CN202787298U - Foundation pre-buried bolt tool - Google Patents
Foundation pre-buried bolt tool Download PDFInfo
- Publication number
- CN202787298U CN202787298U CN 201220316205 CN201220316205U CN202787298U CN 202787298 U CN202787298 U CN 202787298U CN 201220316205 CN201220316205 CN 201220316205 CN 201220316205 U CN201220316205 U CN 201220316205U CN 202787298 U CN202787298 U CN 202787298U
- Authority
- CN
- China
- Prior art keywords
- level
- foundation
- axis
- buried bolt
- supports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a foundation pre-buried bolt tool which comprises a transverse level, a longitudinal level, supports, locating holes, an axis, an aluminum plate and adjusting nuts. The transverse level, the longitudinal level, the locating holes and the axis are arranged on the front face of the aluminum plate. The number of the supports is four and the four supports are evenly distributed on the bottom face of the aluminum plate. Each support is sleeved by one adjusting nut. The number of the locating holes is 2 to 10. Compared with the prior art, the foundation pre-buried bolt tool has the advantages of being simple in structure, reliable in quality, convenient to operate, strong in practicality and remarkable in comprehensive economic benefits. The foundation pre-buried bolt tool effectively reduces displacement of a center axis and deviation of verticality and levelness of a foundation bolt, shortens construction period, decreases construction cost and improves construction efficiency and advancement of technology.
Description
Technical field
The utility model relates to building engineering field, particularly a kind of foundation built-in bolt instrument.
Background technology
Fast development along with Modern Steel Structure system and scale, structural steelwork is more and more, with regard to himself advantage, at bridge, industrial premises, be used widely in the modern architectures such as highrise building, with regard to steel-structure factory building, if the heel foundation pre-embedded bolt goes wrong, the integral layout skew, affecting pillar installs, cause the bolt refitting pre-buried, do not meet the construction inspection rules requirement yet, if when foundation built-in bolt, check relative dimensions and in time fixation before the casting and compacting of concrete, thereby the problem of steel column misalignment of axe and perpendicularity deviation has just solved thoroughly so.
Therefore, a kind of foundation built-in bolt instrument has effectively solved the problem of steel column misalignment of axe and perpendicularity deviation.
Summary of the invention
The purpose of this utility model provides a kind of pre-embedded bolt instrument that reduces the displacement of stone bolt central axis and verticality, levelness deviation.
For achieving the above object, the utility model is realized by the following technical solutions:
A kind of foundation built-in bolt instrument, comprise cross level, fore-and-aft level, support, locating hole, axis, aluminium sheet and adjusting nut, described aluminium sheet front is provided with cross level, fore-and-aft level, locating hole and axis, support has four to be evenly distributed on the aluminium sheet bottom surface, and each support casing has adjusting nut.
Described locating hole has 2~10.
Compared with prior art, the beneficial effects of the utility model are:
A kind of foundation built-in bolt instrument, have simple in structure, reliable in quality, easy to operate, practical, overall economic efficiency outstanding feature, effectively reduce the deviation of the displacement of stone bolt central axis and verticality, levelness, shortened the construction period, reduce construction cost, improved the advance of efficiency of construction and technology.
Description of drawings
Fig. 1 is structure chart of the present utility model;
Fig. 2 is left view of the present utility model.
1-cross level, 2-fore-and-aft level, 3-support, 4-locating hole, 5-axis, 6-aluminium sheet, 7-adjusting nut
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is further specified:
As depicted in figs. 1 and 2, a kind of foundation built-in bolt instrument of the utility model, comprise cross level 1, fore-and-aft level 2, support 3, locating hole 4, axis 5, aluminium sheet 6 and adjusting nut 7, aluminium sheet 6 fronts are provided with cross level 1, fore-and-aft level 2, locating hole 4 and axis 5, support 3 has four to be evenly distributed on aluminium sheet 6 bottom surfaces, each support 3 cover has adjusting nut 7, locating hole 4 to have 2~10.
When using the utility model, utilize infrared rays to align instrument or other rectifies an instrument, with the axis 5 on the aluminium sheet 6 and the axis on sideline and the foundation platform, the sideline overlaps, and fixing, adjust with adjusting nut 7 again, make respectively the bubble of cross level 1 and fore-and-aft level 2 placed in the middle, realize the level of aluminium sheet 6, bolt is passed locating hole 4, and be fixed with four Φ, 14 reinforcing bar spot welding, then carry out concreting, in the casting process, forbid only to vibrate from the one side of template, necessarily require around template, evenly to vibrate, after building, before initial set, stone bolt is proofreaied and correct concrete.
Above described only be basic principle of the present utility model, be not that the utility model is imposed any restrictions, everyly according to the utility model it is carried out equivalent variations and modification, all within the category of the art of this patent protection scheme.
Claims (2)
1. foundation built-in bolt instrument, it is characterized in that, comprise cross level, fore-and-aft level, support, locating hole, axis, aluminium sheet and adjusting nut, described aluminium sheet front is provided with cross level, fore-and-aft level, locating hole and axis, support has four to be evenly distributed on the aluminium sheet bottom surface, and each support casing has adjusting nut.
2. a kind of foundation built-in bolt instrument according to claim 1 is characterized in that, described locating hole has 2~10.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220316205 CN202787298U (en) | 2012-07-02 | 2012-07-02 | Foundation pre-buried bolt tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220316205 CN202787298U (en) | 2012-07-02 | 2012-07-02 | Foundation pre-buried bolt tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202787298U true CN202787298U (en) | 2013-03-13 |
Family
ID=47814580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220316205 Expired - Lifetime CN202787298U (en) | 2012-07-02 | 2012-07-02 | Foundation pre-buried bolt tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202787298U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831746A (en) * | 2015-06-04 | 2015-08-12 | 国网山东省电力公司经济技术研究院 | Street lamp embedded part installing and positioning device |
CN105019470A (en) * | 2015-08-03 | 2015-11-04 | 共享钢构有限责任公司 | Method for pre-burying of large group of foundation bolts |
CN106193330A (en) * | 2016-08-30 | 2016-12-07 | 中铁二十局集团有限公司 | A kind of steel building construction land tenure foot bolt pre-embedded construction method |
CN106193094A (en) * | 2016-08-30 | 2016-12-07 | 中铁二十局集团有限公司 | A kind of embedding anchor bolts construction mould and foundation bolt regulation construction method |
CN106352776A (en) * | 2016-09-27 | 2017-01-25 | 中铁五局集团有限公司 | Tool plate for embedded bolt assembly installation and checking |
CN106368330A (en) * | 2016-08-30 | 2017-02-01 | 中铁二十局集团有限公司 | Pre-burying construction mould and method of foundation bolts used for steel structure building construction |
CN107386316A (en) * | 2017-08-31 | 2017-11-24 | 中冶天工集团天津有限公司 | A kind of foundation bolt once grouting fixture and its construction method |
CN108005349A (en) * | 2017-11-30 | 2018-05-08 | 中建六局第三建筑工程有限公司 | Leveling method for super large ultra-flat terrace built-in fitting |
CN112112185A (en) * | 2020-09-25 | 2020-12-22 | 临海市广安建筑工程有限公司 | Municipal building foundation embedded structure and construction method thereof |
CN114622593A (en) * | 2022-02-18 | 2022-06-14 | 中铁六局集团路桥建设有限公司 | Device capable of accurately controlling installation precision of contact net foundation embedded bolt |
-
2012
- 2012-07-02 CN CN 201220316205 patent/CN202787298U/en not_active Expired - Lifetime
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831746A (en) * | 2015-06-04 | 2015-08-12 | 国网山东省电力公司经济技术研究院 | Street lamp embedded part installing and positioning device |
CN104831746B (en) * | 2015-06-04 | 2016-06-29 | 国网山东省电力公司经济技术研究院 | Preembedded streetlamp part mounting and positioning device |
CN105019470A (en) * | 2015-08-03 | 2015-11-04 | 共享钢构有限责任公司 | Method for pre-burying of large group of foundation bolts |
CN106193330B (en) * | 2016-08-30 | 2018-04-13 | 中铁二十局集团有限公司 | A kind of steel building construction land tenure foot bolt pre-embedded construction method |
CN106193094A (en) * | 2016-08-30 | 2016-12-07 | 中铁二十局集团有限公司 | A kind of embedding anchor bolts construction mould and foundation bolt regulation construction method |
CN106368330A (en) * | 2016-08-30 | 2017-02-01 | 中铁二十局集团有限公司 | Pre-burying construction mould and method of foundation bolts used for steel structure building construction |
CN106193330A (en) * | 2016-08-30 | 2016-12-07 | 中铁二十局集团有限公司 | A kind of steel building construction land tenure foot bolt pre-embedded construction method |
CN106193094B (en) * | 2016-08-30 | 2018-08-03 | 中铁二十局集团有限公司 | A kind of embedding anchor bolts construction mould and foundation bolt adjust construction method |
CN106368330B (en) * | 2016-08-30 | 2018-11-09 | 中铁二十局集团有限公司 | Steel building construction land tenure foot bolt pre-embedded construction method |
CN106352776A (en) * | 2016-09-27 | 2017-01-25 | 中铁五局集团有限公司 | Tool plate for embedded bolt assembly installation and checking |
CN107386316A (en) * | 2017-08-31 | 2017-11-24 | 中冶天工集团天津有限公司 | A kind of foundation bolt once grouting fixture and its construction method |
CN108005349A (en) * | 2017-11-30 | 2018-05-08 | 中建六局第三建筑工程有限公司 | Leveling method for super large ultra-flat terrace built-in fitting |
CN112112185A (en) * | 2020-09-25 | 2020-12-22 | 临海市广安建筑工程有限公司 | Municipal building foundation embedded structure and construction method thereof |
CN112112185B (en) * | 2020-09-25 | 2021-11-09 | 临海市广安建筑工程有限公司 | Municipal building foundation embedded structure and construction method thereof |
CN114622593A (en) * | 2022-02-18 | 2022-06-14 | 中铁六局集团路桥建设有限公司 | Device capable of accurately controlling installation precision of contact net foundation embedded bolt |
CN114622593B (en) * | 2022-02-18 | 2022-09-20 | 中铁六局集团路桥建设有限公司 | Device capable of accurately controlling installation precision of contact net foundation embedded bolt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202787298U (en) | Foundation pre-buried bolt tool | |
CN102561712B (en) | Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof | |
CN202913420U (en) | Reusable positioning device for installing foundation bolts | |
CN204059395U (en) | The pre-buried location structure of stone bolt | |
CN103174166A (en) | Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof | |
CN103526954B (en) | Construction method of overweight precision embedded part | |
CN203247603U (en) | High-order rag bolt positioner | |
CN204781624U (en) | Floor elevation and roughness controlling means | |
CN106193094B (en) | A kind of embedding anchor bolts construction mould and foundation bolt adjust construction method | |
CN103967268A (en) | Building template for aluminum frame wood-plastic plate | |
CN106193330A (en) | A kind of steel building construction land tenure foot bolt pre-embedded construction method | |
CN103603506B (en) | Inner support, Counter procedure verticality of stand column controller | |
PH22019000250U1 (en) | Rebar structural body of earthquake-resistant building | |
CN201377173Y (en) | Foundation bolt positioning template of steel-structure building | |
CN207314830U (en) | Shear force wall negative and positive angle construction mould | |
CN204435409U (en) | A kind of embedding anchor bolts construction jig | |
CN204551936U (en) | A kind of steel external staircase | |
CN103174300B (en) | Viscous damper installation construction method | |
CN206267527U (en) | Building iron protective layer and top board flatness controller | |
CN106368330B (en) | Steel building construction land tenure foot bolt pre-embedded construction method | |
CN202000681U (en) | Three-dimensional die bracket for concrete embedded parts | |
CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
CN203879017U (en) | Tool-type column-top bar embedding device for structural columns | |
CN204212175U (en) | A kind of positioning auxiliary device installing pre-embedded bolt | |
CN201258602Y (en) | Regulable foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191125 Address after: 114000 Anshan province Liaoning City Mountain Road No. 105 building materials Patentee after: CHINA THIRD METALLURGICAL GROUP Co.,Ltd. Address before: Bayuquan District of Liaoning city in Yingkou province 115007 big Dong Tun Cun Patentee before: China Third Metallurgical Group (Yingkou) Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130313 |