CN105239729B - It has constructed the construction method of poling reparation of punching after roofing - Google Patents

It has constructed the construction method of poling reparation of punching after roofing Download PDF

Info

Publication number
CN105239729B
CN105239729B CN201510631110.2A CN201510631110A CN105239729B CN 105239729 B CN105239729 B CN 105239729B CN 201510631110 A CN201510631110 A CN 201510631110A CN 105239729 B CN105239729 B CN 105239729B
Authority
CN
China
Prior art keywords
roofing
region
constructed
cut
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510631110.2A
Other languages
Chinese (zh)
Other versions
CN105239729A (en
Inventor
夏志强
于新平
谭建国
余刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201510631110.2A priority Critical patent/CN105239729B/en
Publication of CN105239729A publication Critical patent/CN105239729A/en
Application granted granted Critical
Publication of CN105239729B publication Critical patent/CN105239729B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of construction method for the poling reparation that punches after roofing of having constructed, roofing of having constructed includes that the waterproof roll layer, thermal insulation board layer and concrete layer, construction method being set to from bottom to top on structure roof boarding include:Perforative pipe hole is excavated on roofing having constructed, and pipeline is plugged in pipe hole;Circumferentially roofing of having constructed is cut centered on pipeline, and is cut to waterproof roll layer, region is cut to be formed;The surface in region is cut described in exposing in pipeline and cuts the surface of the waterproof roll layer in region brushing water-repellent paint respectively;Expose the viscous waterproof roll of surface laying reaction for cutting the surface in region and cutting the waterproof roll layer in region in pipeline;Cutting casting concrete and vibration compacting in region.The present invention is by the pipeline that punches after and cuts and is laid with reaction on waterproof roll layer in region and glues waterproof roll, then is cutting casting concrete and vibration compacting in region, can reach good waterproof effect.

Description

It has constructed the construction method of poling reparation of punching after roofing
Technical field
The present invention relates to building engineering field, a kind of construction party for the poling reparation that refers in particular to punch after roofing of having constructed Method.
Background technology
Some architectural engineerings in the prior art lead to have pipeline that must pass through due to change of design scheme etc. The roofing completed through construction, must punch after roofing, and again to its secondary processing repaired that punches.Due to room at this time All construction is completed for face waterproof, heat preservation and rigid layer, and secondary punch wears fire extinguisher canvas hose on molding roofing floor, has pole Big leakage hidden trouble.Also, roofing poling is since tube wall and concrete are not belonging to identical material, and compatibility is poor, and there are temperature Stress is spent, nozzle is nearby very easy to cracking, is always one technological difficulties of roof waterproof.
In order to improve the water resistance of roofing, in the prior art frequently with waterproof roll or water-repellent paint to Roof system into Row water-proofing treatment.When using waterproof roll as roof waterproof construction, waterproof roll can not receive head in this position coiled material, only Head can be received by water-repellent paint or construction sealant, be the portion for being susceptible to cracking under the influence of temperature stress and aging action Position.When using water-repellent paint as roof waterproof construction, water-repellent paint construction is finished and will be protected with cement mortar, generally Thickness of mortar coverage does closing in mortar in 20mm~30mm, at drain gully position and is easier cracking problem, or even broken Bad original waterproof layer, causes to leak.
In the prior art, pair therefore, and complete secondary punch of roofing of construction and carry out the nozzle of poling and nearby crack, ooze Leakage and repair process are at this field technical problem urgently to be resolved hurrily.
Invention content
In view of the above problem, the present invention provides a kind of construction methods for the poling reparation that punches after roofing of having constructed, Roofing of constructing includes the waterproof roll layer, thermal insulation board layer and concrete layer being set to from bottom to top on structure roof boarding, described Construction method includes:
Perforative pipe hole is excavated on roofing having constructed, and pipeline is plugged in the pipe hole;
Circumferentially roofing of having constructed is cut centered on the pipeline, and is cut to the waterproof roll layer, with Formation cuts region;
The surface in region and the surface of the waterproof roll layer cut in region are cut described in exposing in the pipeline Brushing water-repellent paint respectively;
The surface in region and the surface of the waterproof roll layer cut in region are cut described in exposing in the pipeline It is laid with reaction and glues waterproof roll;
Casting concrete and vibration compacting in region are cut described.
The present invention has constructed the construction method of poling reparation of punching after roofing, passes through the waterproof roll layer exposed after cutting It is laid with reaction on the pipeline to punch after and and glues waterproof roll, and is cutting casting concrete and vibration compacting in region, completes To the poling repairing construction that punches after roofing of having constructed, good waterproof effect can be reached.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, excavate the pipe hole When, the diameter in the pipe hole is bigger 50mm than the diameter of the pipeline.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, cut room of having constructed When face, the radius for cutting region is not less than 300mm.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, on the pipeline When cutting the external coating water-repellent paint in region described in exposing, the finished surface for brushing height than roofing of having constructed is higher by 300mm.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that:
Described in being used at the node of the concrete layer cut in region and the thermal insulation board layer cut in region Water-repellent paint carries out cementation of fissures closing;
Institute is used at the node of the thermal insulation board layer cut in region and the waterproof roll layer cut in region It states water-repellent paint and carries out cementation of fissures closing.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, cut area described The surface of concrete layer in domain and the surface of the thermal insulation board layer cut in region are using plugging material and described anti- Water paint is blocked.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, the water-repellent paint Thickness for polyurethane water-proof paint, the water-repellent paint is 1.5mm.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, the reaction is viscous anti- Water coiled material and the waterproof roll layer overlap and the finished surface turned to along the pipeline than roofing of having constructed is higher by 300mm, institute State reaction and glue waterproof roll and the interface for cutting the concrete poured in region and sealed using cement mortar, the pipeline and The seam crossing of the waterproof roll layer uses ointment filleting.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, it is described to cut region The concrete inside poured expands pea gravel concreten using C30, mixes 8% waterproofing agent, and the concrete poured is constructed roofing than Finished surface be higher by 20mm.
The present invention constructed punch after roofing poling reparation construction method further improvement lies in that, it is described pour it is mixed Solidifying soil is higher by the part of the finished surface for roofing of having constructed within the scope of the pipeline 350mm, by 2cm height differences along the pipeline Center to the pipeline outside carry out slope.
Description of the drawings
Fig. 1 be the present invention constructed punch after roofing poling reparation construction method flow chart.
Fig. 2 be the present invention constructed punch after roofing poling reparation construction method roofing of having constructed structural representation Figure.
Fig. 3 is the structural schematic diagram after the completion of step S101 in Fig. 1.
Fig. 4 is the structural schematic diagram after the completion of step S102 in Fig. 1.
Fig. 5 is the enlarged diagram of Fig. 4 interior joints A.
Fig. 6 is the structural schematic diagram after the completion of step S104 in Fig. 1.
Fig. 7 is the structural schematic diagram after the completion of step S105 in Fig. 1.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
First, cooperation is referring to shown in Fig. 2, and Fig. 2 is that the present invention has constructed the construction method of poling reparation of punching after roofing It has constructed the structural schematic diagram of roofing.The present invention constructed punch after roofing poling reparation construction method in, roofing 9 of having constructed Including the waterproof roll layer 91, thermal insulation board layer 92 and concrete layer 93 being set to from bottom to top on structure roof boarding 90.Wherein, With smashing with troweling, surface cleans up structure roof boarding 90;Waterproof roll layer 91 is 1.5mm thickness reaction bonded type macromolecule wet-layings Waterproof roll (single side is viscous, green black intersection powerful film);Thermal insulation board layer 92 is 30mm thickness extruded polystyrene boards;Concrete layer 93 is 40mm Thick C20 muscle microlith concrete layer, matches 6.5I grade steel of φ, and two-way 150, reinforced mesh is bound, if 4m*4m dividing joints, slit width 10mm is close Seal cream filleting.Preferably, 1.2 solid cement base infiltration crystallization type water-proofs are additionally provided between structure roof boarding 90 and waterproof roll layer 91 Coating;10mm thickness low-intensity M5 mortar separation layers are additionally provided between thermal insulation board layer 92 and concrete layer 93.
Cooperation referring to shown in Fig. 1, Fig. 1 be the present invention constructed punch after roofing poling reparation construction method flow Figure.The present invention has constructed the construction method of poling reparation of punching after roofing, including:
Step S101:In conjunction with shown in Fig. 3, Fig. 3 is the structural schematic diagram after the completion of step S101 in Fig. 1.In room of having constructed Perforative pipe hole 10 is excavated on face 9, and pipeline 20 is plugged in pipe hole 10.Preferably, when excavating pipe hole 10, the diameter ratio in pipe hole 10 The big 50mm of diameter of pipeline 20 ensures that pipeline 20 can pass through.
Step S102:In conjunction with shown in Fig. 4, Fig. 4 is the structural schematic diagram after the completion of step S102 in Fig. 1.It is with pipeline 20 Center circumferentially cuts roofing 9 of having constructed, and cuts the concrete layer 93 of roofing 9 of having constructed with thermal insulation board layer 92 to The waterproof roll layer 91 of construction roofing 9 cuts region 30 to be formed.Preferably, it cuts when having constructed roofing 9, cuts region 30 Radius be not less than 300mm, with after guarantee spread waterproof roll have enough laps of splice.
Step S103:The surface in region 30 is cut in the exposing of pipeline 20 and cuts the waterproof roll layer 91 in region 30 Surface brushing water-repellent paint respectively.Preferably, it when exposing cuts the external coating water-repellent paint in region 30 on pipeline 20, brushes Height is higher by 300mm than the finished surface 94 for roofing 9 of having constructed, to ensure better waterproof effect.
Specifically, as shown in fig.5, Fig. 5 is the enlarged diagram of Fig. 4 interior joints A.Cutting the concrete in region 30 Layer 93 carries out cementation of fissures closing at the node of the thermal insulation board layer 92 cut in region 30 using water-repellent paint 40;Cutting region 30 Interior thermal insulation board layer 92 carries out cementation of fissures closing at the node of the waterproof roll layer 91 cut in region 30 using water-repellent paint 40; Leak stopping material is used on the surface for cutting the concrete layer 93 in region 30 and the surface for cutting the thermal insulation board layer 92 in region 30 Material and water-repellent paint 40 are blocked.Preferably, water-repellent paint 40 is polyurethane water-proof paint, and the thickness of water-repellent paint is 1.5mm, the plugging material are leak stopping spirit.
Step S104:In conjunction with shown in Fig. 6, Fig. 6 is the structural schematic diagram after the completion of step S104 in Fig. 1.Reveal in pipeline 20 Waterproof roll 50 is glued in the surface laying reaction for going out to cut the surface in region 30 and cutting the waterproof roll layer 91 in region 30.It is excellent Selection of land reacts and glues waterproof roll 50 and the overlap joint of waterproof roll layer 91 and turn to the finished surface than roofing 9 of having constructed along pipeline 20 94 are higher by 300mm, and pipeline 20 and the seam crossing of waterproof roll layer 91 use 110 filleting of ointment, to ensure better waterproof effect.
Step S105:In conjunction with shown in Fig. 7, Fig. 7 is the structural schematic diagram after the completion of step S105 in Fig. 1.Cutting region Casting concrete 60 and vibration compacting in 30.Preferably, it is mixed using C30 expansion microliths to cut the concrete 60 poured in region 30 Solidifying soil, mixes 8% waterproofing agent, the concrete 60 poured is higher by 20mm than the finished surface 94 for roofing 9 of having constructed.Further, it pours Concrete 60 be higher by roofing 9 of having constructed finished surface 94 part 610 apart from pipeline 20 within the scope of 350mm, by 2cm high Difference carries out slope along the outside at the center of pipeline 20 to pipeline 20, ensures that water will not be flowed away toward the inside of pipeline 20.Further Ground is reacted viscous waterproof roll 50 and is sealed using cement mortar with the interface for cutting the concrete 60 poured in region 30, to ensure Better waterproof effect.
The present invention has constructed the construction method of poling reparation of punching after roofing, passes through the waterproof roll layer exposed after cutting It is laid with reaction on the pipeline to punch after and and glues waterproof roll, and is cutting casting concrete and vibration compacting in region, completes To the poling repairing construction that punches after roofing of having constructed, good waterproof effect can be reached.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, in the range of not departing from technical solution of the present invention, when the technology contents using the disclosure above make a little change or repair Decorations are the equivalent embodiment of equivalent variations, as long as being the content without departing from technical solution of the present invention, technology according to the present invention is real Any simple modification, equivalent change and modification made by confrontation above example still fall within the range of technical solution of the present invention It is interior.

Claims (10)

1. a kind of construction method for the poling reparation that punches after roofing of having constructed, roofing of having constructed includes being set to structure from bottom to top Waterproof roll layer, thermal insulation board layer on roof boarding and concrete layer, which is characterized in that the construction method includes:
Perforative pipe hole is excavated on roofing having constructed, and pipeline is plugged in the pipe hole;
Circumferentially roofing of having constructed is cut centered on the pipeline, and is cut to the waterproof roll layer, to be formed Cut region;
Distinguish on the surface on surface and the waterproof roll layer cut in region that region is cut described in exposing in the pipeline Brushing water-repellent paint;
The surface on surface and the waterproof roll layer cut in region that region is cut described in exposing in the pipeline is laid with Waterproof roll is glued in reaction;
Casting concrete and vibration compacting in region are cut described, the concrete mixes waterproof using expansion pea gravel concreten Agent.
2. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that described in excavation When pipe hole, the diameter in the pipe hole is bigger 50mm than the diameter of the pipeline.
3. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that cut and applied When work roofing, the radius for cutting region is not less than 300mm.
4. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that in the pipe When cutting the external coating water-repellent paint in region described in road exposing, the finished surface for brushing height than roofing of having constructed is higher by 300mm.
5. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, it is characterised in that:
The waterproof is used at the node of the concrete layer cut in region and the thermal insulation board layer cut in region Coating carries out cementation of fissures closing;
Using described anti-at the node of the thermal insulation board layer cut in region and the waterproof roll layer cut in region Water paint carries out cementation of fissures closing.
6. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that in the chisel Except the surface of the concrete layer in region and the surface of the thermal insulation board layer cut in region use plugging material and institute Water-repellent paint is stated to be blocked.
7. the construction method for the poling reparation that punches after the roofing of having constructed as described in claim 1,4,5 or 6, which is characterized in that The water-repellent paint is polyurethane water-proof paint, and the thickness of the water-repellent paint is 1.5mm.
8. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that the reaction Viscous waterproof roll is overlapped with the waterproof roll layer and the finished surface turned to along the pipeline than roofing of having constructed is higher by 300mm, the reaction are glued waterproof roll and are sealed using cement mortar with the interface for cutting the concrete poured in region, institute The seam crossing for stating pipeline and the waterproof roll layer uses ointment filleting.
9. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that described to cut The concrete poured in region expands pea gravel concreten using C30, mixes 8% waterproofing agent, the concrete poured is constructed than The finished surface of roofing is higher by 20mm.
10. the construction method for the poling reparation that punches after roofing as described in claim 1 of having constructed, which is characterized in that described to pour The concrete built is higher by the part of the finished surface for roofing of having constructed within the scope of the pipeline 350mm, by 2cm height differences along institute Center to the outside of the pipeline for stating pipeline carries out slope.
CN201510631110.2A 2015-09-29 2015-09-29 It has constructed the construction method of poling reparation of punching after roofing Active CN105239729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510631110.2A CN105239729B (en) 2015-09-29 2015-09-29 It has constructed the construction method of poling reparation of punching after roofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510631110.2A CN105239729B (en) 2015-09-29 2015-09-29 It has constructed the construction method of poling reparation of punching after roofing

Publications (2)

Publication Number Publication Date
CN105239729A CN105239729A (en) 2016-01-13
CN105239729B true CN105239729B (en) 2018-07-31

Family

ID=55037527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510631110.2A Active CN105239729B (en) 2015-09-29 2015-09-29 It has constructed the construction method of poling reparation of punching after roofing

Country Status (1)

Country Link
CN (1) CN105239729B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288274A (en) * 2017-07-03 2017-10-24 中国十七冶集团有限公司 It is a kind of go out roof pipeline composite water-proof processing method
CN109184089A (en) * 2018-08-06 2019-01-11 恒城建设科技有限公司 Building element and preparation method thereof and construction method
CN108979195A (en) * 2018-08-25 2018-12-11 广州天衣防水补强新技术开发有限公司 Holes reinforced construction method after reinforced concrete floor
CN113323428A (en) * 2020-11-17 2021-08-31 广东良实机电工程有限公司 Construction method for additionally building pipeline well by opening hole on existing roof
CN116290874A (en) * 2023-02-07 2023-06-23 中国十七冶集团有限公司 Anti-leakage open pore plugging method for inverted roof waterproof construction

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4070592B2 (en) * 2002-12-09 2008-04-02 株式会社大林組 Method of injecting water-stopping material for steel pipe joints
CN102561405A (en) * 2010-12-09 2012-07-11 上海市基础工程有限公司 Opening treatment method for pipe-roofing continuous perforation
CN203258205U (en) * 2013-05-14 2013-10-30 中国建筑第八工程局有限公司 Anti-leakage structure of floor-penetrating pipeline without sleeve
CN204001334U (en) * 2014-07-24 2014-12-10 中国建筑东北设计研究院有限公司 Be applicable to first seal the in-situ reinforced concrete slab punching afterwards

Also Published As

Publication number Publication date
CN105239729A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN105239729B (en) It has constructed the construction method of poling reparation of punching after roofing
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN106930331A (en) The waterproof construction system and its construction method at underground pipe gallery expansion joint
CN106703084A (en) Waterproofing treatment method and system of construction joint structure of plane and elevation structure junction areas of basement
CN106640154A (en) Treatment method and structure for water seepage of tunnel lining circular construction joint crack
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN206319910U (en) Infiltration disposal system is reinforced in a kind of tunnel-liner
CN111734457A (en) Construction method of tunnel water-drainage-preventing system
CN109440951A (en) New-old concrete works intersection stitches waterproof construction and construction technology
CN103774663A (en) Waterproof structure and construction method of basement anti-floating anchor bar
CN108842816A (en) A kind of waterproofing for subway station structure and its construction technology
CN105839677A (en) Advanced water prevention construction process for post-cast strip of side wall of basement
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN106812219A (en) Filling wall top stuff up a crack construction method
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN109667607B (en) Tunnel partition waterproof construction process
CN102912945A (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN110528905A (en) Punch the construction method of poling reparation after a kind of roofing of having constructed
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN110258656A (en) A kind of underground waterproof engineering pre-installed and inverted adhered construction method
CN109457571A (en) The construction method of ground deformation slot repairing
CN105756102A (en) Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall
CN206429253U (en) Seep water treatment structures in tunnel-liner circular construction joint crack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant