CN105257321A - Shield tunnel initial-stage construction duct piece pulling connection device and construction method - Google Patents

Shield tunnel initial-stage construction duct piece pulling connection device and construction method Download PDF

Info

Publication number
CN105257321A
CN105257321A CN201510627284.1A CN201510627284A CN105257321A CN 105257321 A CN105257321 A CN 105257321A CN 201510627284 A CN201510627284 A CN 201510627284A CN 105257321 A CN105257321 A CN 105257321A
Authority
CN
China
Prior art keywords
construction
jurisdiction
section
fining twisted
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510627284.1A
Other languages
Chinese (zh)
Other versions
CN105257321B (en
Inventor
康杰
杨成龙
朱文良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201510627284.1A priority Critical patent/CN105257321B/en
Publication of CN105257321A publication Critical patent/CN105257321A/en
Application granted granted Critical
Publication of CN105257321B publication Critical patent/CN105257321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a shield tunnel initial-stage construction duct piece pulling connection device and a construction method. The construction method comprises the following steps of fixing a front box body and a rear box body by using a duct piece central screw; fixing a manual hydraulic center hole jack onto an arc-shaped steel plate in the front box body; penetrating a fining twisted steel bar in the center of the manual hydraulic center hole jack and the center of the duct piece central screw, and fixing the fining twisted steel bar and an anchor plate; extending the rest portion of the fining twisted steel bar by using a fining twisted steel bar connector until the length of the fining twisted steel bar reaches to the length required for construction; effectively connecting the fining twisted steel bar with the rear box body; stretching the fining twisted steel bar through oil pressure of the manual hydraulic center hole jack under the condition that pulling connection load is required to be checked and computed to determine length extension before stretching; fixing by using an anchor plate and a fixing anchor after construction requirements are met; and dismounting the jack. The construction method not only is suitable for the conventional earth pressure balance shield tunneling machine with the diameter of 6760 mm, but also is suitable for a slurry balance shield tunneling machine with a larger diameter; after pulling connection is finished, the jack can be dismounted, and the problem of duct piece pulling connection during shield tunnel initial-stage construction is solved effectively.

