CN105297919A - Seismic strengthening method for frame beam-column joint core area - Google Patents

Seismic strengthening method for frame beam-column joint core area Download PDF

Info

Publication number
CN105297919A
CN105297919A CN201510734782.6A CN201510734782A CN105297919A CN 105297919 A CN105297919 A CN 105297919A CN 201510734782 A CN201510734782 A CN 201510734782A CN 105297919 A CN105297919 A CN 105297919A
Authority
CN
China
Prior art keywords
stirrup
muscle
cover
steel bar
stirrup cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510734782.6A
Other languages
Chinese (zh)
Inventor
赵东东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510734782.6A priority Critical patent/CN105297919A/en
Publication of CN105297919A publication Critical patent/CN105297919A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a seismic strengthening method for a frame beam-column joint core area. The method comprises the following steps that firstly, an integrated stirrup sleeve is prefabricated; secondly, main column ribs, beam bottom column stirrups and beam lower portion longitudinal ribs are installed; thirdly, the integrated stirrup sleeve is installed; fourthly, beam upper portion longitudinal ribs and waist ribs are installed. By means of the method, the integrated stirrup sleeve is prefabricated first and then integrally installed on site, and thus compared with an existing method, the method has the advantages that construction is easy, and operation is convenient; the requirement for seismic performance and construction quality in the frame beam-column joint core area can be effectively met, and the quality problem brought by the construction difficulty of the traditional binding technology can be effectively solved.

Description

A kind of concrete frame joint core space Shockproof reinforcing method
Technical field
The present invention relates to construction work middle frame beam column construction field, specifically relate to a kind of concrete frame joint core space Shockproof reinforcing method.
Background technology
At present, because China's structure design is relatively conservative, Vierendeel girder, Column border node core space reinforcing bar are overstocked, reinforcing bar binding difficulty is larger, consider dodging between reinforcing bar, stirrup spacing, quantity and colligation difficult quality guarantee, add operator's weak quality consciousness, if strictly do not monitored this region stirrup colligation quality, easily leak and tie up.Frame joint core space transmits node, anti-seismic performance weakness zone as beam, post internal force, when earthquake occurs, if this region anti-seismic construction measure is not in place, very easily causes destructive destruction.
Summary of the invention
For the technical problem existed in prior art, the object of the present invention is to provide a kind of concrete frame joint core space Shockproof reinforcing method.
To achieve these goals, the technical solution adopted in the present invention is: a kind of concrete frame joint core space Shockproof reinforcing method, comprises the following steps:
S1, overall stirrup cover is prefabricated: choose the equal steel bar end of four length as skeleton, four steel bar end peripheries are set in by equidistant for the some foursquare stirrup cover made, and by four each reserved 10cm in steel bar end two ends, the corner, inner side that steel bar end overlaps with stirrup is respectively fixed by spot welding;
The main muscle of S2, post, beam foundation stirrup and beam bottom are indulged muscle and are installed: muscle is indulged in the main muscle of erection column, beam foundation stirrup and beam bottom, and the beam bottom after installing is indulged muscle insertion column cap and fixed;
S3, overall stirrup cover is installed: prefabricated overall stirrup cover is set in the main muscle periphery of post, and stirrup cover bottom flushes with at the bottom of beam, finally 10cm steel bar end reserved for two ends and the main muscle spot welding of post is fixed;
S4, beam upper longitudinal bar and waist muscle are installed: overall stirrup cover installs beam upper longitudinal bar and waist muscle after installing and fixing successively.
Preferably, in step S1 when making stirrup cover, the angle of bend of the crotch of stirrup cover is 135 °, and hook length is the greater in 10d and 75mm, and d is the bar diameter making stirrup cover.
Preferably, in step S1 steel bar end and stirrup overlap the spot welding of corner, inner side time, selected wlding strength grade is not less than strength of parent grade, by through examining professional welder that is qualified, that take appointment with certificate to operate, guarantees that weld seam is full, welding defect.
Beneficial effect of the present invention shows:
The method that the present invention proposes, by first precast monolithic stirrup cover, integral installation at the scene again, it is than existing method, there is the advantage that construction is simple, easy to operate, effectively can meet Vierendeel girder, Column border node core space anti-seismic performance and construction quality, effectively can avoid the quality problems brought because of traditional technology for binding difficulty of construction.
Accompanying drawing explanation
Fig. 1 is the schematic diagram after step S3 completes.
Detailed description of the invention
For further describing the present invention, below in conjunction with embodiment, it is described further.
As shown in Figure 1, a kind of concrete frame joint core space Shockproof reinforcing method, comprises the following steps:
S1, overall stirrup overlap 1 prefabricated: choose the equal steel bar end 2 of four length as skeleton, the some foursquare stirrup made is overlapped 1 and be equidistantly set in four steel bar end 2 peripheries, and by four each reserved 10cm in steel bar end 2 two ends, the corner, inner side steel bar end 2 being overlapped respectively 1 with stirrup is fixed by spot welding, when making stirrup and overlapping 1, the angle of bend of the crotch of stirrup cover 1 is 135 °, and hook length is the greater in 10d and 75mm, and d is the bar diameter making stirrup cover 1.When steel bar end 2 and stirrup overlap corner, the inner side spot welding of 1, selected wlding strength grade is not less than strength of parent grade, by through examining professional welder that is qualified, that take appointment with certificate to operate, guarantees that weld seam is full, welding defect.
The main muscle of S2, post 3, beam foundation stirrup and beam bottom are indulged muscle and are installed: muscle is indulged in the main muscle 3 of erection column, beam foundation stirrup and beam bottom, and the beam bottom after installing is indulged muscle insertion column cap and fixed.
S3, overall stirrup cover 1 is installed: prefabricated overall stirrup cover 1 is set in post main muscle 3 periphery, and stirrup cover 1 bottom flushes with at the bottom of beam, is finally fixed with the spot welding of post main muscle 3 by 10cm steel bar end 2 reserved for two ends.
S4, beam upper longitudinal bar and waist muscle are installed: overall stirrup cover 1 installs beam upper longitudinal bar and waist muscle after installing and fixing successively.
The present invention proposes a kind of concrete frame joint core space Shockproof reinforcing method, the present invention propose method adopt be Vierendeel girder, Column border node core space anti-seismic construction adopt column cap overall stirrup cover is installed, overall stirrup cover is on-the-spot pre-formed, the construction technology that then integral installation puts in place, thus reach beam, Column border node core space antidetonation working measure specification, standard, meet shockproof requirements.
Above content is only to design example of the present invention and explanation; affiliated those skilled in the art make various amendment to described specific embodiment or supplement or adopt similar mode to substitute; only otherwise depart from the design of invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.

Claims (3)

1. a concrete frame joint core space Shockproof reinforcing method, is characterized in that, comprises the following steps:
S1, overall stirrup cover (1) are prefabricated: choose the equal steel bar end (2) of four length as skeleton, four steel bar end (2) peripheries are set in by equidistant for the some foursquare stirrup cover (1) made, and by four each reserved 10cm in steel bar end (2) two ends, steel bar end (2) is fixed by spot welding with the corner, inner side of stirrup cover (1) respectively;
The main muscle of S2, post (3), beam foundation stirrup and beam bottom are indulged muscle and are installed: muscle is indulged in the main muscle of erection column (3), beam foundation stirrup and beam bottom, and the beam bottom after installing is indulged muscle insertion column cap and fixed;
S3, overall stirrup cover (1) are installed: prefabricated overall stirrup cover (1) is set in the main muscle of post (3) periphery, and stirrup cover (1) bottom flushes with at the bottom of beam, are finally fixed with the main muscle of post (3) spot welding by 10cm steel bar end (2) reserved for two ends;
S4, beam upper longitudinal bar and waist muscle are installed: the installation of overall stirrup cover (1) installs beam upper longitudinal bar and waist muscle after fixing successively.
2. concrete frame joint core space Shockproof reinforcing method according to claim 1, it is characterized in that, in step S1 when making stirrup cover (1), the angle of bend of the crotch of stirrup cover (1) is 135 °, hook length is the greater in 10d and 75mm, and d is the bar diameter making stirrup cover (1).
3. concrete frame joint core space Shockproof reinforcing method according to claim 1, it is characterized in that, in step S1 during corner, the inner side spot welding of steel bar end (2) and stirrup cover (1), selected wlding strength grade is not less than strength of parent grade, by through examining professional welder that is qualified, that take appointment with certificate to operate, guarantee that weld seam is full, welding defect.
CN201510734782.6A 2015-10-30 2015-10-30 Seismic strengthening method for frame beam-column joint core area Pending CN105297919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510734782.6A CN105297919A (en) 2015-10-30 2015-10-30 Seismic strengthening method for frame beam-column joint core area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510734782.6A CN105297919A (en) 2015-10-30 2015-10-30 Seismic strengthening method for frame beam-column joint core area

Publications (1)

Publication Number Publication Date
CN105297919A true CN105297919A (en) 2016-02-03

Family

ID=55195670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510734782.6A Pending CN105297919A (en) 2015-10-30 2015-10-30 Seismic strengthening method for frame beam-column joint core area

Country Status (1)

Country Link
CN (1) CN105297919A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729645A (en) * 2017-04-18 2018-11-02 五冶集团上海有限公司 Pre-fabricated one beam column core space reinforcing bar binding construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136881A (en) * 1991-02-22 1994-05-17 Shimizu Corp Split type previously assembled beam reinforcement and method of assembling construction of split type previously assembled beam reinforcement
CN102352655A (en) * 2011-07-28 2012-02-15 华南理工大学 Multi-floor type rectangular steel pipe concrete column and floor system beam connecting node and manufacturing method thereof
CN202483073U (en) * 2012-03-22 2012-10-10 中国建筑第四工程局有限公司 Quake-proof beam-column node column hoop structure
CN203238780U (en) * 2013-03-12 2013-10-16 中国水利水电第二工程局有限公司 Prefabricated stirrup cage of beam column core area
CN203808249U (en) * 2014-01-16 2014-09-03 北京天润建设有限公司 Column stirrup cage assembly for beam-column joint core region

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136881A (en) * 1991-02-22 1994-05-17 Shimizu Corp Split type previously assembled beam reinforcement and method of assembling construction of split type previously assembled beam reinforcement
CN102352655A (en) * 2011-07-28 2012-02-15 华南理工大学 Multi-floor type rectangular steel pipe concrete column and floor system beam connecting node and manufacturing method thereof
CN202483073U (en) * 2012-03-22 2012-10-10 中国建筑第四工程局有限公司 Quake-proof beam-column node column hoop structure
CN203238780U (en) * 2013-03-12 2013-10-16 中国水利水电第二工程局有限公司 Prefabricated stirrup cage of beam column core area
CN203808249U (en) * 2014-01-16 2014-09-03 北京天润建设有限公司 Column stirrup cage assembly for beam-column joint core region

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729645A (en) * 2017-04-18 2018-11-02 五冶集团上海有限公司 Pre-fabricated one beam column core space reinforcing bar binding construction method

Similar Documents

Publication Publication Date Title
KR101076581B1 (en) Joint structure for hollow core concrete filled tube column and H shaped beam and construction method therefor
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN104831818B (en) The connecting node of precast reinforced concrete beam and superposed column
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN205529905U (en) Take prefabricated decking connection structure of U type muscle
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN205653923U (en) Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN112900619B (en) Fabricated concrete beam-column joint and construction method thereof
CN105040816A (en) Prefabricated assembly type and hidden-support-equipped superposed plate type reinforced concrete core wall
CN106545088B (en) Conversion node of upper concrete column and lower concrete-filled steel tubular column and implementation method
CN104775516A (en) Field connecting method among prefabricated reinforced concrete columns
CN102936924A (en) Girder embedding ribbed through partition square concrete filled steel tube column-H-shaped girder combination nodes
CN209958499U (en) Connecting joint for steel pipe concrete column and multi-layer reinforced concrete beam
CN207079479U (en) A kind of prefabricated pier of highway bridge is connected locating structure with basis
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN204804057U (en) Beam column connecting device of prefabricated frame
CN207794299U (en) A kind of complete assembled steel reinforced concrete frame structure system
CN206245763U (en) The positioner of live assembling reinforcement in precast construction
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN102619286B (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
CN105297919A (en) Seismic strengthening method for frame beam-column joint core area
CN105926774A (en) End plate connection integral type combination frame beam and combination method thereof
CN203640061U (en) Node connecting structure of reinforced concrete column of basement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication