CN102444275A - Silo flexible slip form torsion resistance construction device - Google Patents
Silo flexible slip form torsion resistance construction device Download PDFInfo
- Publication number
- CN102444275A CN102444275A CN2011102791193A CN201110279119A CN102444275A CN 102444275 A CN102444275 A CN 102444275A CN 2011102791193 A CN2011102791193 A CN 2011102791193A CN 201110279119 A CN201110279119 A CN 201110279119A CN 102444275 A CN102444275 A CN 102444275A
- Authority
- CN
- China
- Prior art keywords
- silo
- antitorque
- template
- slip form
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a silo flexible slip form torsion resistance construction device, which comprises a hoisting frame, an operation platform, a template and a combined torsion resistant column, and is characterized in that the combined torsion resistant column uniformly distributed around the silo wall includes supporting rods and connecting rods; the three supporting rod are arranged to form a regular triangle; and a regular triangle lattice column is formed by welding the three connecting rods between the three supporting rods. The connecting rods have a clearance of 350 to 400 mm, and are made of steel bars with 20mm as the minimum diameter. In the invention, the combined torsion resistant column is uniformly distributed around the silo wall, so as to solve the technical problems that large-diameter silo flexible slip form is easy to twist and difficult to correct in construction; appearance quality of the external silo wall is improved, and structural safety of buildings is enhanced; further the silo flexible slip form torsion resistance construction device is reasonably designed, has a simple structure, is convenient to operate, and has the low cost.
Description
Technical field
The present invention relates to the silo technical field, exactly is the antitorque construction equipment of the flexible sliding formwork of a kind of silo.
Technical background
The slding form operation technology is that mechanization degree is high in steel concrete bulkhead and the tube structure construction, speed of application is fast, safety work is secure, the significant a kind of job practices of comprehensive benefit.Slip form construction device comprises hoisting frame; Operating platform; Inside and outside template; Rises in the process that reason is easy to make sliding liter of warehouse to twist because unbalance stress, the concrete setting time of jack are inconsistent, and inside and outside template gradient everywhere is inconsistent etc. in that warehouse is sliding, thereby influence normally carrying out of slding form operation.At present common correction, entangle the method for turning round and have: 1. platform inclination method; 2. correction control method leads; 3. correction control method is taken turns on the top; 4. outer force method; 5. two jack methods; 6. displacement Deviation rectifier remedy; 7. bridging entangles the method for turning round.These methods all are measures of taking after the deviation taking place, make the outward appearance of inner vertical reinforcement of bulkhead and pilaster form the distribution of " S " shape, and not only the quality to building has certain influence, and needs to drop into great amount of manpower and material resources and time.
Summary of the invention
The objective of the invention is to have overcome the deficiency of above-mentioned prior art; Provide a kind of not only can the solution effectively in the flexible slding form operation of major diameter silo to be prone to reverse, to entangle and turn round difficult technical barrier to people, improve the impression quality of silo outer wall, strengthen the safety of structure of building; And it is reasonable in design; Simple in structure, easy to operate, the antitorque construction equipment of the flexible sliding formwork of silo with low cost.
The present invention includes hoisting frame; Operating platform; Template and be used for the antitorque post of the antitorque combination of flexible sliding formwork; It is characterized in that: the antitorque post of combination along evenly arranging in one week of silo bulkhead comprises cramp bar and connecting rod, and three cramp bars are arranged into equilateral triangle, is welded into the equilateral triangle lattice column by three connecting rods between three cramp bars.
The spacing of connecting rod is 350-400mm.
The reinforcing bar that connecting rod adopts diameter to be at least 20mm is processed.
Effect of the present invention
1, the present invention is because along evenly being placed with the antitorque post of combination in one week of silo bulkhead; Therefore can solve effectively in the flexible slding form operation of major diameter silo and be prone to reverse, entangle and turn round difficult technical barrier; Improve the impression quality of silo outer wall, strengthen the safety of structure of building.
2, the present invention is reasonable in design, and is simple in structure, easy to operate, with low cost.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the sliding formwork sketch map.
The specific embodiment
Embodiment 1:
Referring to Fig. 1~2; The present invention includes hoisting frame 1; Operating platform 2, template 3 and be used for the antitorque post 4 of the antitorque combination of flexible sliding formwork comprises cramp bar 5 and connecting rod 6 along the antitorque post 4 of combination of evenly arranging in one week of silo bulkhead; Three cramp bars are arranged into equilateral triangle, are welded into the equilateral triangle lattice column by three connecting rods between three cramp bars.
The spacing of connecting rod is 350~400mm.The reinforcing bar that connecting rod adopts diameter to be at least 20mm is processed.
During practical implementation, emit the barrel sideline in the bulkhead position earlier, the horizontal reinforcement in first section vertical reinforcement of colligation and the template altitude range is is also checked and accepted.Surpass template height of level reinforcing bar and first section later vertical reinforcement, behind template sliding lifting, with sliding with tying up.
Adopt No. 8 iron wires to be connected between template and enclosure.Last enclosure is 240mm apart from template distance suitable for reading, is no more than 250mm.The template end opening with open cabinet frame at the bottom of concordant.Mounting template front template surface should the brushing interleaving agent, installs by the outer order in back in earlier then.The template tapering is an internal mold 0.5%, external mold 0.3%.
Enclosure is locked with the hoisting frame column by the order outside the back in the elder generation, in the elder generation under the back, and enclosure is linked to be integral body.When enclosure is installed, check the level of hoisting frame, vertical and center at any time, and check the spacing of inside and outside enclosure.
According to the sliding formwork design scheme, hoisting frame is installed in design attitude by model.When laying hoisting frame, make each hoisting frame all on same horizontal plane, with its levelness of inspect by instrument such as spirit level and plumb bob, verticality (comprise in the plane, plane outside) and center thereof, carry out support fixation then during installation temporarily.Press the center line symmetry of silo and install, and all install along the silo radial direction.
Operation platform system by inside and outside operating platform, hang scaffold and form, the inside and outside scaffold that hangs should treat that the sliding step heel that rises hangs with peace.
Jack adopts GYD-60 ball-type jack; Cramp bar adopts the flush type cramp bar; Adopt
steel pipe; Be located at the wall center, and use the plummet centering; The joint rate of the cramp bar of jack must not should be less than 1m greater than 25%, two adjacent head height difference on the sustained height.
When cramp bar installation and spreading, requirement is concentric with jack and vertical, and its deviation is not more than 0.5mm.The cramp bar spreading adopts and to add 2 length 200mm diameters of weldering in the steel pipe and reinforce for the 8mm bar dowel, and with electric welding that the groove place weldering of 45 degree is full then, the back polishes off unnecessary weldering meat with hand-held abrasive machine, and rounding is sliding, so that jack passes through.After joint slips over jack, again that the joint area weld all around is firm.
The sliding formwork hydraulic system installs, and should try (before in jack, inserting cramp bar) out, has or not oil impregnate, oil leakage phenomenon in the inspection total system, and whether jack climbs synchronously.Simultaneously to the load condition of part mechanical verification electric power system.Through trial run, could insert cramp bar after all normal.
Just sliding: in template, carry out earlier concrete first pouring, first pouring divides to be carried out for 3~4 times, and every circle is built highly and should be controlled at about 300mm; Build to accomplish and begin just to slide; Sliding rise is 50mm, answers scrutiny concrete depanning situation after the depanning, observes the concrete situation of solidifying; Press bulkhead can extrude finger mark, not cave in finger, use wood float can flatten to normally.Should check comprehensively, adjust the sliding shuttering system immediately after just sliding, change normal sliding the liter stage then over to.The content of inspection comprises: whether template rises even; Form joint has or not distortion, spillage situation; Whether the template gradient is normal; Have or not inclination and distortion after hoisting frame is stressed; Evenly whether enclosure stressed, whether rigidity meets the demands; Whether the operating platform stressing conditions is normal; Cramp bar has or not bending, pulls up phenomenon; Jack, oil connection have or not oil leakage phenomenon; Oil circuit has or not the sliding situation that rises that hinders.Change normal sliding the liter stage after just sliding normally over to, promptly each sliding 300mm that rises.
The initial sliding formwork stage, arrange 3 jack on the cabinet frame opening of per two pilaster centers, be the equilateral triangle line and arrange.Before first envelope mould, remove and to carry out the bottom welding to 3 cramp bars and also need reinforce once after fixing according to 600mm is high; Reinforcing must make 3 cramp bars form 1 independently lattice column; Through forming wholely, so just can effectively control the skew of sliding formwork platform and reverse again with the welding of connecting rod is fixing.
The template climbing speed should specifically be grasped according to the concrete test block situation of condensing of trial-production in early stage.Concrete depanning intensity should be controlled at 0.25~0.4Mpa, promptly presses bulkhead can extrude finger mark, not cave in finger, can hear rustle during template sliding lifting, explains that depanning concrete situation is normal basically.After each template sliding lifting finishes, should in time check depanning concrete situation (finger pressure is examined inspection), build the 300mm that highly must be consistent at every turn, and conscientiously carry out record.Per tour is highly measured once concreting at least, and revises and to build height, accurate with the time that guarantees every layer of depanning and level.The platform level error is allowable variation with at 25mm, wouldn't adjust, and surpasses 25mm and should carry out leveling immediately.Each sliding liter all will accurately be rule, spacing elevated height 300mm with platform erection on cramp bar with level gauge during adjustment.At the sliding climb altitude of adjusting stop according to concrete depanning situation that rises in the process.
Rise in the process sliding, should check the working condition of template system, hydraulic system at any time, to reduce liter poor as far as possible.Poor in order to reduce rising of each jack, can be on every cramp bar certain at interval absolute altitude, alignment target is set; The discrepancy in elevation of adjacent two jack; Generally be not more than 10mm, when promoting at every turn, must make apart from hydraulic control panel jack farthest all rise reach stroke and require after; Can stop pressurization, oil return then; During oil return, also must make the abundant oil return of jack farthest, to rise difference inconsistent in order to avoid cause because of pressurization, oil return are insufficient.
The reason of reversing is various, but is embodied in the inclination that is out cabinet frame inclination or jack, cramp bar in the reality.Therefore, these are reformed could climb smoothly.One, when finding to reverse tendency and torsional amplitude hour, with the pad about 4mm jack is prevented to reverse along the opposite direction bed hedgehopping and continue development, excessively can suitably remove the part pad if find to entangle to turn round, until stablizing; Two, when finding to have tendency reversed and torsional amplitude big, the adjacent cabinet frame of opening is connected with leading chain, lead chain one end and be pulled in out cabinet frame frame leg, the other end is pulled in out cabinet frame frame head piece.Oppositely connect according to torsional direction, when sliding the liter, utilize the slip of opening cabinet frame will lead the chain tension, needn't draw when stopping and leading chain with leading chain.When the revolution tendency, can shed and lead chain.But each action is unsuitable too quickly, and amplitude can not be excessive.Or with built-in fitting under bulkhead skid off the back in time with open the anti-drawknot of cabinet frame top rail, suitably loosen while sliding, make out cabinet frame slowly keep vertical.
In a word, rectify a deviation and turn round all and will carry out with sliding the liter, can not be too quickly, to be controlled to be the master, be auxilliary to entangle.
Claims (3)
1. the antitorque construction equipment of the flexible sliding formwork of a silo; Comprise hoisting frame; Operating platform, template and be used for the antitorque post of the antitorque combination of flexible sliding formwork, it is characterized in that: the antitorque post of combination along evenly arranging in one week of silo bulkhead comprises cramp bar and connecting rod; Three cramp bars are arranged into equilateral triangle, are welded into the equilateral triangle lattice column by three connecting rods between three cramp bars.
2. the antitorque construction equipment of the flexible sliding formwork of silo according to claim 1, it is characterized in that: the spacing of connecting rod is 350-400mm.
3. the flexible sliding antitorque mould construction equipment of silo according to claim 1, it is characterized in that: the reinforcing bar that connecting rod adopts diameter to be at least 20mm is processed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102791193A CN102444275A (en) | 2011-09-20 | 2011-09-20 | Silo flexible slip form torsion resistance construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102791193A CN102444275A (en) | 2011-09-20 | 2011-09-20 | Silo flexible slip form torsion resistance construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102444275A true CN102444275A (en) | 2012-05-09 |
Family
ID=46007179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102791193A Pending CN102444275A (en) | 2011-09-20 | 2011-09-20 | Silo flexible slip form torsion resistance construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102444275A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147569A (en) * | 2013-02-27 | 2013-06-12 | 青岛一建集团有限公司 | Operation platform system for cross-pulling slip form with both full-diameter silo and spoke-type center plate |
CN103343639A (en) * | 2013-07-29 | 2013-10-09 | 中国化学工程第三建设有限公司 | Efficiently-adjusting module sliding system |
CN103362342A (en) * | 2013-07-29 | 2013-10-23 | 中国化学工程第三建设有限公司 | Slip form system capable of exactly adjusting template taper |
CN106088757A (en) * | 2016-04-13 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of ring beam and construction method of top barrel in the middle part of ultra-large silo |
CN106337557A (en) * | 2016-10-31 | 2017-01-18 | 中国冶集团有限公司 | Anti-twisting construction method of large-size double-body silo slip form |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1054136A (en) * | 1996-08-09 | 1998-02-24 | Kajima Corp | Frame system in slip form construction method |
CN101126279A (en) * | 2007-07-31 | 2008-02-20 | 中国建筑第七工程局 | Silo slipform construction technique |
CN201148730Y (en) * | 2007-12-11 | 2008-11-12 | 山西焦煤集团有限责任公司 | Super large diameter cylindrical silo hydraulic slip mold construction operating platform |
CN202338107U (en) * | 2011-09-20 | 2012-07-18 | 中煤建筑安装工程集团有限公司 | Flexible sliding mold torsion-resisting construction device of silo |
-
2011
- 2011-09-20 CN CN2011102791193A patent/CN102444275A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1054136A (en) * | 1996-08-09 | 1998-02-24 | Kajima Corp | Frame system in slip form construction method |
CN101126279A (en) * | 2007-07-31 | 2008-02-20 | 中国建筑第七工程局 | Silo slipform construction technique |
CN201148730Y (en) * | 2007-12-11 | 2008-11-12 | 山西焦煤集团有限责任公司 | Super large diameter cylindrical silo hydraulic slip mold construction operating platform |
CN202338107U (en) * | 2011-09-20 | 2012-07-18 | 中煤建筑安装工程集团有限公司 | Flexible sliding mold torsion-resisting construction device of silo |
Non-Patent Citations (1)
Title |
---|
武清茹等: "21米筒仓柔性平台滑模的应用", 《山西煤炭管理干部学院学报》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147569A (en) * | 2013-02-27 | 2013-06-12 | 青岛一建集团有限公司 | Operation platform system for cross-pulling slip form with both full-diameter silo and spoke-type center plate |
CN103343639A (en) * | 2013-07-29 | 2013-10-09 | 中国化学工程第三建设有限公司 | Efficiently-adjusting module sliding system |
CN103362342A (en) * | 2013-07-29 | 2013-10-23 | 中国化学工程第三建设有限公司 | Slip form system capable of exactly adjusting template taper |
CN103343639B (en) * | 2013-07-29 | 2015-09-02 | 中国化学工程第三建设有限公司 | A kind of sliding mode system of efficient adjustment |
CN103362342B (en) * | 2013-07-29 | 2015-09-09 | 中国化学工程第三建设有限公司 | A kind of can the sliding mode system of accurate adjustment formwork gradient |
CN106088757A (en) * | 2016-04-13 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of ring beam and construction method of top barrel in the middle part of ultra-large silo |
CN106088757B (en) * | 2016-04-13 | 2018-06-12 | 中国十七冶集团有限公司 | A kind of construction method for ring beam in the middle part of ultra-large silo and top barrel |
CN106337557A (en) * | 2016-10-31 | 2017-01-18 | 中国冶集团有限公司 | Anti-twisting construction method of large-size double-body silo slip form |
CN106337557B (en) * | 2016-10-31 | 2019-01-11 | 中国一冶集团有限公司 | A kind of construction method that large size binary silo sliding formwork is antitorque |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN104712143B (en) | A kind of circular steel reinforced concrete chimney wall reverse mould construction method | |
CN109026065B (en) | Tunnel secondary lining zero-defect construction method | |
CN204098463U (en) | Builder's jack | |
CN104499485B (en) | One pile for one column fully automatic hydraulic verticality-regulating system and vertical adjustment method | |
CN203247603U (en) | High-order rag bolt positioner | |
CN103882813B (en) | For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction | |
CN102444275A (en) | Silo flexible slip form torsion resistance construction device | |
CN203947771U (en) | A kind of Bailey beam pendent form support system | |
CN106193330B (en) | A kind of steel building construction land tenure foot bolt pre-embedded construction method | |
CN102926538A (en) | Reaction box and construction method of reaction wall | |
CN206352391U (en) | Socket joint type key slot type Quick Release support system | |
CN106150060A (en) | Based on assembled wall-connecting piece exterior wall scaffold system and construction method | |
CN106049363A (en) | Fixing device for water stop belt for water conservancy engineering and water stop belt installing method | |
CN103276899B (en) | Reinforced steel bar ring is around steel kind design construction method | |
CN110080516B (en) | Method for mounting wall-attached support of attached lifting scaffold | |
CN202338107U (en) | Flexible sliding mold torsion-resisting construction device of silo | |
CN108678767B (en) | Excavation and yielding-rigid combined supporting construction method for extruded large-deformation surrounding rock tunnel | |
CN205822792U (en) | A kind of regulation support for masonry direct-burried | |
CN107587770A (en) | Disjunctor storehouse synchronization slding form operation method | |
CN105735228B (en) | High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method | |
CN103174155B (en) | Reverse construction method for erecting steel column and pouring concrete foundation | |
CN106703014A (en) | Underground diaphragm wall pre-buried section steel column fixing and secondary rectifying device and method | |
CN203654721U (en) | Support frame | |
CN106368330B (en) | Steel building construction land tenure foot bolt pre-embedded construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120509 |