CN110331740A - A kind of Waterproofing Technology of Underground Works method - Google Patents

A kind of Waterproofing Technology of Underground Works method Download PDF

Info

Publication number
CN110331740A
CN110331740A CN201910486652.3A CN201910486652A CN110331740A CN 110331740 A CN110331740 A CN 110331740A CN 201910486652 A CN201910486652 A CN 201910486652A CN 110331740 A CN110331740 A CN 110331740A
Authority
CN
China
Prior art keywords
concrete
underground
fixed frame
waterproof
waterproof layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910486652.3A
Other languages
Chinese (zh)
Other versions
CN110331740B (en
Inventor
刘波
李磊
潘涛
黄峰
许炳刚
刘韦娟
程建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201910486652.3A priority Critical patent/CN110331740B/en
Publication of CN110331740A publication Critical patent/CN110331740A/en
Application granted granted Critical
Publication of CN110331740B publication Critical patent/CN110331740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Building Environments (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of Waterproofing Technology of Underground Works methods, the following steps are included: digging foundation pit in advance in construction ground, smooth bed course is laid in bottom of foundation ditch, the assembling reinforcement at the top of the bed course, concrete cushion is poured by the reinforcing bar, it is plugged with fixed frame in the fixation of concrete cushion side wall, pouring reinforcement is connected by the fixed frame, partition is fixedly welded by fixed frame inner wall side;The fixed frame and pouring reinforcement junction are filled with water proof rubber, the water proof rubber is bonded to each other with fixed frame, pass through pouring reinforcement casting concrete, it is laid with waterproof layer in the concrete surface, it is relatively complicated in the construction process to solve present Waterproofing Technology of Underground Works method, and do not have good Lock gate in seepage in underground, it is easy have ponding in underground when seepage in underground, when in use, ponding is excessive for underground engineering, is easy the problem of influencing the use of underground installation.

Description

A kind of Waterproofing Technology of Underground Works method
Technical field
The present invention relates to beneath field of engineering technology, specially a kind of Waterproofing Technology of Underground Works method.
Background technique
Underground engineering, which refers to, to be goed deep into ground the following are the underground civil-engineerings built of development and utilization Underground Space Resource.Packet Include ground lower room (being commonly called as basement) and underground structure (such as market place builet below the ground), underground railway (such as city underground), highway tunnel Road (such as massif tunnel), submerged tunnel (such as seabed tunnel), street crossing underpass (such as Urban Underground pavement), underground people's air defense system System, underground pipe gallery etc..Current underground project waterproof has inner waterproofing and outer waterproof, will do outer waterproof: " in principle Lower engineering waterproofing technical specification " the 3.1.4 articles of GB50108-2008, underground engineering upstream face main structure should be mixed using waterproof Solidifying soil, and other waterproof measures should be taken according to the requirement of waterproofing grade.And the underground engineering having in the past does not do outer waterproof, has Although having done outer waterproof but failure (not retrieving the technical literature for doing outer waterproof for existing underground engineering at present), underground work In water, steel bar corrosion, concrete breakaway, it is existing that serious infiltration leak occurs to the main structure long period of soaking of journey in the underground space , to building use and safety belt great hidden danger.
But there are some drawbacks for present Waterproofing Technology of Underground Works method, such as:
1, present Waterproofing Technology of Underground Works method is relatively complicated in the construction process, and not good in seepage in underground Lock gate, when seepage in underground, are easy there is ponding in underground, and when in use, ponding is excessive for underground engineering, are easy to influence underground The use of facility.
2, present Waterproofing Technology of Underground Works method is in the construction process since the underground temperature difference is larger, in use It is easy to happen to expand with heat and contract with cold after the completion of concreting and leads to concrete cracking, influence the quality of underground waterproof engineering.
Summary of the invention
The purpose of the present invention is to provide a kind of Waterproofing Technology of Underground Works methods, to solve to propose in above-mentioned background technique The problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of Waterproofing Technology of Underground Works method, including with Lower step;
S1, foundation pit is dug in advance in construction ground, be laid with smooth bed course in bottom of foundation ditch, the assembling reinforcement at the top of the bed course passes through institute It states reinforcing bar and pours concrete cushion, be plugged with fixed frame in the fixation of concrete cushion side wall.
S2, pouring reinforcement is connected by the fixed frame, partition is fixedly welded by fixed frame inner wall side;The fixation Frame and pouring reinforcement junction are filled with water proof rubber, and the water proof rubber is bonded to each other with fixed frame.
S3, pass through pouring reinforcement casting concrete, be laid with waterproof layer in the concrete surface, it is separate in the waterproof layer The side of concrete is laid with insulating layer, in the fixed laying water-proof coiled material in side of the insulating layer far from waterproof layer.
S4, it is fixedly welded fixed upper frame at the top of fixed frame, in fixed upper frame bottom welding diaphragm, is connected by fixed upper frame Pouring reinforcement is connect, by pouring reinforcement casting concrete layer, waterproof layer is laid at the top of the concrete layer, in the waterproof layer Side far from concrete is laid with insulating layer, in the fixed laying water-proof coiled material in side of the insulating layer far from waterproof layer.
S5, diversion trench, the diversion trench and side waterproof roll of top waterproof roll are opened up in waterproof roll outer wall fixation The diversion trench of material.
S6, it is located on the outside of fixed frame in the concrete cushion two sides and opens up diversion trench, makes diversion trench and waterproof roll phase Mutually cooperation, is equipped with waterproof layer in the water conservancy diversion trench bottom, protective cover is equipped at the top of the diversion trench, at the top of protective cover Open up discharge orifice.
Preferably, waterproof layer uses self-adhering-type water-repellent paint, and the self-adhering-type water-repellent paint passes through SBS synthetic rubber, increasing Stick and bi tumenf orr oad are base-material, are mixed using density polyethylene film with high, polyester film as top surface.
Preferably, the insulating layer is made of mineral wool.
Preferably, concrete adds water-reducing agent, triethanolamine and iron chloride in concrete mix.
Preferably, the fixed frame is made with fixed upper frame of steel material.
Preferably, the bed course is using coarse-grained soil and fine grained soil placement in layers.
Preferably, the concrete cushion is reserved has the gap, and rubber waterproof layer is filled between the gap.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention is discharged by use being collected water using waterproof roll and diversion trench, can will by diversion trench Underground engineering is discharged in ponding, prevents underground engineering ponding, influences the use of underground engineering, ponding can be prevented anti-by waterproof layer The concrete surface layer of Hydraulic Projects, damages concrete.
2, the present invention can carry out certain heat preservation to underground waterproof construction project subject by preset insulating layer, on ground When lower generation difference variation, the expansion of concrete is adapted to by preset water proof rubber with contraction, guarantees concrete not It can lead to concrete cracking because expanding with heat and contract with cold, influence the quality of underground waterproof engineering.
Specific embodiment
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field Art personnel every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Embodiment 1, the present invention provide a kind of technical solution: a kind of Waterproofing Technology of Underground Works method includes the following steps;
S1, foundation pit is dug in advance in construction ground, be laid with smooth bed course in bottom of foundation ditch, the assembling reinforcement at the top of the bed course passes through institute It states reinforcing bar and pours concrete cushion, be plugged with fixed frame in the fixation of concrete cushion side wall.
S2, pouring reinforcement is connected by the fixed frame, partition is fixedly welded by fixed frame inner wall side;The fixation Frame and pouring reinforcement junction are filled with water proof rubber, and the water proof rubber is bonded to each other with fixed frame.
S3, pass through pouring reinforcement casting concrete, be laid with waterproof layer in the concrete surface, it is separate in the waterproof layer The side of concrete is laid with insulating layer, in the fixed laying water-proof coiled material in side of the insulating layer far from waterproof layer.
S4, it is fixedly welded fixed upper frame at the top of fixed frame, in fixed upper frame bottom welding diaphragm, is connected by fixed upper frame Pouring reinforcement is connect, by pouring reinforcement casting concrete layer, waterproof layer is laid at the top of the concrete layer, in the waterproof layer Side far from concrete is laid with insulating layer, in the fixed laying water-proof coiled material in side of the insulating layer far from waterproof layer.
S5, diversion trench, the diversion trench and side waterproof roll of top waterproof roll are opened up in waterproof roll outer wall fixation The diversion trench of material.
S6, it is located on the outside of fixed frame in the concrete cushion two sides and opens up diversion trench, makes diversion trench and waterproof roll phase Mutually cooperation, is equipped with waterproof layer in the water conservancy diversion trench bottom, protective cover is equipped at the top of the diversion trench, at the top of protective cover Open up discharge orifice.
Wherein, waterproof layer uses self-adhering-type water-repellent paint, and the self-adhering-type water-repellent paint passes through SBS synthetic rubber, thickening Agent and bi tumenf orr oad are base-material, are mixed using density polyethylene film with high, polyester film as top surface.
Wherein, the insulating layer is made of mineral wool.
Wherein, concrete adds water-reducing agent, triethanolamine and iron chloride in concrete mix.
Wherein, the fixed frame is made with fixed upper frame of steel material.
Wherein, the bed course is using coarse-grained soil and fine grained soil placement in layers.
Wherein, the concrete cushion is reserved has the gap, and rubber waterproof layer is filled between the gap.
The present invention is discharged by use being collected water using waterproof roll and diversion trench, can be with by diversion trench Underground engineering is discharged in ponding, prevents underground engineering ponding, influences the use of underground engineering, ponding can be prevented by waterproof layer The concrete surface layer of waterproofing work, damages concrete, can be to underground waterproof construction engineering by preset insulating layer Main body carries out certain heat preservation, when difference variation occurs for underground, expansion and receipts by preset water proof rubber to concrete Retraction row adapts to, and guarantees that concrete will not lead to concrete cracking because of expanding with heat and contract with cold, influences the quality of underground waterproof engineering.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of Waterproofing Technology of Underground Works method, it is characterised in that: include the following steps;
S1, foundation pit is dug in advance in construction ground, be laid with smooth bed course in bottom of foundation ditch, the assembling reinforcement at the top of the bed course passes through institute It states reinforcing bar and pours concrete cushion, be plugged with fixed frame in the fixation of concrete cushion side wall;
S2, pouring reinforcement is connected by the fixed frame, partition is fixedly welded by fixed frame inner wall side;The fixed frame with Pouring reinforcement junction is filled with water proof rubber, and the water proof rubber is bonded to each other with fixed frame;
S3, pass through pouring reinforcement casting concrete, waterproof layer is laid in the concrete surface, in the waterproof layer far from coagulation The side of soil is laid with insulating layer, in the fixed laying water-proof coiled material in side of the insulating layer far from waterproof layer;
S4, it is fixedly welded fixed upper frame at the top of fixed frame, in fixed upper frame bottom welding diaphragm, is poured by fixed upper frame connection Reinforcing bar is built, by pouring reinforcement casting concrete layer, is laid with waterproof layer at the top of the concrete layer, it is separate in the waterproof layer The side of concrete is laid with insulating layer, in the fixed laying water-proof coiled material in side of the insulating layer far from waterproof layer;
S5, diversion trench, diversion trench and the side waterproof roll of top waterproof roll are opened up in waterproof roll outer wall fixation Diversion trench;
S6, it is located on the outside of fixed frame in the concrete cushion two sides and opens up diversion trench, makes diversion trench and waterproof roll phase interworking It closes, is equipped with waterproof layer in the water conservancy diversion trench bottom, is equipped with protective cover at the top of the diversion trench, is opened up at the top of protective cover Discharge orifice.
2. a kind of Waterproofing Technology of Underground Works method according to claim 1, it is characterised in that: waterproof layer uses self-adhering-type Water-repellent paint, the self-adhering-type water-repellent paint is base-material by SBS synthetic rubber, tackifier and bi tumenf orr oad, with height Density polyethylene film, polyester film are mixed for top surface.
3. a kind of Waterproofing Technology of Underground Works method according to claim 1, it is characterised in that: the insulating layer uses mine Object cotton is made.
4. a kind of Waterproofing Technology of Underground Works method according to claim 1, it is characterised in that: concrete is mixed in concrete It closes and adds water-reducing agent, triethanolamine and iron chloride in object.
5. a kind of Waterproofing Technology of Underground Works method according to claim 1, it is characterised in that: the fixed frame and fixation Upper frame is made of steel material.
6. a kind of Waterproofing Technology of Underground Works method according to claim 1, it is characterised in that: the bed course uses coarse grain Soil and fine grained soil placement in layers.
7. a kind of Waterproofing Technology of Underground Works method according to claim 1, it is characterised in that: the concrete cushion is pre- There are gap, rubber waterproof layer is filled between the gap.
CN201910486652.3A 2019-06-05 2019-06-05 Waterproof construction method for underground engineering Active CN110331740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910486652.3A CN110331740B (en) 2019-06-05 2019-06-05 Waterproof construction method for underground engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910486652.3A CN110331740B (en) 2019-06-05 2019-06-05 Waterproof construction method for underground engineering

Publications (2)

Publication Number Publication Date
CN110331740A true CN110331740A (en) 2019-10-15
CN110331740B CN110331740B (en) 2021-03-23

Family

ID=68140355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910486652.3A Active CN110331740B (en) 2019-06-05 2019-06-05 Waterproof construction method for underground engineering

Country Status (1)

Country Link
CN (1) CN110331740B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663780A (en) * 2020-06-30 2020-09-15 深圳市建工集团股份有限公司 Synchronous construction method for outer wall waterproof layer and concrete structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100926183B1 (en) * 2009-05-18 2009-11-10 협성개발(주) Underground cave with waterproof structure
CN205522820U (en) * 2016-04-29 2016-08-31 贵州省交通规划勘察设计研究院股份有限公司 Waterproofing membrane for tunnel of subsidiary drainage water conservancy diversion function
CN206408645U (en) * 2016-12-19 2017-08-15 江苏欧西建材科技发展有限公司 A kind of pipe gallery guard system structure
CN107083780A (en) * 2017-05-15 2017-08-22 江阴正邦化学品有限公司 The full encirclement skin-type structure and construction method of a kind of underground waterproof engineering
CN206545228U (en) * 2016-11-30 2017-10-10 上海东方雨虹防水工程有限公司 A kind of piping lane with waterproof construction
CN107542115A (en) * 2017-08-25 2018-01-05 广西金雨伞防水装饰有限公司 Underground project waterproof structure and its construction method
CN108842816A (en) * 2018-07-18 2018-11-20 中铁贵州工程有限公司 A kind of waterproofing for subway station structure and its construction technology
CN109183844A (en) * 2018-10-31 2019-01-11 中国冶集团有限公司 A kind of construction method of piping lane bottom plate pre-installed and inverted adhered type TPO waterproof roll

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100926183B1 (en) * 2009-05-18 2009-11-10 협성개발(주) Underground cave with waterproof structure
CN205522820U (en) * 2016-04-29 2016-08-31 贵州省交通规划勘察设计研究院股份有限公司 Waterproofing membrane for tunnel of subsidiary drainage water conservancy diversion function
CN206545228U (en) * 2016-11-30 2017-10-10 上海东方雨虹防水工程有限公司 A kind of piping lane with waterproof construction
CN206408645U (en) * 2016-12-19 2017-08-15 江苏欧西建材科技发展有限公司 A kind of pipe gallery guard system structure
CN107083780A (en) * 2017-05-15 2017-08-22 江阴正邦化学品有限公司 The full encirclement skin-type structure and construction method of a kind of underground waterproof engineering
CN107542115A (en) * 2017-08-25 2018-01-05 广西金雨伞防水装饰有限公司 Underground project waterproof structure and its construction method
CN108842816A (en) * 2018-07-18 2018-11-20 中铁贵州工程有限公司 A kind of waterproofing for subway station structure and its construction technology
CN109183844A (en) * 2018-10-31 2019-01-11 中国冶集团有限公司 A kind of construction method of piping lane bottom plate pre-installed and inverted adhered type TPO waterproof roll

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周健: "某地下停车场综合防水施工技术 ", 《安徽建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663780A (en) * 2020-06-30 2020-09-15 深圳市建工集团股份有限公司 Synchronous construction method for outer wall waterproof layer and concrete structure

Also Published As

Publication number Publication date
CN110331740B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN101298782B (en) Method and system for basement engineering water proof and water drain
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN110080242A (en) The construction method of basement pile wall interaction structural system
CN107938692A (en) A kind of draining and recharge construction method and structure
CN206706791U (en) Base pit dewatering well plugging structure
CN105019919A (en) Tunnel for transmitting fluid and construction method thereof
CN109403332B (en) Method for combined excavation of layered bench sections of deep foundation pit of sandy cobble thick covering layer wide shallow valley
CN108412506A (en) Ground fissure region tunnel lining structure based on shield tunnel and its construction method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN112832279A (en) Waterproof structure and method for dewatering well of underground foundation pit
CN109797874A (en) A kind of high level Multi-tower post-cast strip advance water stop construction method
CN108301466A (en) Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN109914445A (en) A kind of level of ground water alternately changes the construction method of location expensive soil cutting
CN105756100B (en) Basement post-pouring zone system and preparation method thereof
CN208040386U (en) A kind of ground fissure region tunnel lining structure based on shield tunnel
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN104846935B (en) Head-tank treating seepage remodeling method
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN109024640A (en) One kind closing water valve device, shut-in well structure and its construction method
CN110331740A (en) A kind of Waterproofing Technology of Underground Works method
CN105507348B (en) The waterproof construction method and structure of basement detached column and Vierendeel girder in junction
CN207828994U (en) It is a kind of draining and recharge constructing structure
CN113187487B (en) Construction method of double-layer full-section frozen underground excavation station structure of subway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant