CN106760036B - A kind of prefabricated steel-combined concrete shear wall - Google Patents

A kind of prefabricated steel-combined concrete shear wall Download PDF

Info

Publication number
CN106760036B
CN106760036B CN201611243912.7A CN201611243912A CN106760036B CN 106760036 B CN106760036 B CN 106760036B CN 201611243912 A CN201611243912 A CN 201611243912A CN 106760036 B CN106760036 B CN 106760036B
Authority
CN
China
Prior art keywords
steel plate
shear wall
prefabricated
notch
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611243912.7A
Other languages
Chinese (zh)
Other versions
CN106760036A (en
Inventor
关巧英
王培军
胡树青
李阳
马国润
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Steel Ltd By Share Ltd
Original Assignee
China Steel Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Steel Ltd By Share Ltd filed Critical China Steel Ltd By Share Ltd
Priority to CN201611243912.7A priority Critical patent/CN106760036B/en
Publication of CN106760036A publication Critical patent/CN106760036A/en
Application granted granted Critical
Publication of CN106760036B publication Critical patent/CN106760036B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/14Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements being composed of two or more materials

Abstract

A kind of prefabricated steel-combined concrete shear wall, shear wall include middle steel plate, concrete layer, continuous bending reinforcing steel bar, stiffener;There is concrete layer in middle steel plate two sides, middle steel plate edge stretches out the concrete layer certain length of two sides, and the continuous bending reinforcing steel bar arranges that solid welding is in middle steel plate two sides in the same direction;Middle steel plate reserves notch at floor, is welded with the stiffener on middle steel plate sponson at notch.The problem of invention bearing capacity is high, and shear wall cross section is uniform, does not leak column, guarantees the bonding of concrete and steel plate, prevents crack from generating.Continuous bending reinforcing steel bar is to disconnect at reserved notch, avoids the connection of vertical reinforcement, eliminates grout sleeve connection charge, reduces project cost.Scene splicing is completed by bolt or welding, the convenient and efficient saving duration.Prefabrication reduces construction stage template consumption, facilitates construction.There is concrete layer protection outside continuous bending reinforcing steel bar and stiffener, solves the problems, such as fire retardant anticorrosion and cold-heat bridge problem.

