CN108842816A CN201810791723.6A CN201810791723A CN108842816A CN 108842816 A CN108842816 A CN 108842816A CN 201810791723 A CN201810791723 A CN 201810791723A CN 108842816 A CN108842816 A CN 108842816A
Authority
CN
China
Prior art keywords
layer
concrete
waterproof
water
waterproofing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810791723.6A
Other languages
Chinese (zh)
Inventor
纪曲波
闫红娟
徐大义
郑兵兵
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guizhou Engineering Co Ltd
Original Assignee
China Railway Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guizhou Engineering Co Ltd filed Critical China Railway Guizhou Engineering Co Ltd
Priority to CN201810791723.6A priority Critical patent/CN108842816A/en
Publication of CN108842816A publication Critical patent/CN108842816A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Sustainable Development (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of waterproofing for subway station structure and its construction technologies; bottom plate including top plate and below top plate; two sides are provided with side wall respectively between top plate and bottom plate; wherein; top plate includes concrete layer one, damp proof insulation layer, waterproof layer one, puncture resistant layer and the protective layer one set gradually on lower; bottom plate includes concrete layer two, waterproof layer two and the protective layer two set gradually on lower, and side wall includes the concrete layer three, waterproof layer three and protective layer three set gradually from outside to inside.Beneficial effects of the present invention are:Pass through setting concrete layer one, damp proof insulation layer, waterproof layer one, puncture resistant layer, protective layer one, concrete layer two, waterproof layer two, protective layer two, concrete layer three, waterproof layer three and protective layer three; to guarantee that subway station has good waterproof performance; and then safety and stability of the subway station when coming into operation in the later period is improved, and then guarantee the good operation of the safety of subway.

Description

A kind of waterproofing for subway station structure and its construction technology
Technical field
The present invention relates to station waterproof technical fields, it particularly relates to a kind of waterproofing for subway station structure and its construction Technique.
Background technique
Subway station is made of station layer, station hall layer, mechanical floor and entrance.The construction method of subway station includes bright The construction of digging method, lid excavation construction, shallow burial hidden digging construction, drill bursting construction etc., wherein for cut and cover tunneling, excavate deep About 10-24m is spent, excavation of foundation pit is excavated using two and three-level slope, soil nailing bolt-spary supports, underground double-layer structure, is built for open cut is suitable Method construction, four entrances, two groups of wind pavilions, channel and air channel base plate buried depth about 3-11m;Therefore, for taking cut and cover tunneling For, the underground space, entrance and exit of the passage and air duct waterproofing grade are level-one, and structure does not allow to seep water, and body structure surface is without wet pool.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For the problems in the relevant technologies, the present invention proposes a kind of waterproofing for subway station structure and its construction technology, with gram Take above-mentioned technical problem present in existing the relevant technologies.
The technical proposal of the invention is realized in this way:
According to an aspect of the invention, there is provided a kind of waterproofing for subway station structure.
The waterproofing for subway station structure includes top plate and the bottom plate below the top plate, the top plate and the bottom plate Between two sides be provided with side wall respectively, wherein the top plate includes concrete layer one, the damp proof insulation set gradually on lower Layer, waterproof layer one, puncture resistant layer and protective layer one, the bottom plate include the concrete layer two set gradually on lower, waterproof Layer two and protective layer two, the side wall include the concrete layer three, waterproof layer three and protective layer three set gradually from outside to inside.
Further, the concrete layer one is cast-in-place water-proof concrete, and the damp proof insulation layer is adhesive bitument primer, the waterproof Layer one is the single-component polyurethane water-proof paint of 2.5mm thickness, and the puncture resistant layer is the PVC of 1.5mm thickness, and the protective layer one is thick Degree is the pea gravel concreten of 100mm, and using along pressure mode when the waterproof layer one is taken with three material of waterproof layer, the lap of splice is extremely It is less 1m, and smears polyurethane sealant between the waterproof layer one and the waterproof layer three, while uses the elongated aluminium of 50x3 Item compacting is closed up plus nail M8@200 is fixed.
Further, the concrete layer two is cast-in-place water-proof concrete, and the waterproof layer two is HDPE adhesive polymer Glue film waterproof roll, thickness >=1.5mm and HDPE layer thickness >=1.0mm, sizing material thickness 0.5mm, the protective layer two are 50mm thick Pea gravel concreten, intensity >=C20, on the side wall and respectively position apart from the top plate and bottom plate armpit angle 0.3m It is respectively provided with circular construction joint, the circular construction joint is made of rubber watertight strip and sealing rod, outside the circular construction joint Side is provided with the double-sided self-adhesive waterproof coiled materials of 600mm wide.
Further, the concrete layer three is cast-in-place water-proof concrete, and the waterproof layer three is HDPE self-adhesion macromolecule Class waterproof roll, the protective layer three are the high density polyphenyl of 240 thick brick walls or 50mm thickness, and the corner of the side wall is provided with 50x50mm cement mortar chamfering, inner corner trim are the circular arc of radius 50mm, and outside builds 300mm high 240mm thickness and protects brick wall, the guarantor It protects brick wall and the waterproof layer two overlaps at least 300mm.
According to another aspect of the present invention, a kind of construction technology of waterproofing for subway station structure is provided.
The production of the waterproofing for subway station structure, includes the following steps:
According to above-mentioned waterproofing for subway station structure, each raw material needed for preparing the waterproofing for subway station structure;
When the construction of bottom plates, it is first laid with concrete layer two, is successively laid on the top for laying the concrete layer two Waterproof layer two and the protective layer two, and the bottom plate is poured to the above 0.3m in armpit angle;
When the side wall is constructed, it is first laid with the concrete layer three, while the buried rubber fastening band in construction joint use, It pours to middle plate, with 1:2.5 cement mortar carry out interface to polish processing, are laid with the waterproof layer three, in the waterproof layer three Outside is laid with protective layer three, then pours middle plate to the top plate, handles treatment of construction joints and interface;
When the top board construction, it is first laid with the concrete layer one, is successively laid with damp proof insulation on one top of concrete layer Layer, the waterproof layer one, the puncture resistant layer and the protective layer one, backfill.
Further, underground structure uses high performance concrete, and seepage-resistant grade is greater than P8;
Concrete uses dual mixing technology, and it is additional that the cracking resistances such as suitable high-quality coal ash powder and high performance water reducing agent of polyocarboxy acid are added Agent;
Compact-type waterproofing agent is added in the component at certain position;
Concrete structural strength is greater than C35, and for maximum water-cement ratio less than 0.45, concrete raw material meets following requirements, glue Gel material is greater than 320KG/m3;It, should be depending on experimental result when intensity requirement is high or underground water has aggressivity;
Sand coarse aggregate ratio is preferably 35%~40%, and pumping can rise to 45%;
Cement-sand ratio is preferably 1:1.5~1:2.5;
Cement amount is greater than 260KG/m3
It seeps plus air entraining agent or air-entraining water-reducing agent, concrete 's air-containing should be controlled 3%~5%;
The concrete premixing presetting period is preferably 6~8h;
Various types of materials total alkali is less than 3KG in every cubic meter of concrete, and all kinds of additives are total in every cubic meter of concrete Alkali content is less than 1KG;
Should by regulation strict control concrete in Cl- content, the content of maximum Cl- account for cementitious material specific gravity≤ 0.06%;
The content of tricalcium aluminate should be lower than 8% in cement;
The maximum level of sulfur trioxide is less than the 4% of binder total amount;
When water-proof concrete uses ready-mixed concrete, enters to pump the slump and preferably control in 120~160mm, the slump is per hour Penalty values are less than 20mm, and slump total losses value is less than 40mm;
Summer molding temperature is lower than 30 DEG C, when surface temperature of concrete and atmospheric temperature difference are greater than 20 DEG C, concrete table It face must covering and heat insulating.
Further, circular construction joint spacing is preferably 1/4~1/3 across range, and the circular construction joint of composite wall structure is set It sets and is less than 24m, and underground water and the more section of crevice water should be avoided;
Horizontal construction joint should not stay in the junction of shearing and moment of flexure maximum or plate and side wall, should stay in and be higher by base surface At 300mm, when wall has reserving hole, construction joint is greater than 300mm away from hole edge;
, should be clean by its removing surface before circular construction joint casting concrete, then painted concrete interface treating agent or water Mud based penetration crystallization type water proofing paint, and answer timely casting concrete;
Before horizontal construction joint casting concrete, should then its surface laitance and eliminating impurities be laid with net slurry or brushed mixed The materials such as solidifying Soil Interface inorganic agent, cement based penetration crystallization type water proofing paint repave 30~50mm thick 1:2.5 cement mortar, And answer timely casting concrete;
Water expandable waterstop should be closely connected with joint surface;Select water expandable waterstop that there should be expansion character, 7 days swollen Swollen rate is less than the 60% of final expansion rate, and final expansion rate is greater than 220%;
The buried water stop or when built-in type Grouting Pipe in answers accurate positioning, solid and reliable;
Zinc-plated rubber watertight strip and water expandable waterstop and 600mm wide are two-sided together for setting in the middle part of longitudinal construction joint One of rubber watertight strip of setting and water expandable waterstop from the middle part of a waterproof roll, circular construction joint;
600mm wide double-sided self-adhesive waterproof coiled materials are added on the outside of the construction joint of top plate and bottom plate and side wall;
Circular construction joint adds one of polyurethane sealant on the outside of top plate position and separate type side wall;
At the underground space and service channel port connections, auxiliary waterproof layer should respectively close up, and use and its The compatible auxiliary material in both sides is excessively linked;
The underground space and accessory structure excuse position construction joint use brushing cement-base infiltration crystallization water-repellent paint, twice Sealing rod and Grouting Pipe sealing;
Waterstop position must place correctly, and each half, waterstop must be welded firmly construction joint in lap-joint up and down Or bonding;
The first brushing cement-base infiltration crystallization water-repellent paint before pouring next stage concrete, construction joint should be adopted when pouring Weak vibration is taken, vibrating head must not touch waterstop member, avoid the leakproofness of damage material.
Further, the built-in fitting in main structure should use pre-buried, the concrete of built-in fitting end or preformed hole bottom Thickness is greater than 250mm, when thickness is less than 250mm, it is necessary to which part thickeies;
Waterproof layer in preformed hole, the structurally waterproof layer connection outside Ying Yukong.
Further, roof deformation seam is filled up completely bottom end using polyethylene and is blocked with sealant, and top uses diameter 20 Simultaneously 20x20 polysulfide sealant is arranged in foam rods, and seam outside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials, middle part setting Middle waterstop with grouting tube;
Side wall deformation joint is filled up completely bottom end using polyethylene and is blocked with sealant, and top is using external labeling type waterstop and prevents In water layer bonding, and place 20 foam rods of diameter;Seam outside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials;Middle part is set Set the middle waterstop with grouting tube;
Bottom deformation seam is filled up completely bottom end using polyethylene and is blocked with sealant, and top is using 20 foam rods of diameter and sets 20x20 polysulfide sealant to be set, and places 20 foam rods of diameter, seam inside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials, The middle waterstop with grouting tube is arranged in middle part;
It changes when because of station structure, ground, basis or load, it is possible to create when biggish relative settlement, should be arranged Deformation joint has track to be less than 5mm by place's modified difference in light and dark digging boundary, station and section boundary etc.;
It can be taken when necessary in responsible measures such as deformation joint setting shear connectors, it is ensured that the structure on deformation joint both sides does not generate Influence the relative settlement of traffic safety and normal use;
Deformation joint, construction joint, built-in fitting, various structures the positions such as interface, be the weak link of waterproof, it is necessary to reinforce anti- Water measure, while different assisted drainage measures can be also selected according to different structure type.
Further, to the basal plane requirement of laying waterproof roll:
The basal plane of laying waterproof roll is answered smooth, base treatment should be carried out before laying waterproof roll, using cement mortar The method of plastering must not have sharp burr position on basal plane, avoid puncturing waterproof roll when casting concrete;
Otherwise base face must not should be cut off with the presence of protrusions such as iron pipe, steel pipe, iron wires from root, and throughout position With cement mortar covering treatment, before waterproof roll is laid in segmentation, there must not be bright water on the base face of laying protection coiled material, otherwise The construction of next procedure can be just carried out after the method for leak stopping should be taken to live water blocking;
The laying of waterproof roll, waterproof roll are fixed on stake or mat surface using mechanical Fixing Method, and fixed point is away from coiled material At edge 2cm, pitch of nails is less than 50cm, and nail is long to be greater than 3cm, and waterproof roll is firmly fixed to substrate surface by tie spacer, Washer diameter is greater than 2cm, avoids falling off when casting concrete;
Effective lap width of adjacent two width coiled material is 10cm, and nail hole position is covered, it is desirable that upper width pressure width carries out Overlap joint, when overlap joint, the isolation film overlapped in range must be torn;
Waterproof roll on the corner, must be connected with special adhesive tape and be sealed;
After side wall waterproof roll applies, provisional mobile protection board should be set in assembling reinforcement, in order to avoid welded reinforcement When waterproof roll it is impaired;
Basal plane requirement to coating waterproof layer;
The stomata of base, uneven, honeycomb, gap, dusting etc. should be repaired and smear processing, basal plane must completely, without laitance, Without droplet, impermeable;
Before coating application, base's yin-yang angle should do in the arc-shaped, and inner corner trim diameter is preferably greater than 50mm, and external corner diameter is preferably greater than 10mm;
Coating water-proof, which goes out ground, to close up.
Beneficial effects of the present invention are:By the way that concrete layer one, damp proof insulation layer, waterproof layer one, puncture resistant layer, protective layer is arranged One, concrete layer two, waterproof layer two, protective layer two, concrete layer three, waterproof layer three and protective layer three, to guarantee subway Standing has good waterproof performance, and then improves safety and stability of the subway station when coming into operation in the later period, Jin Erbao Demonstrate,prove the good operation of safety of subway.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of schematic diagram of waterproofing for subway station structure according to an embodiment of the present invention;
Fig. 2 is that a kind of structure of the top plate of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention is shown One of be intended to;
Fig. 3 is that a kind of structure of the top plate of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention is shown The two of intention;
Fig. 4 is that a kind of structure of the side wall of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention is shown It is intended to;
Fig. 5 is that a kind of structure of the bottom plate of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention is shown It is intended to;
Fig. 6 is the side wall circumferential direction construction of a kind of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention Crack structure schematic diagram;
Fig. 7 is the floor circumferential direction construction of a kind of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention The structural schematic diagram of seam;
Fig. 8 is the closing-in structure signal of a kind of waterproofing for subway station structure and its construction technology according to an embodiment of the present invention Figure.
In figure:
1, top plate;2, bottom plate;3, side wall;4, concrete layer one;5, damp proof insulation layer;6, waterproof layer one;7, puncture resistant layer;8, it protects Sheath one;9, concrete layer two;10, waterproof layer two;11, protective layer two;12, concrete layer three;13, waterproof layer three;14, it protects Layer three.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
According to an embodiment of the invention, providing a kind of waterproofing for subway station structure.
As shown in figures 1-8, waterproofing for subway station structure and its construction technology according to an embodiment of the present invention, including top plate 1 With the bottom plate 2 for being located at 1 lower section of top plate, two sides are provided with side wall 3 respectively between the top plate 1 and the bottom plate 2, In, the top plate 1 includes the concrete layer 1 set gradually on lower, damp proof insulation layer 5, waterproof layer 1, puncture resistant layer 7 and protects Sheath 1, the bottom plate 2 include concrete layer 29, waterproof layer 2 10 and the protective layer 2 11 set gradually on lower, institute Stating side wall 3 includes concrete layer 3 12, waterproof layer 3 13 and the protective layer 3 14 set gradually from outside to inside.
In one embodiment, the concrete layer 1 is cast-in-place water-proof concrete, and the damp proof insulation layer 5 is adhesive bitument primer, The waterproof layer 1 is the single-component polyurethane water-proof paint of 2.5mm thickness, and the puncture resistant layer 7 is the PVC of 1.5mm thickness, described Protective layer 1 is pressed when the waterproof layer 1 is taken with 3 13 material of waterproof layer using suitable with a thickness of the pea gravel concreten of 100mm Mode, the lap of splice is at least 1m, and smears polyurethane sealant between the waterproof layer 1 and the waterproof layer 3 13, It is closed up simultaneously using the elongated aluminum strip compacting of 50x3 plus nail M8@200 is fixed.
In one embodiment, the concrete layer 29 is cast-in-place water-proof concrete, and the waterproof layer 2 10 is HDPE high Molecule self-adhesion glue film waterproof roll, thickness >=1.5mm and HDPE layer thickness >=1.0mm, sizing material thickness 0.5mm, the protective layer two 11 be the pea gravel concreten of 50mm thickness, intensity >=C20, on the side wall 3 and respectively apart from the top plate 1 and the bottom plate 2 The position of armpit angle 0.3m is respectively provided with circular construction joint, and the circular construction joint is made of rubber watertight strip and sealing rod, institute State the double-sided self-adhesive waterproof coiled materials that 600mm wide is provided on the outside of circular construction joint.
In one embodiment, the concrete layer 3 12 is cast-in-place water-proof concrete, and the waterproof layer 3 13 is HDPE Self-adhesion high score subclass waterproof roll, the protective layer 3 14 are the high density polyphenyl of 240 thick brick walls or 50mm thickness, the side wall 3 Corner be provided with 50x50mm cement mortar chamfering, inner corner trim is the circular arc of radius 50mm, and outside is built 300mm high 240mm thickness and protected Brick wall is protected, the protection brick wall and the waterproof layer 2 13 overlap at least 300mm.
With the aid of the technical scheme, pass through setting concrete layer 1, damp proof insulation layer 5, waterproof layer 1, puncture resistant layer 7, guarantor Sheath 1, concrete layer 29, waterproof layer 2 10, protective layer 2 11, concrete layer 3 12, waterproof layer 3 13 and protective layer three 14, to guarantee that subway station has good waterproof performance, and then improve safety of the subway station when coming into operation in the later period Property and stability, and then guarantee the good operation of the safety of subway.
According to an embodiment of the invention, additionally providing a kind of construction technology of waterproofing for subway station structure.
Include the following steps:
According to above-mentioned waterproofing for subway station structure, each raw material needed for preparing the waterproofing for subway station structure;
When the bottom plate 2 is constructed, it is first laid with concrete layer 29, is successively spread on the top for laying the concrete layer 29 It sets up defences water layer 2 10 and the protective layer 2 11, and pours the bottom plate 2 to the above 0.3m in armpit angle;
When the side wall 3 is constructed, it is first laid with the concrete layer 3 12, while the buried rubber water-proof in construction joint use Band is poured to middle plate, with 1:2.5 cement mortar carry out interface to polish processing, the waterproof layer 3 13 are laid with, in the waterproof 3 13 outside of layer is laid with protective layer 3 14, then pours middle plate to the top plate 1, handles treatment of construction joints and interface;
The top plate 1 construct when, be first laid with the concrete layer 1, one 4 top of concrete layer be successively laid with every Damp layer 5, the waterproof layer 1, the puncture resistant layer 7 and the protective layer 1, backfill.
In one embodiment, underground structure uses high performance concrete, and seepage-resistant grade is greater than P8;
Concrete uses dual mixing technology, and it is additional that the cracking resistances such as suitable high-quality coal ash powder and high performance water reducing agent of polyocarboxy acid are added Agent;
Compact-type waterproofing agent is added in the component at certain position;
Concrete structural strength is greater than C35, and for maximum water-cement ratio less than 0.45, concrete raw material meets following requirements, glue Gel material is greater than 320KG/m3;It, should be depending on experimental result when intensity requirement is high or underground water has aggressivity;
Sand coarse aggregate ratio is preferably 35%~40%, and pumping can rise to 45%;
Cement-sand ratio is preferably 1:1.5~1:2.5;
Cement amount is greater than 260KG/m3
It seeps plus air entraining agent or air-entraining water-reducing agent, concrete 's air-containing should be controlled 3%~5%;
The concrete premixing presetting period is preferably 6~8h;
Various types of materials total alkali is less than 3KG in every cubic meter of concrete, and all kinds of additives are total in every cubic meter of concrete Alkali content is less than 1KG;
Should by regulation strict control concrete in Cl- content, the content of maximum Cl- account for cementitious material specific gravity≤ 0.06%;
The content of tricalcium aluminate should be lower than 8% in cement;
The maximum level of sulfur trioxide is less than the 4% of binder total amount;
When water-proof concrete uses ready-mixed concrete, enters to pump the slump and preferably control in 120~160mm, the slump is per hour Penalty values are less than 20mm, and slump total losses value is less than 40mm;
Summer molding temperature is lower than 30 DEG C, when surface temperature of concrete and atmospheric temperature difference are greater than 20 DEG C, concrete table It face must covering and heat insulating.
In one embodiment, circular construction joint spacing is preferably 1/4~1/3 across range, and the circumferential direction of composite wall structure is applied Work, which seams, sets less than 24m, and should avoid underground water and the more section of crevice water;
Horizontal construction joint should not stay in the junction of shearing and moment of flexure maximum or plate and side wall, should stay in and be higher by base surface At 300mm, when wall has reserving hole, construction joint is greater than 300mm away from hole edge;
, should be clean by its removing surface before circular construction joint casting concrete, then painted concrete interface treating agent or water Mud based penetration crystallization type water proofing paint, and answer timely casting concrete;
Before horizontal construction joint casting concrete, should then its surface laitance and eliminating impurities be laid with net slurry or brushed mixed The materials such as solidifying Soil Interface inorganic agent, cement based penetration crystallization type water proofing paint repave 30~50mm thick 1:2.5 cement mortar, And answer timely casting concrete;
Water expandable waterstop should be closely connected with joint surface;Select water expandable waterstop that there should be expansion character, 7 days swollen Swollen rate is less than the 60% of final expansion rate, and final expansion rate is greater than 220%;
The buried water stop or when built-in type Grouting Pipe in answers accurate positioning, solid and reliable;
Zinc-plated rubber watertight strip and water expandable waterstop and 600mm wide are two-sided together for setting in the middle part of longitudinal construction joint One of rubber watertight strip of setting and water expandable waterstop from the middle part of a waterproof roll, circular construction joint;
600mm wide double-sided self-adhesive waterproof coiled materials are added on the outside of the construction joint of top plate 1, bottom plate 2 and side wall 3;
Circular construction joint adds one of polyurethane sealant on the outside of 1 position of top plate and separate type side wall 3;
At the underground space and service channel port connections, auxiliary waterproof layer should respectively close up, and use and its The compatible auxiliary material in both sides is excessively linked;
The underground space and accessory structure excuse position construction joint use brushing cement-base infiltration crystallization water-repellent paint, twice Sealing rod and Grouting Pipe sealing;
Waterstop position must place correctly, and each half, waterstop must be welded firmly construction joint in lap-joint up and down Or bonding;
The first brushing cement-base infiltration crystallization water-repellent paint before pouring next stage concrete, construction joint should be adopted when pouring Weak vibration is taken, vibrating head must not touch waterstop member, avoid the leakproofness of damage material.
In one embodiment, the built-in fitting in main structure should using pre-buried, built-in fitting end or preformed hole bottom Concrete thickness is greater than 250mm, when thickness is less than 250mm, it is necessary to which part thickeies;
Waterproof layer in preformed hole, the structurally waterproof layer connection outside Ying Yukong.
In one embodiment, roof deformation seam is filled up completely bottom end using polyethylene and is blocked with sealant, and top uses Simultaneously 20x20 polysulfide sealant is arranged in 20 foam rods of diameter, and seam outside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials, in The middle waterstop with grouting tube is arranged in portion;
3 deformation joint of side wall is filled up completely bottom end and is blocked with sealant using polyethylene, top using external labeling type waterstop with In waterproof layer bonding, and place 20 foam rods of diameter;Seam outside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials;Middle part Middle waterstop with grouting tube is set;
2 deformation joint of bottom plate is filled up completely bottom end using polyethylene and is blocked with sealant, and top uses 20 foam rods of diameter simultaneously 20x20 polysulfide sealant is set, and places 20 foam rods of diameter, seam inside is built using 4mm thickness double-sided self-adhesive modified asphalt waterproof The middle waterstop with grouting tube is arranged in material, middle part;
It changes when because of station structure, ground, basis or load, it is possible to create when biggish relative settlement, should be arranged Deformation joint has track to be less than 5mm by place's modified difference in light and dark digging boundary, station and section boundary etc.;
It can be taken when necessary in responsible measures such as deformation joint setting shear connectors, it is ensured that the structure on deformation joint both sides does not generate Influence the relative settlement of traffic safety and normal use;
Deformation joint, construction joint, built-in fitting, various structures the positions such as interface, be the weak link of waterproof, it is necessary to reinforce anti- Water measure, while different assisted drainage measures can be also selected according to different structure type.
In one embodiment, to the basal plane requirement of laying waterproof roll:
The basal plane of laying waterproof roll is answered smooth, base treatment should be carried out before laying waterproof roll, using cement mortar The method of plastering must not have sharp burr position on basal plane, avoid puncturing waterproof roll when casting concrete;
Otherwise base face must not should be cut off with the presence of protrusions such as iron pipe, steel pipe, iron wires from root, and throughout position With cement mortar covering treatment, before waterproof roll is laid in segmentation, there must not be bright water on the base face of laying protection coiled material, otherwise The construction of next procedure can be just carried out after the method for leak stopping should be taken to live water blocking;
The laying of waterproof roll, waterproof roll are fixed on stake or mat surface using mechanical Fixing Method, and fixed point is away from coiled material At edge 2cm, pitch of nails is less than 50cm, and nail is long to be greater than 3cm, and waterproof roll is firmly fixed to substrate surface by tie spacer, Washer diameter is greater than 2cm, avoids falling off when casting concrete;
Effective lap width of adjacent two width coiled material is 10cm, and nail hole position is covered, it is desirable that upper width pressure width carries out Overlap joint, when overlap joint, the isolation film overlapped in range must be torn;
Waterproof roll on the corner, must be connected with special adhesive tape and be sealed;
After side wall waterproof roll applies, provisional mobile protection board should be set in assembling reinforcement, in order to avoid welded reinforcement When waterproof roll it is impaired;
Basal plane requirement to coating waterproof layer;
The stomata of base, uneven, honeycomb, gap, dusting etc. should be repaired and smear processing, basal plane must completely, without laitance, Without droplet, impermeable;
Before coating application, base's yin-yang angle should do in the arc-shaped, and inner corner trim diameter is preferably greater than 50mm, and external corner diameter is preferably greater than 10mm;
Coating water-proof, which goes out ground, to close up.
In conclusion by means of above-mentioned technical proposal of the invention, by the way that concrete layer 1, damp proof insulation layer 5, waterproof is arranged Layer one 6, puncture resistant layer 7, protective layer 1, concrete layer 29, waterproof layer 2 10, protective layer 2 11, concrete layer 3 12, waterproof Layer 3 13 and protective layer 3 14 to guarantee that subway station has good waterproof performance, and then improve subway station in the later period Safety and stability when coming into operation, and then guarantee the good operation of the safety of subway.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of waterproofing for subway station structure, which is characterized in that including top plate (1) and the bottom plate being located at below the top plate (1) (2), two sides are provided with side wall (3) respectively between the top plate (1) and the bottom plate (2), wherein the top plate (1) includes Concrete layer one (4), damp proof insulation layer (5), waterproof layer one (6), puncture resistant layer (7) and the protective layer one set gradually on lower (8), the bottom plate (2) includes concrete layer two (9), waterproof layer two (10) and the protective layer two set gradually on lower (11), the side wall (3) includes the concrete layer three (12), waterproof layer three (13) and protective layer three set gradually from outside to inside (14)。
2. a kind of waterproofing for subway station structure according to claim 1, which is characterized in that the concrete layer one (4) is Cast-in-place water-proof concrete, the damp proof insulation layer (5) are adhesive bitument primer, and the waterproof layer one (6) is the monocomponent polyurethane of 2.5mm thickness Water-repellent paint, the puncture resistant layer (7) be 1.5mm thickness PVC, the protective layer one (8) with a thickness of 100mm microlith coagulation Using along pressure mode when taking, the lap of splice is at least 1m for soil, the waterproof layer one (6) and the waterproof layer three (13) material, and Polyurethane sealant is smeared between the waterproof layer one (6) and the waterproof layer three (13), while using the elongated aluminum strip pressure of 50x3 Paid mouth adds nail M8@200 to be fixed.
3. a kind of waterproofing for subway station structure according to claim 2, which is characterized in that the concrete layer two (9) is Cast-in-place water-proof concrete, the waterproof layer two (10) be HDPE Macromolecular self-adhesive membrane waterproof roll, thickness >=1.5mm and HDPE layer thickness >=1.0mm, sizing material thickness 0.5mm, pea gravel concreten of the protective layer two (11) for 50mm thickness, intensity >=C20, The position apart from the top plate (1) and the bottom plate (2) armpit angle 0.3m is respectively provided with circumferential construction on the side wall (3) and respectively Seam, the circular construction joint are made of rubber watertight strip and sealing rod, are provided with 600mm wide on the outside of the circular construction joint Double-sided self-adhesive waterproof coiled materials.
4. a kind of waterproofing for subway station structure according to claim 3, which is characterized in that the concrete layer three (12) is Cast-in-place water-proof concrete, the waterproof layer three (13) are HDPE self-adhesion high score subclass waterproof roll, and the protective layer three (14) is The high density polyphenyl of 240 thick brick walls or 50mm thickness, the corner of the side wall (3) are provided with 50x50mm cement mortar chamfering, yin Angle is the circular arc of radius 50mm, and outside builds 300mm high 240mm thickness and protects brick wall, the protection brick wall and the waterproof layer two (13) at least 300mm is overlapped.
5. a kind of construction technology of waterproofing for subway station structure, which is characterized in that for waterproofing for subway station described in claim 4 The production of structure, includes the following steps:
According to above-mentioned waterproofing for subway station structure, each raw material needed for preparing the waterproofing for subway station structure;
When the bottom plate (2) is constructed, concrete layer two (9) first are laid with, are laying the top of the concrete layer two (9) successively It is laid with waterproof layer two (10) and the protective layer two (11), and pours the bottom plate (2) to the above 0.3m in armpit angle;
When the side wall (3) is constructed, it is first laid with the concrete layer three (12), while the buried rubber water-proof in construction joint use Band is poured to middle plate, with 1:2.5 cement mortar carry out interface to polish processing, are laid with the waterproof layer three (13), described anti- Protective layer three (14) are laid on the outside of water layer three (13), then pour middle plate to the top plate (1), treatment of construction joints and interface are carried out Processing;
When the top plate (1) is constructed, it is first laid with the concrete layer one (4), is successively laid on concrete layer one (4) top Damp proof insulation layer (5), the waterproof layer one (6), the puncture resistant layer (7) and the protective layer one (8), backfill.
6. a kind of construction technology of waterproofing for subway station structure according to claim 5, which is characterized in that underground structure is adopted With high performance concrete, seepage-resistant grade is greater than P8;
Concrete uses dual mixing technology, and the anti-crack additives such as suitable high-quality coal ash powder and high performance water reducing agent of polyocarboxy acid are added;
Compact-type waterproofing agent is added in the component at certain position;
Concrete structural strength is greater than C35, and for maximum water-cement ratio less than 0.45, concrete raw material meets following requirements, and be gelled material Material is greater than 320KG/m3;It, should be depending on experimental result when intensity requirement is high or underground water has aggressivity;
Sand coarse aggregate ratio is preferably 35%~40%, and pumping can rise to 45%;
Cement-sand ratio is preferably 1:1.5~1:2.5;
Cement amount is greater than 260KG/m3
It seeps plus air entraining agent or air-entraining water-reducing agent, concrete 's air-containing should be controlled 3%~5%;
The concrete premixing presetting period is preferably 6~8h;
Various types of materials total alkali is less than 3KG in every cubic meter of concrete, and all kinds of additive total alkalis contain in every cubic meter of concrete Amount is less than 1KG;
Cementitious material specific gravity≤0.06% should be accounted for by the content of Cl- in regulation strict control concrete, the content of maximum Cl-;
The content of tricalcium aluminate should be lower than 8% in cement;
The maximum level of sulfur trioxide is less than the 4% of binder total amount;
When water-proof concrete uses ready-mixed concrete, enters to pump the slump and preferably control in 120~160mm, the slump is lost per hour Value is less than 20mm, and slump total losses value is less than 40mm;
Summer molding temperature is lower than 30 DEG C, and when surface temperature of concrete and atmospheric temperature difference are greater than 20 DEG C, concrete surface must It must covering and heat insulating.
7. a kind of construction technology of waterproofing for subway station structure according to claim 5, which is characterized in that circular construction joint Spacing is preferably 1/4~1/3 across range, and the circular construction joint setting of composite wall structure is less than 24m, and should avoid underground water and split The more section of gap water;
Horizontal construction joint should not stay in the junction of shearing and moment of flexure maximum or plate and side wall, should stay in and be higher by base surface At 300mm, when wall has reserving hole, construction joint is greater than 300mm away from hole edge;
, should be clean by its removing surface before circular construction joint casting concrete, then painted concrete interface treating agent or cement base Penetration crystallization type water proofing paint, and answer timely casting concrete;
Before horizontal construction joint casting concrete, then its surface laitance and eliminating impurities should be laid with net slurry or painted concrete The materials such as interface treating agent, cement based penetration crystallization type water proofing paint repave 30~50mm thick 1:2.5 cement mortar, and answer Timely casting concrete;
Water expandable waterstop should be closely connected with joint surface;Select water expandable waterstop that should have expansion character, 7 days expansion rates Less than the 60% of final expansion rate, final expansion rate is greater than 220%;
The buried water stop or when built-in type Grouting Pipe in answers accurate positioning, solid and reliable;
In the middle part of longitudinal construction joint setting together zinc-plated rubber watertight strip and water expandable waterstop and 600mm wide it is two-sided from Waterproof roll, circular construction joint middle part one of rubber watertight strip of setting and water expandable waterstop;
600mm wide double-sided self-adhesive waterproof coiled materials are added on the outside of the construction joint of top plate (1), bottom plate (2) and side wall (3);
Circular construction joint adds one of polyurethane sealant on the outside of top plate (1) position and separate type side wall (3);
At the underground space and service channel port connections, auxiliary waterproof layer should respectively close up, and use and its both sides Compatible auxiliary material is excessively linked;
The underground space and accessory structure excuse position construction joint use brushing cement-base infiltration crystallization water-repellent paint, twice sealing Item and Grouting Pipe sealing;
Waterstop position must place correctly, and each half, waterstop firmly must be welded or be glued in lap-joint construction joint up and down Knot;
The first brushing cement-base infiltration crystallization water-repellent paint before pouring next stage concrete, construction joint should be taken weak when pouring Vibration, vibrating head must not touch waterstop member, avoid the leakproofness of damage material.
8. a kind of construction technology of waterproofing for subway station structure according to claim 5, which is characterized in that in main structure Built-in fitting should be using pre-buried, the concrete thickness of built-in fitting end or preformed hole bottom is greater than 250mm, when thickness is less than 250mm, it is necessary to which part thickeies;
Waterproof layer in preformed hole, the structurally waterproof layer connection outside Ying Yukong.
9. a kind of construction technology of waterproofing for subway station structure according to claim 5, which is characterized in that roof deformation seam Bottom end being filled up completely using polyethylene to be blocked with sealant, top is using 20 foam rods of diameter and 20x20 polysulfide sealant is arranged, Seam outside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials, and the middle waterstop with grouting tube is arranged in middle part;
Side wall (3) deformation joint is filled up completely bottom end using polyethylene and is blocked with sealant, and top is using external labeling type waterstop and prevents In water layer bonding, and place 20 foam rods of diameter;Seam outside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials;Middle part is set Set the middle waterstop with grouting tube;
Bottom plate (2) deformation joint is filled up completely bottom end using polyethylene and is blocked with sealant, and top is using 20 foam rods of diameter and sets 20x20 polysulfide sealant to be set, and places 20 foam rods of diameter, seam inside uses 4mm thickness double-sided self-adhesive modified asphalt waterproof building materials, The middle waterstop with grouting tube is arranged in middle part;
It changes when because of station structure, ground, basis or load, it is possible to create when biggish relative settlement, deformation should be set Seam has track to be less than 5mm by place's modified difference in light and dark digging boundary, station and section boundary etc.;
It can be taken when necessary in responsible measures such as deformation joint setting shear connectors, it is ensured that the structure on deformation joint both sides does not have an impact The relative settlement of traffic safety and normal use;
Deformation joint, construction joint, built-in fitting, various structures the positions such as interface, be the weak link of waterproof, it is necessary to reinforce waterproof and arrange It applies, while can also select different assisted drainage measures according to different structure type.
10. a kind of construction technology of waterproofing for subway station structure according to claim 5, which is characterized in that anti-to laying The basal plane requirement of water coiled material:
The basal plane of laying waterproof roll is answered smooth, base treatment should be carried out before laying waterproof roll, using cement sand plaster Method, must not have sharp burr position on basal plane, avoid puncturing waterproof roll when casting concrete;
Otherwise base face must not should be cut off with the presence of protrusions such as iron pipe, steel pipe, iron wires from root, and throughout position water Cement mortar covering treatment before waterproof roll is laid in segmentation, must not have bright water on the base face of laying protection coiled material, otherwise should adopt The construction of next procedure can be just carried out after taking the method for leak stopping to live water blocking;
The laying of waterproof roll, waterproof roll are fixed on stake or mat surface using mechanical Fixing Method, and fixed point is away from coil edge At 2cm, pitch of nails is less than 50cm, and nail is long to be greater than 3cm, and waterproof roll is firmly fixed to substrate surface, gasket by tie spacer Diameter is greater than 2cm, avoids falling off when casting concrete;
Effective lap width of adjacent two width coiled material is 10cm, and nail hole position is covered, it is desirable that upper width pressure width is overlapped, When overlap joint, the isolation film overlapped in range must be torn;
Waterproof roll on the corner, must be connected with special adhesive tape and be sealed;
After side wall waterproof roll applies, provisional mobile protection board should be set in assembling reinforcement, in order to avoid prevent when welded reinforcement Water coiled material is impaired;
Basal plane requirement to coating waterproof layer;
The stomata of base, uneven, honeycomb, gap, dusting etc. should be repaired and smear processing, basal plane must completely, without laitance, anhydrous It is pearl, impermeable;
Before coating application, base's yin-yang angle should do in the arc-shaped, and inner corner trim diameter is preferably greater than 50mm, and external corner diameter is preferably greater than 10mm;
Coating water-proof, which goes out ground, to close up.
CN201810791723.6A 2018-07-18 2018-07-18 A kind of waterproofing for subway station structure and its construction technology Pending CN108842816A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810791723.6A CN108842816A (en) 2018-07-18 2018-07-18 A kind of waterproofing for subway station structure and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810791723.6A CN108842816A (en) 2018-07-18 2018-07-18 A kind of waterproofing for subway station structure and its construction technology

Publications (1)

Publication Number Publication Date
CN108842816A true CN108842816A (en) 2018-11-20

Family

ID=64196337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810791723.6A Pending CN108842816A (en) 2018-07-18 2018-07-18 A kind of waterproofing for subway station structure and its construction technology

Country Status (1)

Country Link
CN (1) CN108842816A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842817A (en) * 2018-07-18 2018-11-20 中铁贵州工程有限公司 A kind of subway station overlays waterproof roll structure and its construction technology
CN110331740A (en) * 2019-06-05 2019-10-15 中建八局第三建设有限公司 A kind of Waterproofing Technology of Underground Works method
CN110878700A (en) * 2019-12-05 2020-03-13 福建鑫远建工有限公司 Tunnel waterproof structure and construction method thereof
CN111548088A (en) * 2020-05-13 2020-08-18 深圳市居安建筑科技有限公司 Impervious structure of underground station axillary angle
CN114294007A (en) * 2022-01-04 2022-04-08 北京市政建设集团有限责任公司 Interface construction process and equipment for existing subway line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590425A (en) * 2013-11-28 2014-02-19 中铁二十局集团第五工程有限公司 Peaty soft soil stratum subway station construction technology
CN203583524U (en) * 2013-11-28 2014-05-07 中铁二十局集团第五工程有限公司 Waterproof structure for annular construction joints of peat soft soil stratum subway station
JP2014227721A (en) * 2013-05-22 2014-12-08 株式会社村上製作所 Cut-off device
CN108842817A (en) * 2018-07-18 2018-11-20 中铁贵州工程有限公司 A kind of subway station overlays waterproof roll structure and its construction technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014227721A (en) * 2013-05-22 2014-12-08 株式会社村上製作所 Cut-off device
CN103590425A (en) * 2013-11-28 2014-02-19 中铁二十局集团第五工程有限公司 Peaty soft soil stratum subway station construction technology
CN203583524U (en) * 2013-11-28 2014-05-07 中铁二十局集团第五工程有限公司 Waterproof structure for annular construction joints of peat soft soil stratum subway station
CN108842817A (en) * 2018-07-18 2018-11-20 中铁贵州工程有限公司 A kind of subway station overlays waterproof roll structure and its construction technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈曙鹏: "溶洞、溶蚀破碎带联络通道防水施工技术应用", 《丝路视野》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842817A (en) * 2018-07-18 2018-11-20 中铁贵州工程有限公司 A kind of subway station overlays waterproof roll structure and its construction technology
CN110331740A (en) * 2019-06-05 2019-10-15 中建八局第三建设有限公司 A kind of Waterproofing Technology of Underground Works method
CN110878700A (en) * 2019-12-05 2020-03-13 福建鑫远建工有限公司 Tunnel waterproof structure and construction method thereof
CN111548088A (en) * 2020-05-13 2020-08-18 深圳市居安建筑科技有限公司 Impervious structure of underground station axillary angle
CN114294007A (en) * 2022-01-04 2022-04-08 北京市政建设集团有限责任公司 Interface construction process and equipment for existing subway line
CN114294007B (en) * 2022-01-04 2023-08-22 北京市政建设集团有限责任公司 Interface construction process and equipment for existing subway line

Similar Documents

Publication Publication Date Title
CN108842816A (en) A kind of waterproofing for subway station structure and its construction technology
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN110080242A (en) The construction method of basement pile wall interaction structural system
CN106703084A (en) Waterproofing treatment method and system of construction joint structure of plane and elevation structure junction areas of basement
CN206545228U (en) A kind of piping lane with waterproof construction
CN110206073B (en) Waterproof construction method for lattice column pile and main structure joint
CN106120873A (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN105256810B (en) Construction method for round underground continuous wall two-in-one structure
CN103774663A (en) Waterproof structure and construction method of basement anti-floating anchor bar
CN213952303U (en) Basement outer wall post-cast strip assembled protection wall construction structures
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN107916873A (en) Exterior window waterproof construction and its construction method in a kind of masonry project
CN110258640A (en) A kind of construction method of the overlapping wall system of covered back-digging
CN109797874A (en) A kind of high level Multi-tower post-cast strip advance water stop construction method
CN105239729B (en) It has constructed the construction method of poling reparation of punching after roofing
CN108755696A (en) A kind of rapid construction of pit earthwork at raining season method
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN105401962A (en) Full-seal waterproof construction method for side wall and engineering top face
CN110067311A (en) The connection structure and method of new-old concrete component junction
CN211006779U (en) Water stop ring device of lattice column pile
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
Kavitha et al. An overview of water proofing system in concrete structures
CN208039491U (en) Outer wall of basement waterproof construction post-cast strip component
CN106013256B (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181120

RJ01 Rejection of invention patent application after publication