CN106368330B - Steel building construction land tenure foot bolt pre-embedded construction method - Google Patents

Steel building construction land tenure foot bolt pre-embedded construction method Download PDF

Info

Publication number
CN106368330B
CN106368330B CN201610785477.4A CN201610785477A CN106368330B CN 106368330 B CN106368330 B CN 106368330B CN 201610785477 A CN201610785477 A CN 201610785477A CN 106368330 B CN106368330 B CN 106368330B
Authority
CN
China
Prior art keywords
bolt
mounting holes
group
foundation
billet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610785477.4A
Other languages
Chinese (zh)
Other versions
CN106368330A (en
Inventor
吴应明
仲维玲
郭朋超
朱红桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN201610785477.4A priority Critical patent/CN106368330B/en
Publication of CN106368330A publication Critical patent/CN106368330A/en
Application granted granted Critical
Publication of CN106368330B publication Critical patent/CN106368330B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of steel building construction land tenure foot bolt pre-embedded construction methods, the construction mould that the construction method uses includes upper level board, lower horizontal board and multiple support elements, horizontal measurement ruler has been kept flat on upper level board or lower horizontal board, upper bolt mounting holes group there are two being opened on upper level board, lower bolt mounting holes group there are two being opened on lower horizontal board, lower horizontal board bottom is fixed with shaped steel rod piece;The construction method includes step:One, billet determines:The billet installed to the pre-embedded bolt group is determined;Two, bolt mounting holes group determines;Three, surveying setting-out;Four, mold is placed and foundation bolt is tentatively installed;Five, first leveling;Six, shaped steel rod piece is fixed;Seven, foundation bolt is fixed;Eight, mold is removed;Nine, concreting.Reasonable design, easy construction and using effect of the present invention are good, and energy is easy, the Embedment Construction process of steel building construction land tenure foot bolt is rapidly completed, and can ensure that the pre-buried precision of foundation bolt.

Description

Steel building construction land tenure foot bolt pre-embedded construction method
Technical field
The invention belongs to steel building technical field of construction, more particularly, to a kind of steel building construction land tenure foot spiral shell Bolt pre-embedded construction method.
Background technology
It is typically each used when constructing to steel-structure factory building, between the steel structure system and basis of steel-structure factory building pre-buried Foundation bolt be fixedly connected.Each steel column is respectively supported at an isolated footing in the steel structure system of steel-structure factory building On, which is reinforced concrete foundation, passes through a pre-embedded bolt group between each steel column and supported isolated footing It is fixed, four pre-embedded bolts being laid in respectively on four vertex of a rectangle is generally included in the pre-embedded bolt group.Needle To various sizes of steel column, the spacing of pre-embedded bolt is different in used pre-embedded bolt group.Steel-structure factory building was constructed The Embedment Construction of Cheng Zhong, foundation bolt are an exigent critical processes of construction precision, according to specification《Structural steelwork is applied Working medium amount acceptance specification GB50205-2001》And《Structural steelwork job specfication GB 50755-2012》Requirement, foundation bolt Error displacement be no more than 5mm.But when nowadays, carrying out Embedment Construction to foundation bolt, neither one unification, standard and rule The construction method of model be inevitably present for following, in work progress constructing operation relatively arbitrarily, it is low construction efficiency, pre-buried The problems such as construction precision is poor, along with needing pre-buried foundation bolt quantity very more, construction volume is very big.Also, it is corresponding to lack A kind of few mold being exclusively used in embedding anchor bolts construction, it is accurately fixed easy, quickly to be carried out to the pre-buried position of pre-embedded bolt Position, and ensure the Embedment Construction precision of foundation bolt.
Invention content
It is built in view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing a kind of steel construction Build construction land tenure foot bolt Embedment Construction mold, simple structure and reasonable design and processing and fabricating and easy to use, use Effect is good, and energy is easy, quickly the foundation bolt that need to construct is accurately positioned.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of steel building construction land tenure foot spiral shell Bolt Embedment Construction mold, it is characterised in that:Including upper level board, the lower horizontal board below upper level board and multiple it is supported in Support element between upper level board and lower horizontal board, the upper level board pass through in parallel laying and therebetween with lower horizontal board Multiple support elements are fastenedly connected;Horizontal measurement ruler, the horizontal survey have been kept flat on the upper level board or lower horizontal board Ruler includes cross tablet and two level detection devices, the cross tablet connect with vertically flat by lateral tablet and At the transverse direction tablet and the vertically flat are laid in the same plane and the perpendicular laying of the two, two horizontal inspections Device is surveyed to be laid in respectively on the lateral tablet and the vertically flat;Upper bolt is installed there are two being opened on the upper level board Hole group, two upper bolt mounting holes groups respectively go up outside bolt mounting holes group and are located at the upper outside bolt mounting holes The upper inside bolt mounting holes group of group inside;Lower bolt mounting holes group there are two being opened on the lower horizontal board, two lower spiral shells Bolt mounting hole group is respectively lower outside bolt mounting holes group and the lower inside spiral shell on the inside of the lower outside bolt mounting holes group Bolt mounting hole group;The structure snd size all same of the upper inside bolt mounting holes group and the lower inside bolt mounting holes group, The upper inside bolt mounting holes group is located at the surface of the lower inside bolt mounting holes group, the upper inside bolt mounting holes Include multiple the first bolt mounting holes for supplying the installation of the first foundation bolt respectively in group and the lower inside bolt mounting holes group, In the upper inside bolt mounting holes group and the lower inside bolt mounting holes group quantity of included first bolt mounting holes with Need to construct the first foundation bolt quantity it is identical, the installation positions of multiple first bolt mounting holes is respectively with multiple described The installation position of one foundation bolt corresponds;The upper outside bolt mounting holes group and the lower outside bolt mounting holes group Structure snd size all same, the upper outside bolt mounting holes group are located at the surface of the lower outside bolt mounting holes group, institute State in outside bolt mounting holes group and the lower outside bolt mounting holes group supplies the second foundation bolt to pacify respectively including multiple Second bolt mounting holes of dress, the installation positions of multiple second bolt mounting holes respectively with multiple second foundation bolts Installation position correspond;First foundation bolt and the second foundation bolt with the perpendicular laying of upper level board;It is described Lower horizontal board bottom is fixed with shaped steel rod piece.
Above-mentioned steel building construction land tenure foot bolt Embedment Construction mold, it is characterized in that:Further include lateral leveling ruler and with Longitudinal leveling ruler of the lateral perpendicular laying of leveling ruler, the transverse direction leveling ruler are in parallel laying with the lateral tablet, and the longitudinal direction is flat Ruler is in parallel laying with vertically flat;The transverse direction leveling ruler and longitudinal leveling ruler are laid in level in horizontal layout and the two On plate.
Above-mentioned steel building construction land tenure foot bolt Embedment Construction mold, it is characterized in that:The upper level board and lower water Tablet is bamboo slab rubber, and the support element is L-shaped support element.
Above-mentioned steel building construction land tenure foot bolt Embedment Construction mold, it is characterized in that:The upper level board and lower water Tablet is the structure snd size all same of rectangular flat and the two.
Above-mentioned steel building construction land tenure foot bolt Embedment Construction mold, it is characterized in that:The upper level board and lower water Spacing between tablet is 200mm~400mm.
Above-mentioned steel building construction land tenure foot bolt Embedment Construction mold, it is characterized in that:The quantity of the shaped steel rod piece For multiple tracks and its be in parallel laying, shaped steel rod piece described in multiple tracks is laid in lower horizontal board bottom from left to right.
Above-mentioned steel building construction land tenure foot bolt Embedment Construction mold, it is characterized in that:Further include being fixed on lower level The ceiling hammer in board bottom portion, the level detection device are spirit level.
Meanwhile a kind of the invention also discloses method and steps simple, reasonable design and the good steel of easy construction, using effect Structural construction construction land tenure foot bolt pre-embedded construction method, it is characterised in that:In the steel structure framework of constructed steel building Including more steel columns, each steel column is supported on a reinforced concrete foundation, each steel column bottom It is welded with one piece of billet in horizontal layout;Multiple foundation bolts that need to construct are installed on the billet, it is described Billet is fixed on by multiple foundation bolts that need to construct on reinforced concrete foundation, multiple foundation bolts that need to construct It is the foundation bolt being embedded in reinforced concrete foundation, multiple foundation bolts that need to construct form one and stood to the steel The pre-embedded bolt group that column is fixed, the every steel column are fixed on armored concrete by a pre-embedded bolt group On the basis of;
The steel column is the first steel column or the second steel column, the fixed billet in first steel column bottom For the first billet, the fixed billet in second steel column bottom is the second billet, first billet and The structure of second billet is identical, and the size of first billet is less than the size of the second billet;First billet On the foundation bolt that need to construct installed be the first foundation bolt, that is installed on second billet described needs to construct Foundation bolt is the second foundation bolt;
The pre-embedded construction method all same of the pre-embedded bolt group of all steel column fixations in the steel structure framework; When carrying out Embedment Construction to the pre-embedded bolt group of any steel column fixation, process is as follows:
Step 1: billet determines:The billet installed to the pre-embedded bolt group is determined, and obtains the pre-embedded bolt The installed billet of group is the first billet or the second billet;
Step 2: bolt mounting holes group determines:According to the billet definitive result obtained in step 1, to the pre-embedded bolt The bolt mounting holes group of group is determined:When showing that billet that the pre-embedded bolt group is installed is the first billet in step 1 When, show that the bolt mounting holes group that the pre-embedded bolt group is installed is the upper inside bolt mounting holes group and the lower inside spiral shell Bolt mounting hole group;When the billet for showing that the pre-embedded bolt group is installed in step 1 is the second billet, show that this is pre-buried The bolt mounting holes group that bolt group is installed is the upper outside bolt mounting holes group and the lower outside bolt mounting holes group;
Step 3: surveying setting-out:Wait for steel reinforcement cage binding set in reinforced concrete foundation residing for the pre-embedded bolt group Before after the completion and carrying out concreting to reinforced concrete foundation, to multiple lower margins that need to construct in the pre-embedded bolt group Pre-buried position and pre-buried height of the bolt on reinforced concrete foundation measure unwrapping wire respectively;
Step 4: mold is placed and foundation bolt is tentatively installed:It is obtained according to surveying setting-out in step 3 multiple described Need to construct the pre-buried position of foundation bolt, and the molding embedding anchor bolts construction mould will be pre-machined and be positioned over step 3 Described on steel reinforcement cage;Multiple foundation bolts that need to construct tentatively are installed again;
When tentatively being installed to the foundation bolt that need to construct described in any one, according to the bolt mounting holes obtained in step 2 Group definitive result is installed:When showing that bolt mounting holes group that the pre-embedded bolt group is installed is the upper inside in step 2 When bolt mounting holes group and the lower inside bolt mounting holes group, from top to bottom by the foundation bolt that need to construct from upper level board It is pierced by with the first bolt mounting holes opened on lower horizontal board;When the bolt peace for showing that the pre-embedded bolt group is installed in step 2 When filling upper outside bolt mounting holes group described in Kong Zuwei and the lower outside bolt mounting holes group, from top to bottom need to construct by described The second bolt mounting holes that foundation bolt is opened from upper level board and lower horizontal board are pierced by;
Step 5: first leveling:Leveling is carried out to embedding anchor bolts construction mould described in step 4, makes the lower margin Bolt embedment construction mould is in horizontality, and is constructed to the embedding anchor bolts by two level detection devices The horizontality of mold is detected;Meanwhile the multiple foundation bolts that need to construct obtained according to surveying setting-out in step 1 Pre-buried height, preliminary multiple mounting heights that need to construct foundation bolt that installation is complete in step 2 are adjusted, The foundation bolt that need to construct is limited by being fixed temporarily nut after the completion of adjustment, makes multiple lower margin spiral shells that need to construct Bolt is connected as one with the embedding anchor bolts construction mould, and the nut that is fixed temporarily is mounted on the lower margin that need to construct Bolt top;
Step 6: shaped steel rod piece is fixed:Using rod piece fixedly connected part, embedding anchor bolts described in step 5 are constructed Shaped steel rod piece in mold is fixed on steel reinforcement cage described in step 3;
Step 7: foundation bolt is fixed:It is fixed by bolts connector, by multiple lower margin spiral shells that need to construct in step 5 Bolt is separately fixed on steel reinforcement cage described in step 3;
Step 8: mold is removed:Multiple being fixed temporarily on foundation bolt that need to construct are mounted in removal step five Nut takes out the embedding anchor bolts construction mould from the bottom to top;
Step 9: concreting:Concreting is carried out to reinforced concrete foundation described in step 3, waits being poured After concrete setting, the Embedment Construction process of pre-embedded bolt group described in step 1 is completed.
Above-mentioned construction method, it is characterized in that:The shaped steel rod piece is mounted on by connecting bolt on lower horizontal board;Step 6 Described in bolt fixedly connected part described in shaped steel rod piece and step 7 be connection reinforcing bar;
When carrying out shaped steel rod piece in step 6 and fixing, the rod piece fixedly connected part and shaped steel rod piece and the steel reinforcement cage it Between be fixedly connected with welding manner;
When carrying out foundation bolt fixation in step 7, the bolt fixedly connected part and need to construct foundation bolt and the steel It is fixedly connected with welding manner between muscle cage.
Above-mentioned construction method, it is characterized in that:After measuring unwrapping wire in step 3, surveying setting-out is obtained multiple described It need to construct the pre-buried position of foundation bolt and pre-buried height is labeled on the steel reinforcement cage, multiple foundation bolts that need to construct Pre-buried height all same, the pre-buried height of the foundation bolt that need to construct is the elevation of top of the foundation bolt that need to construct;? When being labeled to the pre-buried height of the foundation bolt that need to construct on the steel reinforcement cage, by the top of the foundation bolt that need to construct The position of 20cm~30cm is labeled on the steel reinforcement cage below portion's absolute altitude.
Compared with the prior art, the present invention has the following advantages:
1, used embedding anchor bolts construction mould is simple in structure, processing and fabricating is easy and input cost is low, processing Quality is easy to ensure.
2, used embedding anchor bolts construction mould is reasonable in design, including upper level board, lower horizontal board and more A support element being supported between level board and lower horizontal board, on upper level board or lower horizontal board;It is provided with one on upper level board A upper bolt mounting holes group, opens that there are one lower bolt mounting holes group, upper bolt mounting holes group and the installations of lower bolt on lower horizontal board The quantity of bolt mounting holes included by Kong Zuzhong is identical as the quantity of foundation bolt that need to construct, and lower horizontal board bottom is fixed with type Steel rod elements are dismounted easily, and installation is laid convenient.
3, used embedding anchor bolts construction mould is easy to use and uses flexible operation mode, using effect Good, energy is easy, is quickly accurately installed, and can carry out Embedment Construction, and energy to the pre-embedded anchoring bolts group of two kinds of different sizes Pre-embedded anchoring bolts group is accurately positioned, it is ensured that the pre-buried position for the foundation bolt that need to construct and pre-buried height.
4, used embedding anchor bolts construction method is simple, reasonable design and realization are convenient, using effect is good, can letter Just the Embedment Construction process of steel building construction land tenure foot bolt, is rapidly completed, and can ensure that the pre- of foundation bolt that need to construct Precision is buried, to accelerate the steel building construction period.
In conclusion reasonable design of the present invention, easy construction and using effect are good, energy is easy, steel construction is rapidly completed builds The Embedment Construction process of construction land tenure foot bolt is built, and energy is easy, quickly the foundation bolt that need to construct is accurately positioned, it is ensured that The pre-buried precision of foundation bolt.
Below by drawings and examples, technical scheme of the present invention will be described in further detail.
Description of the drawings
Fig. 1 is the floor map of the present invention.
Fig. 2 is the elevational schematic view of the present invention.
Fig. 3 is the use state reference chart that the first foundation bolt is completed using present invention construction.
Fig. 4 is the use state reference chart that the second foundation bolt is completed using present invention construction.
Fig. 5 is the construction method flow diagram of the present invention.
Reference sign:
1-upper level board;2-lower horizontal boards;3-support elements;
4-cross tablets;5-level detection devices;The first foundation bolts of 6-1-;
The second foundation bolts of 6-2-;7-shaped steel rod pieces;8-ceiling hammers;
The first steel columns of 9-1-;The second steel columns of 9-2-;The first billets of 10-1-;
The second billets of 10-2-;11- reinforced concrete foundations;12-1- transverse direction leveling rulers;
12- is fixed temporarily nut;The longitudinal directions 13- leveling ruler.
Specific implementation mode
A kind of steel building construction land tenure foot bolt Embedment Construction mold as shown in Figure 1 and Figure 2, including upper level board 1, the lower horizontal board 2 positioned at 1 lower section of upper level board and multiple support elements 3 being supported between upper level board 1 and lower horizontal board 2, The upper level board 1 is fastenedly connected in parallel laying and by multiple support elements 3 therebetween with lower horizontal board 2; Horizontal measurement ruler is kept flat on the upper level board 1 or lower horizontal board 2, the horizontal measurement ruler includes cross tablet 4 and two water Flat detection device 5, the cross tablet 4 are formed by connecting by lateral tablet with vertically flat, the transverse direction tablet and described vertical It is laid in the same plane to tablet and the perpendicular laying of the two, two level detection devices 5 is laid in the cross respectively To on tablet and the vertically flat;It is opened on the upper level board 1 there are two upper bolt mounting holes group, two upper bolts are pacified It is respectively upper outside bolt mounting holes group and the upper inside bolt peace on the inside of the upper outside bolt mounting holes group to fill hole group Fill hole group;It is opened on the lower horizontal board 2 there are two lower bolt mounting holes group, two lower bolt mounting holes groups are respectively lower outer Side bolt mounting holes group and the lower inside bolt mounting holes group on the inside of the lower outside bolt mounting holes group;The upper inside The structure snd size all same of bolt mounting holes group and the lower inside bolt mounting holes group, the upper inside bolt mounting holes group Positioned at the surface of the lower inside bolt mounting holes group, the upper inside bolt mounting holes group and the lower inside bolt installation Kong Zuzhong includes multiple the first bolt mounting holes for supplying the first foundation bolt 6-1 installations respectively, the upper inside bolt installation The quantity of included first bolt mounting holes and first foundation bolt that need to construct in lower inside bolt mounting holes group described in Kong Zuhe The quantity of 6-1 is identical, and the installation position of multiple first bolt mounting holes is respectively with multiple first foundation bolt 6-1's Installation position corresponds;The structure snd size of the upper outside bolt mounting holes group and the lower outside bolt mounting holes group are equal Identical, the upper outside bolt mounting holes group is located at the surface of the lower outside bolt mounting holes group, the upper outside bolt Include multiple the second spiral shells for supplying the second foundation bolt 6-2 installations respectively in mounting hole group and the lower outside bolt mounting holes group Bolt mounting hole, the installation position laying with multiple second foundation bolt 6-2 respectively of multiple second bolt mounting holes Position corresponds;The first foundation bolt 6-1 and the second foundation bolt 6-2 with the 1 perpendicular laying of upper level board;It is described 2 bottom of lower horizontal board is fixed with shaped steel rod piece 7.
In the present embodiment, steel building construction land tenure foot bolt Embedment Construction mold of the present invention, further includes cross Longitudinal leveling ruler 13 to leveling ruler 12-1 and with the lateral perpendicular layings of leveling ruler 12-1, the transverse direction leveling ruler 12-1 are flat with the transverse direction Plate is in parallel laying, and the longitudinal direction leveling ruler 13 is in parallel laying with vertically flat;The transverse direction leveling ruler 12-1 and longitudinal leveling ruler 13 It is laid on level board 1 in horizontal layout and the two.
In the present embodiment, the horizontal measurement ruler is lain against on level board 1.
In the present embodiment, the upper level board 1 and lower horizontal board 2 are bamboo slab rubber.Also, the upper level board 1 is under The thickness of level board 2 is 20mm.
Thus, the upper level board 1 and lower horizontal board 2 have it is easy to process be easy with cutting, drilling, mold weight is light, The features such as site operation is quickly had bad luck.
When practice of construction, the upper level board 1 and lower horizontal board 2 can also be using the tablets of other materials, such as plank.
In the present embodiment, the support element 3 is L-shaped support element.
Also, the support element 3 is the support element by two pieces of bamboo slab rubber machine-shaping.
In the present embodiment, the upper level board 1 and lower horizontal board 2 are that the structure snd size of rectangular flat and the two are homogeneous Together.
Also, the quantity of the support element 3 is four, and four support elements 3 are laid in four of lower horizontal board 2 respectively On apex angle.
In the present embodiment, the spacing between the upper level board 1 and lower horizontal board 2 is 200mm~400mm.
, can according to specific needs when actual processing, the spacing between upper level board 1 and lower horizontal board 2 is accordingly adjusted It is whole.
In the present embodiment, the quantity of the shaped steel rod piece 7 be multiple tracks and its be in parallel laying, shaped steel rod piece described in multiple tracks 7 are laid in 2 bottom of lower horizontal board from left to right.
In actual use, multiple first foundation bolt 6-1 and multiple second foundation bolt 6-2 divide equally multiple rows of more Row are laid, and the quantity of the shaped steel rod piece 7 is identical as the columns of the first foundation bolt 6-1 and the second foundation bolt 6-2.It is real Border in use, each shaped steel rod piece 7 be multiple first foundation bolt 6-1 to being laid in same row or The bottom locating piece that multiple second foundation bolt 6-2 are positioned.
Also, the perpendicular of the first foundation bolt 6-1 and the second foundation bolt 6-2 can be effectively ensured using shaped steel rod piece 7 Straight degree.
Meanwhile the support platform that 7 groups of pairs of lower horizontal boards 2 of shaped steel rod piece are supported described in multiple tracks, enhance lower horizontal board 2 Rigidity.
In the present embodiment, the level detection device 5 is spirit level.
Meanwhile steel building construction land tenure foot bolt Embedment Construction mold of the present invention, further include being fixed on down The ceiling hammer 8 of 2 bottom of level board.
Also, the ceiling hammer 8 is located at the underface of lower horizontal board 2.
In the present embodiment, the shaped steel rod piece 7 is in horizontal layout with lower horizontal board 2, and the shaped steel rod piece 7 is angle steel.Institute It is equal leg angle to state angle steel.
In the present embodiment, the quantity of the first foundation bolt 6-1 and the second foundation bolt 6-2 are four, four institutes The second foundation bolt 6-2 is stated to be separately fixed on four vertex of a rectangle.
As shown in Figure 3 and Figure 4, four the first foundation bolt 6-1 are separately fixed on four vertex of a rectangle, And four the second foundation bolt 6-2 are separately fixed on four vertex of a rectangle.
In the present embodiment, as shown in Figure 3, Figure 4, four the first foundation bolt 6-1 are to be carried out to the first steel column 9-1 Fixed foundation bolt, the bottoms the first steel column 9-1 are welded with the first billet 10-1, first billet 10-1 is in horizontal layout, and four the first foundation bolt 6-1 are installed on the first billet 10-1.
Also, four the second foundation bolt 6-2 are the foundation bolt that the second steel column 9-2 is fixed, described It is in horizontal layout, four institutes that second bottoms steel column 9-2, which are welded with the second billet 10-2, the second billet 10-2, The second foundation bolt 6-2 is stated to be installed on the second billet 10-2.
In the present embodiment, the first billet 10-1 is rectangular steel plates, and four the first foundation bolt 6-1 pacify respectively On four apex angles of the first billet 10-1.
Also, the second billet 10-2 is rectangular steel plates, and four the second foundation bolt 6-2 are separately mounted to the On four apex angles of two billet 10-2.The structure of the first billet 10-1 and the second billet 10-2 are identical, and described The size of one billet 10-1 is less than the size of the second billet 10-2.
When practice of construction, the first steel column 9-1 and the second steel column 9-2 are supported in reinforced concrete foundation 11 On, it is provided with steel reinforcement cage in the reinforced concrete foundation 11.
In the present embodiment, the knot of the structure snd size of the upper level board 1 and lower horizontal board 2 with the second billet 10-2 Structure is identical with size.
Also, multiple second foundation bolt 6-2 are in the installation site of upper level board 1 and lower horizontal board 2 and second Installation site all same on billet 10-2.
A kind of steel building construction land tenure foot bolt pre-embedded construction method as shown in Figure 5, constructed steel building Steel structure framework include more steel columns, each steel column is supported on a reinforced concrete foundation, each The steel column bottom is welded with one piece of billet in horizontal layout;Being equipped on the billet multiple needs to construct Foundation bolt, the billet are fixed on by multiple foundation bolts that need to construct on reinforced concrete foundation 11, Duo Gesuo It is the foundation bolt being embedded in reinforced concrete foundation 11 to state the foundation bolt that need to construct, multiple foundation bolts that need to construct A pre-embedded bolt group that the steel column is fixed is formed, the every steel column passes through a pre-embedded bolt Group is fixed on reinforced concrete foundation 11;
The steel column is that the first steel column 9-1 or the second steel column 9-2, the bottoms the first steel column 9-1 are fixed The billet is the first billet 10-1, and the fixed billet in the bottoms the second steel column 9-2 is the second billet The structure of 10-2, the first billet 10-1 and the second billet 10-2 are identical, and the size of the first billet 10-1 is small In the size of the second billet 10-2;The foundation bolt that need to construct installed on the first billet 10-1 is the first The foundation bolt that need to construct installed on foot bolt 6-1, the second billet 10-2 is the second foundation bolt 6-2;
The pre-embedded construction method of the pre-embedded bolt group of 9 fixation of all steel columns is homogeneous in the steel structure framework Together;When carrying out Embedment Construction to the pre-embedded bolt group of any 9 fixation of the steel column, process is as follows:
Step 1: billet determines:The billet installed to the pre-embedded bolt group is determined, and obtains the pre-embedded bolt The installed billet of group is the first billet 10-1 or the second billet 10-2;
Step 2: bolt mounting holes group determines:According to the billet definitive result obtained in step 1, to the pre-embedded bolt The bolt mounting holes group of group is determined:When showing that billet that the pre-embedded bolt group is installed is the first billet in step 1 When 10-1, obtain bolt mounting holes group that the pre-embedded bolt group is installed be the upper inside bolt mounting holes group and it is described it is lower in Side bolt mounting holes group;When the billet for showing that the pre-embedded bolt group is installed in step 1 is the second billet 10-2, obtain It is the upper outside bolt mounting holes group and the lower outside bolt peace to go out the bolt mounting holes group that the pre-embedded bolt group is installed Fill hole group;
Step 3: surveying setting-out:Wait for that steel reinforcement cage set in reinforced concrete foundation 11 residing for the pre-embedded bolt group is tied up Before carrying out concreting after the completion of bundle and to reinforced concrete foundation 11, described need to construct to multiple in the pre-embedded bolt group Pre-buried position and pre-buried height of the foundation bolt on reinforced concrete foundation 11 measure unwrapping wire respectively;
Step 4: mold is placed and foundation bolt is tentatively installed:It is obtained according to surveying setting-out in step 3 multiple described Need to construct the pre-buried position of foundation bolt, and the molding embedding anchor bolts construction mould will be pre-machined and be positioned over step 3 Described on steel reinforcement cage;Multiple foundation bolts that need to construct tentatively are installed again;
When tentatively being installed to the foundation bolt that need to construct described in any one, according to the bolt mounting holes obtained in step 2 Group definitive result is installed:When showing that bolt mounting holes group that the pre-embedded bolt group is installed is the upper inside in step 2 When bolt mounting holes group and the lower inside bolt mounting holes group, from top to bottom by the foundation bolt that need to construct from upper level board 1 and lower horizontal board 2 on the first bolt mounting holes for being opened be pierced by;When the bolt for showing that the pre-embedded bolt group is installed in step 2 When mounting hole group is the upper outside bolt mounting holes group and the lower outside bolt mounting holes group, it need to from top to bottom be applied described The second bolt mounting holes that building site foot bolt is opened from upper level board 1 and lower horizontal board 2 are pierced by;
Step 5: first leveling:Leveling is carried out to embedding anchor bolts construction mould described in step 4, makes the lower margin Bolt embedment construction mould is in horizontality, and is applied to the embedding anchor bolts by two level detection devices 5 The horizontality of tool and mould is detected;Meanwhile the multiple lower margin spiral shells that need to construct obtained according to surveying setting-out in step 1 The pre-buried height of bolt adjusts preliminary multiple mounting heights that need to construct foundation bolt that installation is complete in step 2 It is whole, the foundation bolt that need to construct is limited by being fixed temporarily nut 12 after the completion of adjustment, makes multiple described to need to construct Foundation bolt is connected as one with the embedding anchor bolts construction mould, and the nut 12 that is fixed temporarily is mounted on the need Construction foundation bolt top;
Step 6: shaped steel rod piece is fixed:Using rod piece fixedly connected part, embedding anchor bolts described in step 5 are constructed Shaped steel rod piece 7 in mold is fixed on steel reinforcement cage described in step 3;
Step 7: foundation bolt is fixed:It is fixed by bolts connector, by multiple lower margin spiral shells that need to construct in step 5 Bolt is separately fixed on steel reinforcement cage described in step 3;
Step 8: mold is removed:Multiple being fixed temporarily on foundation bolt that need to construct are mounted in removal step five Nut 12 takes out the embedding anchor bolts construction mould from the bottom to top;
Step 9: concreting:Concreting is carried out to reinforced concrete foundation 11 described in step 3, waits being poured After building concrete setting, the Embedment Construction process of pre-embedded bolt group described in step 1 is completed.
In the present embodiment, the shaped steel rod piece 7 is mounted on by connecting bolt on lower horizontal board 2;Type described in step 6 Bolt fixedly connected part described in steel rod elements and step 7 is connection reinforcing bar;
When carrying out the fixation of shaped steel rod piece in step 6, the rod piece fixedly connected part and shaped steel rod piece 7 and the steel reinforcement cage Between be fixedly connected with welding manner;
When carrying out foundation bolt fixation in step 7, the bolt fixedly connected part and need to construct foundation bolt and the steel It is fixedly connected with welding manner between muscle cage.
In the present embodiment, the rod piece fixedly connected part and the bolt fixedly connected part are waste steel bar section.
It, need to be to the embedding anchor bolts construction mould when reality is processed the embedding anchor bolts construction mould It is accurately processed, especially the position of bolt mounting holes is accurately processed.
In the present embodiment, after measuring unwrapping wire in step 3, multiple lower margins that need to construct that surveying setting-out is obtained The pre-buried position of bolt and pre-buried height are labeled on the steel reinforcement cage, the pre-buried height of multiple foundation bolts that need to construct All same, the pre-buried height of the foundation bolt that need to construct are the elevation of top of the foundation bolt that need to construct;In the steel reinforcement cage On when being labeled to the pre-buried height of the foundation bolt that need to construct, below the elevation of top of the foundation bolt that need to construct The position of 20cm~30cm is labeled on the steel reinforcement cage.
It, need to be to the embedding anchor bolts construction mould when reality is processed the embedding anchor bolts construction mould It is accurately processed, especially the position of bolt mounting holes is accurately processed.
When measuring unwrapping wire in the present embodiment, in step 3, unwrapping wire is measured using total powerstation.To the lower margin that need to construct When the burial place of bolt measures unwrapping wire, unwrapping wire is measured to the axial centerline for the foundation bolt that need to construct.
When carrying out the fixation of shaped steel rod piece in step 6, it need to ensure that the rod piece fixedly connected part is fixed and indeformable;
When carrying out foundation bolt fixation in step 7, it need to ensure that the bolt fixedly connected part is fixed and indeformable.
When taking out the embedding anchor bolts construction mould from the bottom to top in step 8, the embedding anchor bolts are applied Tool and mould is slowly moved up along multiple foundation bolts that need to construct, and is not touched the rod piece in moving process and fixed and connect Fitting and the bolt fixedly connected part, it is ensured that the embedding precision for the foundation bolt that need to construct.
It is fixed, it is multiple right to be laid on the outside of the embedding anchor bolts construction mould when practice of construction The foundation bolt that need to construct be supported it is fixed be fixed temporarily reinforcing bar, the reinforcing bar that is fixed temporarily is in reinforced concrete foundation 11 It could be removed after the completion of concrete pouring construction.
The above is only presently preferred embodiments of the present invention, is not imposed any restrictions to the present invention, every according to the present invention Technical spirit changes any simple modification, change and equivalent structure made by above example, still falls within skill of the present invention In the protection domain of art scheme.

Claims (9)

1. a kind of steel building construction land tenure foot bolt pre-embedded construction method, the construction mould which uses includes upper Level board (1), the lower horizontal board (2) being located at below upper level board (1) and multiple it is supported in level board (1) and lower horizontal board (2) support element (3) between, the upper level board (1) pass through in parallel laying and therebetween multiple institutes with lower horizontal board (2) Support element (3) is stated to be fastenedly connected;Horizontal measurement ruler, the level have been kept flat on the upper level board (1) or lower horizontal board (2) Measurement ruler includes cross tablet (4) and two level detection devices (5), and the cross tablet (4) is by lateral tablet and longitudinal direction Tablet is formed by connecting, and the transverse direction tablet and the vertically flat are laid in the same plane and the perpendicular laying of the two, two The level detection device (5) is laid in respectively on the lateral tablet and the vertically flat;It is opened on the upper level board (1) There are two upper bolt mounting holes group, two upper bolt mounting holes groups are respectively upper outside bolt mounting holes group and are located at described Upper inside bolt mounting holes group on the inside of upper outside bolt mounting holes group;Lower bolt is pacified there are two being opened on the lower horizontal board (2) Dress hole group, two lower bolt mounting holes groups are respectively lower outside bolt mounting holes group and are installed positioned at the lower outside bolt Lower inside bolt mounting holes group on the inside of the group of hole;The upper inside bolt mounting holes group and the lower inside bolt mounting holes group Structure snd size all same, the upper inside bolt mounting holes group are located at the surface of the lower inside bolt mounting holes group, institute It states in inside bolt mounting holes group and the lower inside bolt mounting holes group and supplies the first foundation bolt (6- respectively including multiple 1) the first bolt mounting holes installed, it is included in the upper inside bolt mounting holes group and the lower inside bolt mounting holes group The quantity of first bolt mounting holes is identical as the quantity of the first foundation bolt (6-1) that need to construct, multiple first bolt installations The installation position in hole is corresponded with the installation position of multiple first foundation bolts (6-1) respectively;The upper outside bolt The structure snd size all same of mounting hole group and the lower outside bolt mounting holes group, the upper outside bolt mounting holes group are located at The surface of the lower outside bolt mounting holes group, the upper outside bolt mounting holes group and the lower outside bolt mounting holes group In include multiple the second bolt mounting holes for supplying the second foundation bolt (6-2) installation respectively, multiple second bolts installations The installation position in hole is corresponded with the installation position of multiple second foundation bolts (6-2) respectively;The first lower margin spiral shell Bolt (6-1) and the second foundation bolt (6-2) with upper level board (1) perpendicular laying;Lower horizontal board (2) bottom is fixed with Shaped steel rod piece (7), it is characterised in that:Pre- buriing is carried out with foundation bolt to the steel column fixation of steel building using the mold The steel structure framework of the method for work, constructed steel building includes more steel columns, and each steel column is supported in On one reinforced concrete foundation, each steel column bottom is welded with one piece of billet in horizontal layout;Institute It states and multiple foundation bolts that need to construct is installed on billet, the billet is fixed on by multiple foundation bolts that need to construct On reinforced concrete foundation (11), multiple foundation bolts that need to construct are the ground being embedded in reinforced concrete foundation (11) Foot bolt, multiple foundation bolts that need to construct form a pre-embedded bolt group that the steel column is fixed, every institute Steel column is stated to be fixed on reinforced concrete foundation (11) by a pre-embedded bolt group;
The steel column is the first steel column (9-1) or the second steel column (9-2), and the first steel column (9-1) bottom is fixed The billet be the first billet (10-1), the fixed billet in the second steel column (9-2) bottom be second Billet (10-2), first billet (10-1) is identical with the structure of the second billet (10-2), first billet The size of (10-1) is less than the size of the second billet (10-2);That is installed on first billet (10-1) described need to apply Building site foot bolt is the first foundation bolt (6-1), the lower margin spiral shell that need to construct installed on second billet (10-2) Bolt is the second foundation bolt (6-2);
The pre-embedded construction method all same of the fixed pre-embedded bolt group of all steel columns (9) in the steel structure framework; When the pre-embedded bolt group fixed to any steel column (9) carries out Embedment Construction, process is as follows:
Step 1: billet determines:The billet installed to the pre-embedded bolt group is determined, and obtains the pre-embedded bolt group institute The billet of installation is the first billet (10-1) or the second billet (10-2);
Step 2: bolt mounting holes group determines:According to the billet definitive result obtained in step 1, to the pre-embedded bolt group Bolt mounting holes group is determined:When showing that billet that the pre-embedded bolt group is installed is the first billet (10- in step 1 1) when, show that the bolt mounting holes group that the pre-embedded bolt group is installed is the upper inside bolt mounting holes group and the lower inside Bolt mounting holes group;When the billet for showing that the pre-embedded bolt group is installed in step 1 is the second billet (10-2), obtain It is the upper outside bolt mounting holes group and the lower outside bolt peace to go out the bolt mounting holes group that the pre-embedded bolt group is installed Fill hole group;
Step 3: surveying setting-out:Wait for steel reinforcement cage binding set in reinforced concrete foundation (11) residing for the pre-embedded bolt group Before after the completion and carrying out concreting to reinforced concrete foundation (11), described need to construct to multiple in the pre-embedded bolt group Pre-buried position and pre-buried height of the foundation bolt on reinforced concrete foundation (11) measure unwrapping wire respectively;
Step 4: mold is placed and foundation bolt is tentatively installed:It multiple described need to be applied according to what surveying setting-out in step 3 obtained The pre-buried position of building site foot bolt will be pre-machined the molding embedding anchor bolts construction mould and be positioned over institute in step 3 It states on steel reinforcement cage;Multiple foundation bolts that need to construct tentatively are installed again;
It is true according to the bolt mounting holes group obtained in step 2 when tentatively being installed to the foundation bolt that need to construct described in any one Determine result to be installed:When showing that bolt mounting holes group that the pre-embedded bolt group is installed is the upper inside bolt in step 2 When mounting hole group and the lower inside bolt mounting holes group, from top to bottom by the foundation bolt that need to construct from upper level board (1) It is pierced by with the first bolt mounting holes opened on lower horizontal board (2);When the spiral shell for showing that the pre-embedded bolt group is installed in step 2 When bolt mounting hole group is the upper outside bolt mounting holes group and the lower outside bolt mounting holes group, from top to bottom by the need The second bolt mounting holes that construction foundation bolt is opened from upper level board (1) and lower horizontal board (2) are pierced by;
Step 5: first leveling:Leveling is carried out to embedding anchor bolts construction mould described in step 4, makes the foundation bolt Embedment Construction mold is in horizontality, and is constructed to the embedding anchor bolts by two level detection devices (5) The horizontality of mold is detected;Meanwhile the multiple foundation bolts that need to construct obtained according to surveying setting-out in step 1 Pre-buried height, preliminary multiple mounting heights that need to construct foundation bolt that installation is complete in step 2 are adjusted, The foundation bolt that need to construct is limited by being fixed temporarily nut (12) after the completion of adjustment, makes multiple described to need construction ground Foot bolt is connected as one with the embedding anchor bolts construction mould, and the nut (12) that is fixed temporarily is mounted on the need Construction foundation bolt top;
Step 6: shaped steel rod piece is fixed:Using rod piece fixedly connected part, by embedding anchor bolts construction mould described in step 5 In shaped steel rod piece (7) be fixed on steel reinforcement cage described in step 3;
Step 7: foundation bolt is fixed:It is fixed by bolts connector, by multiple foundation bolts point that need to construct in step 5 It is not fixed on steel reinforcement cage described in step 3;
Step 8: mold is removed:In removal step five nut is fixed temporarily on foundation bolt mounted on multiple described need to construct (12), the embedding anchor bolts construction mould is taken out from the bottom to top;
Step 9: concreting:Concreting is carried out to reinforced concrete foundation described in step 3 (11), waits being poured After concrete setting, the Embedment Construction process of pre-embedded bolt group described in step 1 is completed.
2. steel building construction land tenure foot bolt pre-embedded construction method described in accordance with the claim 1, it is characterised in that:Also wrap Include lateral leveling ruler (12-1) and longitudinal leveling ruler (13) with lateral leveling ruler (12-1) perpendicular laying, the transverse direction leveling ruler (12-1) It is in parallel laying with the lateral tablet, the longitudinal direction leveling ruler (13) is in parallel laying with vertically flat;The transverse direction leveling ruler (12-1) and longitudinal leveling ruler (13) is in horizontal layout and the two is laid on level board (1).
3. according to steel building construction land tenure foot bolt pre-embedded construction method as claimed in claim 1 or 2, it is characterised in that: The upper level board (1) and lower horizontal board (2) are bamboo slab rubber, and the support element (3) is L-shaped support element.
4. according to steel building construction land tenure foot bolt pre-embedded construction method as claimed in claim 1 or 2, it is characterised in that: The upper level board (1) and lower horizontal board (2) are the structure snd size all same of rectangular flat and the two.
5. according to steel building construction land tenure foot bolt pre-embedded construction method as claimed in claim 1 or 2, it is characterised in that: Spacing between the upper level board (1) and lower horizontal board (2) is 200mm~400mm.
6. according to steel building construction land tenure foot bolt pre-embedded construction method as claimed in claim 1 or 2, it is characterised in that: The quantity of the shaped steel rod piece (7) be multiple tracks and its be in parallel laying, shaped steel rod piece (7) described in multiple tracks is laid in from left to right Lower horizontal board (2) bottom.
7. according to steel building construction land tenure foot bolt pre-embedded construction method as claimed in claim 1 or 2, it is characterised in that: Further include the ceiling hammer (8) for being fixed on lower horizontal board (2) bottom, the level detection device (5) is spirit level.
8. steel building construction land tenure foot bolt pre-embedded construction method described in accordance with the claim 1, it is characterised in that:It is described Shaped steel rod piece (7) is mounted on by connecting bolt on lower horizontal board (2);Described in shaped steel rod piece described in step 6 and step 7 Bolt fixedly connected part is connection reinforcing bar;
When carrying out shaped steel rod piece in step 6 and fixing, the rod piece fixedly connected part and shaped steel rod piece (7) and the steel reinforcement cage it Between be fixedly connected with welding manner;
When carrying out foundation bolt fixation in step 7, the bolt fixedly connected part and need to construct foundation bolt and the steel reinforcement cage Between be fixedly connected with welding manner.
9. steel building construction land tenure foot bolt pre-embedded construction method described in accordance with the claim 1, it is characterised in that:Step After unwrapping wire being measured in three, the pre-buried position for multiple foundation bolts that need to construct that surveying setting-out is obtained and pre-buried height It is labeled on the steel reinforcement cage, the pre-buried height all same of multiple foundation bolts that need to construct, the lower margin spiral shell that need to construct The pre-buried height of bolt is the elevation of top of the foundation bolt that need to construct;To the foundation bolt that need to construct on the steel reinforcement cage When pre-buried height is labeled, the position of 20cm~30cm below the elevation of top of the foundation bolt that need to construct is labeled in institute It states on steel reinforcement cage.
CN201610785477.4A 2016-08-30 2016-08-30 Steel building construction land tenure foot bolt pre-embedded construction method Active CN106368330B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610785477.4A CN106368330B (en) 2016-08-30 2016-08-30 Steel building construction land tenure foot bolt pre-embedded construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610785477.4A CN106368330B (en) 2016-08-30 2016-08-30 Steel building construction land tenure foot bolt pre-embedded construction method

Publications (2)

Publication Number Publication Date
CN106368330A CN106368330A (en) 2017-02-01
CN106368330B true CN106368330B (en) 2018-11-09

Family

ID=57899397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610785477.4A Active CN106368330B (en) 2016-08-30 2016-08-30 Steel building construction land tenure foot bolt pre-embedded construction method

Country Status (1)

Country Link
CN (1) CN106368330B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265741B (en) * 2018-01-26 2020-06-16 中国化学赛鼎宁波工程有限公司 Practical method for foundation bolt construction positioning
CN108360550B (en) * 2018-02-28 2019-12-03 五冶集团上海有限公司 A kind of steel construction direct-burried foundation bolt construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240068A (en) * 1999-02-23 2000-09-05 Hitachi Metals Ltd Anchor bolt fixing device
CN201891172U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Fixing bracket with fine-adjusting function for embedding anchor bolts
CN202787298U (en) * 2012-07-02 2013-03-13 中国三冶集团(营口)有限公司 Foundation pre-buried bolt tool
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts
CN103669390A (en) * 2013-11-27 2014-03-26 中国十七冶集团有限公司 Embedding technique of large-diameter foundation bolts
CN205024714U (en) * 2015-10-19 2016-02-10 甘肃建投钢结构有限公司 Steel construction house steel column foot crab -bolt positioner
CN205999920U (en) * 2016-08-30 2017-03-08 中铁二十局集团有限公司 Multi-functional embedding anchor bolts construction mould

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240068A (en) * 1999-02-23 2000-09-05 Hitachi Metals Ltd Anchor bolt fixing device
CN201891172U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Fixing bracket with fine-adjusting function for embedding anchor bolts
CN202787298U (en) * 2012-07-02 2013-03-13 中国三冶集团(营口)有限公司 Foundation pre-buried bolt tool
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts
CN103669390A (en) * 2013-11-27 2014-03-26 中国十七冶集团有限公司 Embedding technique of large-diameter foundation bolts
CN205024714U (en) * 2015-10-19 2016-02-10 甘肃建投钢结构有限公司 Steel construction house steel column foot crab -bolt positioner
CN205999920U (en) * 2016-08-30 2017-03-08 中铁二十局集团有限公司 Multi-functional embedding anchor bolts construction mould

Also Published As

Publication number Publication date
CN106368330A (en) 2017-02-01

Similar Documents

Publication Publication Date Title
CN106193330B (en) A kind of steel building construction land tenure foot bolt pre-embedded construction method
CN106193094B (en) A kind of embedding anchor bolts construction mould and foundation bolt adjust construction method
CN104695557B (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN114086669B (en) Modularized rapid construction method for large-scale space special-shaped curved surface steel net rack
CN105040717B (en) Foundation bolt fixing support and mounting method
CN203247603U (en) High-order rag bolt positioner
CN108035554B (en) Construction method of section steel column support frame of super high-rise building frame column
CN105735319B (en) A kind of large diameter steel pipe stand column pile fast positioning plumbing device and construction method
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN206986719U (en) A kind of bridge floor anti-collision wall reinforcing bar positioning installation apparatus
CN101525873B (en) Pier hydraulic leveling inner-climbing climbing form and concrete pouring method thereby
CN103590603B (en) Large span multi-curvature shell structure of reinforced concrete method
CN201411665Y (en) Hydraulic leveling inside-elevating type slide-rising template of pier
CN103726654A (en) Method for constructing special-shaped thin shell of concrete structure
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN102926538A (en) Reaction box and construction method of reaction wall
CN103526954A (en) Support for overweight precision embedded part and construction method thereof
CN106368330B (en) Steel building construction land tenure foot bolt pre-embedded construction method
CN207362866U (en) A kind of bolt collar fixed structure
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN205999920U (en) Multi-functional embedding anchor bolts construction mould
CN102444275A (en) Silo flexible slip form torsion resistance construction device
CN106677558A (en) Construction method for deep foundation pit assembling type stairway used for people
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170201

Assignee: Xixian New Area century pipe gallery construction management Co.,Ltd.

Assignor: CHINA RAILWAY 20 BUREAU Group Corp.

Contract record no.: X2022980004696

Denomination of invention: Embedded construction method of anchor bolt for steel structure building construction

Granted publication date: 20181109

License type: Common License

Record date: 20220424