Description

A kind of prefabricated steel-combined concrete shear wall
Technical field
The present invention relates to construction engineering technical field, in particular to a kind of prefabricated steel-combined concrete shear wall.
Background technique
In the prior art, shear wall has concrete shear force wall and steel plate shear force wall.
Concrete shear force wall divides cast-in-place concrete shear wall and prefabricated assembled shear wall again.Cast-in-place concrete shear wall is existing Field assembling reinforcement heavy workload, on-site wet operation amount is big, and construction efficiency is low, and construction cost is high;The wall of prefabricated assembled shear wall Plate part is prefabricated in the factory, after-pouring concrete together with the bindings such as reserved steel bar scene and edge member column.It is prefabricated assembled Shear wall structure realizes pre-erection industrialized production, can reduce formwork and concrete construction wet construction amount, and opposite shorten is applied The work period.But when on-site consolidation, longitudinal reinforcement need to be connected using grout sleeve, influenced, be vertically connected with tired by vertical muscle position deviation Difficulty, there are biggish construction hidden danger.
Steel plate shear force wall divides conventional combination steel plate shear force wall and prefabricated steel compound shear wall again.Conventional combination steel plate shearing Wall is to weld peg, outside assembling reinforcement net, then casting concrete in middle steel plate.Current this shear wall structure majority uses work Ground assembling reinforcement, building site casting concrete.Although this shear wall globality is relatively good, on-site wet operation amount is big, construction week Phase is long, and environmental pollution is serious.If such shear wall is changed to prefabrication, due to the presence of vertical reinforcement, vertical steel There is very big problem in muscle overlap joint, need embedded sleeve barrel, therefore cost will increase.There are also a kind of concrete filled double-layer plates to combine Shear wall structure belongs to precast shear wall, is that will fill out between double-layer plate in concrete, and with peg that steel plate is tight with concrete Close coupling is closed, although this shear wall can be with prefabrication, whole steel using amount is larger, and there are fire retardant anticorrosion, cold-heat bridges etc. Problem.
China Patent No. CN201310206999.0, a kind of disclosed entitled " the more Tall Steel shaped Columns of assembled of one kind The frame steel plate shear force wall of frame-steel plate shear wall structure system ", the steel plate of the shear wall are set in inside frame beam column, though Right prefabricated rate is relatively high, but there is a problem of that frame beam column section is exposed, does not have the confining parts such as concrete outside steel plate, is easy Out-of-plane buckling unstability occurs.China Patent No. CN201320068497.1, disclosed one kind is entitled, and " combination fashioned iron box-shaped steel plate is cut Power wall " is that have several " H " shape fashioned iron to splice, weld stud and casting concrete, this shear wall in the cavity that splicing surrounds Although pouring conveniently, it is not required to formwork, since fashioned iron wall is exposed, fire retardant anticorrosion problem is serious, and since shape steel web passes through Logical shear wall whole thickness, causes cold-heat bridge problem serious.
Summary of the invention
To overcome problems of the prior art, it is assembled convenient that the present invention provides a kind of processing, securely and reliably, performance Superior prefabricated steel-combined concrete shear wall.This kind of shear wall had not only accomplished prefabrication but also had solved precast shear wall Two hang-ups of hardly possible of constructing.
The technical scheme adopted by the invention to solve the technical problem is that: this kind of prefabricated steel-combined concrete shear wall, Shear wall includes: middle steel plate, concrete layer, continuous bending reinforcing steel bar, stiffener;There is concrete layer in middle steel plate two sides, in Between steel plate edge stretched out from the concrete layer of two sides, the continuous bending reinforcing steel bar arranges that solid welding is in middle steel plate two sides in the same direction;In Between steel plate notch is reserved at floor, be welded with the stiffener on middle steel plate sponson at notch.
Further, steel plate, no concrete layer are only retained at the notch.
Further, the middle steel plate reserves prefabricated equidistant hole, floor support at notch in floor and bears curved muscle and pass through The equidistant hole.
Further, the continuous bending reinforcing steel bar bending shape can be triangle or rectangle.
Further, distribution bar is bound in the direction perpendicular to continuous bending reinforcing steel bar.
Further, continuous bending reinforcing steel bar is reserved in floor and is disconnected at notch.
Further, the stiffener needs Transducers Embedded in Concrete layer at least 50mm.
Further, the shear wall edge is equipped with confined boundary member, and the confined boundary member includes longitudinal solid welding What it is in middle steel plate two sides longitudinal direction elongated strength plate and the stirrup that is welded on the outside of middle steel plate, and longitudinal elongated strength plate is reserved in floor It is not turned off at notch.
Further, when prefabricated steel-combined concrete shear wall scene splicing, middle steel plate is connected using welding or bolt It connects.
Further, it is linear type, L shape, cross, T shape that prefabricated steel-combined concrete shear wall, which can be made into cross section, Shape.
To sum up, the advantageous effects of the above technical solutions of the present invention are as follows:
1, prefabricated steel of the present invention-combined concrete shear wall reasonable stress, bearing capacity is high, and shear wall cross section is equal Even, the problem of not leaking column, be very ideal high residential building structural elements.
2, prefabricated steel-combined concrete shear wall is sheared using continuous bending reinforcing steel bar instead of conventional steel plates in the present invention Peg and steel mesh on wall guarantee the bonding of concrete and steel plate, prevent crack from generating.Processing and fabricating is more convenient, economical Excellent performance.
3, continuous bending reinforcing steel bar is to disconnect at reserved notch in the present invention, avoids the connection of vertical reinforcement, removes from Grout sleeve connection charge reduces project cost.
4, prefabricated steel-combined concrete shear wall middle steel plate is reserved at notch in floor according to support in the present invention Curved muscle preformed open-cell is born, convenient for passing through for seat shoulder bar, guarantees the continuity of floor.
5, the splicing in the present invention between prefabricated steel-combined concrete shear wall at the scene be by bolt or welding come It realizes, it is convenient and efficient, save the duration.
6, prefabricated steel-combined concrete shear wall is prefabricated in the factory in the present invention, reduces construction stage template consumption, Facilitate construction.
7, there is concrete layer protection outside continuous bending reinforcing steel bar and stiffener in the present invention, solve the problems, such as fire retardant anticorrosion and cold Heat bridge problem.
8, prefabricated steel-combined concrete shear wall scene stitching position is located at a flooring absolute altitude up meter Zuo in the present invention The right side, convenient for construction.
Detailed description of the invention
Fig. 1 is monolithic prefabricated steel-combined concrete shear wall plane perspective view.
Fig. 2 is monolithic prefabricated steel-combined concrete shear wall lateral perspective view.
Fig. 3 is prefabricated steel-combined concrete shear wall plane perspective view of monolithic belt edge component.
Fig. 4 is prefabricated steel-combined concrete shear wall lateral perspective view of monolithic belt edge component.
Fig. 5-1 is one prefabricated steel of embodiment-combined concrete shear wall continuity reinforcement(bar) bending shape.
Fig. 5-2 is two prefabricated steels of embodiment-combined concrete shear wall continuity reinforcement(bar) bending shape.
Fig. 6-1 is the longitudinal perspective view of corresponding diagram 5-1 monolithic prefabricated steel-combined concrete shear wall.
Fig. 6-2 is the longitudinal perspective view of corresponding diagram 5-2 monolithic prefabricated steel-combined concrete shear wall.
In Fig. 6 figure:
1 middle steel plate, 2 concrete layers, 3 continuous bending reinforcing steel bars, the horizontally-spliced place's stiffener of 4 shear walls, 5 shear walls are longitudinal Stitching portion stiffener, stiffener at 6 shear wall floor plates, 7 longitudinal elongated strength plates, 8 stirrups, 9 floor supports bear curved muscle hole.
Specific embodiment
Feature and principle of the invention are described in detail below in conjunction with attached drawing 1-6, illustrated embodiment is only used for explaining The present invention is not limited the scope of protection of the present invention with this.
As shown in Figure 1, prefabricated steel-the combined concrete shear wall, mainly includes middle steel plate 1, concrete layer 2, connects Continuous bending reinforcing steel bar 3, stiffener four are most of.There are concrete layer, coagulation of the middle steel plate edge from two sides in middle steel plate two sides Soil layer stretches out certain length, and extension, as long as meeting connection relationship needs, is connected by screw bolts without too long with facilitating Or welding.Continuous bending reinforcing steel bar is vertical in the same direction on middle steel plate to be arranged, it is solid in middle steel plate two sides continuously to bend steel bar welding.Such as Shown in Fig. 5-Fig. 6, continuous bending reinforcing steel bar bending shape can be triangle or rectangle, and can be according to stress needs, in vertical continuous The direction of bending reinforcing steel bar binds distribution bar.Continuous bending reinforcing steel bar plays the cementation between enhancing steel plate and concrete, and prevents Only concrete cracking.
As depicted in figs. 1 and 2, middle steel plate reserves notch at floor, and continuous bending reinforcing steel bar is reserved at notch in floor It disconnects.Only retain steel plate, no concrete layer at the notch.The stiffener is welded at notch on middle steel plate sponson. There is the horizontally-spliced place's stiffener 4 of shear wall in the lower edges solid welding of middle steel plate, is set in the left and right sides edge of middle steel plate There is shear wall vertical splicing part stiffener 5, solid welding there are stiffener 6 at floor plates at upper sub-floor plates, and the stiffener need to bury Enter concrete layer at least 50mm.
Middle steel plate reserves prefabricated equidistant hole (floor support bears curved muscle hole 9) at notch in floor, so as to floor branch Seat is born curved muscle and is passed through, and hole site and size are born curved muscle according to floor board support and determined.
As shown in Figure 3 and Figure 4, shear wall edge is equipped with confined boundary member, enhances the bonding between steel plate and concrete Effect, and prevent concrete cracking.The confined boundary member includes longitudinal direction elongated strength of longitudinal solid welding in middle steel plate two sides Plate 7 and the stirrup 8 being welded on the outside of middle steel plate, longitudinal elongated strength plate is reserved in floor not to be turned off at notch.
When prefabricated steel-combined concrete shear wall scene splicing, middle steel plate is using welding or bolt connection.Pre-manufactured steel It is linear type, L shape, cross, T-shape that plate-combined concrete shear wall, which can be made into cross section,.
When the scene splicing of the steel plate shear force wall, middle steel plate is connected using welding or bolt first, is then installed Template pours the concrete of joint.
Steel plate shear force wall scene stitching position is at up one meter or so of flooring absolute altitude, convenient for construction.Specific splicing is high Degree can be according to installation habit adjustment.Prefabricated steel-combined concrete shear wall monolithic height suggestion takes index bed high in the present invention, Width is determined according to actual shipment condition and on-site hoisting ability etc..
The continuous bending reinforcing steel bar 3 is vertically welded in middle steel plate two sides in parallel, then pours two sides concrete layer 2.It is pouring Before building concrete, the horizontally-spliced place's stiffener 4 of the shear wall and shear wall vertical splicing part stiffener 5 are welded in notch in advance Locate 1 two sides of middle steel plate.Before casting concrete, stiffener 6 is welded in shear wall splicing in advance at the shear wall floor plates 1 side of middle steel plate at end.In the compound shear wall with edge member, before casting concrete 2, the longitudinal direction is elongated Steel plate 7 is welded in advance on middle steel plate 1, and stirrup 8 is welded in advance on longitudinal elongated steel plate 7 and middle steel plate 1.The two sides coagulation The height of lift height pattern of soil layer 2 should meet continuous bending reinforcing steel bar 3, stiffener and steel plate longitudinally elongated 7 and stirrup 8 concrete protect The requirement of covering thickness.
The problem of invention bearing capacity is high, and shear wall cross section is uniform, does not leak column, is very ideal high residential building structure Component.Using continuous bending reinforcing steel bar instead of the peg and steel mesh on conventional steel plates shear wall, guarantee concrete and steel plate Bonding, prevents crack from generating.Processing and fabricating is more convenient, and economic performance is good.Continuous bending reinforcing steel bar is to disconnect at reserved notch , the connection of vertical reinforcement is avoided, grout sleeve connection charge is eliminated, reduces project cost.Middle steel plate is pre- in floor It stays and curved muscle preformed open-cell is born according to support at notch, convenient for passing through for seat shoulder bar, guarantee the continuity of floor.Prefabricated steel- Splicing between combined concrete shear wall at the scene is realized by bolt or welding, convenient and efficient, saves the duration.In advance Steel plate-concrete combined shear wall processed is prefabricated in the factory, and reduces construction stage template consumption, facilitates construction.Continuous bent steel There is concrete layer protection outside muscle and stiffener, solves the problems, such as fire retardant anticorrosion and cold-heat bridge problem.Live stitching position is located at building Up one meter or so of face absolute altitude, convenient for construction.
Above-described embodiment is only the description that carries out to the preferred embodiment of the present invention, not to the scope of the present invention into Row limits, without departing from the spirit of the design of the present invention, relevant technical staff in the field to various modifications of the invention and It improves, should all expand in protection scope determined by claims of the present invention.

Claims (5)

1. a kind of prefabricated steel-combined concrete shear wall, which is characterized in that shear wall include: middle steel plate, concrete layer, Continuous bending reinforcing steel bar, stiffener;There is concrete layer in middle steel plate two sides, middle steel plate edge is stretched from the concrete layer of two sides Out, the continuous bending reinforcing steel bar arranges that solid welding is in middle steel plate two sides in the same direction;Middle steel plate reserves notch, notch at floor The stiffener is welded on place's middle steel plate sponson;The stiffener needs Transducers Embedded in Concrete layer at least 50mm;
Only retain steel plate, no concrete layer at the notch;
The continuous bending reinforcing steel bar bending shape can be triangle or rectangle;In the direction binding point perpendicular to continuous bending reinforcing steel bar Cloth reinforcing bar;
Continuous bending reinforcing steel bar is reserved in floor and is disconnected at notch;
The horizontally-spliced position in steel plate shear force wall scene takes at floor absolute altitude one meter above height.
2. a kind of prefabricated steel-combined concrete shear wall according to claim 1, which is characterized in that the intermediate steel Plate reserves prefabricated equidistant hole at notch in floor, and floor support bears curved muscle across the equidistant hole.
3. a kind of prefabricated steel-combined concrete shear wall according to claim 1, which is characterized in that the shear wall Edge is equipped with confined boundary member, and the confined boundary member includes longitudinal direction elongated strength plate of longitudinal solid welding in middle steel plate two sides With the stirrup being welded on the outside of middle steel plate, longitudinal elongated strength plate is reserved in floor not to be turned off at notch.
4. a kind of prefabricated steel-combined concrete shear wall according to claim 1, which is characterized in that prefabricated steel-is mixed When solidifying local soil type's combination shearing wall scene splicing, middle steel plate is using welding or bolt connection.
5. a kind of prefabricated steel-combined concrete shear wall according to claim 1, which is characterized in that prefabricated steel-is mixed It is linear type, L shape, cross, T-shape that solidifying local soil type's combination shearing wall, which can be made into cross section,.
CN201611243912.7A 2016-12-29 2016-12-29 A kind of prefabricated steel-combined concrete shear wall Active CN106760036B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611243912.7A CN106760036B (en) 2016-12-29 2016-12-29 A kind of prefabricated steel-combined concrete shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611243912.7A CN106760036B (en) 2016-12-29 2016-12-29 A kind of prefabricated steel-combined concrete shear wall

Publications (2)

Publication Number Publication Date
CN106760036A CN106760036A (en) 2017-05-31
CN106760036B true CN106760036B (en) 2019-04-26

Family

ID=58927551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611243912.7A Active CN106760036B (en) 2016-12-29 2016-12-29 A kind of prefabricated steel-combined concrete shear wall

Country Status (1)

Country Link
CN (1) CN106760036B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107842132B (en) * 2017-12-14 2024-01-09 兰州理工大学 Connecting device and connecting method for bending shear resistant precast reinforced concrete shear wall
CN108265856A (en) * 2018-01-19 2018-07-10 天津大学 A kind of steel plate embedded part formula PC shear walls splice joint structure
CN108661208B (en) * 2018-04-28 2020-04-24 河南城建学院 Horizontal node connection method for assembled steel plate concrete shear wall
CN109629669A (en) * 2019-01-14 2019-04-16 重庆大学 A kind of dual peacetime assembled dismountable steel structure system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3867805A (en) * 1972-05-18 1975-02-25 Kajima Corp Method of forming joint construction of precast concrete columns and beams
CN103883034A (en) * 2014-03-14 2014-06-25 东南大学 Assembled shear wall and wall-beam connecting structure with edge restraining component
CN103924687A (en) * 2013-01-14 2014-07-16 上海核工程研究设计院 Connection method of steel plate-concrete composite shear wall and concrete shear wall
CN103981981A (en) * 2014-03-31 2014-08-13 浙江杭萧钢构股份有限公司 Double-steel-plate concrete combined shear wall connected through waveform reinforced bars
CN105544801A (en) * 2016-01-28 2016-05-04 湖南大学 Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN106168057A (en) * 2016-08-30 2016-11-30 河北建筑工程学院 A kind of assembled steel lath band combined concrete shear wall and making construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3867805A (en) * 1972-05-18 1975-02-25 Kajima Corp Method of forming joint construction of precast concrete columns and beams
CN103924687A (en) * 2013-01-14 2014-07-16 上海核工程研究设计院 Connection method of steel plate-concrete composite shear wall and concrete shear wall
CN103883034A (en) * 2014-03-14 2014-06-25 东南大学 Assembled shear wall and wall-beam connecting structure with edge restraining component
CN103981981A (en) * 2014-03-31 2014-08-13 浙江杭萧钢构股份有限公司 Double-steel-plate concrete combined shear wall connected through waveform reinforced bars
CN105544801A (en) * 2016-01-28 2016-05-04 湖南大学 Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN106168057A (en) * 2016-08-30 2016-11-30 河北建筑工程学院 A kind of assembled steel lath band combined concrete shear wall and making construction method thereof

Also Published As

Publication number Publication date
CN106760036A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN102808465B (en) Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination
CN202831203U (en) Assembly type concrete frame-shear wall split assembling structure and fabricative structure
CN106760036B (en) A kind of prefabricated steel-combined concrete shear wall
CN106677339A (en) Assembly integral type concrete frame structure of dry-wet mixed connection of nodes and construction method
CN202831296U (en) Assembled spliced connecting structure of concrete frame-shear wall and structure constructed
CN206016011U (en) A kind of steel plate concrete composite beam panel structure system
CN105297887A (en) Three-dimensional light steel framework composed of bidirectional continuous twin beams
CN103104053A (en) Assembled concrete shear wall and construction method thereof
CN102900168A (en) Splitting and assembling structure and assembling connecting method of assembled type concrete frame-shear wall
CN102561553A (en) Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof
CN104532997A (en) Assembly type floor system and construction method thereof
KR101225661B1 (en) Concrete shear key strengthened with steel cover plate and tension member and the construction method therewith
CN106759900A (en) Assembled architecture agent structure
KR20110032687A (en) Construction method for joining steel or reinforced steel concrete column and beam with reinforcing end part
CN211848855U (en) Novel swift formula modularization decking seam structure
CN108729564A (en) Assembled architecture system
CN108179809A (en) The connection method of assembled steel tendon concrete frame structure component
CN106522552B (en) A kind of assembled plate-column structure floor and its division methods and floor panels component
CN207538322U (en) A kind of prefabricated PC concrete frame frame system
KR100676627B1 (en) Shear reinforcement device arranged in the slab-column connection and the shear reinforcement structure using the device
CN105220792B (en) A kind of prefabricated concealed bracings energy-consuming shear wall and its assemble method
CN207110083U (en) Assembled architecture system
CN105089182B (en) A kind of concrete partition system and its construction method for steel construction
CN208918133U (en) A kind of assembly concrete beam connection structure
CN108005304A (en) A kind of prefabricated PC concrete frame frame system and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant