the filling roadbed that both can have relatively stablized will not largely increase the load of roadbed, can largely connect again
Deep native load is dug in nearly hole 2 of filling out, and then largely limits the increment of load on subway tunnel structure top.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (5)
1. filled-up ground on a kind of subway line, including present situation pavement of road(1), it is characterized in that:The present situation pavement of road(1)On
Dig and filled out hole(2), it is described to fill out hole(2)Bottom is provided with medium coarse sand bed course(3), the medium coarse sand bed course(3)Top is light provided with EPS
Matter packing layer(4), the EPS light fillers layer(4)Top is provided with reinforced concrete slab(5), the reinforced concrete slab(5)It is light away from EPS
Matter packing layer(4)Side is provided with new road surface structare layer(6).
2. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The medium coarse sand bed course(3)Thickness
For 30cm.
3. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The reinforced concrete slab(5)Thickness is
15cm。
4. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The medium coarse sand bed course(3)Direction
EPS light fillers layer(4)Side offer some grooves(31), the EPS light fillers layer(4)To groove(31)Interior extension
There is stiffener(41).
5. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The reinforced concrete slab(5)Both sides
It is equipped with some fins(51), the EPS light fillers layer(4)With new road surface structare layer(6)On offer and fin(51)
The stopper slot of cooperation(7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720206608.9U CN206553853U (en) | 2017-03-03 | 2017-03-03 | Filled-up ground on a kind of subway line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720206608.9U CN206553853U (en) | 2017-03-03 | 2017-03-03 | Filled-up ground on a kind of subway line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206553853U true CN206553853U (en) | 2017-10-13 |
Family
ID=60362346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720206608.9U Expired - Fee Related CN206553853U (en) | 2017-03-03 | 2017-03-03 | Filled-up ground on a kind of subway line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206553853U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372013A (en) * | 2018-10-25 | 2019-02-22 | 南京吉欧地下空间科技有限公司 | It is a kind of for backfilling the EPS composite soil construction technology and method of pipe gallery on soft foundation |
CN110205890A (en) * | 2019-06-20 | 2019-09-06 | 中国五冶集团有限公司 | A kind of underground tunnel upper lightweight EPS road structure and its construction method |
-
2017
- 2017-03-03 CN CN201720206608.9U patent/CN206553853U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109372013A (en) * | 2018-10-25 | 2019-02-22 | 南京吉欧地下空间科技有限公司 | It is a kind of for backfilling the EPS composite soil construction technology and method of pipe gallery on soft foundation |
CN109372013B (en) * | 2018-10-25 | 2021-06-04 | 南京吉欧地下空间科技有限公司 | Comprehensive pipe gallery on soft foundation filled with EPS (expandable polystyrene) mixed soil and construction method |
CN110205890A (en) * | 2019-06-20 | 2019-09-06 | 中国五冶集团有限公司 | A kind of underground tunnel upper lightweight EPS road structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206666931U (en) | A kind of area of heavy rainfull ballastless track of high-speed railway road structure | |
CN203212964U (en) | Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment | |
CN203960883U (en) | One both wired high embankment is helped wide ruggedized construction | |
CN106400635B (en) | A kind of high embankment widening subgrade of high polymer grouting reinforcement anti-settling | |
CN202969393U (en) | Ribbing load reduction structure of road high hill culvert | |
CN206553853U (en) | Filled-up ground on a kind of subway line | |
CN207672343U (en) | A kind of curb construction reducing railway subgrade surface width | |
CN206385411U (en) | It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement | |
CN101403209A (en) | Fast water-permeable brick for stopping pad and laying method | |
CN206328650U (en) | A kind of highway subgrade pipe strengthening structure | |
CN205591066U (en) | Fine grained soil is received sloping embankment and is filled structure | |
CN102817298B (en) | Construction method on permafrost | |
CN106192652A (en) | A kind of high steep embankment ruggedized construction preventing differential settlement | |
CN207017093U (en) | New-old concrete bond widens seam-line removal structure | |
CN104612105B (en) | Reinforced concrete structural formula flood-control wall | |
CN206245155U (en) | A kind of firm road structure of embankment | |
CN106368093B (en) | A kind of construction method of the high embankment widening subgrade of high polymer grouting reinforcement anti-settling | |
CN210507006U (en) | High-strength steel wire mesh reinforced material filling structure of road embankment | |
CN204491320U (en) | Existing railway station roadbed light supporting structure on filled ground | |
CN107268373A (en) | A kind of water permeability asphalt concrete road and its construction method | |
CN207452609U (en) | A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section | |
CN203212967U (en) | Thermal probe type expressway subgrade widening structure on ice-rich and ice-saturated segment | |
CN103898844B (en) | A kind of slabstone buttress reinforced earth compound embankment culvert pipe structure | |
CN104264581B (en) | Based on the bridge abutment structure and the construction method that eliminate abutment soil pressure | |
CN103898824B (en) | The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171013 |