CN207017093U - New-old concrete bond widens seam-line removal structure - Google Patents

New-old concrete bond widens seam-line removal structure Download PDF

Info

Publication number
CN207017093U
CN207017093U CN201720745727.1U CN201720745727U CN207017093U CN 207017093 U CN207017093 U CN 207017093U CN 201720745727 U CN201720745727 U CN 201720745727U CN 207017093 U CN207017093 U CN 207017093U
Authority
CN
China
Prior art keywords
new
roadbed
old
extended
seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720745727.1U
Other languages
Chinese (zh)
Inventor
李飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai 3rd Construction Of Road And Bridge Co Ltd
Original Assignee
Qinghai 3rd Construction Of Road And Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai 3rd Construction Of Road And Bridge Co Ltd filed Critical Qinghai 3rd Construction Of Road And Bridge Co Ltd
Priority to CN201720745727.1U priority Critical patent/CN207017093U/en
Application granted granted Critical
Publication of CN207017093U publication Critical patent/CN207017093U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

It the utility model is related to a kind of new-old concrete bond and widen seam-line removal structure, including old roadbed, the new roadbed being stitched together with old roadbed, Mosaic face between the new roadbed and old roadbed is provided with multiple steps, the step includes horizontal Mosaic face and vertical Mosaic face, vertical reinforcement is equipped with the horizontal Mosaic face, one end of the vertical reinforcement is extended in old roadbed, the other end is extended in new roadbed, the vertical Mosaic face is provided with horizontal stiffener, one end of the horizontal stiffener is extended in old roadbed, the other end is extended in new roadbed, the new roadbed includes asphalt surface course successively from top to bottom, asphalt macadam Drainage Base, stabilization gravel layer and graded broken stone drainage blanket.By setting horizontal stiffener and vertical reinforcement can increase lateral ties between strong new-old concrete bond road surface, make spliced new-old concrete bond that integrally there is enough stability, use new structure with stylish roadbed, hydrophobic drainage effect is good.

Description

New-old concrete bond widens seam-line removal structure
Technical field
It the utility model is related to road pavement technical field, and in particular to a kind of new-old concrete bond widens seam-line removal structure.
Background technology
In recent years, with the surge developed rapidly with the volume of traffic of China's economic, the highway transportation quantity required in China by Year increase, the magnitude of traffic flow of some existing highways have reached saturation, need badly that it is carried out to widen to transform and are led to improving it Row ability, and then adapt to the fast-developing needs of modern economy.But pass through car load for many years, highway existing roadbed Sedimentation and deformation reached stable state, and the roadbed filling of widened section can also produce compression and sedimentation and deformation, this It is different and produce relative settlement to allow for strength difference between new-old concrete bond, and then causes the road surface of coupling section of the new and old road position to be tied There is serious longitudinal cracking separation in structure.
Utility model content
The purpose of this utility model is to provide a kind of bearing capacity that can be effectively improved at new-old concrete bond Pavement mosaic, added Lateral ties between strong new-old concrete bond road surface, reduce settlement difference, spliced new-old concrete bond is integrally had enough steady It is qualitative, avoid new-old concrete bond joining place after being open to traffic from producing longitudinal cracking separation.
To achieve these goals, the technical solution adopted in the utility model is:New-old concrete bond widens seam-line removal structure, Including old roadbed, the new roadbed being stitched together with old roadbed, the Mosaic face between the new roadbed and old roadbed is provided with more Individual step, the step include horizontal Mosaic face and vertical Mosaic face, vertical reinforcement, institute are equipped with the horizontal Mosaic face The one end for stating vertical reinforcement is extended in old roadbed, and the other end is extended in new roadbed, and the vertical Mosaic face is provided with water Flat reinforcement, one end of the horizontal stiffener are extended in old roadbed, and the other end is extended in new roadbed, the new roadbed by Top to bottm includes asphalt surface course, asphalt macadam Drainage Base, stabilization gravel layer and graded broken stone drainage blanket successively.
New-old concrete bond as described above widens seam-line removal structure, further illustrates to be that the horizontal stiffener extends to One end that the vertical reinforcement in one end lower section adjacent thereto in new roadbed is extended in new roadbed is by being welded to connect.
New-old concrete bond as described above widens seam-line removal structure, further illustrates to be that the vertical reinforcement extends to One end that one end lower horizontal reinforcement adjacent thereto in old roadbed is extended in old roadbed is by being fixedly connected.
New-old concrete bond as described above widens seam-line removal structure, further illustrates to be that the stabilization gravel layer includes position In low content cement stabilized gravel layer and cement stabilized macadam layer, it is broken that the low content cement stabilized gravel layer is located at cement stabilizing The lower section of rock layers.
New-old concrete bond as described above widens seam-line removal structure, further illustrates to be that the low dosage cement stabilizing is broken The joint face of rock layers and cement stabilized macadam layer is provided with one layer of steel and moulds grid.
New-old concrete bond as described above widens seam-line removal structure, further illustrates to be the graded broken stone drainage blanket Thickness be 9~13cm, the thickness of the stabilization gravel layer is 30~50cm, and the thickness of the asphalt macadam Drainage Base is 5 ~10cm.
The beneficial effects of the utility model are:By setting horizontal stiffener and vertical reinforcement to increase strong new and old road Lateral ties between base road surface, reduce settlement difference, make spliced new-old concrete bond that integrally there is enough stability, simultaneously New roadbed uses new structure, and hydrophobic drainage effect is good, avoids new-old concrete bond joining place after being open to traffic from producing longitudinal cracking separation.
Brief description of the drawings
Fig. 1 is the structural representation of an embodiment.
Fig. 2 is the structural representation of another embodiment.
In figure:1st, old roadbed;2nd, new roadbed;201st, asphalt surface course;202nd, asphalt macadam Drainage Base;203rd, stabilization gravel Layer;204th, graded broken stone drainage blanket;205th, low content cement stabilized gravel layer;206th, cement stabilized macadam layer;207th, steel is moulded Grid;3rd, horizontal Mosaic face;4th, vertical Mosaic face;5th, horizontal stiffener;6th, vertical reinforcement.
Embodiment
The utility model embodiment is further elaborated below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of new-old concrete bond that the present embodiment provides widens seam-line removal structure, including old roadbed 1, it is and old The new roadbed 2 that roadbed 1 is stitched together, the Mosaic face between the new roadbed 2 and old roadbed 1 is provided with multiple steps, described Step includes horizontal Mosaic face 3 and vertical Mosaic face 4, the connection knot of step will be arranged between new roadbed 2 and old roadbed 1 Structure, the connection between new roadbed 2 and old roadbed 1 can be made even closer, vertical reinforcement is equipped with the horizontal Mosaic face 3 6, one end of the vertical reinforcement 6 is extended in old roadbed 1, and the other end is extended in new roadbed 2, the vertical Mosaic face 4 Horizontal stiffener 5 is provided with, one end of the horizontal stiffener 5 is extended in old roadbed 1, and the other end is extended in new roadbed 2, By setting horizontal stiffener and vertical reinforcement can increase lateral ties between strong new-old concrete bond road surface, reduce differential settlement It is different, make spliced new-old concrete bond that integrally there is enough stability.
The new roadbed 2 includes asphalt surface course 201, asphalt macadam Drainage Base 202, stabilization gravel layer successively from top to bottom 203 and graded broken stone drainage blanket 204, the specific stabilization gravel layer 203 includes being located at low content cement stabilized gravel layer 205 and cement stabilized macadam layer 206, the low content cement stabilized gravel layer 205 be located under cement stabilized macadam layer 206 Side, based on prevent with delayed reflex crack, prevent the consideration of moisture penetration, can be in the low content cement stabilized gravel layer 205 and the joint face of cement stabilized macadam layer 206 be provided with one layer of steel and mould grid 207, specifically, the graded broken stone draining pad The thickness of layer 204 is 9~13cm, and the thickness of the stabilization gravel layer 203 is 30~50cm, the asphalt macadam Drainage Base 202 thickness is 5~10cm.
As shown in Fig. 2 being another embodiment of the utility model, the difference of the present embodiment and above-described embodiment is: The vertical reinforcement 6 in one end lower section adjacent thereto that the horizontal stiffener 5 is extended in new roadbed 2 is extended in new roadbed 2 One end is by being welded to connect, and by such setting, the connection that can strengthen between horizontal stiffener 5 and vertical reinforcement 6 is closed System, so that new connection between roadbed 2 and old roadbed 1 is even closer, it can further reduce new-old concrete bond joining place after being open to traffic Longitudinal cracking separation is produced, further, one end lower section water adjacent thereto that the vertical reinforcement 6 is extended in old roadbed 1 One end that flat reinforcement 5 is extended in old roadbed 1 is by being fixedly connected, so that between horizontal stiffener 5 and vertical reinforcement 6 Connect, it is more stable to be allowed to structure.
The utility model is not limited to examples detailed above, in claims limited range of the present utility model, this The various deformations or amendments that art personnel can make without creative work are protected by this patent.

Claims (6)

1. new-old concrete bond widens seam-line removal structure, including old roadbed, the new roadbed being stitched together with old roadbed, the new road Mosaic face between base and old roadbed is provided with multiple steps, and the step includes horizontal Mosaic face and vertical Mosaic face, and it is special Sign is:Vertical reinforcement is equipped with the horizontal Mosaic face, one end of the vertical reinforcement is extended in old roadbed, separately One end is extended in new roadbed, and the vertical Mosaic face is provided with horizontal stiffener, and one end of the horizontal stiffener extends to In old roadbed, the other end is extended in new roadbed, and the new roadbed includes asphalt surface course, asphalt macadam draining successively from top to bottom Basic unit, stabilization gravel layer and graded broken stone drainage blanket.
2. new-old concrete bond according to claim 1 widens seam-line removal structure, it is characterised in that:The horizontal stiffener prolongs One end that the vertical reinforcement in the lower section adjacent thereto of one end in new roadbed is extended in new roadbed is extended by being welded to connect.
3. new-old concrete bond according to claim 2 widens seam-line removal structure, it is characterised in that:The vertical reinforcement prolongs One end that the lower horizontal reinforcement adjacent thereto of one end in old roadbed is extended in old roadbed is extended by being fixedly connected.
4. new-old concrete bond according to claim 1 widens seam-line removal structure, it is characterised in that:The stabilization gravel layer bag Include and be located at low content cement stabilized gravel layer and cement stabilized macadam layer, it is steady that the low content cement stabilized gravel layer is located at cement Determine the lower section of metalling.
5. new-old concrete bond according to claim 4 widens seam-line removal structure, it is characterised in that:The low dosage cement is steady The joint face for determining metalling and cement stabilized macadam layer is provided with one layer of steel modeling grid.
6. new-old concrete bond according to claim 1 widens seam-line removal structure, it is characterised in that:The graded broken stone draining The thickness of bed course is 9~13cm, and the thickness of the stabilization gravel layer is 30~50cm, the thickness of the asphalt macadam Drainage Base For 5~10cm.
CN201720745727.1U 2017-06-26 2017-06-26 New-old concrete bond widens seam-line removal structure Active CN207017093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720745727.1U CN207017093U (en) 2017-06-26 2017-06-26 New-old concrete bond widens seam-line removal structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720745727.1U CN207017093U (en) 2017-06-26 2017-06-26 New-old concrete bond widens seam-line removal structure

Publications (1)

Publication Number Publication Date
CN207017093U true CN207017093U (en) 2018-02-16

Family

ID=61486064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720745727.1U Active CN207017093U (en) 2017-06-26 2017-06-26 New-old concrete bond widens seam-line removal structure

Country Status (1)

Country Link
CN (1) CN207017093U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930207A (en) * 2018-08-29 2018-12-04 武钦培 The construction method of expressway widening roadbed
CN109295822A (en) * 2018-10-08 2019-02-01 武钦培 A kind of expressway widening road structure and its construction method
CN111455770A (en) * 2020-04-17 2020-07-28 中国建筑土木建设有限公司 Asphalt pavement splicing structure based on recycled materials and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930207A (en) * 2018-08-29 2018-12-04 武钦培 The construction method of expressway widening roadbed
CN108930207B (en) * 2018-08-29 2019-08-20 武钦培 The construction method of expressway widening roadbed
CN109295822A (en) * 2018-10-08 2019-02-01 武钦培 A kind of expressway widening road structure and its construction method
CN111455770A (en) * 2020-04-17 2020-07-28 中国建筑土木建设有限公司 Asphalt pavement splicing structure based on recycled materials and construction method thereof

Similar Documents

Publication Publication Date Title
CN106192646B (en) Vcehicular tunnel car-driving shock-absorbing denoising structure and its construction method
CN205276086U (en) Expansion joint device is handled to combined type road surface tip
CN207017093U (en) New-old concrete bond widens seam-line removal structure
CN105586818A (en) Light foam layer for widening roadbed of road and construction process of light foam layer
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN105803922B (en) A kind of high embankment filled soil end of the bridge anti-settling structure
CN104328730B (en) The construction method of embedded reinforcement bitumen layer transformation cement concrete pavement
CN204401444U (en) A kind of high embankment filled soil end of the bridge anti-settling structure
CN107805987A (en) The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section
CN105951535B (en) Middle low speed magnetic suspension traffic engineering is low to put circuit single line location support rail beam internode position limiting structure
CN203613426U (en) Groove-shaped embankment structure
CN209307882U (en) It is a kind of for improving the cushion cap device on pile foundation reinforcement basis
CN104947566A (en) Assembled grade crossing
CN206245155U (en) A kind of firm road structure of embankment
CN205804237U (en) A kind of recycling roadbed concrete guardrail
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN104594188B (en) Composite pavement and bridge connection transition structure and constructing process thereof
CN105603846A (en) Dual-layer glass fiber concrete pavement structure applicable to city roads
CN202194048U (en) Pavement structure for joining part of new and old roads
CN206298822U (en) The seamless pavement structure that optimization CRCP is connected with floorings
CN205603974U (en) Low circuit single line location support rail girder segment limit structure within a definite time that puts of well low -speed maglev traffic engineering
CN212270716U (en) Road and bridge crack reinforcing and repairing structure
CN105544334B (en) One kind is used for vehicle jumping at bridge head of highway Treatment Methods
CN209456874U (en) A kind of bridgehead sinking attachment strap structure
CN204174495U (en) Embedded reinforcement bitumen layer transformation cement concrete pavement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant