CN207079479U - A kind of prefabricated pier of highway bridge is connected locating structure with basis - Google Patents

A kind of prefabricated pier of highway bridge is connected locating structure with basis Download PDF

Info

Publication number
CN207079479U
CN207079479U CN201720846071.2U CN201720846071U CN207079479U CN 207079479 U CN207079479 U CN 207079479U CN 201720846071 U CN201720846071 U CN 201720846071U CN 207079479 U CN207079479 U CN 207079479U
Authority
CN
China
Prior art keywords
steel plate
pier
basis
pier stud
plate hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720846071.2U
Other languages
Chinese (zh)
Inventor
肖永铭
张宏远
潘可明
桂睿
贺大朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201720846071.2U priority Critical patent/CN207079479U/en
Application granted granted Critical
Publication of CN207079479U publication Critical patent/CN207079479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Be connected locating structure with basis the utility model discloses a kind of prefabricated pier of highway bridge, including fixing steel plate, ring flange, pier stud steel plate hoop and WELDING STUDS are pushed up in bent cap and the integrated prefabricated bridge lower member of pier stud, cast-in-place basis, basis;Steel plate hoop is wrapped up on the outside of precast concrete pedestal, concrete knoll lowermost end is provided with the end socket steel plate being connected with pier stud steel plate hoop;WELDING STUDS is distributed on the outside of steel plate hoop, rapid hardening high-strength concrete is filled between cast-in-place basic rim of a cup and pier stud steel plate hoop;Ring flange is fixed with the top of cast-in-place basic rim of a cup, ring flange upper end radial is provided with some bases and pushes up fixing steel plate, the inner face and pier stud steel plate hoop the week side of boss Site Welding of some basis tops fixing steel plate, positioned for prefabricated pier.The utility model can solve the installation orientation problem of prefabricated pier, both speed up the work, and reduce field operation time, make the position of both linkage interfaces have enough intensity again.

Description

A kind of prefabricated pier of highway bridge is connected locating structure with basis
Technical field
The utility model belongs to bridge structure rapid construction, prefabrication technical field of construction.
Background technology
The concept of prefabricated installation is accepted already, but mainly to superstructure.Beams of concrete or girder steel are in factory After completing, building site is transported to, only waits Bent beam to finish, it is possible to which roof beam structure is got on.At present, prefabricated installation concept expands Open up substructure.Bent cap and column start to be prefabricated in the factory, then transport to building site installation.For example, the U.S. some without earthquake Area has been carried out this technique if (such as moral gram Long Si states).But in some earthquake prone areas, just seldom in this way. From construction, two components of column and bent cap use prefabricated installation most convenient.Because they are all straight-bars, make, transport, hang Dress is all very simple.But in earthquake areas, problem is exactly appeared on both linkage interfaces.From antidetonation angle, this interface It is most critical position, it is desirable to which the position will have enough intensity and ductility.And in most cases, the prefabricated peace of bent cap column Dress can cause anti-seismic performance to decline.
The domestic research of substructure precast segment assembling technique and application are relatively fewer, but just gradually obtain China engineer Concern and attention.Precast segment assembly bridge pier is that bridge is vertically divided into some block parts, such as cushion cap, post, bent cap, work Factory is prefabricated, transports to construction site, on-site consolidation.Engineering prefabricated components easily standardize, the advantages of more playing precasting process: Pre-fabricated factory, it is easy to quality control;It is small to surrounding enviroment and traffic impact;Can effectively eliminate danger region job safety it is hidden Suffer from;Precast concrete shrinkage and creep is small etc..
In huge highway bridge colony, there are about 1/4 bridge is weathered out-of-date or afunction.That is, There is thousands of bridge to need repairing, reinforce or change.The transformation and upgrade of bridge, undoubtedly part of taking a long view is meddlesome, is It is necessary;But consider from instantly, it can bring the deuce to pay to daily traffic.Break off a friendship, traffic disturbance can not only be caused by detouring, and And user's delay time at stop and unnecessary fuel consumption can be also caused, economic loss is huge.Therefore, process is reconstructed in bridge strengthening In, it should try one's best and shorten the duration, minimally disturb traffic.
It undoubtedly can more be speeded up the work than cast-in-place using the construction of prefabricated installation method, reduce field operation time, this is The conclusion having already been confirmed.Prefabricated mounting process can be completed with parallel operations, extensive work in factory, few occupancy scene Room and time, it is not necessary to close traffic for a long time and detour.In addition, also reduce the danger that worker works in chaotic scene Property.
Existing each component connecting node of prefabricated substructure technology is still to be tested in the reliability that high earthquake region uses.
The content of the invention
The purpose of this utility model is to provide a kind of prefabricated substructure of highway bridge and is connected locating structure with basis, to solve The installation positioning of integrated prefabricated bridge substructure component, both speeded up the work, and reduced field operation time, make both again The position of linkage interface will have the technical problems such as enough intensity and ductility.
To achieve these goals, technical essential is as follows used by the utility model:
A kind of prefabricated pier of highway bridge is connected locating structure with basis, including bent cap and the integrated prefabricated bridge bottom of pier stud Component, cast-in-place basis, basis top fixing steel plate, ring flange, pier stud steel plate hoop and WELDING STUDS;It is existing in stretching into for concrete knoll Part in casting foundation rim of a cup, outside are fixed with pier stud steel plate hoop, and concrete knoll lowermost end is provided with to be connected with pier stud steel plate hoop The end socket steel plate connect;WELDING STUDS is set on the outside of steel plate hoop, filled between cast-in-place basic rim of a cup and pier stud steel plate hoop fast hard high Reinforced concrete;Ring flange is fixed with the top of cast-in-place basic rim of a cup, it is fixed that ring flange upper end radial is provided with some basis tops Position steel plate, the inner faces of some basis tops fixing steel plates are connection positioning end, itself and pier stud steel plate hoop Site Welding.
The dowel of cross arrangement, the outer end of dowel and the foot stall steel of outside fixation are embedded with inside the concrete knoll Plate hoop connects.
The utility model has the advantages that it can be used in positioning prefabricated components pier stud, it is ensured that pier before rapid hardening high-strength concrete hardening Post perpendicularity.Solve the prefabricated substructure connectivity problem in high earthquake region simultaneously, Short/Medium Span Bridge rapid construction requirement can be met, had Effect shortens the duration, reduces bridge construction to traffic impact.This patent is particularly suitable for use in the high existing Bridge Reconstruction of earthquake region heavy traffic Engineering.
Brief description of the drawings
Fig. 1 is facade structures schematic diagram of the present utility model.
Fig. 2 is steel plate hoop diagrammatic cross-section of the present utility model.
Numbered in figure:1st, bearing, 2, prefabricated bent cap, 3, anti-seismic steel bar, 4, concrete knoll, 5, dowel, 6, foot stall steel Plate hoop, 7, basis top fixing steel plate, 8, WELDING STUDS, 9, cast-in-place basis, 10, rim of a cup, 11, ring flange 12, end socket steel plate.
Embodiment
Structure of the present utility model is referring to shown in Fig. 1,2.A kind of prefabricated pier of highway bridge is connected locating structure with basis, including Concrete knoll and prefabricated bent cap 2, cast-in-place basic 9, basis top fixing steel plate 7, ring flange 11, pier stud steel plate hoop 6 and shearing Nail 8.Concrete knoll 4 stretch into cast-in-place basic rim of a cup 10 and on certain altitude part, outside is fixed with Pier stud steel plate hoop 6, the lowermost end of concrete knoll 6 are provided with the end socket steel plate 12 being connected with pier stud steel plate hoop;Stretching into cast-in-place base WELDING STUDS 8 is distributed with the outside of pier stud steel plate hoop 6 in the rim of a cup 10 of plinth, between cast-in-place basic rim of a cup 10 and pier stud steel plate hoop 6 Filled with rapid hardening high-strength concrete;It is fixed with ring flange 11 in the cast-in-place basic end of rim of a cup 10, the upper end of ring flange 11 is into radiation Shape is provided with some bases and pushes up fixing steel plates 7, and the inner faces of some basis tops fixing steel plates 7 are connection positioning end, itself and pier The week side of boss of post steel plate hoop 6 is offseted or welded.The dowel 5 of cross arrangement is embedded with inside the concrete knoll, dowel 5 Outer end is connected with the pier stud steel plate hoop 6 that outside is fixed.
The basis top sets ring flange and ring flange welding fixing steel plate, for positioning prefabricated components pier stud, it is ensured that fast Pier stud perpendicularity before hard high-strength concrete hardening.Prefabricated components are made up of bent cap, pier stud two parts, and in factory, one-piece casting is applied Work.Basis is site concrete, and sets rim of a cup, and pier stud stretches into rim of a cup, and built-in length need to meet 2 times of pier stud diameters.Stretch into rim of a cup Pier stud portion outboard anchor plate hoop, the welding long WELDING STUDSs of 5cm on the outside of steel plate hoop, rim of a cup uses rapid hardening high-strength with pier stud gap Concrete Filled, WELDING STUDS are used to increase pier stud and rapid hardening high-strength concrete binding power.Steel plate hoop construction such as Fig. 2.

Claims (3)

1. a kind of prefabricated pier of highway bridge is connected locating structure with basis, it is characterised in that integrated prefabricated including bent cap and pier stud Bridge lower member, cast-in-place basis, basis top fixing steel plate, ring flange, pier stud steel plate hoop and WELDING STUDS;In precast concrete The part stretched into cast-in-place basic rim of a cup of pier, outside are fixed with pier stud steel plate hoop, and concrete knoll lowermost end is provided with and pier The end socket steel plate of post steel plate hoop connection;WELDING STUDS is set on the outside of steel plate hoop, between cast-in-place basic rim of a cup and pier stud steel plate hoop Fill rapid hardening high-strength concrete;Ring flange is fixed with the top of cast-in-place basic rim of a cup, if ring flange upper end radial is provided with Butt plinth top fixing steel plate, the inner face of some basis tops fixing steel plate is connection positioning end, and it shows with pier stud steel plate hoop Field welding.
2. the prefabricated pier of a kind of highway bridge according to claim 1 is connected locating structure with basis, it is characterised in that described pre- The dowel of cross arrangement is embedded with inside concrete pier processed, the pier stud steel plate hoop that outer end and the outside of dowel are fixed welds.
3. the prefabricated pier of a kind of highway bridge according to claim 1 is connected locating structure with basis, it is characterised in that if described The inner face of butt plinth top fixing steel plate is with pier stud steel plate hoop the week side of boss by being welded to connect.
CN201720846071.2U 2017-07-13 2017-07-13 A kind of prefabricated pier of highway bridge is connected locating structure with basis Active CN207079479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720846071.2U CN207079479U (en) 2017-07-13 2017-07-13 A kind of prefabricated pier of highway bridge is connected locating structure with basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720846071.2U CN207079479U (en) 2017-07-13 2017-07-13 A kind of prefabricated pier of highway bridge is connected locating structure with basis

Publications (1)

Publication Number Publication Date
CN207079479U true CN207079479U (en) 2018-03-09

Family

ID=61427236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720846071.2U Active CN207079479U (en) 2017-07-13 2017-07-13 A kind of prefabricated pier of highway bridge is connected locating structure with basis

Country Status (1)

Country Link
CN (1) CN207079479U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644353A (en) * 2019-10-08 2020-01-03 山东省交通规划设计院 Energy-consuming and shock-absorbing corrugated steel pipe-rubber concrete assembled pier and method
CN110656575A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Bridge and pier thereof
CN110656574A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Method for manufacturing bridge pier
CN112647619A (en) * 2020-12-17 2021-04-13 西南科技大学 Construction method of assembled large-span internal partition wall
CN112853948A (en) * 2021-04-08 2021-05-28 长安大学 Assembled bridge pier column node structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656575A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Bridge and pier thereof
CN110656574A (en) * 2018-06-29 2020-01-07 比亚迪股份有限公司 Method for manufacturing bridge pier
CN110656574B (en) * 2018-06-29 2022-03-18 比亚迪股份有限公司 Method for manufacturing bridge pier
CN110644353A (en) * 2019-10-08 2020-01-03 山东省交通规划设计院 Energy-consuming and shock-absorbing corrugated steel pipe-rubber concrete assembled pier and method
CN112647619A (en) * 2020-12-17 2021-04-13 西南科技大学 Construction method of assembled large-span internal partition wall
CN112853948A (en) * 2021-04-08 2021-05-28 长安大学 Assembled bridge pier column node structure

Similar Documents

Publication Publication Date Title
CN207079479U (en) A kind of prefabricated pier of highway bridge is connected locating structure with basis
CN106499051B (en) A kind of column perforation prefabricated PC concrete frame frame system and its construction method
CN207227935U (en) A kind of bridge prefabrication substructure
CN105386405B (en) Based on bolted Precast Concrete Segmental Bridges concrete pier of steel tube
CN105735112B (en) Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier
CN206308796U (en) A kind of post insertion prefabricated PC concrete frame frame system
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN205313967U (en) Connection construction between precast pier and bearing platform
CN207062745U (en) A kind of bridge prefabricated abutment pier abutment component entirely
CN205857032U (en) The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket
CN106013432A (en) Joint connecting structure in high-ductility assembled integrated frame and construction method
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN106368348A (en) Overlapped combined shear wall with double-phase stress characteristic
CN105970803B (en) The shearing resistance energy-dissipating device and construction method of assembled bridge pier
CN107989228A (en) A kind of prefabricated steel reinforced concrete shear wall structure and its preparation and installation method
CN103924680A (en) Precast concrete beam and square-rectangular concrete-filled steel tube column combining joint employing unbonded prestressed and ordinary reinforcement for connection
CN107338864A (en) A kind of prefabricated reinforced concrete frame structure node
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN108005264A (en) A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method
CN108775114A (en) The prefabrication and assembly construction beam column built from concrete connection structure and method of steel concrete supporting
KR101460559B1 (en) Structure and Method for Connecting between Precast Column and In-situ Concrete Slab
CN207739438U (en) A kind of strip frame precast reinforced concrete shear wall structure
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant