CN105293163A - Paying-off device for iron tower pile of transmission line and construction method of paying-off device - Google Patents

Paying-off device for iron tower pile of transmission line and construction method of paying-off device Download PDF

Info

Publication number
CN105293163A
CN105293163A CN201510774735.4A CN201510774735A CN105293163A CN 105293163 A CN105293163 A CN 105293163A CN 201510774735 A CN201510774735 A CN 201510774735A CN 105293163 A CN105293163 A CN 105293163A
Authority
CN
China
Prior art keywords
connecting rod
spool
pin
paying
track adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510774735.4A
Other languages
Chinese (zh)
Other versions
CN105293163B (en
Inventor
高世龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.
Boao Zongheng Network Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510774735.4A priority Critical patent/CN105293163B/en
Publication of CN105293163A publication Critical patent/CN105293163A/en
Application granted granted Critical
Publication of CN105293163B publication Critical patent/CN105293163B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a paying-off device for an iron tower pile of a transmission line and a construction method of the paying-off device. The paying-off device comprises a bottom plate. Dovetail grooves are formed in the bottom plate. Supporting plates are installed on the bottom plate in the manner that bottom connecting pieces are clamped into the dovetail grooves. The paying-off device is characterized in that pin clamps are installed on the supporting plates, and first connecting rods, second connecting rods and third connecting rods form triangular frames to be installed on the supporting plates; a shaft bracket is installed at the joint of each first connecting rod and the corresponding second connecting rod; and the bottom of each second connecting rod is provided with a fourth pin which penetrates in the corresponding supporting plate; and each first connecting rod is connected with the corresponding third connecting rod through a second pin, and each third connecting rod penetrates in the corresponding pin clamp to be fixed through an adjusting pin. The paying-off device has the beneficial effects that the paying-off device is fixed to a transportation vehicle and is driven by the vehicle to move forwards to conduct paying-off; a coiling cylinder is convenient to demount, little labor force is needed, and the wire outlet speed of the device is high; and wire outlet circuits are not twined with one another, and the paying-off device is suitable for being used and popularized.

Description

Iron tower of power transmission line stake actinobacillus device and construction method thereof
Technical field
The present invention relates to a kind of electric power network constructing device, be specifically related to a kind of iron tower of power transmission line stake actinobacillus device and construction method thereof, belong to technical field of electric power construction.
Background technology
Power engineering (electricpowerengineering), namely relevant with the production of electric energy, conveying, distribution engineering, broadly also comprises the engineering that electricity is applied in multiple fields as power and energy.Its bubbling area is made up of angle steel mutually arranged side by side, and the orientation of angle steel is parallel with liquid flow path direction.The wedge angle limit of steel tower stake angle steel is in bottom, and cross section is in " V " font, and have certain grid seam between adjacent two angle steel, downflow spout is identical with general column plate.The liquid of a upper plate flows into " V " font angle steel by downflow spout, gas then by grid sew on rise time and liquid generation bubbling, carry out mass transport process, the Liquid Flow state on column plate and sieve plate similar.Angle iron tower plate pressure drop is less, and gas phase flux is comparatively large, and plate efficiency is better, and structure is simple, and convenient processing and manufacture, rigidity is better.
As Patent publication No CN203674641U discloses a kind of cable unreeling rack, comprise the support on the angle bar for being arranged in common trench, support can be fixed on the corner place of common trench; Can be positioned at the first horizontal cylinder of a metope side in corner, the first horizontal cylinder is arranged on support; Can be positioned at the second horizontal cylinder of another metope side in corner, the second horizontal cylinder is arranged on support, and can walk around the first horizontal cylinder and the second horizontal cylinder successively when cable is advanced; For preventing cable to the first vertical cylinder of side, corner movement, the first vertical cylinder is positioned at the side of support near corner.It is friction of rolling that the utility model makes cable between corner place and cable unreeling rack, reduce in cabling process at the friction force that corner place is subject to, reduce the wearing and tearing of cable surface, and then improve power supply reliability, also improve the operating efficiency of cable installatition simultaneously.The utility model additionally provides a kind of cable-laying gear with above-mentioned cable unreeling rack.
And for example Patent publication No CN203883439U discloses a kind of cable drum carriage, comprise vehicle frame, be installed on two wheels of vehicle frame both sides, be installed on the drum on vehicle frame, the electromagnetic power brake be fixed on vehicle frame by rotating shaft I rotation, be fixed on vehicle frame and the coder being connected to a certain wheel shaft and the storage battery be installed on vehicle frame, described rotating shaft I one end is connected and fixed in the endoporus of electromagnetic power brake by key, described electromagnetic power brake is connected to storage battery by relay, and described coder is connected to the control end of relay.When using this cable drum carriage unwrapping wire, vehicle wheel rotation is slow, and coder inspection vehicle wheel speed, when unwrapping wire is complete, during this cable drum carriage mobile, coder inspection vehicle wheel speed uprises, now control relay adhesive, conducting storage battery and electromagnetic power brake, after electromagnetic power brake energising, locking lives rotating shaft I, now drum can not rotate again, therefore effectively prevents in wheeled cable drum carriage moving process, because the situation of jolting or wire coil eccentric generation cable freely discharges occurs.
At present, the line construction work between iron tower of power transmission line stake is too heavy, because the relative aperture of high tension cord is thicker, weight is large, needing manually to promote spool and advances, also needing manually to tighten up when tightening up in erection process, speed is slow, and workmen's work capacity is large.Simultaneously when outlet, spool due to weight large, winding displacement is also more difficult.
Summary of the invention
Instant invention overcomes prior art Problems existing, propose a kind of iron tower of power transmission line stake actinobacillus device and construction method thereof, this device and construction method thereof are between iron tower of power transmission line stake during line construction, easy to use, save manpower, go out linear velocity fast, be not wound around between the circuit of outlet simultaneously.
Concrete technical scheme of the present invention is as follows: iron tower of power transmission line stake actinobacillus device, comprise base plate, described base plate is provided with dovetail furrow, stay bearing plate is snapped in dovetail furrow by bottom linker and is arranged on base plate, it is characterized in that: described stay bearing plate is provided with pin folder, connecting rod one, connecting rod two and connecting rod three form spider and are arranged on above stay bearing plate, wherein: connecting rod one and connecting rod two junction are provided with shaft tray, be provided with pin four and penetrate in stay bearing plate bottom connecting rod two; Connecting rod one is connected with connecting rod three by pin two, and connecting rod threeway overregulate pin penetrates pin folder internal fixtion;
Described shaft tray is provided with spool, and spool both sides are provided with adapter plate, and shaft tray is provided with sensor, and described base plate is provided with bearing support block, and screw rod is arranged on bearing support block, and described screw rod one end is connected with motor; Signal wire (SW) is connected with between described motor and sensor;
Described screw rod is also provided with track adjusting wheel, and track adjusting wheel permanent seat is mounted on below track adjusting wheel, described track adjusting wheel permanent seat is also provided with and splits track adjusting wheel; Base plate is also provided with lift dog, and wire sleeve is arranged on lift dog; Be provided with fixed block bottom described base plate, in fixed block, offer bar knock hole.
Preferentially, described spool both sides are also provided with handle, and connecting rod is connected between handle, connecting rod are provided with track adjusting wheel one, and described handle is also provided with friction lining; Detouchable spring is installed bottom handle.
Preferentially, be also provided with bracing frame bottom described base plate, cardan wheel is arranged on above bracing frame.Described cardan wheel can carry out left and right and fold on bracing frame, and the thickness of described fixed block is less than the thickness of bracing frame.
In addition, present invention also offers a kind of manual payingoff construction method of iron tower of power transmission line stake actinobacillus device, it is characterized in that, comprise the following steps:
1) pack up folding for cardan wheel, single unit system is placed on transport trolley, also through bar knock hole, single unit system is firmly fixed on car body through car body stock; 2) by manually handle being pressed down; 3) with pin four for fulcrum, by shaft tray pull-up, connecting rod one and connecting rod two position change, and reduce the position of shaft tray; 4) spool is manually fixed on shaft tray to pushing by utilization, makes connecting rod one and connecting rod two reset simultaneously and forms triangle; 5) track adjusting wheel one is passed through in the cable pull-up above spool, picked up by workmen and enter steel tower stake; 6) handle is pressed down continuous unwrapping wire by workmen, handle is lifted friction lining is contacted with the roller bearing of spool stop unwrapping wire, and other workmens are the construction of line between steel tower stake; 7) when the electric wire in spool is finished, repeat not 1)-6), until line construction completes.
In addition, present invention also offers a kind of automatic payingoff construction method of iron tower of power transmission line stake actinobacillus device, it is characterized in that, comprise the following steps:
1) pack up folding for cardan wheel, single unit system is placed on transport trolley, also through bar knock hole, single unit system is firmly fixed on car body through car body stock; 2) by manually being disassembled by spring, handle is pressed down automatically; 3) by shaft tray pull-up, with pin four for fulcrum, connecting rod one and connecting rod two position change, and reduce the position of shaft tray; 4) spool is manually fixed on shaft tray to pushing by utilization, makes connecting rod one and connecting rod two reset simultaneously and forms triangle; 5) by the cable pull-up above spool by after track adjusting wheel through splitting track adjusting wheel, electric motor starting drives screw rod to rotate to start outside defeated line, pick up cable enter the steel tower stake construction of line by workmen; 6) when the electric wire in spool is finished, repeat not 1)-5), until line construction completes.
Beneficial effect of the present invention: be fixed on by this device above transport trolley, drives its advance unwrapping wire by vehicle, and spool convenient disassembly, does not need to expend too many manpower simultaneously, and it is fast that device goes out linear velocity, is not wound around, is applicable to promoting the use of between the circuit of outlet simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of iron tower of power transmission line stake actinobacillus device of the present invention;
Fig. 2 be spider of the present invention structural representation;
Fig. 3 is the structural representation of another form of Fig. 2;
Fig. 4 is the structural representation of track adjusting wheel permanent seat of the present invention;
Fig. 5 is the structural representation of lift dog of the present invention;
Fig. 6 is that the present invention constructs schematic diagram.
Detailed description of the invention
As shown in the figure, iron tower of power transmission line stake actinobacillus device, comprise base plate 1, described base plate 1 is provided with dovetail furrow 13, stay bearing plate 28 is snapped in dovetail furrow 13 by bottom linker and is arranged on base plate 1, described stay bearing plate 28 is provided with pin folder 31, pin folder 31 has multiple pin-and-hole above, is met the spool 8 of different-diameter by the height regulating pin 11 to penetrate the adjustable spider of different pin-and-holes.Connecting rod 1, connecting rod 2 20 and connecting rod 3 32 composition spider is arranged on above stay bearing plate 28, and wherein: connecting rod 1 and connecting rod 2 20 junction are provided with shaft tray 19, shaft tray 19 scribbles lubricating oil above.Being provided with pin 4 21 bottom connecting rod 2 20 penetrates in stay bearing plate 28; Connecting rod 1 is connected with connecting rod 3 32 by pin 2 16, and connecting rod 3 32 presss from both sides 31 internal fixtion by regulating pin 11 to penetrate pin.Be provided with fixed block 34 bottom described base plate 1, offer bar knock hole 36 in fixed block 34, the thickness of described fixed block 34 is less than the thickness of bracing frame 26.
Shaft tray 19 is provided with spool 8, spool 8 both sides are provided with adapter plate 9, shaft tray 19 are provided with sensor 29, described base plate 1 is provided with bearing support block 2, screw rod 3 is arranged on bearing support block 2, and described screw rod 3 one end is connected with motor 12, and motor 12 is PLC control motor; Be connected with signal wire (SW) between described motor 12 and sensor 29, by the transducing signal of sensor 29, make motor 12 with spool 8 synchronous rotary.
Screw rod 3 is also provided with track adjusting wheel 23, and track adjusting wheel permanent seat 24 is mounted on below track adjusting wheel 23, described track adjusting wheel permanent seat 24 is also provided with and splits track adjusting wheel 25; Base plate 1 is also provided with lift dog 15, and wire sleeve 14 is arranged on lift dog 15, and wire sleeve 14 is provided with multiple wire hole, scribbles lubricating oil in wire hole.
Spool 8 both sides are also provided with handle 5, and connecting rod 6 is connected between handle 5, connecting rod 6 is provided with track adjusting wheel 1, and described handle 5 is also provided with friction lining 30; Detouchable spring 10 is installed bottom handle 5.Also be provided with bracing frame 26 bottom base plate 1, cardan wheel 27 is arranged on above bracing frame 26.Described cardan wheel 27 can carry out left and right and fold on bracing frame 26.
In addition, present invention also offers a kind of manual payingoff construction method of iron tower of power transmission line stake actinobacillus device, it is characterized in that, comprise the following steps:
1) pack up folding for cardan wheel 27, single unit system is placed on transport trolley, also through bar knock hole 36, single unit system is firmly fixed on car body through car body stock; 2) by manually handle 5 being pressed down; 3) with pin 4 21 for fulcrum, by shaft tray 19 pull-up, connecting rod 1 and connecting rod 2 20 position change, and reduce the position of shaft tray 19; 4) spool 8 is manually fixed on shaft tray 19 to pushing by utilization, makes connecting rod 1 and connecting rod 2 20 reset simultaneously and forms triangle; 5) track adjusting wheel 1 is passed through in the cable pull-up above spool 8, picked up by workmen and enter steel tower stake; 6) handle 5 is pressed down continuous unwrapping wire by workmen, handle 5 is lifted friction lining 30 is contacted with the roller bearing of spool 8 stop unwrapping wire, and other workmens are the construction of line between steel tower stake; 7) when the electric wire in spool 8 is finished, repeat not 1)-6), until line construction completes.
In addition, present invention also offers a kind of automatic payingoff construction method of iron tower of power transmission line stake actinobacillus device, it is characterized in that, comprise the following steps:
1) pack up folding for cardan wheel 27, single unit system is placed on transport trolley, also through bar knock hole 36, single unit system is firmly fixed on car body through car body stock; 3) by shaft tray 19 pull-up, with pin 4 21 for fulcrum, connecting rod 1 and connecting rod 2 20 position change, and reduce the position of shaft tray 19; 4) spool 8 is manually fixed on shaft tray 19 to pushing by utilization, makes connecting rod 1 and connecting rod 2 20 reset simultaneously and forms triangle; 5) by the cable pull-up above spool 8 by after track adjusting wheel 23 through splitting track adjusting wheel 25, motor 12 starts and drives screw rod 3 to rotate to start outside defeated line, pick up cable enter the steel tower stake construction of line by workmen; 6) when the electric wire in spool 8 is finished, repeat not 1)-5), until line construction completes.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of application claims.

Claims (7)

1. iron tower of power transmission line stake actinobacillus device, comprise base plate (1), described base plate (1) is provided with dovetail furrow (13), stay bearing plate (28) is snapped in dovetail furrow (13) by bottom linker and is arranged on base plate (1), it is characterized in that: described stay bearing plate (28) is provided with pin folder (31), connecting rod one (17), connecting rod two (20) and connecting rod three (32) form spider and are arranged on above stay bearing plate (28), wherein: connecting rod one (17) and connecting rod two (20) junction are provided with shaft tray (19), connecting rod two (20) bottom is provided with pin four (21) and penetrates in stay bearing plate (28), connecting rod one (17) is connected with connecting rod three (32) by pin two (16), and connecting rod three (32) penetrates pin folder (31) internal fixtion by regulating pin (11),
Described shaft tray (19) is provided with spool (8), spool (8) both sides are provided with adapter plate (9), shaft tray (19) is provided with sensor (29), described base plate (1) is provided with bearing support block (2), screw rod (3) is arranged on bearing support block (2), and described screw rod (3) one end is connected with motor (12); Signal wire (SW) is connected with between described motor (12) and sensor (29);
Described screw rod (3) is also provided with track adjusting wheel (23), track adjusting wheel permanent seat (24) is mounted on track adjusting wheel (23) below, described track adjusting wheel permanent seat (24) is also provided with and splits track adjusting wheel (25); Base plate (1) is also provided with lift dog (15), wire sleeve (14) is arranged on lift dog (15); Described base plate (1) bottom is provided with fixed block (34), offers bar knock hole (36) in fixed block (34).
2. iron tower of power transmission line stake actinobacillus device as claimed in claim 1, it is characterized in that: described spool (8) both sides are also provided with handle (5), connecting rod (6) is connected between handle (5), connecting rod (6) is provided with track adjusting wheel one (7), described handle (5) is also provided with friction lining (30); Handle (5) bottom is provided with detouchable spring (10).
3. iron tower of power transmission line stake actinobacillus device as claimed in claim 1 or 2, is characterized in that: described base plate (1) bottom is also provided with bracing frame (26), and cardan wheel (27) is arranged on above bracing frame (26).
4. iron tower of power transmission line stake actinobacillus device as claimed in claim 3, is characterized in that: described cardan wheel (27) can carry out left and right and fold on bracing frame (26).
5. iron tower of power transmission line stake actinobacillus device as claimed in claim 1, is characterized in that: the thickness of described fixed block (34) is less than the thickness of bracing frame (26).
6. the manual payingoff construction method of iron tower of power transmission line stake actinobacillus device, is characterized in that, comprise the following steps:
1) pack up folding for cardan wheel (27), single unit system is placed on transport trolley, also through bar knock hole (36), single unit system is firmly fixed on car body through car body stock; 2) by manually handle (5) being pressed down; 3) with pin four (21) for fulcrum, by shaft tray (19) pull-up, connecting rod one (17) and connecting rod two (20) position change, and reduce the position of shaft tray (19); 4) spool (8) is manually fixed on shaft tray (19) to pushing by utilization, makes connecting rod one (17) and connecting rod two (20) reset simultaneously and forms triangle; 5) track adjusting wheel one (7) is passed through in the cable pull-up above spool (8), picked up by workmen and enter steel tower stake; 6) handle (5) is pressed down continuous unwrapping wire by workmen, handle (5) is lifted friction lining (30) is contacted with the roller bearing of spool (8) stop unwrapping wire, and other workmens are the construction of line between steel tower stake; 7) when the electric wire in spool (8) is finished, repeat not 1)-6), until line construction completes.
7. the automatic payingoff construction method of iron tower of power transmission line stake actinobacillus device, is characterized in that, comprise the following steps:
Pack up folding for cardan wheel (27), single unit system is placed on transport trolley, also through bar knock hole (36), single unit system is firmly fixed on car body through car body stock; 2) by manually being disassembled by spring (10), handle (5) is pressed down automatically; 3) by shaft tray (19) pull-up, with pin four (21) for fulcrum, connecting rod one (17) and connecting rod two (20) position change, and reduce the position of shaft tray (19); 4) spool (8) is manually fixed on shaft tray (19) to pushing by utilization, makes connecting rod one (17) and connecting rod two (20) reset simultaneously and forms triangle; 5) by the cable pull-up above spool (8) by after track adjusting wheel (23) through splitting track adjusting wheel (25), motor (12) starts and drives screw rod (3) to rotate to start outside defeated line, pick up cable enter the steel tower stake construction of line by workmen; 6) when the electric wire in spool (8) is finished, repeat not 1)-5), until line construction completes.
CN201510774735.4A 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method Active CN105293163B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510774735.4A CN105293163B (en) 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510774735.4A CN105293163B (en) 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method

Publications (2)

Publication Number Publication Date
CN105293163A true CN105293163A (en) 2016-02-03
CN105293163B CN105293163B (en) 2018-08-28

Family

ID=55191128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510774735.4A Active CN105293163B (en) 2015-11-13 2015-11-13 Iron tower of power transmission line stake actinobacillus device and its construction method

Country Status (1)

Country Link
CN (1) CN105293163B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016933A (en) * 2017-12-25 2018-05-11 湖南科技大学 A kind of intelligence heat-shrink tube bundling device and method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001072344A (en) * 1999-09-08 2001-03-21 Mitsubishi Cable Ind Ltd Cable delivery device for feeding power to moving structure
CA2653152A1 (en) * 2009-02-09 2010-08-09 Marcus Anderson Method and apparatus for lifting, handling and transporting a reel
CN202107370U (en) * 2011-06-25 2012-01-11 宜昌供电公司变电检修中心 Stepless telescopic cable spinning reel
CN102464231A (en) * 2010-11-15 2012-05-23 贵州航天天马机电科技有限公司 Cable winding and unwinding device
CN103015136A (en) * 2012-11-29 2013-04-03 偌纬创艺私人有限公司 Outdoor drying rack capable of improving clothes drying and putting away efficiency and being pulled indoors
CN103342264A (en) * 2013-06-18 2013-10-09 国家电网公司 Electric paying-off automobile
CN203398651U (en) * 2013-06-14 2014-01-15 国家电网公司 Cable reel brake device
CN104192637A (en) * 2014-09-16 2014-12-10 北京航空航天大学 Rope drive device with reciprocating wire arrangement function
CN104332882A (en) * 2014-11-19 2015-02-04 国家电网公司 Adjustable cable paying-off support
CN104326313A (en) * 2014-08-12 2015-02-04 中航光电科技股份有限公司 Pay-off and take-up device
CN104863529A (en) * 2015-04-09 2015-08-26 山东科瑞机械制造有限公司 Rapid-traverse type power catwalk

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001072344A (en) * 1999-09-08 2001-03-21 Mitsubishi Cable Ind Ltd Cable delivery device for feeding power to moving structure
CA2653152A1 (en) * 2009-02-09 2010-08-09 Marcus Anderson Method and apparatus for lifting, handling and transporting a reel
CN102464231A (en) * 2010-11-15 2012-05-23 贵州航天天马机电科技有限公司 Cable winding and unwinding device
CN202107370U (en) * 2011-06-25 2012-01-11 宜昌供电公司变电检修中心 Stepless telescopic cable spinning reel
CN103015136A (en) * 2012-11-29 2013-04-03 偌纬创艺私人有限公司 Outdoor drying rack capable of improving clothes drying and putting away efficiency and being pulled indoors
CN203398651U (en) * 2013-06-14 2014-01-15 国家电网公司 Cable reel brake device
CN103342264A (en) * 2013-06-18 2013-10-09 国家电网公司 Electric paying-off automobile
CN104326313A (en) * 2014-08-12 2015-02-04 中航光电科技股份有限公司 Pay-off and take-up device
CN104192637A (en) * 2014-09-16 2014-12-10 北京航空航天大学 Rope drive device with reciprocating wire arrangement function
CN104332882A (en) * 2014-11-19 2015-02-04 国家电网公司 Adjustable cable paying-off support
CN104863529A (en) * 2015-04-09 2015-08-26 山东科瑞机械制造有限公司 Rapid-traverse type power catwalk

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016933A (en) * 2017-12-25 2018-05-11 湖南科技大学 A kind of intelligence heat-shrink tube bundling device and method

Also Published As

Publication number Publication date
CN105293163B (en) 2018-08-28

Similar Documents

Publication Publication Date Title
CN105293162A (en) Power transmission line iron tower pile paying-off device and construction method thereof
CN205407205U (en) Cable spool wire rack
CN203423593U (en) Core pulling inspection device for large-sized motor
CN101880006B (en) Roll-on device and method for large fixed type rotary crane
CN102815565A (en) Combined multifunctional tape winding and unwinding device
CN102820744A (en) Method and device for mounting rotor of large-sized synchronous motor
CN203740777U (en) Power line winding and straightening device
CN102176613A (en) Portable intelligent cable wire barrow
CN105417271A (en) Electric transmission line iron tower pile pay-off device and construction method thereof
CN105293163A (en) Paying-off device for iron tower pile of transmission line and construction method of paying-off device
CN202247344U (en) Cloth unfolding machine
CN205046870U (en) Top pushes away construction laterally offset controlling means
CN204022083U (en) A kind of hydraulic pressure wire-unfolding rack
CN202586243U (en) Cable pay-off machine
CN202924297U (en) Pouring ferry vehicle for aerated concrete production
CN202639156U (en) Mineral cable straightener
CN202373912U (en) Traveling type manual pay-off stand
CN204847572U (en) Support frame that cable laying used
CN210852451U (en) Rail trolley device for transporting pressure steel pipe in hole
CN206417734U (en) A kind of assistance type cable hank
CN202704641U (en) Combined-type multifunctional tape coiling and uncoiling device
CN105921937A (en) Rotating deflection device of heavy-load module
CN201520540U (en) Rotary disc for slip transportation of equipment
CN202006361U (en) Core extraction machine
CN105869878B (en) Novel and multifunctional coiling rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180718

Address after: 236231 the comprehensive building on the north side of Luo Yang resettlement area on the east side of Luo Yang Road, Yingshang County Economic Development Zone, Fuyang, Anhui, China

Applicant after: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 510000 Guangdong science and Technology Industrial Development Zone, Guangzhou, 231 and 233 podium B1B2 Building 1, two, three, four

Applicant before: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Effective date of registration: 20180718

Address after: 510000 Guangdong science and Technology Industrial Development Zone, Guangzhou, 231 and 233 podium B1B2 Building 1, two, three, four

Applicant after: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Address before: 737200 22 eight, Yu Bao Village, six dam Township, Yongchang County, Jinchang, Gansu

Applicant before: Gao Shilong

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Transmission line iron tower pile setting out device and its construction method

Effective date of registration: 20211101

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2021980011630

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221024

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2021980011630

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Setting out device of transmission line tower pile and its construction method

Effective date of registration: 20221108

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2022340000036

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231013

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2022340000036

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation and construction method of transmission line tower pile pay-off device

Effective date of registration: 20231017

Granted publication date: 20180828

Pledgee: The small and medium-sized enterprise financing Company limited by guarantee Yingshang County

Pledgor: ANHUI XIANGYUE CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2023980061562