Description

Shield tunnel initial stage construction section of jurisdiction sockets device and construction method
Technical field
The present invention relates to a kind of tunneling shield construction equipment and method, especially a kind of shield tunnel initial stage construction section of jurisdiction sockets device and construction method.
Background technology
Along with the development of shield method technology, the application of shield tunnel is more and more extensive, develops into taking and discharging tunnel, nuclear power tunnel and subway tunnel etc. from early stage highway tunnel, railway tunnel.Especially subway tunnel, is all century-old engineering, has can't permit mishap, and the normal operation of subway tunnel is related to the development process in whole city.
The principal element affecting subway tunnel use is the construction quality in tunnel itself.As attitude of shield machine during shield construction controls improper or measure error etc., cause tunnel axis and gap of the shield tail unreasonable, cause section of jurisdiction fragmentation situation, percolating water situation.Especially when shield tunnel is constructed in the early stage, because the frictional force between section of jurisdiction and the soil body is less, and simultaneous grouting slurry sedimentation is not also stablized, and it is uneven by system stiffness after shield launching, in order to prevent molded section of jurisdiction entirety from causing tunnel axis skew, section of jurisdiction fragmentation, percolating water, screw rod to be pulled off to active well displacement (the especially uneven dislocation in both sides, tunnel), entirety must be carried out in type section of jurisdiction and fixing.The experience of constructing according to Shanghai Underground and Shen Tong group build tube hub requirement, and needing provides this cover section of jurisdiction a kind of to socket device.
Summary of the invention
The problems such as tunnel axis skew, section of jurisdiction fragmentation, percolating water, screw rod are pulled off are caused to active well displacement in order to prevent molded section of jurisdiction entirety, the present invention will provide construction of a kind of shield tunnel initial stage section of jurisdiction to socket device and construction method, for solve shield tunnel construct in the early stage time, because the frictional force between section of jurisdiction and the soil body is less, and simultaneous grouting slurry sedimentation is not also stablized, and by technical problems such as system stiffness are uneven after shield launching.
For achieving the above object, technical scheme of the present invention is:
A kind of shield tunnel initial stage construction section of jurisdiction sockets device, tunnel axis is caused to offset for preventing molded section of jurisdiction entirety to active well displacement, section of jurisdiction is broken, percolating water, screw rod is pulled off, this device comprises steel casing, Manual hydraulic punching jack, anchor slab, mooring anchor, fining twisted steel, connector of finish rolling thread steel, section of jurisdiction center bolt, described steel casing is by front, rear portion casing is formed, before, rear portion casing is fixedly connected with by section of jurisdiction center bolt, described anterior casing is built with Manual hydraulic punching jack, before described, anchor slab is respectively equipped with in the casing of rear portion, described fining twisted steel is through actuated hydraulic punching jack and center bolt center, section of jurisdiction, and be fixedly connected with anchor slab.
Described fining twisted steel by length required for connector of finish rolling thread steel spreading to construction, and is effectively connected with rear portion casing.
Apply the construction method that shield tunnel initial stage construction section of jurisdiction sockets device, Specific construction step: 1) fix front and rear portions casing with section of jurisdiction center bolt; 2) Manual hydraulic punching jack is fixed on the curved plate in anterior casing; 3) fining twisted steel is passed Manual hydraulic punching jack and center bolt center, section of jurisdiction, and fix with anchor slab; 4) with connector of finish rolling thread steel, remaining fining twisted steel spreading is needed length to construction, and be effectively connected with rear portion casing; 5) manually formula hydraulic pressure punching jack oil pressure, stretches to fining twisted steel, needing to adjust socketing load, determining elongation before stretching; 6), after reaching construction requirement, fix with anchor slab, mooring anchor; 7) jack is removed.
The invention has the beneficial effects as follows:
Shield tunnel initial stage construction section of jurisdiction of the present invention sockets device and method and is not only used in conventional diameter 6760mm balancing earth-pressure shielding machine, and be applicable to the slurry balance shield machine of larger diameter, and after having socketed, jack can be removed, efficiently solve the shield tunnel initial stage construction time section of jurisdiction socket problem.
Accompanying drawing explanation
Fig. 1 is that shield tunnel initial stage of the present invention construction section of jurisdiction sockets apparatus structure floor map;
Fig. 2 is that anterior casing cuts open top view;
Fig. 3 is the sectional view of Fig. 1 middle front part casing along A-A;
Fig. 4 is the sectional view of Fig. 1 middle front part casing along B-B;
Fig. 5 is the sectional view of Fig. 1 postmedian casing along C-C;
Fig. 6 is the sectional view of Fig. 1 postmedian casing along D-D;
Fig. 7 is the sectional view of Fig. 1 postmedian casing along E-E;
Fig. 8 is that rear portion casing cuts open top view;
Fig. 9 is section of jurisdiction lifting center bolt schematic diagram.
Detailed description of the invention
Below in conjunction with specific embodiment, set forth the present invention further.
The present invention relates to construction of a kind of shield tunnel initial stage section of jurisdiction and socket device and construction method.When shield tunnel is constructed in the early stage, because the frictional force between section of jurisdiction and the soil body is less, and simultaneous grouting slurry sedimentation is not also stablized, and it is uneven by system stiffness after shield launching, in order to prevent molded section of jurisdiction entirety from causing tunnel axis skew, section of jurisdiction fragmentation, percolating water, screw rod to be pulled off to active well displacement, special this device of invention.
As shown in Figures 1 to 9, shield tunnel initial stage construction section of jurisdiction of the present invention sockets device, comprises following a few part: steel casing 1, Manual hydraulic punching jack 2, anchor slab 3, mooring anchor, fining twisted steel 4, connector of finish rolling thread steel 5, section of jurisdiction center bolt 6.
Steel casing 1 is made up of front and rear portions casing, front and rear portions casing is fixedly connected with by section of jurisdiction center bolt 6, anterior casing is built with Manual hydraulic punching jack 2, anchor slab 3 is respectively equipped with in front and rear portions casing, fining twisted steel 4 through actuated hydraulic punching jack 2 and section of jurisdiction center bolt 6 center, and is fixedly connected with anchor slab 3; Fining twisted steel 4 by length required for connector of finish rolling thread steel 5 spreading to construction, and is effectively connected with rear portion casing.
At constructing tunnel to 75 ring, when namely vehicle frame 25 ring is deviate from section of jurisdiction, start installation and socket device, at center, B1, B2 section of jurisdiction, hole for hoist height and position is respectively installed a set of.Specific construction step: (1) fixes two parts before and after steel casing 1(with section of jurisdiction center bolt); (2) jack is fixed on interior (first half) curved plate of steel casing 1; (3) fining twisted steel 4 of long an about 1m is passed Manual hydraulic punching jack 2 and section of jurisdiction center bolt 6 center, and fix with anchor slab 3.(4) with connector of finish rolling thread steel 5 remaining fining twisted steel 4 spreading to construction need length (25m), and with steel casing 1(latter half) be effectively connected; (5) manually formula hydraulic pressure punching jack 2 oil pressure, stretches to fining twisted steel 4, needing to adjust socketing load, determining elongation before stretching; (6), after reaching construction requirement, fix with anchor slab 3, mooring anchor; (7) jack is removed.Efficiently solve the shield tunnel initial stage construction time section of jurisdiction socket problem.
The present invention is applied in running tunnel total length and is about 1.73km, and tunnel outlet section 300 ring is straight line ring, section of jurisdiction internal diameter 5900mm, external diameter 6600mm, section of jurisdiction thickness 350mm.When uplink constructing tunnel to 75 ring, vehicle frame 25 ring is deviate from section of jurisdiction, and project management department sockets going out hole segment pipe sheet.Socket effectiveness comparison ideal, when the later stage advances, section of jurisdiction is overall basic not loosening to active well direction, and occurs without broken and percolating water.

Claims (3)

1. a shield tunnel initial stage construction section of jurisdiction sockets device, tunnel axis is caused to offset for preventing molded section of jurisdiction entirety to active well displacement, section of jurisdiction is broken, percolating water, screw rod is pulled off, this device comprises steel casing (1), Manual hydraulic punching jack (2), anchor slab (3), mooring anchor, fining twisted steel (4), connector of finish rolling thread steel (5), section of jurisdiction center bolt (6), it is characterized in that: described steel casing (1) is by front, rear portion casing is formed, before, rear portion casing is fixedly connected with by section of jurisdiction center bolt (6), described anterior casing is built with Manual hydraulic punching jack (2), before described, anchor slab (3) is respectively equipped with in the casing of rear portion, described fining twisted steel (4) is through actuated hydraulic punching jack (2) and section of jurisdiction center bolt (6) center, and be fixedly connected with anchor slab (3).
2. shield tunnel initial stage construction section of jurisdiction according to claim 1 sockets device, it is characterized in that: described fining twisted steel (4) by length required for connector of finish rolling thread steel (5) spreading to construction, and is effectively connected with rear portion casing.
3. application rights requires that the construction of the shield tunnel initial stage described in 2 section of jurisdiction sockets a construction method for device, it is characterized in that, Specific construction step: 1) with section of jurisdiction center bolt (6) fixing front and rear portions casing; 2) Manual hydraulic punching jack (2) is fixed on the curved plate in anterior casing; 3) a fining twisted steel (4) through Manual hydraulic punching jack (2) and section of jurisdiction center bolt (6) center, and with anchor slab (3) fix; 4) with connector of finish rolling thread steel (5), remaining fining twisted steel (4) spreading is needed length to construction, and be effectively connected with rear portion casing; 5) manually formula hydraulic pressure punching jack (2) oil pressure, stretches to fining twisted steel (4), needing to adjust socketing load, determining elongation before stretching; 6), after reaching construction requirement, fix with anchor slab (3), mooring anchor; 7) jack is removed.
CN201510627284.1A 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method Active CN105257321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510627284.1A CN105257321B (en) 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510627284.1A CN105257321B (en) 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method

Publications (2)

Publication Number Publication Date
CN105257321A true CN105257321A (en) 2016-01-20
CN105257321B CN105257321B (en) 2018-05-04

Family

ID=55097210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510627284.1A Active CN105257321B (en) 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method

Country Status (1)

Country Link
CN (1) CN105257321B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2392836Y (en) * 1999-11-12 2000-08-23 开封预应力技术研究所 Pretensioned beam special clamp
JP2003268922A (en) * 2002-03-13 2003-09-25 Ps Mitsubishi Construction Co Ltd Anchorage body of pc steel member
JP2004360399A (en) * 2003-06-06 2004-12-24 Sumiken Concrete Kogyo Kk Concrete member
CN101021100A (en) * 2006-11-10 2007-08-22 天津市耀新科技发展有限公司 Fiber reinforced ground tackle for fiber reinforcing method
CN101338680A (en) * 2008-08-08 2009-01-07 上海市隧道工程轨道交通设计研究院 Construction method for pretightening digging tunnel segment
KR20100053847A (en) * 2008-11-13 2010-05-24 한국건설기술연구원 Structure reinforcing apparatus and method for srtucture reinforcement under concrete surface
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN101851985A (en) * 2010-05-27 2010-10-06 卓清 Articulated anchor and prestress tensioning method of high strength fibre composite sheet
CN202323717U (en) * 2011-10-28 2012-07-11 科达集团股份有限公司 Cantilever type pre-stress hoop and special tensioning device thereof
CN202644401U (en) * 2012-05-15 2013-01-02 长安大学 Omnipotent prestress stretch-draw connecting structure for finish-rolling screw-thread steel
CN203065976U (en) * 2013-02-20 2013-07-17 郭逢庆 Active prestressed carbon fiber plate reinforcing system
CN103321430A (en) * 2013-06-07 2013-09-25 华北水利水电大学 Construction method of reinforcing large-span concrete structure with prestressed carbon fiber sheet
CN103797216A (en) * 2011-09-15 2014-05-14 韩国建设技术研究院 Segment structure having vertical strands and horizontal shear keys and method for constructing shield tunnel using same
CN104264593A (en) * 2014-09-05 2015-01-07 华侨大学 Surface embedded bar reinforced prestress tension method and device
CN104406523A (en) * 2014-09-29 2015-03-11 樊晓莉 Shield tunnel segment shift detection method
CN104631851A (en) * 2014-12-26 2015-05-20 柳州欧维姆机械股份有限公司 Prestressed carbon fiber plate tensioning device and method for tensioning prestressed carbon fiber plate

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2392836Y (en) * 1999-11-12 2000-08-23 开封预应力技术研究所 Pretensioned beam special clamp
JP2003268922A (en) * 2002-03-13 2003-09-25 Ps Mitsubishi Construction Co Ltd Anchorage body of pc steel member
JP2004360399A (en) * 2003-06-06 2004-12-24 Sumiken Concrete Kogyo Kk Concrete member
CN101021100A (en) * 2006-11-10 2007-08-22 天津市耀新科技发展有限公司 Fiber reinforced ground tackle for fiber reinforcing method
CN101338680A (en) * 2008-08-08 2009-01-07 上海市隧道工程轨道交通设计研究院 Construction method for pretightening digging tunnel segment
KR20100053847A (en) * 2008-11-13 2010-05-24 한국건설기술연구원 Structure reinforcing apparatus and method for srtucture reinforcement under concrete surface
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN101851985A (en) * 2010-05-27 2010-10-06 卓清 Articulated anchor and prestress tensioning method of high strength fibre composite sheet
CN103797216A (en) * 2011-09-15 2014-05-14 韩国建设技术研究院 Segment structure having vertical strands and horizontal shear keys and method for constructing shield tunnel using same
CN202323717U (en) * 2011-10-28 2012-07-11 科达集团股份有限公司 Cantilever type pre-stress hoop and special tensioning device thereof
CN202644401U (en) * 2012-05-15 2013-01-02 长安大学 Omnipotent prestress stretch-draw connecting structure for finish-rolling screw-thread steel
CN203065976U (en) * 2013-02-20 2013-07-17 郭逢庆 Active prestressed carbon fiber plate reinforcing system
CN103321430A (en) * 2013-06-07 2013-09-25 华北水利水电大学 Construction method of reinforcing large-span concrete structure with prestressed carbon fiber sheet
CN104264593A (en) * 2014-09-05 2015-01-07 华侨大学 Surface embedded bar reinforced prestress tension method and device
CN104406523A (en) * 2014-09-29 2015-03-11 樊晓莉 Shield tunnel segment shift detection method
CN104631851A (en) * 2014-12-26 2015-05-20 柳州欧维姆机械股份有限公司 Prestressed carbon fiber plate tensioning device and method for tensioning prestressed carbon fiber plate

Also Published As

Publication number Publication date
CN105257321B (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN104213508B (en) A kind of method utilizing stull and external tendon to control king-post displacement
CN104032678B (en) H type king-post internal force adjustable false stull structure and construction method thereof
CN107313589A (en) Outer wall of basement one side steel form support system and its construction method
CN106120568A (en) Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN106836547B (en) The construction method of prefabricated assembled shear wall structure
CN107130524A (en) Steel case arch bridge faces across pre-splicing rear anchor pushing tow system and method
CN104652285B (en) Large span self-anchored suspension bridge construction method for hanging and tower beam temporary anchoring device
CN105887590A (en) Height direction adjusting system and method after railway foundation subsidence
CN207568156U (en) Steel platform supports bracket
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN102444275A (en) Silo flexible slip form torsion resistance construction device
CN105257321A (en) Shield tunnel initial-stage construction duct piece pulling connection device and construction method
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN205557349U (en) Device is changed to jib
CN108678767B (en) Excavation and yielding-rigid combined supporting construction method for extruded large-deformation surrounding rock tunnel
CN203907010U (en) Flexible connection device for pipe jacking construction in soft soil layer
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN109057328A (en) With the wall split bolt structure of cable bearer linkage function in pipe gallery
CN107460879A (en) A kind of fixed structure of flare template
CN112982188A (en) Method for rebuilding or adding vertical prestress to active concrete bridge
CN106988219A (en) A kind of method for connecting reel and cable hoisting Arch Bridge Construction being carried out using it
CN203866710U (en) Temporary cross arm structure of H-shaped tower column with internal force adjustable
CN207314348U (en) A kind of fixed structure of flare template
CN208088827U (en) The detachable earth anchor of iron on floor beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant