CN104989105B - Method for installing and tensioning stay rope among nodes of N-shaped rope network - Google Patents

Method for installing and tensioning stay rope among nodes of N-shaped rope network Download PDF

Info

Publication number
CN104989105B
CN104989105B CN201510303938.5A CN201510303938A CN104989105B CN 104989105 B CN104989105 B CN 104989105B CN 201510303938 A CN201510303938 A CN 201510303938A CN 104989105 B CN104989105 B CN 104989105B
Authority
CN
China
Prior art keywords
tensioning
drag
line
shoulder pole
install
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510303938.5A
Other languages
Chinese (zh)
Other versions
CN104989105A (en
Inventor
韦福堂
莫德荣
张国强
黎祖金
沈理
熊佳雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU OVM ENGINEERING Co Ltd
Original Assignee
LIUZHOU OVM ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU OVM ENGINEERING Co Ltd filed Critical LIUZHOU OVM ENGINEERING Co Ltd
Priority to CN201510303938.5A priority Critical patent/CN104989105B/en
Publication of CN104989105A publication Critical patent/CN104989105A/en
Application granted granted Critical
Publication of CN104989105B publication Critical patent/CN104989105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A method for installing and tensioning stay rope among nodes of an N-shaped rope network includes the steps that anchoring cylinders, symmetrical about node discs and provided with the stay rope, of the to-be-installed stay rope serve as anchoring points and are fixed through high-strength bolts, active tensioning counterforce points are installed on lengthening sleeves of the to-be-installed stay rope, tensioning rods penetrate through two shoulder pole beams, one ends of the tensioning rods are directly anchored to the ends of the shoulder pole beams through tensioning nuts and thick bottom plates, the other ends of the tensioning rods penetrate through supporting pins and jacks to be anchored through tensioning nuts and serve as tensioning ends, the supporting pins serve as temporary anchoring devices when the stroke of the jacks is controlled by oil pumps, the anchor shoulder pole beams and the jacks of the to-be-installed stay rope are repeatedly tensioned and dragged till fork lug holes of the to-be-installed stay rope and pin holes of the node disc are overlapped and connected through fork pins so that the stay rope can be installed and tensioned among the nodes. By means of the method, under the conditions of limited counterforce space, difficult counterforce point search and the like, the large tensioning force required for installing the stay rope can be met, detaching, assembling and constructing are facilitated, and installing quality and work efficiency are improved.

Description

A kind of method of drag-line installation and tensioning between " N " type rope net node
Technical field
The present invention relates to a kind of installation method for stretching of prestressed cable, drag-line between particularly a kind of " N " type rope net node Installation and the method for tensioning.
Background technology
For some large-scale dome supporting structures, its dome supporting structure adopts large-scale cable net structure, i.e. " N " type rope net, Being somebody's turn to do " N " type rope net includes some drag-lines(Also it is main rope), several nodes composition, by node contacts between main rope, referring to Fig. 4, i represent drag-line between node, and j represents the intermediate node of drag-line, and each node has many drag-lines;The drag-line is typically using double forks Ear formula length-fixed structure, node structure is disc format, and disc-shaped structure circumference is divided into six pin-and-holes, and pin-and-hole connects respectively with drag-line Connect;General rope net has multiple node plates, and with rope and disk a large-scale cable net structure is formed;Need to saving two-by-two during rope net forming Double fork ear main ropes carry out force tensioning between point disk, but because rope net is in multi-dimensional spatial structure, pin joint quality of fit is high, space Various dimensions change, and rope net is flexible structure, and a drag-line space stress docking technique difficult problem is big between node, using conventional double forks Ear tensioning cannot accurately connect and exactitude position, and double fork ear main rope length-fixed structures, all no with foreign countries at home to borrow Method for stretching of the mirror for fixed length drag-line between " N " type rope net node.
The content of the invention
It is an object of the invention to provide cable tension construction method between a kind of " N " type rope net node, this method provides one Kind convenient method for installing double fork ear type fixed length drag-line, reaction volume is limited, when difficult searching counter-force point, can provide Meet the powerful stretching force needed for drag-line is installed, be easy to dismount and construct again, improve installation quality and work efficiency;To solve existing skill The problems referred to above that art is present.
The technical scheme for solving the above problems is:The method of drag-line installation and tensioning, described between a kind of " N " type rope net node Drag-line is including cable body, positioned at the fork ear at cable body two ends, for the tensioning equipment component bag of stretching construction between " N " type rope net node Include:Jack, spike, shoulder pole girder, tension rod, tensioning nut and high-strength bolt;
Shoulder pole girder for the tensioning equipment component of stretching construction has two sets, and it is split two halves formula structure often to cover shoulder pole girder, Have in the middle of monolithic shoulder pole girder for by the arc groove of anchor-hold cylinder, both sides respectively have the arc groove for installing tension rod and Bolt hole;
Drag-line is installed and the method for tensioning is utilized in installing drag-line with regard to node plate between " N " the type rope net node As anchor point on the symmetrical anchorage drum for installing drag-line, and fixed by high-strength bolt;Active tensioning counter-force point is arranged on Will install on the anchorage drum of drag-line;Tension rod passes through two sets of shoulder pole girders, one end tensioning nut and hassock plate to be directly anchored at Shoulder pole beam-ends, the other end is anchored through spike and jack and with tensioning nut, used as stretching end;By oil pump control jack Stroke, by the use of spike as temporary anchoring device, to the anchorage shoulder pole girder and jack that will install drag-line, repeatedly tensioning is led Draw, be connected with the pin-and-hole weight merga pass bolt of node plate until the fork earhole of drag-line will be installed, realize drag-line between node Install and tensioning.
Its further technical scheme is that the method is comprised the following steps:
A, the shoulder pole girder for installing anchor point:The two panels monolithic shoulder pole girder of a set of shoulder pole girder is separately mounted to install The both sides of the anchorage drum of complete drag-line, and fixed by high-strength bolt;
B, the shoulder pole girder for installing tensioning counter-force point:The two panels monolithic shoulder pole girder of another set of shoulder pole girder is respectively mounted shortly By on the anchorage sleeve for installing drag-line;
C, installation jack, spike, shoulder pole girder and tension rod:Tension rod is passed through into two sets of shoulder pole girders, one end tensioning spiral shell Mother is directly anchored at the shoulder pole beam-ends of anchor point, and the other end is anchored through spike and jack and with tensioning nut, used as tensioning End;
D, tensioning:By the stroke of oil pump control jack, the pin that will install the fork ear of drag-line near node plate is forced Hole, if will install drag-line fork ear from node plate pin-and-hole farther out, can be by the use of tensioning nut and spike as jury anchor It is fixedly mounted with and puts to shoulder pole girder and drag-line will be installed fixed temporarily, then to jack release oil return, tightens jack rear end Tensioning nut after, then tensioning is carried out, constantly repeatedly, until completing the installation of drag-line bolt;
E, anchoring:When the fork earhole that will install drag-line overlaps with the pin-and-hole of node plate, will be used to connect drag-line fork ear Passing through with the bolt of node plate will install the fork earhole of drag-line and the pin-and-hole of node plate, will install anchor-hold in node On disk.
Its further technical scheme is, for being used to lead in the middle of the monolithic shoulder pole girder of the tensioning equipment component of stretching construction Diameter 4~the 5mm bigger than the anchorage drum diameter of drag-line of the arc groove of anchor-hold cylinder is crossed, both sides are used to install the circular arc of tension rod The diameter of groove 2~3mm bigger than tensioning shank diameter.
Due to taking said structure, cable tension construction method has following between the present invention one kind " N " type rope net node Beneficial effect:
1st, drag-line between " N " type rope net node that cable tension construction method is adopted between present invention one kind " N " type rope net node Tensioning equipment modular construction is ingenious, practicality, can guarantee that construction effect;The list of cable tension device assembly between " N " type rope net node Have in the middle of piece shoulder pole girder for just compressing anchor-hold by the through hole of the arc groove of anchor-hold cylinder, two arc grooves composition Cylinder, by the use of the step on guy anchor cup as sticking point, prevents shoulder pole girder from sliding on dragline anchorage, brings dragline anchorage The effect that zinc coat and drag-line thermal shrinkable sleeve are not destroyed.
2nd, because a wherein shoulder pole girder of this device assembly is arranged on existing drag-line, on this Cable forces direction Can accurately install under stress with node plate beneficial to Ben Lasuo using pin as rotation between the symmetrical drag-line of node plate;No Need to set up powerful counterforce device again, bring easy accessibility, be easy to the effect of construction.
3rd, because shoulder pole girder is designed to the symmetrical form of left and right two panels, an entirety is connected into by high-strength bolt, is brought Safe and reliable, easy accessibility effect.
With reference to the accompanying drawings and examples the skill of cable tension construction method between one kind " N " type rope net node of the invention Art feature is described further.
Description of the drawings
Fig. 1:Draw between " N " type rope net node that cable tension construction method is adopted between one kind " N " type rope net node of the invention The structure of cable stretching device assembly and its install and use state reference map;
Fig. 2:The top view of Fig. 1;
Fig. 3-1:The structural representation of the shoulder pole girder of cable tension device assembly between " N " type rope net node(Two panels combines shape Under state);
Fig. 3-2:The single chip architecture schematic diagram of shoulder pole girder shown in Fig. 3-1;
Fig. 4:" N " type cable net structure schematic diagram.
In Fig. 1~Fig. 3-2:
1- jack, 2- spikes;3- shoulder pole girders, 31- high-strength bolts, 32- tension rod half slots, 33- bolts hole, 34- ropes Arc groove at body anchorage drum;
The drag-line that 74- will be installed;7401- pitches ear;5- is used to connect the bolt of drag-line fork ear and node plate, 6- nodes Disk, the pin-and-hole in 601- node plates;
71st, 72,73, the 75, drag-line that 76- has been installed, 9- tensioning nuts, 10- tension rods.
In Fig. 4:Drag-line between i- " N " type rope net node;J- " N " type rope net node.
Specific embodiment
Embodiment one:
Cable tension device assembly between a kind of " N " type rope net node:
Drag-line is including cable body, positioned at the fork ear at cable body two ends, the drawing on node circumference between " N " the type rope net node Rustling sound body is connected to form " N " type rope net drag-line and joint system by pitching ear and bolt with node plate;
Being somebody's turn to do cable tension device assembly between " N " type rope net node includes:Jack 1, spike 2, shoulder pole girder 3, tension rod 10, Tensioning nut 9 and high-strength bolt 31;
The shoulder pole girder 3 has two sets, and it is split two halves formula structure often to cover shoulder pole girder 3, is had in the middle of monolithic shoulder pole girder for leading to The arc groove 34 of anchor-hold cylinder is crossed, respectively there is the arc groove 32 and bolt hole 33 for installing tension rod on both sides;
Under use state, as anchor point on the anchorage drum of the drag-line that a set of shoulder pole girder has been installed, and Fixed by high-strength bolt 31;Another set of shoulder pole girder is then arranged on and will install on the anchorage drum of drag-line as counter-force point;Tensioning Bar 10 passes through two sets of shoulder pole girders, one end tensioning nut 9 and hassock plate 8 to be directly anchored at shoulder pole beam-ends, and the other end passes through spike 2 Anchor with jack 1 and with tensioning nut 9, as stretching end.
For bigger by 4 than the anchorage drum diameter of drag-line by the diameter of the arc groove 34 of anchor-hold cylinder in the middle of monolithic shoulder pole girder ~5mm, both sides are used for the diameter 2~3mm bigger than tensioning shank diameter of the arc groove 32 for installing tension rod.
Embodiment two:
One kind is used for the method for stretching of drag-line between " N " type rope net node, and it is using " N " type rope net section described in embodiment one The method that cable tension device assembly implements cable tension between " N " type rope net node between point;It is utilized in that drag-line will be installed With regard to, as anchor point, and being fixed by high-strength bolt on the symmetrical anchorage drum for installing drag-line 71 of node plate;Active tensioning Counter-force point is arranged on the anchorage drum of the drag-line 74 that will be installed;Tension rod 10 passes through two sets of shoulder pole girders, one end tensioning nut Shoulder pole beam-ends is directly anchored at, the other end is anchored through spike and jack and with tensioning nut, used as stretching end;By oil pump The stroke of control jack, by the use of spike as temporary anchoring device, the method so as to realize installation and the tensioning of drag-line.
It is comprised the following steps:
A, the shoulder pole girder for installing anchor point:The two panels monolithic shoulder pole girder of a set of shoulder pole girder 3 is separately mounted to install The both sides of the anchorage drum of the drag-line 71 for finishing, and fixed by high-strength bolt;
B, the shoulder pole girder for installing tensioning counter-force point:The two panels monolithic shoulder pole girder of another set of shoulder pole girder 3 is respectively mounted shortly By on the anchorage sleeve for installing drag-line 74;
C, installation jack, spike, shoulder pole girder and tension rod:Tension rod 10 is passed through into two sets of shoulder pole girders, one end tensioning Nut 9 is directly anchored at the shoulder pole beam-ends of anchor point, and the other end passes through spike 2 and jack 1 and anchored with tensioning nut 9, makees For stretching end;
D, tensioning:By the stroke of oil pump control jack 1, the fork ear 7401 that will install drag-line 74 is forced near section Point disk pin-and-hole 601, if will install drag-line 74 fork ear 7401 from node plate pin-and-hole 601 farther out, tensioning can be utilized Nut 9 and spike 2 as temporary anchoring device is to shoulder pole girder and will install drag-line 74 and is fixed temporarily, then to jack 1 release oil return, after tightening the tensioning nut of jack rear end, then carries out tensioning, constantly repeatedly, until completing the peace of drag-line bolt Dress;
E, anchoring:When the fork hole of ear 7401 of drag-line 74 overlaps with the pin-and-hole 601 of node plate, will be used to connect drag-line fork ear Passing through with the bolt 5 of node plate will install the fork earhole 7401 of drag-line 74 and the pin-and-hole 601 of node plate, will install drag-line 74 are anchored in node plate 6.

Claims (3)

1. between a kind of " N " type rope net node drag-line install and tensioning method, drag-line includes rope between " N " the type rope net node Body, positioned at the fork ear at cable body two ends, the tensioning equipment component for stretching construction includes:Jack, spike, shoulder pole girder, tensioning Bar, tensioning nut and high-strength bolt;It is characterized in that:
Shoulder pole girder for the tensioning equipment component of stretching construction has two sets, often covers shoulder pole girder for split two halves formula structure, monolithic Have in the middle of shoulder pole girder for by the arc groove of anchor-hold cylinder(34), respectively there is the arc groove for installing tension rod on both sides(32) And bolt hole(33);
Between " N " the type rope net node drag-line install and tensioning method be utilized in installing drag-line with regard to node plate pair What is claimed installs the anchorage drum of drag-line as anchor point, and is fixed by high-strength bolt;Active tensioning counter-force point is arranged on will Install on the anchorage drum of drag-line;Tension rod passes through two sets of shoulder pole girders, one end tensioning nut and hassock plate to be directly anchored at shoulder pole Beam-ends, the other end is anchored through spike and jack and with tensioning nut, used as stretching end;By the row of oil pump control jack Journey, by the use of spike as temporary anchoring device, the anchorage shoulder pole girder and jack tensioning traction repeatedly to drag-line will be installed, directly Pin-and-hole weight merga pass bolt to fork earhole and the node plate that will install drag-line be connected, realize between node drag-line installation with Tensioning.
2. between one kind " N " type rope net node according to claim 1 drag-line install and tensioning method, it is characterised in that:
The method is comprised the following steps:
A, the shoulder pole girder for installing anchor point:By a set of shoulder pole girder(3)Two panels monolithic shoulder pole girder be separately mounted to install The both sides of the anchorage drum of complete drag-line, and fixed by high-strength bolt;
B, the shoulder pole girder for installing tensioning counter-force point:By another set of shoulder pole girder(3)Two panels monolithic shoulder pole girder be separately mounted to will Install on the anchorage sleeve of drag-line;
C, installation jack, spike and tension rod:By tension rod(10)Through two sets of shoulder pole girders, one end tensioning nut(9)Directly The shoulder pole beam-ends for being anchored at anchor point is connect, the other end passes through spike(2)And jack(1)And use tensioning nut(9)Anchoring, as Stretching end;
D, tensioning:By oil pump control jack(1)Stroke, forcing will install drag-line(74)Fork ear(7401)It is close The pin-and-hole of node plate(601)If the fork ear of drag-line will be installed(7401)From the pin-and-hole of node plate(601)Farther out, then utilize and open Draw nut(9)And spike(2)As temporary anchoring device is to shoulder pole girder and will install drag-line and is fixed temporarily, then to thousand Jin top(1)Release oil return, after tightening the tensioning nut of jack rear end, then carries out tensioning, constantly repeatedly, until completing drag-line fork The installation of pin;
E, anchoring:When the pin-and-hole of the fork earhole and node plate that will install drag-line(601)During coincidence, will be used to connect drag-line fork ear With the bolt of node plate(5)Through the pin-and-hole for pitching earhole and node plate that will install drag-line(601), drag-line will be installed (74)It is anchored in node plate.
3. between one kind " N " type rope net node according to claim 1 drag-line install and tensioning method, it is characterised in that For being used for the arc groove by anchor-hold cylinder in the middle of the monolithic shoulder pole girder of the tensioning equipment component of stretching construction(34)It is straight Footpath 4~5mm bigger than the anchorage drum diameter of drag-line, both sides are used to install the arc groove of tension rod(32)Diameter than tensioning shank diameter Big 2~3mm.
CN201510303938.5A 2015-06-04 2015-06-04 Method for installing and tensioning stay rope among nodes of N-shaped rope network Active CN104989105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510303938.5A CN104989105B (en) 2015-06-04 2015-06-04 Method for installing and tensioning stay rope among nodes of N-shaped rope network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510303938.5A CN104989105B (en) 2015-06-04 2015-06-04 Method for installing and tensioning stay rope among nodes of N-shaped rope network

Publications (2)

Publication Number Publication Date
CN104989105A CN104989105A (en) 2015-10-21
CN104989105B true CN104989105B (en) 2017-05-10

Family

ID=54300986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510303938.5A Active CN104989105B (en) 2015-06-04 2015-06-04 Method for installing and tensioning stay rope among nodes of N-shaped rope network

Country Status (1)

Country Link
CN (1) CN104989105B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672359B (en) * 2016-04-07 2017-09-29 中铁隧道集团二处有限公司 A kind of tensioning equipment docked for tunnel pipe connector PC drag-lines and construction method
CN107769142B (en) * 2017-11-30 2023-09-08 国家电网公司 Tension releasing device for wind deflection prevention inhaul cable of power transmission line
CN107840211B (en) * 2017-12-04 2023-06-13 柳州欧维姆机械股份有限公司 Data line wiring device and method for FAST cable network structure
CN108221668B (en) * 2018-02-02 2023-11-24 柳州桂桥缆索有限公司 Adjustable inhaul cable for constructional engineering and tensioning method thereof
CN109295859B (en) * 2018-10-18 2023-12-19 柳州欧维姆机械股份有限公司 Tensioning device for front supporting point hanging construction and tensioning construction method thereof
CN109137763B (en) * 2018-10-29 2023-12-01 招商局重庆交通科研设计院有限公司 Cable cutting device and cable dismantling construction method
CN109775628B (en) * 2019-01-29 2024-04-30 北京城建集团有限责任公司 Double-rope lifting device and construction method thereof
CN109914253A (en) * 2019-03-20 2019-06-21 中交路桥建设有限公司 A kind of aerial Dock With Precision Position system and method for suspension bridge girder steel
PT3936738T (en) 2020-07-15 2023-05-10 Soletanche Freyssinet Cable drain wire
CN114150891B (en) * 2021-12-30 2023-03-14 柳州欧维姆工程有限公司 Inhaul cable replacing method for space cable net supporting structure
CN115110672B (en) * 2022-06-16 2023-03-21 广东省第四建筑工程有限公司 Construction method of prestressed single-layer bidirectional cable net structure curtain wall
CN115992566B (en) * 2023-03-23 2023-05-30 北京市建筑工程研究院有限责任公司 Rigid-flexible orthogonal cable network structure and forming method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1821519A (en) * 2005-12-22 2006-08-23 高维成 Tension string beam structure with dog bone type damper
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN101851985A (en) * 2010-05-27 2010-10-06 卓清 Articulated anchor and prestress tensioning method of high strength fibre composite sheet

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100560247B1 (en) * 2004-03-13 2006-03-10 학교법인 신동아학원 Cable tension introduction unit and the way that used temporary support blocks

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1821519A (en) * 2005-12-22 2006-08-23 高维成 Tension string beam structure with dog bone type damper
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN101851985A (en) * 2010-05-27 2010-10-06 卓清 Articulated anchor and prestress tensioning method of high strength fibre composite sheet

Also Published As

Publication number Publication date
CN104989105A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104989105B (en) Method for installing and tensioning stay rope among nodes of N-shaped rope network
CN104110086B (en) Suspen-shell structure and plane prestressed combined structure, tensioning tooling and construction method
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
CN104847122B (en) Device assembly for tensioning fork ear type stay rope or steel pull rod and tensioning construction method of device assembly
CN110726615B (en) Loading device suitable for T-shaped beam column node test and application method thereof
CN101793010A (en) Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
CN103866986A (en) Installing method of large-span variable-cross-section screw bolt ball node reticulated shell
CN113622683B (en) Tool suitable for synchronous lifting and tensioning of double cables of cable structure and using method
CN111636623A (en) Beam string structure with high continuous collapse resistance and implementation method thereof
CN203222917U (en) Novel archaistic slope roof of net rack structure
CN111927094B (en) Construction method for integrally lifting and tensioning double-layer cable net structure by drawing lower-layer cable net
CN102182251B (en) Bottom chord node fastening device of multi-suspend structure and fastening tension method thereof
CN108952207B (en) Steel structure building storey adding structure and storey adding method
CN107842109B (en) Endless cable node for irregular plane cable net
CN202064275U (en) Double-stayed-steel arch tower in-situ cantilever split joint structure
CN212507050U (en) Beam string structure with high continuous collapse resistance
CN113089837B (en) Environment-friendly steel structure spiral ramp and construction method thereof
CN100535364C (en) Prestressing force beam string structure stretching device
CN211013830U (en) Be applicable to experimental loading device of T font beam column node
CN209855018U (en) Annular cable supporting structure and suspended dome
CN105113426A (en) Cable connector and steel truss arch bridge cable connecting method
CN204959605U (en) Knotted rope hookup
CN203347248U (en) Self-climbing-type tensioning tool
CN203222892U (en) Station arch gate of net rack structure
CN204781997U (en) A device subassembly that is used for stretch -draw fork ear formula cable or steel pull -rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant