CN101851985A - Articulated anchor and prestress tensioning method of high strength fibre composite sheet - Google Patents

Articulated anchor and prestress tensioning method of high strength fibre composite sheet Download PDF

Info

Publication number
CN101851985A
CN101851985A CN 201010183803 CN201010183803A CN101851985A CN 101851985 A CN101851985 A CN 101851985A CN 201010183803 CN201010183803 CN 201010183803 CN 201010183803 A CN201010183803 A CN 201010183803A CN 101851985 A CN101851985 A CN 101851985A
Authority
CN
China
Prior art keywords
anchor
sheet material
articulated
frp sheet
spill piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010183803
Other languages
Chinese (zh)
Other versions
CN101851985B (en
Inventor
卓清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010101838037A priority Critical patent/CN101851985B/en
Publication of CN101851985A publication Critical patent/CN101851985A/en
Application granted granted Critical
Publication of CN101851985B publication Critical patent/CN101851985B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

An articulated anchor and a prestress tensioning method of high strength fibre composite sheet relate to an anchor holder used to perform prestress tensioning to the high strength fibre composite material of the enhancement or reinforcement engineering structure and a method thereof. The articulated anchor of the invention comprises an anchor head and a compression and locking device, and the articulated anchor is characterized in that the anchor head contains a raised head anchor and a concave block. The method of the invention is that the articulated anchor is used to clamp and anchor the two ends of FRP sheet, a jack is used to apply a tension on the concave block and the concave block pushes the raised head anchor to perform prestress tensioning to FRP sheet. The articulated anchor of the invention has simple structure, convenient installation and low cost; and the method of the invention is simple, intuitive and practical, and can ensure the tensioning uniformity of FRP sheet, made full use of the intensity of FRP sheet and effectively increase the bearing capacity of the engineering structure. The articulated anchor of the invention can be widely used to enhance or reinforce the large engineering structures such as bridges or buildings and especially to perform external prestressing reinforcement to longspan concrete beams, longspan concrete slabs and the like.

