CN105293163B - Iron tower of power transmission line stake actinobacillus device and its construction method - Google Patents

Iron tower of power transmission line stake actinobacillus device and its construction method Download PDF

Info

Publication number
CN105293163B
CN105293163B CN201510774735.4A CN201510774735A CN105293163B CN 105293163 B CN105293163 B CN 105293163B CN 201510774735 A CN201510774735 A CN 201510774735A CN 105293163 B CN105293163 B CN 105293163B
Authority
CN
China
Prior art keywords
connecting rod
spool
pin
directive wheel
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510774735.4A
Other languages
Chinese (zh)
Other versions
CN105293163A (en
Inventor
高世龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.
Boao Zongheng Network Technology Co ltd
Original Assignee
Anhui Xiang Yue Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xiang Yue Construction Engineering Co Ltd filed Critical Anhui Xiang Yue Construction Engineering Co Ltd
Priority to CN201510774735.4A priority Critical patent/CN105293163B/en
Publication of CN105293163A publication Critical patent/CN105293163A/en
Application granted granted Critical
Publication of CN105293163B publication Critical patent/CN105293163B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of iron tower of power transmission line stake actinobacillus device and its construction method, including bottom plate, the bottom plate is equipped with dovetail groove, and support plate is caught in dovetail groove by bottom linker and is mounted on bottom plate, it is characterised in that:Pin folder is installed in the support plate, connecting rod one, connecting rod two and connecting rod three form tripod and are mounted on above support plate, wherein:Connecting rod one is equipped with shaft tray with two junction of connecting rod, and two bottom of connecting rod is penetrated equipped with pin four in support plate;Connecting rod one is connect by pin two with connecting rod three, and connecting rod threeway overregulates pin and penetrates fixation in pin folder;Beneficial effects of the present invention:The present apparatus is fixed on above transport vehicle, its advance unwrapping wire, while spool convenient disassembly are driven by vehicle, need not expend too many manpower, it is fast that device goes out linear velocity, while not being wound between outlet circuit, is suitble to promote the use of.

Description

Iron tower of power transmission line stake actinobacillus device and its construction method
Technical field
The present invention relates to a kind of electric power network constructing devices, and in particular to a kind of iron tower of power transmission line stake actinobacillus device and its Construction method belongs to technical field of electric power construction.
Background technology
Power engineering(electric power engineering), i.e., with the production of electric energy, conveying, the related work of distribution Journey further includes broadly the engineering that electricity is applied as power and energy in multiple fields.Its bubbling area is by being mutually juxtaposed Angle steel composition, the orientation of angle steel is parallel with liquid flow path direction.In lower part, section is in " V " word on the wedge angle side of steel tower stake angle steel Shape has between two neighboring angle steel certain grid seam, downspout identical as general column plate.The liquid of a upper plate passes through downspout stream Enter " V " font angle steel, and when gas is then sewed on liter by grid, is bubbled with liquid, carries out mass transport process, the gas-liquid on column plate Flow regime is similar with sieve plate.Angle iron tower plate pressure drop is smaller, and gas phase flux is larger, and plate efficiency is preferable, simple in structure, processing system It makes conveniently, rigidity is preferable.
As Patent publication No CN203674641U discloses a kind of cable pay-off rack, including it is used to be arranged in common trench Angle bar on holder, holder can be fixed at the corner of common trench;The first level of a metope side in corner can be located at Roller, first level roller are arranged on holder;The second horizontal cylinder of another metope side in corner can be located at, second is horizontal Roller is arranged on holder, and can bypass first level roller and the second horizontal cylinder successively when cable traveling;For preventing The first vertical roller that cable is moved to corner side, the first vertical roller are located at side of the holder close to corner.The utility model It between cable pay-off rack is rolling friction at corner to make cable, reduces rubbing of being subject at corner in cabling process Power is wiped, reduces the abrasion of cable surface, and then improve power supply reliability, while also improving the construction effect of cable laying Rate.The utility model additionally provides a kind of cable-laying gear with above-mentioned cable pay-off rack.
For another example Patent publication No CN203883439U discloses a kind of cable drum carriage, including vehicle frame, is installed on vehicle frame two Two wheels of side, by shaft I rotational installation on vehicle frame drum, be fixed on vehicle frame magnetic powder brake, be fixed on On vehicle frame and the accumulator that is connected to the encoder of a certain wheel shaft and is installed on vehicle frame, I one end of the shaft passes through Key connection is fixed in the endoporus of magnetic powder brake, and the magnetic powder brake is connected to accumulator, the coding by relay Device is connected to the control terminal of relay.When using this cable drum carriage unwrapping wire, vehicle wheel rotation is slow, and encoder detects wheel and turns Speed, when unwrapping wire finishes, and moves this cable drum carriage, encoder detection vehicle wheel rotational speed is got higher, and is controlled relay at this time and is attracted, leads Logical accumulator and magnetic powder brake, locking lives shaft I after magnetic powder brake is powered, and drum is no longer able to turn at this time, therefore effectively It prevents in wire barrow moving process, since the either wire coil eccentric that jolts occurs there is a situation where cable freely discharges.
Currently, the construction of line work between iron tower of power transmission line stake is excessively heavy, since the bore of high-voltage line is thicker, Weight is big, needs that spool is manually pushed to advance in erection process, is also required to manually tighten when being tightened, and speed is slow, Construction personnel's heavy workload.Simultaneously in outlet, for spool since weight is big, winding displacement is also relatively difficult.
Invention content
The present invention overcomes problems of the existing technology, it is proposed that a kind of iron tower of power transmission line stake actinobacillus device and its applies Work method, the device and its construction method are between iron tower of power transmission line stake when the construction of line, and easy to use, saving manpower goes out Linear velocity is fast, while not being wound between outlet circuit.
The specific technical solution of the present invention is as follows:Iron tower of power transmission line stake actinobacillus device, including bottom plate are set on the bottom plate There are dovetail groove, support plate to be caught in dovetail groove and be mounted on bottom plate by bottom linker, it is characterised in that:The support plate On pin folder is installed, connecting rod one, connecting rod two and connecting rod three form tripod and are mounted on above support plate, wherein:Connecting rod one with Two junction of connecting rod is equipped with shaft tray, and two bottom of connecting rod is penetrated equipped with pin four in support plate;Connecting rod one by pin two with Connecting rod three connects, and connecting rod threeway overregulates pin and penetrates fixation in pin folder;
