CN206553853U - Filled-up ground on a kind of subway line - Google Patents

Filled-up ground on a kind of subway line Download PDF

Info

Publication number
CN206553853U
CN206553853U CN201720206608.9U CN201720206608U CN206553853U CN 206553853 U CN206553853 U CN 206553853U CN 201720206608 U CN201720206608 U CN 201720206608U CN 206553853 U CN206553853 U CN 206553853U
Authority
CN
China
Prior art keywords
layer
filled
eps
reinforced concrete
light fillers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720206608.9U
Other languages
Chinese (zh)
Inventor
史松磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201720206608.9U priority Critical patent/CN206553853U/en
Application granted granted Critical
Publication of CN206553853U publication Critical patent/CN206553853U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses filled-up ground on a kind of subway line, belong to roadbed field, it is intended to which the increment of load that can largely limit subway tunnel structure top is excessive.Its drip irrigation device is:Including present situation pavement of road, dug on the present situation pavement of road and filled out hole, the hole bottom of filling out is provided with medium coarse sand bed course, provided with EPS light fillers layer above the medium coarse sand bed course, the EPS light fillers layer top is provided with reinforced concrete slab, and the reinforced concrete slab is provided with new road surface structare layer away from EPS light fillers layer side.

Description

Filled-up ground on a kind of subway line
Technical field
The utility model is related to roadbed field, filled-up ground on more particularly to a kind of subway line.
Background technology
The filled-up ground of Ordinary Rd, only need to carry out clear table to earth's surface, remove earth's surface debris, and substrate reaches that construction machinery grinds After pressure request, so that it may which successively placement grinding shapes.For high-fill roadbed or soft soil roadbed, to avoid subgrade settlement excessive, city City's subway is generally located on below town road, it is necessary to be adjusted to road elevation during existing town road transformation, is needed sometimes 1 ~ 5 meter is raised on the basis of original grade elevation, but subway tunnel structure is sensitive to top increment of load, can produce moderate finite deformation, shadow Subway traffic safety is rung, therefore it is excessive to limit the increment of load on subway tunnel structure top.
Utility model content
The purpose of this utility model is to provide filled-up ground on a kind of subway line, and it can largely limit subway tunnel The increment of load of structure upper is excessive.
Above-mentioned technical purpose of the present utility model technical scheme is that:Embankment on a kind of subway line Dug on roadbed, including present situation pavement of road, the present situation pavement of road and filled out hole, the hole bottom of filling out is provided with medium coarse sand pad Provided with EPS light fillers layer above layer, the medium coarse sand bed course, the EPS light fillers layer top is provided with reinforced concrete slab, described Reinforced concrete slab is provided with new road surface structare layer away from EPS light fillers layer side.
By such scheme, dug on present situation pavement of road and fill out hole, medium coarse sand bed course is arranged on the bottom for filling out hole, can The fastness of hole bottom is filled out in increase, and provided with EPS light fillers layer above medium coarse sand bed course, its filling that can either relatively stablize is filled out Hole, it is light that material compares again, and larger increment of load will not be formed above subway, and reinforced concrete slab is arranged on EPS light fillers layer Side, for compressing EPS light fillers layer, makes EPS light fillers layer relatively stablize, new road surface structare layer is arranged on reinforced concrete flaggy Thus top, the stabilization that can compare just forms roadbed above subway line, and roadbed is by medium coarse sand bed course, EPS light fillers Layer and reinforced concrete slab are constituted, and load is smaller, can largely be limited largely close to the deep native load of hole digging is filled out Increment of load on subway tunnel structure top.
Further, the medium coarse sand cushion thickness is 30cm.
By such scheme, the bottom for filling out hole so can either be preferably reinforced, subway will not be influenceed due to blocked up again The structural stability of roadbed above line.
Further, the reinforced concrete slab thickness is 15cm.
By such scheme, the compression EPS light fillers layer that reinforced concrete slab thick 15cm both can relatively stablize again can be compared with Stable supports new road surface structare layer.
Further, the side of the medium coarse sand bed course towards EPS light fillers layer offers some grooves, the EPS Light filler layer is extended with stiffener into groove.
By such scheme, open up fluted on medium coarse sand bed course, and EPS is extended with stiffener in groove, can So that EPS light fillers layer largely combines with medium coarse sand bed course, so that EPS light fillers layer is relatively stablized.
Further, the both sides of the reinforced concrete slab are equipped with some fins, the EPS light fillers layer and new road surface knot The stopper slot coordinated with fin is offered on structure layer.
By such scheme, such reinforced concrete slab will be by the fin of both sides while relatively stablizing with EPS light fillers layer Combine, another side can with new road surface structare layer is relatively stable combines, make whole road structure more steady It is fixed.
In summary, the utility model has the advantages that:
1st, the roadbed being made up of EPS light fillers layer, medium coarse sand bed course reinforced concrete flaggy and new road surface structare layer, both Stability Analysis of Structures can be made, it is small that increment of load compares again;
2nd, by the cooperation of fin and stopper slot, whole roadbed can be allowed to be in relatively stable state.
Brief description of the drawings
Fig. 1 is the structural representation that the present embodiment is used to embody EPS light fillers layer;
The enlarged drawing that Fig. 2 is A in Fig. 1;
The enlarged drawing that Fig. 3 is B in Fig. 1.
In figure, 1, present situation pavement of road;2nd, hole is filled out;3rd, medium coarse sand bed course;31st, groove;4th, EPS light fillers layer;41st, add Strong bar;5th, reinforced concrete slab;51st, fin;6th, new road surface structare layer;7th, stopper slot.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Filled-up ground on a kind of subway line, as shown in figure 1, including present situation pavement of road 1, on present situation pavement of road 1 Dig and filled out hole 2.
As shown in figure 1, being equipped with medium coarse sand bed course 3 in the bottom for filling out hole 2, the thickness of medium coarse sand bed course 3 is 30cm, is laid on The bottom that the bottom in hole 2 is used to strengthen filling out hole 2 is filled out, makes the bottom for filling out hole 2 more stable.
As illustrated in fig. 1 and 2, in half of the top of medium coarse sand bed course 3 provided with EPS light fillers 4, EPS of layer light fillers layer 4 Positioned at filling out in hole 2, second half, which is protruded, is filling out outside hole 2, for raising road surface, and in medium coarse sand bed course 3 towards EPS light fillers layer 4 side opens up fluted 31, and EPS light fillers layer 4 is extended with stiffener 41, stiffener 41 and EPS into groove 31 The one of light filler layer 4, is embedded in the groove 31 spacing to EPS light fillers layer 4, makes EPS light fillers layer 4 in relatively stablizing State.
As shown in figure 1, being provided with reinforced concrete slab 5 in the top of EPS light fillers layer 4, the thickness of reinforced concrete slab 5 is 15cm, its It is covered on EPS light fillers layer 4, for compressing EPS light fillers layer 4, EPS light fillers layer 4 is relatively stablized.
As shown in figs. 1 and 3, new road surface structare layer 6 is equipped with the top of reinforced concrete slab 5, while in the both sides of reinforced concrete slab 5 Some fins 51 are equipped with, and the limit coordinated with fin 51 is offered on EPS light fillers layer 4 and new road surface structare layer 6 Position groove 7, makes the fin 51 of the both sides of reinforced concrete slab 5 be embedded in corresponding stopper slot 7, is embedded the limit in EPS light fillers layer 4 Fin 51 in the groove 7 of position is spacing to reinforced concrete slab 5, reinforced concrete slab 5 is not easily touched, is embedded in new road surface structare layer The new road surface structare layer 6 of 51 pairs of fin in 6 upper limit position grooves 7 is spacing, because reinforced concrete slab 5 is spacing by EPS light fillers layer 4, then New road surface structare layer 6 is at the state relatively stablized, so that roadbed is in relatively stable state.
Additionally, due to being provided with filled-up ground, EPS light fillers 4, EPS of layer light fillers layer 4 is relatively light, but its structure ratio Relatively stablize, the filling roadbed that both can have relatively stablized will not largely increase the load of roadbed, can largely connect again Deep native load is dug in nearly hole 2 of filling out, and then largely limits the increment of load on subway tunnel structure top.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (5)

1. filled-up ground on a kind of subway line, including present situation pavement of road(1), it is characterized in that:The present situation pavement of road(1)On Dig and filled out hole(2), it is described to fill out hole(2)Bottom is provided with medium coarse sand bed course(3), the medium coarse sand bed course(3)Top is light provided with EPS Matter packing layer(4), the EPS light fillers layer(4)Top is provided with reinforced concrete slab(5), the reinforced concrete slab(5)It is light away from EPS Matter packing layer(4)Side is provided with new road surface structare layer(6).
2. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The medium coarse sand bed course(3)Thickness For 30cm.
3. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The reinforced concrete slab(5)Thickness is 15cm。
4. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The medium coarse sand bed course(3)Direction EPS light fillers layer(4)Side offer some grooves(31), the EPS light fillers layer(4)To groove(31)Interior extension There is stiffener(41).
5. filled-up ground on a kind of subway line according to claim 1, it is characterized in that:The reinforced concrete slab(5)Both sides It is equipped with some fins(51), the EPS light fillers layer(4)With new road surface structare layer(6)On offer and fin(51) The stopper slot of cooperation(7).
CN201720206608.9U 2017-03-03 2017-03-03 Filled-up ground on a kind of subway line Expired - Fee Related CN206553853U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720206608.9U CN206553853U (en) 2017-03-03 2017-03-03 Filled-up ground on a kind of subway line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720206608.9U CN206553853U (en) 2017-03-03 2017-03-03 Filled-up ground on a kind of subway line

Publications (1)

Publication Number Publication Date
CN206553853U true CN206553853U (en) 2017-10-13

Family

ID=60362346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720206608.9U Expired - Fee Related CN206553853U (en) 2017-03-03 2017-03-03 Filled-up ground on a kind of subway line

Country Status (1)

Country Link
CN (1) CN206553853U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372013A (en) * 2018-10-25 2019-02-22 南京吉欧地下空间科技有限公司 It is a kind of for backfilling the EPS composite soil construction technology and method of pipe gallery on soft foundation
CN110205890A (en) * 2019-06-20 2019-09-06 中国五冶集团有限公司 A kind of underground tunnel upper lightweight EPS road structure and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372013A (en) * 2018-10-25 2019-02-22 南京吉欧地下空间科技有限公司 It is a kind of for backfilling the EPS composite soil construction technology and method of pipe gallery on soft foundation
CN109372013B (en) * 2018-10-25 2021-06-04 南京吉欧地下空间科技有限公司 Comprehensive pipe gallery on soft foundation filled with EPS (expandable polystyrene) mixed soil and construction method
CN110205890A (en) * 2019-06-20 2019-09-06 中国五冶集团有限公司 A kind of underground tunnel upper lightweight EPS road structure and its construction method

Similar Documents

Publication Publication Date Title
CN206666931U (en) A kind of area of heavy rainfull ballastless track of high-speed railway road structure
CN203212964U (en) Rubble type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN203960883U (en) One both wired high embankment is helped wide ruggedized construction
CN106400635B (en) A kind of high embankment widening subgrade of high polymer grouting reinforcement anti-settling
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN206553853U (en) Filled-up ground on a kind of subway line
CN207672343U (en) A kind of curb construction reducing railway subgrade surface width
CN206385411U (en) It is a kind of to prevent the steep embankment ruggedized construction of height of differential settlement
CN101403209A (en) Fast water-permeable brick for stopping pad and laying method
CN206328650U (en) A kind of highway subgrade pipe strengthening structure
CN205591066U (en) Fine grained soil is received sloping embankment and is filled structure
CN102817298B (en) Construction method on permafrost
CN106192652A (en) A kind of high steep embankment ruggedized construction preventing differential settlement
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN104612105B (en) Reinforced concrete structural formula flood-control wall
CN206245155U (en) A kind of firm road structure of embankment
CN106368093B (en) A kind of construction method of the high embankment widening subgrade of high polymer grouting reinforcement anti-settling
CN210507006U (en) High-strength steel wire mesh reinforced material filling structure of road embankment
CN204491320U (en) Existing railway station roadbed light supporting structure on filled ground
CN107268373A (en) A kind of water permeability asphalt concrete road and its construction method
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN203212967U (en) Thermal probe type expressway subgrade widening structure on ice-rich and ice-saturated segment
CN103898844B (en) A kind of slabstone buttress reinforced earth compound embankment culvert pipe structure
CN104264581B (en) Based on the bridge abutment structure and the construction method that eliminate abutment soil pressure
CN103898824B (en) The method that Cold And Frozen-soil Regions roadbed processes substrate with plastic draining board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171013