Description

The pre-stress stretching method of articulated anchor and high strength fibre composite sheet
One, technical field
The invention belongs to high strength fiber composite material prestressing stretching technique field, be specifically related to strengthen or the prestressed anchor clamp of high strength fiber composite material and the method for stabilization works structure.
Two, background technology
High strength fiber composite material (English name Fiber Reinforced Polymer, be called for short FRP), as carbon fibre reinforced plastic, high molecular polymer fibre reinforced plastics, glass fiber reinforced plastics etc., have, antifatigue big, characteristic such as corrosion-resistant, be widely used in fields such as space flight and aviation, aircraft manufacturing, sports entertainment article, boats and ships, automobile, building from heavy and light, bearing capacity.Particularly through the high strength fibre composite sheet of prestressed stretch-draw (being called for short the FRP sheet material), can be widely used in strengthening or reinforcing civil engineering structure (as concrete structure, steel work, wooden construction etc.), thereby improve the supporting capacity of engineering structures, and prolong its application life, have very important society, economic benefit.
The existing device that the FRP sheet material is carried out prestressed stretch-draw, as the patent No. is " carbon fiber sheet pre-stress stretching device " patent of ZL200520051104.1, disclosed carbon cloth pre-stress stretching device, grade by standing part and sliding part and to form, standing part and slipper are provided with the permanent dull and stereotyped ground tackle to carbon fiber sheet, anchor clamps by two jack synchronous push slippers are realized the prestressed stretch-draw to carbon fiber board, and this device mainly contains following shortcoming:
1. when with this device carbon fiber board being carried out prestressed stretch-draw, very high to the positioning accuracy request of anchoring crossbeam, the very difficult accurate centering of anchor clamps anchor that guarantees carbon fiber board two ends during construction, hidden danger has been buried in the inhomogeneous stretch-draw of carbon fiber board during for stretch-draw.
2. this tensioning equipment adopts two hydraulic jack synchronous pushs, during to the stretch-draw of carbon fiber board, also is difficult to keep two jack accurately synchronous, directly causes the inhomogeneous stretch-draw to carbon fiber board.
3. after carbon fiber board prestress tension was finished, the parts that forever are retained on the reinforced structure were many, and these parts can only disposablely use, thereby increased the later maintenance expense, correspondingly also increased the cost of prestressed reinforcement.
Existing method of the FRP sheet material being carried out prestressed stretch-draw, it as application number " transverse stretching method of prestressed fiber cloth reinforced concrete column " patent of 200910103192.8, disclosed method for stretching is: two bracing frames are anchored on the concrete beam by screw rod, and the two ends of cloth are connected on the bracing frame by tool holder and connecting rod; The lateral bearing beam is established in the end that strides across cloth, the lateral bearing beam is connected with the tension rod that is fixed on the beam both sides, the tensioning nut of synchronous rotating beam both sides, driving the lateral bearing beam moves to the concrete beam surface, make cloth elongation produce prestressing force simultaneously and be close to the surface of concrete beam, again cloth is sticked on the concrete beam, and with fixture cloth is anchored on the concrete beam at the two ends of cloth.This method mainly contain following shortcoming:
1. this method is that pitch based fiber cloth is not carried out transverse stretching, and the actual stretch-draw intensity of pitch based fiber cloth is not very low, the length of cloth is long more, actual stretch-draw intensity is just lower, the pretension that can obtain is just very limited, thereby has reduced the consolidation effect to concrete beam.
2. when carrying out transverse stretching with this method, bigger if the relative deformation between the two end supports frame is big with causing to the loss of the pretension in the cloth, thus influence is to the consolidation effect of concrete beam.
3. moving of the lateral bearing beam of this method is subjected to the control of both sides tensioning nut, is difficult to keep follow-up synchronously, and the uniformity of cloth stretch-draw is very poor, influences the intensity performance of cloth.
Three, summary of the invention
The objective of the invention is the FRP sheet material to be carried out the deficiency of the device and method of prestressed stretch-draw, the pre-stress stretching method of a kind of articulated anchor and high strength fibre composite sheet is provided, have the simple in structure of ground tackle at existing, easy for installation, with low cost; Method for stretching is directly perceived, simple, practical, and easy construction particularly can reliably realize the even stretch-draw to the FRP sheet material, can give full play to the characteristics such as high strength of FRP sheet material.
Mechanism of the present invention is circular-arc (being the plush copper anchor) of the front end of the anchor clamp of FRP sheet material (comprising waveform toothholder tool anchor, plate jig anchor etc.) being made projection, and make the circular-arc pressure block (being the spill piece) of a spill with matching, the latter's arc radius is greater than the former, and both are combined together being hinged of can freely rotating mutually of formation on arc contact surface.When the FRP sheet material is carried out prestressed stretch-draw, two ends with fibre sheet material, carry out clamping and anchoring with this plush copper anchor, then by the automatic adjustment FRP sheet material prestressed stretch-draw direction that relatively rotates between spill piece and the plush copper anchor, can guarantee that the FRP sheet material forms two one lines between two articulated anchors, uniformity when guaranteeing FRP sheet material tension improves its stretch-draw prestressing force, further improves the bearing capacity of enhancing and stabilization works structure.
The technical scheme that realizes the object of the invention is: a kind of articulated anchor mainly comprises anchor head and compresses and locking device that feature is that described anchor head is made up of plush copper anchor and spill piece.The plush copper anchor is made up of upper and lower clamping plate again, and the front end of the upper and lower clamping plate of plush copper anchor is cambered outwards arc surface.The spill piece of articulated anchor is made up of upper and lower half block, and the middle part of a side of spill piece is the arc surface that concaves, the interior concaved circular cambered surface coupling of the outer convex arc surface of plush copper anchor and spill piece, and the contact of formation face also forms the hinge connection of freely rotating mutually.Middle part at the concave shaped arc surface of the upper and lower half block of spill piece, one open slot is set respectively, when the upper and lower half block of spill piece overlaps, middle part at the concave shaped arc surface of spill piece constitutes a rectangular groove of remaining silent (i.e. the FRP sheet material groove of Yu Liuing), the size of groove and the sectional dimension of FRP sheet material of remaining silent is complementary, so that the FRP sheet material can pass the rectangular groove and moving freely of remaining silent, be subjected to force direction when the stretch-draw in order to regulate the FRP sheet material; Both sides at the reservation FRP sheet material groove of the upper and lower half block of spill piece, the open slot of one semicircle is set respectively, when the upper and lower half block of spill piece overlaps, constitute the closed pore (i.e. the connecting screw rod hole of Yu Liuing) of two circles, the size of circular closed pore and the diameter of connecting screw rod are complementary, so that connecting screw rod passes circular closed pore, in order to connect spill piece and anchor block.Two ends at the upper and lower half block of spill piece are provided with bolt hole respectively accordingly, and when the upper and lower half block of spill piece overlapped, two fastening bolts passed bolt hole respectively and by nut the upper and lower half block of spill piece connected into an integral body.The upper and lower clamping plate of the plush copper anchor of the articulated anchor of described clamping and anchoring FRP sheet material are the upper and lower waveform tooth plate of waveform toothholder tool anchor, perhaps the upper and lower cover plate of plate jig anchor, the perhaps upper and lower clamping plate of other ground tackle.
A kind of pre-stress stretching method of high strength fibre composite sheet, utilize the two ends of articulated anchor clamping of the present invention and anchoring FRP sheet material, apply pulling force by reaction frame and jack pair spill piece, the spill piece promotes the plush copper anchor FRP sheet material is carried out prestressed stretch-draw.Its concrete grammar step is as follows:
(1) clamping and anchoring FRP sheet material
Anchor block is working parts, at the both ends of anchor block and corresponding to the place, connecting bolt hole of two reservations of the spill piece of articulated anchor, is respectively arranged with the connecting bolt hole, so that connecting screw rod passes.At the middle part of anchor block and corresponding to the FRP sheet material groove place of the reservation at the spill piece middle part of articulated anchor, a FRP sheet material groove of reserving is set accordingly, so that the FRP sheet material passes.Described anchor block is steel construction piece commonly used.
During construction, earlier with two anchor blocks, connect by bolt respectively or welding or mode such as anchor into, be fixedly connected on the engineering structures surface that is enhanced or reinforces, anchor block is determined according to the specific requirement of the engineering structures that is enhanced or reinforces and the length of FRP sheet material being enhanced or the spacing of structural particular location of stabilization works and two anchor blocks.
Refill and establish articulated anchor and clamping and anchoring FRP sheet material.To fixed end, articulated anchor is installed in the inboard or the outside of anchor block: when articulated anchor is installed in the inboard (being to be separated by the plush copper anchor of articulated anchor between the spill piece of anchor block and articulated anchor) of anchor block, after two connecting screw rods pass the connecting screw rod hole of the spill piece two ends of anchor block and articulated anchor reserving respectively, before using respectively, back anchoring nut with the spill piece of anchor block and articulated anchor fixedly connected (be that the spill piece of articulated anchor is suspension status and is connected with anchor block, being called suspension type connects), after then an end of FRP sheet material being passed the FRP sheet material groove of reservation at spill piece middle part of articulated anchor, be clamped in articulated anchor the plush copper anchor on, between the lower plate, again with articulated anchor compress and locking device will be gone up, the FRP sheet material of lower plate and clamping therebetween compresses and locks; When articulated anchor is installed in the outside (being anchor block abuts against with the spill piece of articulated anchor) of anchor block, after two connecting screw rods pass the connecting screw rod hole of the spill piece two ends of anchor block and articulated anchor reserving respectively, before using respectively, back anchoring nut is fixedlyed connected the spill piece of anchor block and articulated anchor that (the spill piece and the anchor block that are articulated anchor are connection status back-to-back, being called the formula that leans against connects), after then an end of FRP sheet material being passed the FRP sheet material groove of reservation at spill piece middle part of anchor block and articulated anchor, be clamped in articulated anchor the plush copper anchor on, between the lower plate, again with articulated anchor compress and locking device will be gone up, the FRP sheet material of lower plate and clamping therebetween compresses and locks.To the stretch-draw end, articulated anchor is installed in the inboard (being to be separated by the plush copper anchor of articulated anchor between the spill piece of anchor block and articulated anchor) of anchor block, after two connecting screw rods pass the connecting screw rod hole of the spill piece two ends of anchor block and articulated anchor reserving respectively, before using respectively, back anchoring nut is with the spill piece of anchor block and articulated anchor fixedly connected (being that suspension type is connected), after then the other end of FRP sheet material being passed the FRP sheet material groove of reservation at spill piece middle part of articulated anchor, be clamped in articulated anchor the plush copper anchor on, between the lower plate, again with articulated anchor compress and locking device will be gone up, the FRP sheet material of lower plate and clamping therebetween compresses and locks.
When FRP sheet material and the engineering structures that is enhanced or reinforces have stickup to require, after the surfacings such as the adhesive surface to engineering structures also will be polished, cleaning, again at the adhesive surface brushing cementing agent of engineering structures and FRP sheet material, so that the FRP sheet attaching is on the surface of the engineering structures that is enhanced or reinforces.
(2) the FRP sheet material is carried out prestressed stretch-draw
(1) step finish after, respectively two connecting screw rods at the anchor block two ends of stretch-draw end are fixedlyed connected with two tensioning screw rods earlier with two sleeves, again counter-force piece (being the construction steel plate that two ends are provided with bolt hole) is fixedly connected on two tensioning screw rods by two tensioning screw rods and counter-force nut, constitutes reaction frame.Then jack is placed between the anchor block and counter-force piece of stretch-draw end.Drive jack pushing tow counter-force piece then, the counter-force piece drives tensioning screw rod and connecting screw rod moves together, and the articulated anchor that drives clamping and anchoring FRP sheet material stretch-draw end moves together, has realized utilizing articulated anchor and anchor block that the FRP sheet material is carried out prestressed stretch-draw.After the prestressed stretch-draw of FRP sheet material puts in place, tighten the back anchoring nut on the connecting screw rod of stretch-draw end earlier.
(3) remove jack and reaction frame
(2) step was withdrawn from jack earlier after finishing, and backed out the counter-force nut again, took off the counter-force piece, removed sleeve and tensioning screw rod at last.
Paste when requiring when FRP sheet material and the engineering structures that is enhanced or reinforces have, between the stickup face of FRP sheet material and the engineering structures that is enhanced and reinforces, replenish and pour into cementing agent, and maintenance is till the adhesive cures.
After the present invention adopts technique scheme, mainly contain following effect:
1. with articulated anchor clamping of the present invention and anchoring FRP sheet material, can guarantee that the FRP sheet material regulates automatically and keep two one lines between two articulated anchors, uniformity when guaranteeing FRP sheet material tension improves its tension stress, further improves the bearing capacity of enhancing and stabilization works structure.
2. the method for stretch-draw FRP sheet material of the present invention is direct stretching method, and the pretension in the FRP sheet material is exactly the thrust of jack, can directly read by the oil pressure gauge of jack, and unusual intuitive and convenient, and be convenient to control stretching process.
3. can freely rotate between two parts of articulated anchor of the present invention (being plush copper anchor and spill piece), not parallel or cause when misaligning the spill piece can not be exactly parallel or during centering when the position of anchor block, its error can obtain revising with respect to relatively rotating of spill piece by the plush copper anchor, guarantee that the FRP sheet material keeps accurate centering, the uniformity in the time of guaranteeing FRP sheet material prestressed stretch-draw automatically between articulated anchor.
4. identical plush copper anchor and spill piece and other standard fitting are adopted in the two ends of the FRP sheet material of the inventive method, make that installation, replacing, the dismounting of construction are all very simple and convenient, are convenient to standardized work, reduce construction costs.And parts are simple, are easy to produce in batches, reduce cost.
5 plush copper anchor structures of the present invention are simple, only need to transform slightly on the end face of anchor clamps such as existing waveform toothholder tool anchor, plate jig anchor, and are very simple and convenient, and with low cost, easy to utilize.
6. the inventive method can be carried out prestressed stretch-draw and anchoring to the FRP sheet material of finished product, compare not pitch based fiber cloth of stretch-draw, not only stretching force is big, prestressing force is effective, and can give full play to the intensity of FRP sheet material, and then can more effectively improve the bearing capacity of engineering structures and prolong its application life.
7. articulated anchor of the present invention can be made of the waveform toothholder tool anchor of energy clamping and the thick type composite material sheet of anchoring, and more reliable, bigger pretension can be provided, and to improving the bearing capacity of reinforced structure, improves its functional performance and has more significant effect.
The present invention can be widely used in building or strengthening or reinforce in major works structures such as bridge of building or building constructions, be specially adapted to large-span concrete beam, plate etc. are carried out external prestressing strengthening, improve the strength of materials utilization rate of FRP sheet material, significantly improve and be enhanced or the bearing capacity and application life of stabilization works structure.
Four, description of drawings
Fig. 1 is the schematic perspective view of articulated anchor clamping FRP sheet material of the present invention;
2 pairs of FRP sheet materials of Fig. 2 present embodiment carry out the schematic diagram of prestressed stretch-draw;
Fig. 3 is reinforced the engineering structures schematic diagram for 2 pairs of FRP sheet materials of embodiment carry out prestressed stretch-draw after finishing;
Fig. 4 carries out the schematic diagram of prestressed stretch-draw for 3 pairs of FRP sheet materials of embodiment;
Fig. 5 is reinforced the engineering structures schematic diagram for 3 pairs of FRP sheet materials of embodiment carry out prestressed stretch-draw after finishing.
Wherein: 1 plush copper anchor, the 1a train wheel bridge, 1b lower plate, 1c compress and locking device, 2 spill pieces, the last half block of 2a, half block under the 2b, 2c are reserved the FRP sheet material groove of remaining silent, 2d reserves connecting screw rod closed pore, 2e fastening bolt, 3FRP sheet material, 4 anchor blocks, 5 connecting screw rods, 6 preceding anchoring nuts, 7 back anchoring nuts, 8 jack, 9 counter-force pieces, 10 tensioning screw rods, 11 sleeves, 12 counter-force nuts, 13 girder steels that are reinforced, 14 concrete beam that are reinforced, 15 anchor into concrete bolt, 16 cementing agents.
Five, the specific embodiment
Below in conjunction with specific embodiment, further specify the present invention.
Embodiment 1
As shown in Figure 1, a kind of articulated anchor mainly comprises anchor head and compresses and locking device 1c that feature is that described anchor head is made up of plush copper anchor 1 and spill piece 2.Plush copper anchor 1 is made up of upper and lower clamping plate 1a, 1b, and the front end of upper and lower clamping plate 1a, the 1b of plush copper anchor 1 is cambered outwards arc surface.The spill piece 2 of articulated anchor is made up of upper and lower half block 2a, 2b, the middle part of one side of spill piece 2 is the arc surface that concaves, the interior concaved circular cambered surface coupling of the outer convex arc surface of plush copper anchor 1 and spill piece 2, the contact of formation face also forms the hinge connection of freely rotating mutually.Middle part at the concave shaped arc surface of upper and lower half block 2a, the 2b of spill piece 2, one open slot is set respectively, when the upper and lower half block of spill piece overlaps, middle part at the concave shaped arc surface of spill piece constitutes a rectangular groove 2c that remains silent (i.e. the FRP sheet material groove of Yu Liuing), the size of groove 2c and the sectional dimension of FRP sheet material 3 of remaining silent is complementary, so that the FRP sheet material can pass the rectangular groove 2c and moving freely of remaining silent, be subjected to force direction when the stretch-draw in order to regulate FRP sheet material 3; Both sides at the reservation FRP sheet material groove of upper and lower half block 2a, the 2b of spill piece 2, the open slot of one semicircle is set respectively, when upper and lower half block 2a, the 2b of spill piece 2 overlap, constitute the closed pore (i.e. the connecting screw rod hole 2d of Yu Liuing) of two circles respectively, the size of circular closed pore 2d and the diameter of connecting screw rod 5 are complementary, so that connecting screw rod 5 passes circular closed pore 2d, in order to connect spill piece 2 and anchor block 4.Two ends at upper and lower half block 2a, the 2b of spill piece 2 are provided with bolt hole respectively accordingly, when the upper and lower half block of spill piece overlapped, two fastening bolt 2e passed bolt hole respectively and by nut upper and lower half block 2a, the 2b of spill piece 2 are connected into an integral body.。
Embodiment 2
Shown in Fig. 2,3, a kind of concrete grammar step of pre-stress stretching method of high strength fibre composite sheet is as follows:
(1) clamping and anchoring FRP sheet material
With two anchor blocks 4, by the mode of welding, be fixedly connected on girder steel 13 surfaces that are reinforced respectively earlier.
Refill and establish articulated anchor and clamping and anchoring FRP sheet material 3.To fixed end, articulated anchor is installed in the inboard (being to be separated by the plush copper anchor 1 of articulated anchor between the spill piece 2 of anchor block 4 and articulated anchor) of anchor block 4, after two connecting screw rods 5 pass the connecting screw rod hole of spill piece 2 two ends of anchor block 4 and articulated anchor reserving respectively, before using respectively, back anchoring nut 6,7 spill pieces 2 fixedly connected (being that suspension type is connected) with anchor block 4 and articulated anchor, after then an end of FRP sheet material 3 being passed the FRP sheet material groove 2c of reservation at spill piece 2 middle parts of articulated anchor, be clamped in articulated anchor plush copper anchor 1 on, lower plate 1a, between the 1b, again with articulated anchor compress and locking device 1c will go up, lower plate 1a, the FRP sheet material 3 of 1b and clamping therebetween compresses and locks.To the stretch-draw end, articulated anchor is installed in the inboard (being to be separated by the plush copper anchor 1 of articulated anchor between the spill piece 2 of anchor block 4 and articulated anchor) of anchor block 4, after two connecting screw rods 5 pass the connecting screw rod hole of spill piece 2 two ends of anchor block 4 and articulated anchor reserving respectively, before using respectively, back anchoring nut 6,7 spill pieces 2 fixedly connected (being that suspension type is connected) with anchor block 4 and articulated anchor, after then the other end of FRP sheet material 3 being passed the FRP sheet material groove 2c of reservation at spill piece 2 middle parts of articulated anchor, be clamped in articulated anchor plush copper anchor 1 on, lower plate 1a, between the 1b, again with articulated anchor compress and locking device 1c will go up, lower plate 1a, the FRP sheet material 3 of 1b and clamping therebetween compresses and locks.
(2) the FRP sheet material is carried out prestressed stretch-draw
(1) step finish after, respectively two connecting screw rods 5 at anchor block 4 two ends of stretch-draw end are fixedlyed connected with two tensioning screw rods 10 earlier with two sleeves 11, again counter-force piece 9 (being the steel plate that two ends are provided with bolt hole) is fixedly connected on two tensioning screw rods 5 by two tensioning screw rods 10 and counter-force nut 12, constitutes reaction frame.Jack 8 is placed between the anchor block 4 and counter-force piece 9 of stretch-draw end then.Drive jack 8 pushing tow counter-force pieces 9 then, counter-force piece 9 drives tensioning screw rod 10 and connecting screw rod 5 moves together, and the articulated anchor that drives clamping and anchoring FRP sheet material 3 stretch-draw ends moves together, realized utilizing 4 pairs of FRP sheet materials of articulated anchor and anchor block 3 to carry out prestressed stretch-draw.After the prestressed stretch-draw of FRP sheet material 3 puts in place, tighten the back anchoring nut 7 on the connecting screw rod 5 of stretch-draw end earlier.
(3) remove jack and reaction frame
(2) step was withdrawn from jack 8 earlier after finishing, and backed out counter-force nut 12 again, took off counter-force piece 9, removed sleeve 11 and tensioning screw rod 10 at last.
Embodiment 3
Shown in Fig. 4,5, a kind of pre-stress stretching method of high strength fibre composite sheet, with embodiment 2, wherein:
In (1) step, earlier with two anchor blocks 4,, be fixedly connected on concrete beam 14 surfaces that are enhanced or reinforce respectively by bolted mode, described bolt 15 anchors in the concrete beam 14 in advance.Refill and establish articulated anchor and clamping and anchoring FRP sheet material 3.To fixed end, articulated anchor is installed in the outside (being anchor block abuts against with the spill piece of articulated anchor) of anchor block 4, after two connecting screw rods 5 pass the connecting screw rod hole of spill piece 2 two ends of anchor block 4 and articulated anchor reserving respectively, before using respectively, back anchoring nut 6,7 spill pieces 2 fixedly connected (formula that promptly leans against is connected) with anchor block 4 and articulated anchor, after then an end of FRP sheet material 3 being passed the FRP sheet material groove 2c of reservation at spill piece 2 middle parts of anchor block 4 and articulated anchor, be clamped in articulated anchor plush copper anchor 1 on, lower plate 1a, between the 1b, again with articulated anchor compress and locking device 1c will go up, lower plate 1a, the FRP sheet material 3 of 1b and clamping therebetween compresses and locks.
Because FRP sheet material 3 has the stickup requirement with the surface of the concrete beam 14 that is enhanced or reinforces, after the surfacings such as the adhesive surface to concrete beam 14 also will be polished, cleaning, again at the adhesive surface brushing cementing agent of concrete beam 14 and FRP sheet material 3, so that FRP sheet material 3 sticks on the surface of concrete beam 14.
In (3) step, between the stickup face of FRP sheet material and concrete beam 14, replenish to pour into cementing agent, and maintenance is till the adhesive cures.

Claims (2)

1. articulated anchor, mainly comprise anchor head and compress and locking device (1c), it is characterized in that described anchor head is made up of plush copper anchor (1) and spill piece (2), plush copper anchor (1) is by last, lower plate (1a, 1b) form, on the plush copper anchor (1), lower plate (1a, front end 1b) is cambered outwards arc surface, the spill piece (2) of articulated anchor is by last, following half block (2a, 2b) form, the middle part of one side of spill piece (2) is the arc surface that concaves, the interior concaved circular cambered surface coupling of the outer convex arc surface of plush copper anchor (1) and spill piece (2), the contact of formation face also forms the hinge connection of freely rotating mutually; Middle part at the concave shaped arc surface of the upper and lower half block (2a, 2b) of spill piece (2), one open slot is set respectively, when the upper and lower half block (2a, 2b) of spill piece (2) overlaps, middle part at the concave shaped arc surface of spill piece (2) constitutes a rectangular groove of remaining silent (2c), and the sectional dimension of the size of the groove of remaining silent (2c) and FRP sheet material (3) is complementary; Both sides at the reservation FRP sheet material groove of the upper and lower half block (2a, 2b) of spill piece (2), the open slot of one semicircle is set respectively, when the upper and lower half block (2a, 2b) of spill piece (2) overlaps, constitute the closed pore (2d) of two circles, the diameter of the size of circular closed pore (2d) and connecting screw rod (5) is complementary; Two ends at the upper and lower half block (2a, 2b) of spill piece (2), be provided with bolt hole respectively accordingly, when the upper and lower half block of spill piece (2) overlapped (2a, 2b), two fastening bolts (2e) passed bolt hole respectively and by nut the upper and lower half block (2a, 2b) of spill piece (2) are connected into an integral body.
2. the pre-stress stretching method of a high strength fibre composite sheet is characterized in that concrete method step is as follows:
(1) clamping and anchoring FRP sheet material
Earlier with two anchor blocks (4), connect by bolt respectively or welding or the mode that anchors into, be fixedly connected on the engineering structures surface that is enhanced or reinforces, anchor block (4) is determined according to the specific requirement of the engineering structures that is enhanced or reinforces and the length of FRP sheet material (3) being enhanced or the spacing of structural particular location of stabilization works and two anchor blocks (4);
Refill and establish articulated anchor and clamping and anchoring FRP sheet material (3); To fixed end, articulated anchor is installed in the inboard or the outside of anchor block (4): when articulated anchor is installed in anchor block (4) inboard, after two connecting screw rods (5) pass the connecting screw rod hole of spill piece (2) two ends of anchor block (4) and articulated anchor reserving respectively, before using respectively, back anchoring nut (6,7) the spill piece (2) of anchor block (4) and articulated anchor is fixedlyed connected, after then an end of FRP sheet material (3) being passed the FRP sheet material groove (2c) of reservation at spill piece (2) middle part of articulated anchor, be clamped in articulated anchor plush copper anchor (1) on, lower plate (1a, 1b), again with articulated anchor compress and locking device (1c) will be gone up, lower plate (1a, 1b) and the FRP sheet material (3) of clamping therebetween compress and lock; When articulated anchor is installed in the outside of anchor block (4), after two connecting screw rods (5) pass the connecting screw rod hole of spill piece (2) two ends of anchor block (4) and articulated anchor reserving respectively, before using respectively, back anchoring nut (6,7) the spill piece (2) of anchor block (4) and articulated anchor is fixedlyed connected, after then an end of FRP sheet material (3) being passed the FRP sheet material groove (2c) of reservation at spill piece (2) middle part of anchor block (4) and articulated anchor, be clamped in articulated anchor plush copper anchor (1) on, lower plate (1a, 1b), again with articulated anchor compress and locking device (1c) will be gone up, lower plate (1a, 1b) and the FRP sheet material (3) of clamping therebetween compress and lock; To the stretch-draw end, articulated anchor is installed in the inboard of anchor block (4), after two connecting screw rods (5) pass the connecting screw rod hole of spill piece (2) two ends of anchor block (4) and articulated anchor reserving respectively, before using respectively, back anchoring nut (6,7) the spill piece (2) of anchor block (4) and articulated anchor is fixedlyed connected, after then the other end of FRP sheet material (3) being passed the FRP sheet material groove (2c) of reservation at spill piece (2) middle part of articulated anchor, be clamped in articulated anchor plush copper anchor (1) on, lower plate (1a, 1b), again with articulated anchor compress and locking device (3) will be gone up, lower plate (1a, 1b) and the FRP sheet material (3) of clamping therebetween compress and lock;
Paste when requiring when FRP sheet material (3) and the engineering structures that is enhanced or reinforces have, to the adhesive surface of engineering structures also to polish, after clean Surface handles, again at the adhesive surface brushing cementing agent (16) of engineering structures and FRP sheet material;
(2) the FRP sheet material is carried out prestressed stretch-draw
(1) step finish after, respectively two connecting screw rods (5) at anchor block (4) two ends of stretch-draw end are fixedlyed connected with two tensioning screw rods (10) earlier with two sleeves (11), again counter-force piece (9) is fixedly connected on two tensioning screw rods (10) by two tensioning screw rods (10) and counter-force nut (12), constitutes reaction frame; Then jack (8) is placed between the anchor block (4) and counter-force piece (9) of stretch-draw end; And then driving jack (8) pushing tow counter-force piece (9), counter-force piece (9) drives tensioning screw rod (10) and connecting screw rod (5) moves together, and the articulated anchor that drives clamping and anchoring FRP sheet material (3) stretch-draw end moves together, realized utilizing articulated anchor and anchor block (4) that FRP sheet material (3) is carried out prestressed stretch-draw; After the prestressed stretch-draw of FRP sheet material (3) puts in place, tighten the back anchoring nut (7) on the connecting screw rod (5) of stretch-draw end earlier;
(3) remove jack and reaction frame
(2) step was withdrawn from jack (8) earlier after finishing, and backed out counter-force nut (12) again, took off counter-force piece (9), removed sleeve (11) and tensioning screw rod (10) at last;
Paste when requiring when FRP sheet material (3) and the engineering structures that is enhanced or reinforces have, between the stickup face of FRP sheet material and the engineering structures that is enhanced and reinforces, replenish perfusion cementing agent (16), and maintenance is till cementing agent (16) curing.
CN2010101838037A 2010-05-27 2010-05-27 Articulated anchor and prestress tensioning method of high strength fibre composite sheet Expired - Fee Related CN101851985B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101838037A CN101851985B (en) 2010-05-27 2010-05-27 Articulated anchor and prestress tensioning method of high strength fibre composite sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101838037A CN101851985B (en) 2010-05-27 2010-05-27 Articulated anchor and prestress tensioning method of high strength fibre composite sheet

Publications (2)

Publication Number Publication Date
CN101851985A true CN101851985A (en) 2010-10-06
CN101851985B CN101851985B (en) 2012-08-08

Family

ID=42803653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101838037A Expired - Fee Related CN101851985B (en) 2010-05-27 2010-05-27 Articulated anchor and prestress tensioning method of high strength fibre composite sheet

Country Status (1)

Country Link
CN (1) CN101851985B (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094536A (en) * 2011-02-28 2011-06-15 卓清 Array type waved tooth clamp anchor
CN102261166A (en) * 2011-05-25 2011-11-30 湖北金力工程复合材料有限公司 Fiber reinforced polymer (FRP) sheet anchor device and anchoring method thereof
CN102535861A (en) * 2011-12-29 2012-07-04 中国一冶集团有限公司 Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip
CN102561210A (en) * 2012-01-17 2012-07-11 武汉大学 Carbon fiber bar in-vitro prestressed tensioning device and using method thereof
CN102587585A (en) * 2012-02-10 2012-07-18 全恩懋 Flat turn regulation pre-tightening type directional clamping anchor
CN102616696A (en) * 2012-04-19 2012-08-01 东南大学 Assembled continuous lifting jack for finish-rolling threaded steel bar vertical columns
CN102974677A (en) * 2012-12-24 2013-03-20 衡阳泰豪通信车辆有限公司 Skin stretch combination tool
CN104005343A (en) * 2014-06-13 2014-08-27 成都市磐固科技有限公司 Bridge prestress carbon fiber plate tensioning anchoring system device
CN104153584A (en) * 2014-08-22 2014-11-19 中国铁道科学研究院铁道建筑研究所 Tensioned anchorage device and using method of tensioned anchorage device
CN104727561A (en) * 2015-04-02 2015-06-24 招商局重庆交通科研设计院有限公司 Carbon fiber plate anchorage device limiting tensioning block
CN104746803A (en) * 2015-04-02 2015-07-01 招商局重庆交通科研设计院有限公司 Carbon fiber plate anchor gear
CN104763106A (en) * 2015-04-02 2015-07-08 招商局重庆交通科研设计院有限公司 Anchorage device tensioning system for carbon fiber plates
CN104805841A (en) * 2015-02-28 2015-07-29 河海大学 FRP rib anchor rod anchoring head capable of applying prestress
CN104989105A (en) * 2015-06-04 2015-10-21 柳州欧维姆工程有限公司 Method for installing and tensioning stay rope among nodes of N-shaped rope network
CN105257321A (en) * 2015-09-28 2016-01-20 上海市基础工程集团有限公司 Shield tunnel initial-stage construction duct piece pulling connection device and construction method
CN105332513A (en) * 2015-12-11 2016-02-17 招商局重庆交通科研设计院有限公司 Curved plate-type carbon fiber plate anchor device tensioning system
CN106193643A (en) * 2016-07-20 2016-12-07 东南大学 A kind of Prestressed CFRP plate stretching and anchoring device of reinforcing steel beam and combination beam
CN106382011A (en) * 2016-11-09 2017-02-08 陕西通宇新材料有限公司 Tensioning-anchoring system and method for prestressed carbon fiber plate of concrete structure
CN106703433A (en) * 2016-12-29 2017-05-24 华北水利水电大学 Prestress fiber sheet combined and assembled tension device and construction method thereof
CN106760591A (en) * 2016-11-17 2017-05-31 广东工业大学 A kind of anchor for confined concrete models
WO2017197987A1 (en) * 2016-05-20 2017-11-23 东南大学 Automatic tensioning system and method for reinforcing beam, plate and column by pre-stressed fibreboard
CN107794849A (en) * 2017-11-05 2018-03-13 桂林理工大学 Using the construction method of the prestressed fiber cloth reinforced post of detachable tension ground tackle
CN107816217A (en) * 2017-10-13 2018-03-20 海宁安捷复合材料有限责任公司 A kind of double-layer prestressed carbon fiber board hardened system
CN107859348A (en) * 2017-10-20 2018-03-30 长安大学 Fabric positive force system
CN108843037A (en) * 2018-06-07 2018-11-20 桂林理工大学 A kind of prestressed fiber cloth reinforced girder tensioning anchor and its construction method
CN109281439A (en) * 2012-09-17 2019-01-29 Cpc公司 For manufacturing the reinforcer, concrete member and manufacturing method of concrete member
CN109444030A (en) * 2018-11-01 2019-03-08 东南大学 FRP plate material/sheet material the corrosion testing apparatus and method of self-correction prestressing force angle
CN109813604A (en) * 2019-03-21 2019-05-28 华侨大学 Test the experimental rig and its method of the test of steel plate synergisticing performance
CN110029592A (en) * 2019-04-12 2019-07-19 长沙理工大学 A kind of external prestressing FRP tendons stretching and anchoring device
CN111946090A (en) * 2020-08-20 2020-11-17 上海大学 CFRP cloth material concrete beam prestressing force reinforcing apparatus
CN112302257A (en) * 2020-10-08 2021-02-02 山西省交通科技研发有限公司 Pre-clamping device of clamping piece type anchorage device for FRP (fiber reinforced Plastic)
CN112900267A (en) * 2021-01-12 2021-06-04 中国建筑第八工程局有限公司 Tensioning and anchoring system and method for carbon fiber plate bundles
EP3845354A2 (en) 2019-12-10 2021-07-07 Wobben Properties GmbH Method of manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine and prestressing device
CN114941449A (en) * 2022-04-29 2022-08-26 上海交通大学 Tensioning device, tensioning and reinforcing system and method for TRM (blast furnace top gas recovery turbine module) grating
CN117489044A (en) * 2023-11-21 2024-02-02 长沙理工大学 Variable-ripple clamping piece anchorage device for prestressed carbon fiber plate

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002364185A (en) * 2001-06-12 2002-12-18 Faibekkusu Kk Method and device for tightening, bonding and reinforcing structure reinforcing sheet
JP2003328561A (en) * 2002-05-14 2003-11-19 Dps Bridge Works Co Ltd Reinforcing method for concrete member and tensioning device for tendon used therein
CN1699710A (en) * 2005-04-30 2005-11-23 中材科技股份有限公司 Prestressed fiber reinforced plastic plate anchoring device and tensioning towknee coordinated therewith
CN2806645Y (en) * 2005-06-15 2006-08-16 尚守平 Prestressed stretching device for fiber boards
CN101074578A (en) * 2007-06-14 2007-11-21 湖南科技大学 Special anchoros for wedged variable-corrugated clamped sheets
EP2093343A2 (en) * 2008-02-22 2009-08-26 Simpson Strong-Tie Company, Inc. Tension device for connection and tensioning of means connected to construction elements and method for producing the tension device
CN101487346B (en) * 2009-02-16 2010-12-01 周劲宇 Transverse stretching method for prestressed fiber cloth reinforced concrete column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002364185A (en) * 2001-06-12 2002-12-18 Faibekkusu Kk Method and device for tightening, bonding and reinforcing structure reinforcing sheet
JP2003328561A (en) * 2002-05-14 2003-11-19 Dps Bridge Works Co Ltd Reinforcing method for concrete member and tensioning device for tendon used therein
CN1699710A (en) * 2005-04-30 2005-11-23 中材科技股份有限公司 Prestressed fiber reinforced plastic plate anchoring device and tensioning towknee coordinated therewith
CN2806645Y (en) * 2005-06-15 2006-08-16 尚守平 Prestressed stretching device for fiber boards
CN101074578A (en) * 2007-06-14 2007-11-21 湖南科技大学 Special anchoros for wedged variable-corrugated clamped sheets
EP2093343A2 (en) * 2008-02-22 2009-08-26 Simpson Strong-Tie Company, Inc. Tension device for connection and tensioning of means connected to construction elements and method for producing the tension device
CN101487346B (en) * 2009-02-16 2010-12-01 周劲宇 Transverse stretching method for prestressed fiber cloth reinforced concrete column

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094536B (en) * 2011-02-28 2013-12-18 卓清 Array type waved tooth clamp anchor
CN102094536A (en) * 2011-02-28 2011-06-15 卓清 Array type waved tooth clamp anchor
CN102261166A (en) * 2011-05-25 2011-11-30 湖北金力工程复合材料有限公司 Fiber reinforced polymer (FRP) sheet anchor device and anchoring method thereof
CN102535861A (en) * 2011-12-29 2012-07-04 中国一冶集团有限公司 Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip
CN102535861B (en) * 2011-12-29 2014-09-17 中国一冶集团有限公司 Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip
CN102561210A (en) * 2012-01-17 2012-07-11 武汉大学 Carbon fiber bar in-vitro prestressed tensioning device and using method thereof
CN102587585A (en) * 2012-02-10 2012-07-18 全恩懋 Flat turn regulation pre-tightening type directional clamping anchor
CN102587585B (en) * 2012-02-10 2014-02-19 全恩懋 Flat turn regulation pre-tightening type directional clamping anchor
CN102616696B (en) * 2012-04-19 2013-11-27 东南大学 Assembled continuous lifting jack for finish-rolling threaded steel bar vertical columns
CN102616696A (en) * 2012-04-19 2012-08-01 东南大学 Assembled continuous lifting jack for finish-rolling threaded steel bar vertical columns
CN109281439A (en) * 2012-09-17 2019-01-29 Cpc公司 For manufacturing the reinforcer, concrete member and manufacturing method of concrete member
US11365544B2 (en) 2012-09-17 2022-06-21 Cpc Ag Reinforcing element for producing prestressed concrete components, concrete component and production methods
CN102974677A (en) * 2012-12-24 2013-03-20 衡阳泰豪通信车辆有限公司 Skin stretch combination tool
CN102974677B (en) * 2012-12-24 2015-01-21 衡阳泰豪通信车辆有限公司 Skin stretch combination tool
CN104005343A (en) * 2014-06-13 2014-08-27 成都市磐固科技有限公司 Bridge prestress carbon fiber plate tensioning anchoring system device
CN104153584A (en) * 2014-08-22 2014-11-19 中国铁道科学研究院铁道建筑研究所 Tensioned anchorage device and using method of tensioned anchorage device
CN104805841B (en) * 2015-02-28 2016-11-30 河海大学 A kind of prestressed FRP rebar anchor pole anchor head
CN104805841A (en) * 2015-02-28 2015-07-29 河海大学 FRP rib anchor rod anchoring head capable of applying prestress
CN104763106A (en) * 2015-04-02 2015-07-08 招商局重庆交通科研设计院有限公司 Anchorage device tensioning system for carbon fiber plates
CN104727561A (en) * 2015-04-02 2015-06-24 招商局重庆交通科研设计院有限公司 Carbon fiber plate anchorage device limiting tensioning block
CN104746803A (en) * 2015-04-02 2015-07-01 招商局重庆交通科研设计院有限公司 Carbon fiber plate anchor gear
CN104989105A (en) * 2015-06-04 2015-10-21 柳州欧维姆工程有限公司 Method for installing and tensioning stay rope among nodes of N-shaped rope network
CN104989105B (en) * 2015-06-04 2017-05-10 柳州欧维姆工程有限公司 Method for installing and tensioning stay rope among nodes of N-shaped rope network
CN105257321A (en) * 2015-09-28 2016-01-20 上海市基础工程集团有限公司 Shield tunnel initial-stage construction duct piece pulling connection device and construction method
CN105257321B (en) * 2015-09-28 2018-05-04 上海市基础工程集团有限公司 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method
CN105332513A (en) * 2015-12-11 2016-02-17 招商局重庆交通科研设计院有限公司 Curved plate-type carbon fiber plate anchor device tensioning system
WO2017197987A1 (en) * 2016-05-20 2017-11-23 东南大学 Automatic tensioning system and method for reinforcing beam, plate and column by pre-stressed fibreboard
CN106193643B (en) * 2016-07-20 2019-03-12 东南大学 A kind of Prestressed CFRP plate stretching and anchoring device of reinforcing steel beam and combination beam
CN106193643A (en) * 2016-07-20 2016-12-07 东南大学 A kind of Prestressed CFRP plate stretching and anchoring device of reinforcing steel beam and combination beam
CN106382011A (en) * 2016-11-09 2017-02-08 陕西通宇新材料有限公司 Tensioning-anchoring system and method for prestressed carbon fiber plate of concrete structure
CN106382011B (en) * 2016-11-09 2018-07-06 陕西交科新材料有限公司 Concrete structure pre-stressed carbon fiber plate tensioning rollering fastening system and method
CN106760591A (en) * 2016-11-17 2017-05-31 广东工业大学 A kind of anchor for confined concrete models
CN106703433A (en) * 2016-12-29 2017-05-24 华北水利水电大学 Prestress fiber sheet combined and assembled tension device and construction method thereof
CN107816217A (en) * 2017-10-13 2018-03-20 海宁安捷复合材料有限责任公司 A kind of double-layer prestressed carbon fiber board hardened system
CN107859348B (en) * 2017-10-20 2020-05-05 长安大学 Active force application system for fiber fabric
CN107859348A (en) * 2017-10-20 2018-03-30 长安大学 Fabric positive force system
CN107794849B (en) * 2017-11-05 2024-02-06 桂林理工大学 Construction method for reinforcing column by adopting prestressed fiber cloth of detachable tensioning anchorage
CN107794849A (en) * 2017-11-05 2018-03-13 桂林理工大学 Using the construction method of the prestressed fiber cloth reinforced post of detachable tension ground tackle
CN108843037B (en) * 2018-06-07 2020-10-09 桂林理工大学 Construction method of prestressed fiber cloth reinforced beam tensioning and anchoring device
CN108843037A (en) * 2018-06-07 2018-11-20 桂林理工大学 A kind of prestressed fiber cloth reinforced girder tensioning anchor and its construction method
CN109444030A (en) * 2018-11-01 2019-03-08 东南大学 FRP plate material/sheet material the corrosion testing apparatus and method of self-correction prestressing force angle
CN109813604A (en) * 2019-03-21 2019-05-28 华侨大学 Test the experimental rig and its method of the test of steel plate synergisticing performance
CN109813604B (en) * 2019-03-21 2024-01-05 华侨大学 Test device and method for testing synergistic performance of steel plates
CN110029592A (en) * 2019-04-12 2019-07-19 长沙理工大学 A kind of external prestressing FRP tendons stretching and anchoring device
CN110029592B (en) * 2019-04-12 2024-01-30 长沙理工大学 External prestress FRP rib tensioning and anchoring device
US11566605B2 (en) 2019-12-10 2023-01-31 Wobben Properties Gmbh Method for manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine, and prestressing device
EP3845354A2 (en) 2019-12-10 2021-07-07 Wobben Properties GmbH Method of manufacturing segments for a tower, prestressed segment, tower ring, tower, wind turbine and prestressing device
CN111946090A (en) * 2020-08-20 2020-11-17 上海大学 CFRP cloth material concrete beam prestressing force reinforcing apparatus
CN112302257A (en) * 2020-10-08 2021-02-02 山西省交通科技研发有限公司 Pre-clamping device of clamping piece type anchorage device for FRP (fiber reinforced Plastic)
CN112302257B (en) * 2020-10-08 2022-06-28 山西省交通科技研发有限公司 Pre-clamping device of clamping piece type anchorage device for FRP (fiber reinforced Plastic)
CN112900267A (en) * 2021-01-12 2021-06-04 中国建筑第八工程局有限公司 Tensioning and anchoring system and method for carbon fiber plate bundles
CN114941449B (en) * 2022-04-29 2023-01-20 上海交通大学 Tensioning device, tensioning and reinforcing system and method for TRM (Top gas insulated switchgear) grating
CN114941449A (en) * 2022-04-29 2022-08-26 上海交通大学 Tensioning device, tensioning and reinforcing system and method for TRM (blast furnace top gas recovery turbine module) grating
CN117489044A (en) * 2023-11-21 2024-02-02 长沙理工大学 Variable-ripple clamping piece anchorage device for prestressed carbon fiber plate

Also Published As

Publication number Publication date
CN101851985B (en) 2012-08-08

Similar Documents

Publication Publication Date Title
CN101851985B (en) Articulated anchor and prestress tensioning method of high strength fibre composite sheet
CN105862608B (en) The automation tensioning system and method for a kind of pre-stress fibre plate reinforcing slab plate
CN106382011B (en) Concrete structure pre-stressed carbon fiber plate tensioning rollering fastening system and method
CN103061415B (en) Gluing composite connection joint and gluing composite connection method for FRP (fiber reinforced polymer) section and barbed plates
CN101074578B (en) Special anchoros for wedged variable-corrugated clamped sheets
CN101245668A (en) Construction method for two-side reinforcing engineering structure
CN202064523U (en) Self-steering prestressed sheet clamping and stretching anchorage device
CN202017304U (en) Automatic centering tensioning anchoring device for prestress sheet material clamp type anchor
CN110130234B (en) Novel bridge reinforcing system and construction method thereof
CN102127950B (en) Automatic centering tensioning and anchoring device for prestressed sheet clamping anchorage
CN109322503A (en) Hydro-concrete Structures combined prestressing force hardened system and its construction method
CN214302988U (en) Building structure design roof beam reinforced structure
CN211117980U (en) Overhead structure of gas pipeline
CN109537475B (en) Method for reinforcing capping beam by using carbon fiber and reinforcing structure
CN207813076U (en) Hydro-concrete Structures combined prestressing force hardened system
CN214942706U (en) Prestressed carbon fiber plate tensioning external member
CN2712994Y (en) Carbon fiber cloth prestressed tensioner
CN203066245U (en) Stab plate type glued composite connector used for FRP (fiber reinforced plastic) section
CN209277018U (en) The mounting assembly fixed for carbon fiber board
CN109989338B (en) Bending-resistant reinforcement structure and method for concrete beam
CN209891396U (en) Intercolumnar bearing structure for steel construction
CN112376367A (en) Template switching fastening device for building highway and fastening method thereof
CN207757815U (en) The dies plate tap structure of Precast T-Beam
CN112554058A (en) Prestressed anchorage device, anchorage assembly and anchorage construction method
CN106703433B (en) Prestressed fiber sheet combined assembly type tensioning device and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Zhuo Qing

Document name: Notice of Termination of Patent Rights

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120808