Spool is installed on the shaft tray, spool both sides are equipped with fixed plate, sensor are equipped on shaft tray, Bearing support block is installed, screw rod is mounted on bearing support block, and described screw rod one end is connected with motor on the bottom plate;Institute It states and is connected with signal wire between motor and sensor;
Directive wheel is also equipped on the screw rod, the connection of directive wheel fixed seat is mounted below directive wheel, the directive wheel Split directive wheel is also equipped in fixed seat;Lift dog is also equipped on bottom plate, wire sleeve is mounted on lift dog;It is described Bottom base plate is equipped with fixed block, and bar location hole is offered in fixed block.
Preferentially, the spool both sides are also equipped with handle, and connecting rod is connected between handle, and guiding is equipped on connecting rod One is taken turns, friction plate is additionally provided on the handle;Handle bottom is equipped with dismountable spring.
Preferentially, the bottom base plate is also equipped with supporting rack, and universal wheel is mounted on above supporting rack.The universal wheel can It is folded left and right on supporting rack, the thickness of the fixed block is less than the thickness of supporting rack.
In addition, the present invention also provides a kind of manual payingoff construction method of iron tower of power transmission line stake actinobacillus device, feature It is, includes the following steps:
1)Universal wheel folding is packed up, single unit system is placed on transport vehicle, stock is passed through into car body and is determined across bar Position hole makes single unit system securely fix on the car body;2)By the way that manually handle is pushed;3)It is fulcrum with pin four, by shaft tray Pull-up, connecting rod one change with two position of connecting rod, reduce the position of shaft tray;4)Using manually by spool to push-in fixation On shaft tray, while so that connecting rod one is resetted with connecting rod two and forming triangle;5)By the cable pull-up above spool by leading To wheel one, picked up into steel tower stake by construction personnel;6)Handle is pushed continuous unwrapping wire by construction personnel, and being lifted on handle makes friction plate It is contacted with the roller bearing of spool and stops unwrapping wire, other construction personnel construction of line between steel tower stake;7)When the electricity in spool When line is finished, repeat not 1)-6), until the construction of line is completed.
In addition, the present invention also provides a kind of automatic payingoff construction method of iron tower of power transmission line stake actinobacillus device, feature It is, includes the following steps:
1)Universal wheel folding is packed up, single unit system is placed on transport vehicle, stock is passed through into car body and is determined across bar Position hole makes single unit system securely fix on the car body;2)By manually disassembling spring, handle is made to push automatically;3)By axis support Frame pull-up is fulcrum with pin four, and connecting rod one changes with two position of connecting rod, reduces the position of shaft tray;4)Using artificial Spool is fixed on to push-in on shaft tray, while so that connecting rod one is resetted with connecting rod two and forming triangle;5)It will be on spool The cable pull-up in face is by the way that, across split directive wheel, it is defeated outward that electric motor starting drives screw rod rotation to start after directive wheel Line picks up cable by construction personnel and enters the steel tower stake construction of line;6)When the electric wire in spool is finished, repeat not 1)- 5), until the construction of line is completed.
Beneficial effects of the present invention:The present apparatus is fixed on above transport vehicle, its advance unwrapping wire is driven by vehicle, simultaneously Spool convenient disassembly, need not expend too many manpower, and it is fast that device goes out linear velocity, while not being wound between outlet circuit, is suitble to It promotes the use of.
Description of the drawings
Fig. 1 is the structural schematic diagram of iron tower of power transmission line stake actinobacillus device of the present invention;
Fig. 2 is the structural schematic diagram of tripod of the present invention;
Fig. 3 is the structural schematic diagram of another form of Fig. 2;
Fig. 4 is the structural schematic diagram of directive wheel fixed seat of the present invention;
Fig. 5 is the structural schematic diagram of lift dog of the present invention;
Fig. 6 is present invention construction schematic diagram.
Specific implementation mode
As shown, iron tower of power transmission line stake actinobacillus device, including bottom plate 1, the bottom plate 1 are equipped with dovetail groove 13, branch Fagging 28 is caught in dovetail groove 13 by bottom linker and is mounted on bottom plate 1, and pin folder 31, pin are equipped in the support plate 28 Folder 31 has multiple pin holes above, and the height that the adjustable tripod of different pin holes is penetrated by adjusting pin 11 meets different-diameter Spool 8.Connecting rod 1, connecting rod 2 20 and connecting rod 3 32 form tripod and are mounted on above support plate 28, wherein:Connecting rod One 17 are equipped with shaft tray 19 with 2 20 junction of connecting rod, and shaft tray 19 is coated with lubricating oil above.2 20 bottom of connecting rod is equipped with pin 4 21 are followed closely to penetrate in support plate 28;Connecting rod 1 is connect by pin 2 16 with connecting rod 3 32, and connecting rod 3 32 is by adjusting pin 11 penetrate fixation in pin folder 31.1 bottom of the bottom plate is equipped with fixed block 34, and bar location hole 36, institute are offered in fixed block 34 The thickness for stating fixed block 34 is less than the thickness of supporting rack 26.
Spool 8 is installed, 8 both sides of spool are equipped with fixed plate 9, sensing is equipped on shaft tray 19 on shaft tray 19 Device 29 is equipped with bearing support block 2 on the bottom plate 1, and screw rod 3 is mounted on bearing support block 2, the connection of 3 one end of the screw rod It is that PLC controls motor to have motor 12, motor 12;It is connected with signal wire between the motor 12 and sensor 29, passes through sensor 29 transducing signal, make motor 12 and 8 synchronous rotary of spool.
Directive wheel 23 is also equipped on screw rod 3, the connection of directive wheel fixed seat 24 is mounted on 23 lower section of directive wheel, the guiding It is also equipped with split directive wheel 25 in wheel fixed seat 24;Lift dog 15 is also equipped on bottom plate 1, wire sleeve 14 is mounted on lifting On fixture 15, wire sleeve 14 is equipped with multiple outlet holes, and lubricating oil is coated in outlet hole.
8 both sides of spool are also equipped with handle 5, and connecting rod 6 is connected between handle 5, and directive wheel 1 is equipped on connecting rod 6, Friction plate 30 is additionally provided on the handle 5;5 bottom of handle is equipped with dismountable spring 10.1 bottom of bottom plate is also equipped with support Frame 26, universal wheel 27 are mounted on above supporting rack 26.The universal wheel 27 can be folded left and right on supporting rack 26.
In addition, the present invention also provides a kind of manual payingoff construction method of iron tower of power transmission line stake actinobacillus device, feature It is, includes the following steps:
1)The folding of universal wheel 27 is packed up, single unit system is placed on transport vehicle, stock is passed through into car body and passes through bar Location hole 36 makes single unit system securely fix on the car body;2)By the way that manually handle 5 is pushed;3)It is fulcrum with pin 4 21, By 19 pull-up of shaft tray, connecting rod 1 changes with 2 20 position of connecting rod, reduces the position of shaft tray 19;4)It is incited somebody to action using artificial Spool 8 is fixed on to push-in on shaft tray 19, while so that connecting rod 1 is resetted with connecting rod 2 20 and being formed triangle;5)By spiral Cable pull-up above cylinder 8 is picked up by construction personnel into steel tower stake by directive wheel 1;6)Construction personnel pushes handle 5 Continuous unwrapping wire, on handle 5 lift so that friction plate 30 is contacted stopping unwrapping wire with the roller bearing of spool 8, other construction personnel are in steel tower stake Between the construction of line;7)When the electric wire in spool 8 is finished, repeat not 1)-6), until the construction of line is completed.
In addition, the present invention also provides a kind of automatic payingoff construction method of iron tower of power transmission line stake actinobacillus device, feature It is, includes the following steps:
1)The folding of universal wheel 27 is packed up, single unit system is placed on transport vehicle, stock is passed through into car body and passes through bar Location hole 36 makes single unit system securely fix on the car body;3)It is fulcrum, connecting rod 1 with pin 4 21 by 19 pull-up of shaft tray It changes with 2 20 position of connecting rod, reduces the position of shaft tray 19;4)Using manually by spool 8 to push-in be fixed on axis support On frame 19, while so that connecting rod 1 is resetted with connecting rod 2 20 and forming triangle;5)By the cable pull-up above spool 8 by leading Across split directive wheel 25 after to wheel 23, motor 12 starts the drive rotation of screw rod 3 and starts defeated line outward, by constructor Member picks up cable and enters the steel tower stake construction of line;6)When the electric wire in spool 8 is finished, repeat not 1)-5), until circuit It sets up until completing.
In addition to the implementation, the present invention can also have other embodiment.It is all to use equivalent substitution or equivalent transformation shape At technical solution, fall within the scope of protection required by the present invention.

Claims (1)

1. iron tower of power transmission line stake actinobacillus device, including bottom plate(1), the bottom plate(1)It is equipped with dovetail groove(13), support plate (28)It is caught in dovetail groove by bottom linker(13)It is interior to be mounted on bottom plate(1)On, it is characterised in that:The support plate(28)On Pin folder is installed(31), connecting rod one(17), connecting rod two(20)With connecting rod three(32)It forms tripod and is mounted on support plate(28)On Face, wherein:Connecting rod one(17)With connecting rod two(20)Junction is equipped with shaft tray(19), connecting rod two(20)Bottom is equipped with pin four (21)Penetrate support plate(28)It is interior;Connecting rod one(17)Pass through pin two(16)With connecting rod three(32)Connection, connecting rod three(32)Pass through Adjust pin(11)Penetrate pin folder(31)Interior fixation;
The shaft tray(19) spool is installed on(8), spool(8)Both sides are equipped with fixed plate(9), shaft tray(19) on Sensor is installed(29), the bottom plate(1)On bearing support block is installed(2), screw rod(3)Mounted on bearing support block(2) On, the screw rod(3)One end is connected with motor(12);The motor(12)With sensor(29)Between be connected with signal wire;
The screw rod(3)On be also equipped with directive wheel(23), directive wheel fixed seat(24)Connection is mounted on directive wheel(23)Lower section, The directive wheel fixed seat(24)On be also equipped with split directive wheel(25);Bottom plate(1)On be also equipped with lift dog(15), lead Line set(14)Mounted on lift dog(15)On;The bottom plate(1)Bottom is equipped with fixed block(34), fixed block(34)Inside offer Bar location hole(36);
The spool(8)Both sides are also equipped with handle(5), connecting rod(6)It is connected to handle(5)Between, connecting rod(6)On be equipped with Directive wheel one(7), the handle(5)On be additionally provided with friction plate(30);Handle(5)Bottom is equipped with dismountable spring(10);
The bottom plate(1)Bottom is also equipped with supporting rack(26), universal wheel(27)Mounted on supporting rack(26)Above;It is described universal Wheel(27)It can be in supporting rack(26)It is folded left and right above;The fixed block(34)Thickness be less than supporting rack(26)Thickness Degree;
Using the manual payingoff construction method of above-mentioned iron tower of power transmission line stake actinobacillus device, include the following steps:
1)By universal wheel(27)Folding is packed up, and single unit system is placed on transport vehicle, and stock is passed through car body and is determined across bar Position hole(36)Single unit system is set to securely fix on the car body;2)By manually by handle(5)It pushes;3)With pin four(21)For branch Point, by shaft tray(19) pull-up, connecting rod one(17)With connecting rod two(20)Position changes, and reduces shaft tray(19) position; 4)Using manually by spool(8)It is fixed on shaft tray to push-in(19) on, while making connecting rod one(17)With connecting rod two(20)It is multiple Position forms triangle;5)By spool(8)Cable pull-up above passes through directive wheel one(7), picked up into iron by construction personnel Tower stake;6)Construction personnel is by handle(5)Push continuous unwrapping wire, handle(5)Upper lift makes friction plate(30)With spool(8)Roller bearing Contact stops unwrapping wire, other construction personnel construction of line between steel tower stake;7)Work as spool(8)When interior electric wire is finished, weight Multiple step 1)-6), until the construction of line is completed;
Using the automatic payingoff construction method of above-mentioned iron tower of power transmission line stake actinobacillus device, include the following steps:
By universal wheel(27)Folding is packed up, and single unit system is placed on transport vehicle, and stock is passed through car body and is positioned across bar Hole(36)Single unit system is set to securely fix on the car body;2)By manually by spring(10)It disassembles, makes handle(5)Under automatic Pressure;3)By shaft tray(19) pull-up, with pin four(21)For fulcrum, connecting rod one(17)With connecting rod two(20)Position changes, Reduce shaft tray(19) position;4)Using manually by spool(8)It is fixed on shaft tray to push-in(19) on, while making connecting rod One(17)With connecting rod two(20)Reset forms triangle;5)By spool(8)Cable pull-up above passes through directive wheel(23)It Afterwards across split directive wheel(25)Between, motor(12)Start and drives screw rod(3)Rotation starts defeated line outward, by construction personnel It picks up cable and enters the steel tower stake construction of line;6)Work as spool(8)When interior electric wire is finished, step 1 is repeated)-5), until line Until road sets up completion.
CN201510774735.4A 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method Active CN105293163B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510774735.4A CN105293163B (en) 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510774735.4A CN105293163B (en) 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method

Publications (2)

Publication Number Publication Date
CN105293163A CN105293163A (en) 2016-02-03
CN105293163B true CN105293163B (en) 2018-08-28

Family

ID=55191128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510774735.4A Active CN105293163B (en) 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method

Country Status (1)

Country Link
CN (1) CN105293163B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016933A (en) * 2017-12-25 2018-05-11 湖南科技大学 A kind of intelligence heat-shrink tube bundling device and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2653152A1 (en) * 2009-02-09 2010-08-09 Marcus Anderson Method and apparatus for lifting, handling and transporting a reel
CN202107370U (en) * 2011-06-25 2012-01-11 宜昌供电公司变电检修中心 Stepless telescopic cable spinning reel
CN102464231A (en) * 2010-11-15 2012-05-23 贵州航天天马机电科技有限公司 Cable winding and unwinding device
CN104192637A (en) * 2014-09-16 2014-12-10 北京航空航天大学 Rope drive device with reciprocating wire arrangement function
CN104332882A (en) * 2014-11-19 2015-02-04 国家电网公司 Adjustable cable paying-off support
CN104326313A (en) * 2014-08-12 2015-02-04 中航光电科技股份有限公司 Pay-off and take-up device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4279418B2 (en) * 1999-09-08 2009-06-17 三菱電線工業株式会社 Cable feeding device for feeding mobile structure
CN103015136A (en) * 2012-11-29 2013-04-03 偌纬创艺私人有限公司 Outdoor drying rack capable of improving clothes drying and putting away efficiency and being pulled indoors
CN203398651U (en) * 2013-06-14 2014-01-15 国家电网公司 Cable reel brake device
CN103342264A (en) * 2013-06-18 2013-10-09 国家电网公司 Electric paying-off automobile
CN104863529A (en) * 2015-04-09 2015-08-26 山东科瑞机械制造有限公司 Rapid-traverse type power catwalk

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2653152A1 (en) * 2009-02-09 2010-08-09 Marcus Anderson Method and apparatus for lifting, handling and transporting a reel
CN102464231A (en) * 2010-11-15 2012-05-23 贵州航天天马机电科技有限公司 Cable winding and unwinding device
CN202107370U (en) * 2011-06-25 2012-01-11 宜昌供电公司变电检修中心 Stepless telescopic cable spinning reel
CN104326313A (en) * 2014-08-12 2015-02-04 中航光电科技股份有限公司 Pay-off and take-up device
CN104192637A (en) * 2014-09-16 2014-12-10 北京航空航天大学 Rope drive device with reciprocating wire arrangement function
CN104332882A (en) * 2014-11-19 2015-02-04 国家电网公司 Adjustable cable paying-off support

Also Published As

Publication number Publication date
CN105293163A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105293162B (en) Iron tower of power transmission line stake actinobacillus device and its construction method
CN105484538A (en) Stereo cycle garage
CN206789988U (en) A kind of quick laying apparatu of horizontal cable
CN207129760U (en) I-beam wheel servo moves bus cable device
CN209143411U (en) A kind of drawing cable speed automatic patching system
CN105293163B (en) Iron tower of power transmission line stake actinobacillus device and its construction method
CN202591917U (en) Roller changing car of withdrawal and straightening unit
CN105417271B (en) Iron tower of power transmission line stake actinobacillus device and its construction method
CN201132940Y (en) Wire- wrapping machine for stowing rope
CN104117551A (en) Automatic steel coil loading device of uncoiling machine and steel coil loading method thereof
CN206335608U (en) A kind of truss robot wire harness fixing device
CN106410734B (en) A kind of portable iron bag uncovery equipment electric power system
CN107558778A (en) A kind of steel wire rope pull parking systems
CN114336423B (en) Bridge cable laying machine
CN205034880U (en) Davit formula expansion single -end coiling machine
CN203588840U (en) Hydraulic turnover table of electromagnetic wire wheel
CN107017058A (en) High speed copper aluminum steel buncher
CN201832928U (en) Device for winding copper pipe coil
CN202063603U (en) Wire guide roller used for pay-off machine
CN108071256A (en) Charging garage and the take-up and pay-off device for the garage that charges
CN209383168U (en) A kind of mobile separation receipts creel stand
CN205531558U (en) Operating system and stereo garage
CN201969740U (en) Straight wire pressing roller of wire drawing machine
CN105151876A (en) Winding system of textile machine
CN206591885U (en) A kind of Mechanical Three-dimensional Garage with charging pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180718

Address after: 236231 the comprehensive building on the north side of Luo Yang resettlement area on the east side of Luo Yang Road, Yingshang County Economic Development Zone, Fuyang, Anhui, China

Applicant after: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 510000 Guangdong science and Technology Industrial Development Zone, Guangzhou, 231 and 233 podium B1B2 Building 1, two, three, four

Applicant before: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Effective date of registration: 20180718

Address after: 510000 Guangdong science and Technology Industrial Development Zone, Guangzhou, 231 and 233 podium B1B2 Building 1, two, three, four

Applicant after: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Address before: 737200 22 eight, Yu Bao Village, six dam Township, Yongchang County, Jinchang, Gansu

Applicant before: Gao Shilong

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Transmission line iron tower pile setting out device and its construction method

Effective date of registration: 20211101

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2021980011630

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221024

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2021980011630

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Setting out device of transmission line tower pile and its construction method

Effective date of registration: 20221108

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2022340000036

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231013

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2022340000036

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation and construction method of transmission line tower pile pay-off device

Effective date of registration: 20231017

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2023980061562