CN207227935U - A kind of bridge prefabrication substructure - Google Patents

A kind of bridge prefabrication substructure Download PDF

Info

Publication number
CN207227935U
CN207227935U CN201720846073.1U CN201720846073U CN207227935U CN 207227935 U CN207227935 U CN 207227935U CN 201720846073 U CN201720846073 U CN 201720846073U CN 207227935 U CN207227935 U CN 207227935U
Authority
CN
China
Prior art keywords
pier stud
bent cap
prefabricated
bridge
substructure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720846073.1U
Other languages
Chinese (zh)
Inventor
桂睿
潘可明
肖永铭
张宏远
贺大朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201720846073.1U priority Critical patent/CN207227935U/en
Application granted granted Critical
Publication of CN207227935U publication Critical patent/CN207227935U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge prefabrication substructure, including integrated prefabricated bent cap, pier stud;Prefabricated bent cap, pier stud are the structures in factory's one assembling reinforcement, formed by integrally casting concrete;Bent cap is connected the bar connecting form that uses with pier stud, and pier stud stress main reinforcement stretches into bent cap, and built-in length need to meet anchorage length requirement;The Extended chemotherapy of cast in situs reserves groove, during construction, Precast Pier Columns is inserted into groove, pier stud and groove gap rapid hardening high-strength Concrete Filled.The utility model can solve the technical problems such as the reliability of the prefabricated substructure connection in high earthquake region, can meet Short/Medium Span Bridge rapid construction requirement, effectively shorten the construction period, reduce influence of the bridge construction to traffic.

Description

A kind of bridge prefabrication substructure
Technical field
The utility model belongs to bridge structure rapid construction, prefabrication technical field of construction.
Background technology
The concept of prefabricated installation is accepted already, but mainly to superstructure.Beams of concrete or girder steel are in factory After completing, building site is transported to, only waits Bent beam to finish, it is possible to which roof beam structure is got on.At present, prefabricated installation concept is expanding Open up substructure.Bent cap and column start to be prefabricated in the factory, then transport to building site installation.For example, the U.S. some without earthquake Area has been carried out this technique if (such as moral gram Long Si states).But in some earthquake prone areas, just seldom in this way. From structurally saying, two components of column and bent cap use prefabricated installation most convenient.Because they are all straight-bars, make, transport, hang Dress is all very simple.But in earthquake areas, problem is exactly appeared on both linkage interfaces.From antidetonation angle, this interface It is most critical position, it is desirable to which the position will have enough intensity and ductility.And in most cases, the prefabricated peace of bent cap column Dress can cause anti-seismic performance to decline.
The domestic research of substructure precast segment assembling technique and application are relatively fewer, but just gradually obtain China engineer Concern and attention.Precast segment assembly bridge pier is that bridge is vertically divided into some block parts, such as cushion cap, column, bent cap, work Factory is prefabricated, transports to construction site, on-site consolidation.Engineering prefabricated components easily standardize, the advantages of more playing precasting process: Pre-fabricated factory, easy to quality control;It is small to surrounding enviroment and traffic impact;The safety that danger zone operation can be effectively eliminated is hidden Suffer from;Precast concrete shrinkage and creep is small etc..
In huge highway bridge colony, there are about 1/4 bridge is weathered out-of-date or afunction.That is, There is thousands of bridge to need repairing, reinforce or replace.The transformation and upgrade of bridge, undoubtedly part of taking a long view is meddlesome, is It is necessary;But consider from instantly, it can bring the deuce to pay to daily traffic.Break off a friendship, traffic disturbance can not only be caused by detouring, and And user's delay time at stop and unnecessary fuel consumption can be also caused, economic loss is huge.Therefore, process is reconstructed in bridge strengthening In, it should try one's best and shorten the construction period, minimally disturb traffic.
It undoubtedly can more be speeded up the work than cast-in-place using the construction of prefabricated installation method, reduce field operation time, this is The conclusion having already been confirmed.Prefabricated mounting process can be completed with parallel operations, extensive work in factory, few occupancy scene Room and time, it is not necessary to close traffic for a long time and detour.In addition, also reduce the danger that worker works in chaotic scene Property.
Existing prefabricated substructure, is bent cap, pier stud, basis separately prefabricated, each position joint connection in site, but pier stud and base Connection mode or complexity or anti-seismic performance between plinth cannot be guaranteed.
The content of the invention
The purpose of this utility model is to provide a kind of bridge prefabrication substructure, is connected with solving the prefabricated substructure in high earthquake region The technical problems such as the reliability connect, can meet Short/Medium Span Bridge rapid construction requirement, effectively shorten the construction period, and reduce bridge construction Influence to traffic.
In order to realize foregoing invention purpose, technical solution is as follows used by the utility model:
A kind of bridge prefabrication substructure, including integrated prefabricated bent cap, pier stud;Prefabricated bent cap, pier stud are in factory Integral assembling reinforcement, the structure of formed by integrally casting concrete;Bent cap is connected with pier stud uses bar connecting form, pier stud stress main reinforcement Bent cap is stretched into, and built-in length need to meet anchorage length requirement;The Extended chemotherapy of Precast Pier Columns insertion cast in situs is reserved recessed In groove, pier stud is filled with rapid hardening high-strength concrete with groove gap.
The utility model has the advantages that the prefabricated substructure connectivity problem in high earthquake region can be solved, it can meet middle-small span Beam rapid construction requirement, effectively shortens the construction period, and reduces influence of the bridge construction to traffic.
Brief description of the drawings
Fig. 1 is the cross-section of bridge schematic diagram of the utility model.
Fig. 2 is the monolithic substructure schematic diagram of the utility model.
Fig. 3 is the side view of Fig. 2.
Numbered in figure:1st, integrated prefabricated lower member, 2, cast-in-place Extended chemotherapy, 3, Precast Pier Columns, 4, prefabricated bent cap, 5, Extended chemotherapy reserves groove, and 6, block.
Embodiment
The structure of the utility model is referring to shown in Fig. 1,2,3.The utility model is using horizontal piecemeal, monolithic bent cap, pier stud Overall prefabrication.Extended chemotherapy cast in situs and reserved groove.Precast Pier Columns are inserted into Extended chemotherapy groove, pier by construction site Column and groove gap cast-in-place concrete filling.Horizontal piecemeal avoids bent cap and pier stud node joint connection in site, and pier stud insertion expands Basic groove makes pier stud main reinforcement not cut off in Extended chemotherapy and pier stud interface, solves prefabricated components node anti-seismic problem.Under Portion's structure piecemeal quantity need to determine according to unit in charge of construction's Lifting Capacity, as shown in Figure 1.
Monolithic substructure is specifically arranged as shown in Figure 2,3.It is made of bent cap, pier stud two parts, it is whole in factory for prefabrication Body pouring construction.Bent cap, pier stud connection use bar connecting form, and pier stud stress main reinforcement stretches into bent cap, and built-in length need to expire Sufficient anchorage length requirement.Connecting node is conventional coupling arrangement in shop, and construction is simple, meets corresponding code requirement .

Claims (1)

1. a kind of bridge prefabrication substructure, it is characterised in that including integrated prefabricated bent cap, pier stud;Prefabricated bent cap, pier stud It is the structure in factory's one assembling reinforcement, formed by integrally casting concrete;Bent cap is connected with pier stud uses bar connecting form, pier stud Stress main reinforcement stretches into bent cap, and built-in length need to meet anchorage length requirement;Precast Pier Columns are inserted into the Extended chemotherapy of cast in situs In reserved groove, pier stud is filled with rapid hardening high-strength concrete with groove gap.
CN201720846073.1U 2017-07-13 2017-07-13 A kind of bridge prefabrication substructure Active CN207227935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720846073.1U CN207227935U (en) 2017-07-13 2017-07-13 A kind of bridge prefabrication substructure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720846073.1U CN207227935U (en) 2017-07-13 2017-07-13 A kind of bridge prefabrication substructure

Publications (1)

Publication Number Publication Date
CN207227935U true CN207227935U (en) 2018-04-13

Family

ID=61852329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720846073.1U Active CN207227935U (en) 2017-07-13 2017-07-13 A kind of bridge prefabrication substructure

Country Status (1)

Country Link
CN (1) CN207227935U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN110093862A (en) * 2019-05-31 2019-08-06 浙江省交通规划设计研究院有限公司 Vertically and horizontally assembled three working face Bridge Erectors and bent cap can be achieved without sidewalk section assembling engineering method
CN110359363A (en) * 2019-07-26 2019-10-22 山东建筑大学 Prestressing force assembled Self-resetting bridge pier column node and method are cohered in a kind of part
WO2020001156A1 (en) * 2018-06-29 2020-01-02 比亚迪股份有限公司 Bridge and bridge pier thereof
CN112647619A (en) * 2020-12-17 2021-04-13 西南科技大学 Construction method of assembled large-span internal partition wall
CN112796202A (en) * 2021-01-27 2021-05-14 广东省交通规划设计研究院股份有限公司 Bridge splicing structure and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN108547216B (en) * 2018-06-12 2023-07-11 北京市市政工程设计研究总院有限公司 Bridge precast concrete pier column and bridge foundation tooth key socket structure and construction method
WO2020001156A1 (en) * 2018-06-29 2020-01-02 比亚迪股份有限公司 Bridge and bridge pier thereof
CN110093862A (en) * 2019-05-31 2019-08-06 浙江省交通规划设计研究院有限公司 Vertically and horizontally assembled three working face Bridge Erectors and bent cap can be achieved without sidewalk section assembling engineering method
CN110093862B (en) * 2019-05-31 2024-04-05 浙江数智交院科技股份有限公司 Three-working-face bridge girder erection machine capable of realizing longitudinal and transverse assembly and bent cap non-channel segment assembly construction method
CN110359363A (en) * 2019-07-26 2019-10-22 山东建筑大学 Prestressing force assembled Self-resetting bridge pier column node and method are cohered in a kind of part
CN112647619A (en) * 2020-12-17 2021-04-13 西南科技大学 Construction method of assembled large-span internal partition wall
CN112796202A (en) * 2021-01-27 2021-05-14 广东省交通规划设计研究院股份有限公司 Bridge splicing structure and construction method thereof
CN112796202B (en) * 2021-01-27 2024-09-13 广东省交通规划设计研究院集团股份有限公司 Bridge assembly structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN207227935U (en) A kind of bridge prefabrication substructure
CN207079479U (en) A kind of prefabricated pier of highway bridge is connected locating structure with basis
CN104631659B (en) Prefabricated assembled band steel plate concealed bracings overlaid plate type concrete coupled shear wall
CN106049691B (en) A kind of fully-prefabricated assembled steel tube confinement frame joint
CN205742613U (en) A kind of prefabricated assembled overlapped shear wall structure connected by high-strength bolt
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106836479A (en) A kind of prefabricated PC concrete frame structure
CN207062745U (en) A kind of bridge prefabricated abutment pier abutment component entirely
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN106760036B (en) A kind of prefabricated steel-combined concrete shear wall
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN106368348A (en) Overlapped combined shear wall with double-phase stress characteristic
CN108086592A (en) A kind of detached column and construction method
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN105986621B (en) Prefabrication beam column built from concrete shaped steel combination connecting node constructs and method
CN107882234A (en) A kind of connecting node between the vertical member and floor of plate-column structure
CN107165038B (en) A kind of complete prefabricated substructure and construction method of bridge
CN108867885A (en) The damping energy dissipation assembly node and its construction method of prefabricated post and integral preform beam slab
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN105951984B (en) A kind of high ductility prefabricated integral frame mid-side node connection structure and construction method
CN105625571A (en) Prefabricated concrete beam-column joint using medium-strength prestressed tendons
CN207062744U (en) A kind of complete prefabricated middle pier component of bridge
CN205369005U (en) Joint construction of annular cross -section prefabricating bridge pier and cushion cap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant