CN109024640A - One kind closing water valve device, shut-in well structure and its construction method - Google Patents
One kind closing water valve device, shut-in well structure and its construction method Download PDFInfo
- Publication number
- CN109024640A CN109024640A CN201810911192.XA CN201810911192A CN109024640A CN 109024640 A CN109024640 A CN 109024640A CN 201810911192 A CN201810911192 A CN 201810911192A CN 109024640 A CN109024640 A CN 109024640A
- Authority
- CN
- China
- Prior art keywords
- diameter section
- well
- necking down
- shut
- down casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
技术领域technical field
本发明涉及土木工程施工领域,具体为一种闭水阀装置、封井结构及其施工方法。The invention relates to the field of civil engineering construction, in particular to a water closing valve device, a well sealing structure and a construction method thereof.
背景技术Background technique
建筑施工中,深基坑工程和排水工程越来越多,对于基坑面积、深度较大以及地下水相对丰富的区域,仅仅通过外围布置降水井的方案进行排水,不仅工程措施费用较高,很多情况下已经不能满足降水的需求。工程降水中,在建筑和基坑核心区域内部设置降水井的情况越来普遍,但内部打设降水井其闭水封井的安全性往往较差,极易影响工程质量。因此,为满足工程的施工进度及质量要求,需要提供一种对降水井中有效排水且安全闭水封井的装置及施工方法。In building construction, there are more and more deep foundation pit projects and drainage projects. For areas with large foundation pit area and depth and relatively rich groundwater, drainage is only carried out through the scheme of arranging dewatering wells around the periphery. Not only the cost of engineering measures is high, but many Under the circumstances, the demand for precipitation can no longer be met. In engineering dewatering, it is more and more common to install dewatering wells inside the core areas of buildings and foundation pits, but the safety of closing water and sealing wells is often poor when setting dewatering wells inside, which can easily affect the quality of the project. Therefore, in order to meet the construction progress and quality requirements of the project, it is necessary to provide a device and construction method for effectively draining water from the dewatering well and safely closing the water to seal the well.
发明内容Contents of the invention
本发明提出一种闭水阀装置、封井结构及其施工方法,通过闭水阀装置的降水措施和闭水密封工艺,用以解决大出水量下、不影响降水井上部施工进度的安全有效的闭水封井的问题。The present invention proposes a water closing valve device, a well sealing structure and a construction method thereof, through the water closing valve device's dewatering measures and closed water sealing process, it is used to solve the problem of high water output without affecting the construction progress of the upper part of the dewatering well, which is safe and effective The problem of shutting water and sealing wells.
本发明具体技术方案是:Concrete technical scheme of the present invention is:
一种闭水阀装置包括缩颈套管、焊接在缩颈套管管口的法兰环板以及依次连接在法兰环板上的防水胶垫和法兰盲板;所述缩颈套管包括下部的大直径段和上部的小直径段,大直径段和小直径段两者相通、且中轴重合。A shut-off valve device includes a necking sleeve, a flange ring plate welded on the mouth of the necking sleeve, and a waterproof rubber pad and a flange blind plate connected to the flange ring plate in turn; the necking sleeve It includes a lower large-diameter section and an upper small-diameter section, the large-diameter section and the small-diameter section communicate with each other, and their central axes coincide.
所述大直径段和小直径段的过渡肩部为水平段或者倾斜段,缩颈套管的过渡肩部高于降水井井口。The transition shoulder of the large diameter section and the small diameter section is a horizontal section or an inclined section, and the transition shoulder of the necking casing is higher than the head of the dewatering well.
所述闭水阀装置的缩颈套管设置在降水井的上端部、与降水井井壁留有空隙,所述降水井顶部、缩颈套管四周依次布置有基础垫层、防水层、防水保护层以及基础底板层。The necking casing of the shut-off valve device is arranged at the upper end of the dewatering well, leaving a gap with the well wall of the dewatering well, and the top of the dewatering well and the surrounding of the necking casing are arranged in sequence with a foundation cushion, a waterproof layer, a waterproof protective layer and base floor layer.
所述缩颈套管与降水井井壁之间空隙尺寸为50~100mm,空隙内底层为油麻,剩余空隙填充有干硬性防水混凝土。The size of the gap between the necking casing and the well wall of the dewatering well is 50-100 mm, the bottom layer in the gap is made of linseed, and the remaining gap is filled with dry hard waterproof concrete.
所述基础垫层与大直径段过渡肩部位置齐平或低10~30mm。The base cushion is flush with or 10-30mm lower than the transition shoulder of the large-diameter section.
所述基础垫层与大直径段交接位置采用砂浆圆弧与垫层顺接,在小直径段闭合防水收口。The base cushion and the large-diameter section are joined by a mortar arc and the cushion, and the waterproof closure is closed on the small-diameter section.
所述防水层沿基础垫层和砂浆表面铺设、并在小直径段上部贴合收口。The waterproof layer is laid along the surface of the base cushion and the mortar, and the upper part of the small-diameter section is closed.
所述基础底板层内浇筑有底板钢筋,所述底板钢筋骨架为网状结构,且网格间距大于小直径段外直径。Bottom plate steel bars are poured into the foundation bottom plate layer, the steel bar skeleton of the bottom plate is a mesh structure, and the grid spacing is greater than the outer diameter of the small diameter section.
所述的封井结构的施工方法,具体步骤如下:The construction method of described sealing well structure, concrete steps are as follows:
步骤一、测量降水井尺寸,确定水位面及水量;Step 1. Measure the size of the precipitation well, determine the water level and water volume;
步骤二、基于上述测验数据确定缩颈套管装置尺寸、自吸式水泵(8)扬程及抽水量;Step 2. Determine the size of the necking sleeve device, the head of the self-priming water pump (8) and the water pumping capacity based on the above test data;
步骤三、安装缩颈套管,其中大直径段顶部安装在降水井中设计水位位置,利用油麻封底并填充降水井内壁与闭水阀装置之间空隙;Step 3. Install the necking sleeve, where the top of the large diameter section is installed at the design water level position in the dewatering well, and use linoleum to seal the bottom and fill the gap between the inner wall of the dewatering well and the shut-off valve device;
步骤四、防水胶垫和法兰盲板为打开状态,小直径段管口通过水管连接自吸式水泵;Step 4. The waterproof rubber pad and the flange blind plate are in the open state, and the nozzle of the small diameter section is connected to the self-priming water pump through the water pipe;
步骤五、利用自吸式水泵在施工作业面以外进行抽水,在降水井排水状态下,依次进行基础垫层、砂浆圆弧与垫层顺接、防水层、闭合防水收口、防水保护层以及底板钢筋的施工;Step 5. Use the self-priming water pump to pump water outside the construction work surface. Under the drainage state of the dewatering well, carry out the foundation cushion, the mortar arc and the cushion in sequence, the waterproof layer, the closed waterproof mouth, the waterproof protective layer and the bottom plate. construction of steel bars;
步骤六、完成底板钢筋施工后,进行基础底板层混凝土浇筑,浇筑至缩颈套管管口标高下方时,停止浇筑;Step 6. After completing the construction of the bottom slab reinforcement, perform concrete pouring on the foundation floor layer, and stop pouring when the pouring is below the elevation of the nozzle of the necking sleeve;
步骤七、取出连接自吸式水泵的水管,由缩颈套管向降水井内填充混凝土;Step 7, take out the water pipe connected to the self-priming water pump, and fill concrete into the dewatering well from the necking sleeve;
步骤八、缩颈套管内填满混凝土后,在法兰环板上管口螺栓连接防水胶垫和法兰盲板进行闭水封井。Step 8: After the necking sleeve is filled with concrete, the nozzle bolts on the flange ring plate are connected with a waterproof rubber pad and a flange blind plate to seal the well with water.
与现有装置和方法相比本发明具有以下有益效果:Compared with existing devices and methods, the present invention has the following beneficial effects:
本发明对常规降水井的闭水装置进行了改进和完善,通过缩颈套管的变径措施.,即可通过上部小直径段对降水井内进行了有效的排水,又可通过下部大直径段与降水井的密闭填充避免了对地下水浮力作用破坏导致的质量隐患,且经过浇筑混凝土密封有效的提高降水井封堵质量,避免底板渗漏的隐患。本发明设备安装简单,方法操作简便,不影响防水层、防水保护层、基础底板层的工程施工,从而提高了工作效率,节约施工成本。The present invention improves and perfects the water-closing device of the conventional dewatering well. Through the diameter-changing measure of the necking casing, the dewatering well can be effectively drained through the upper small-diameter section, and can be drained through the lower large-diameter section. The airtight filling with the dewatering well avoids potential quality hazards caused by damage to the buoyancy of the groundwater, and the sealing quality of the dewatering well is effectively improved by pouring concrete seals to avoid hidden dangers of floor leakage. The device of the invention is easy to install, the method is easy to operate, does not affect the engineering construction of the waterproof layer, the waterproof protective layer, and the base floor layer, thereby improving work efficiency and saving construction costs.
附图说明Description of drawings
图1是闭水阀装置构造图;Fig. 1 is a structural diagram of a shut-off valve device;
图2是闭水阀装置安装及降水示意图;Figure 2 is a schematic diagram of the installation of the shut-off valve device and the precipitation;
图3是抹砂浆圆弧与垫层顺接示意图;Fig. 3 is a schematic diagram of the connection between the arc of the mortar and the cushion;
图4是防水层、保护层及钢筋施工示意图;Fig. 4 is the construction diagram of waterproof layer, protective layer and reinforcing bar;
图5是底板混凝土浇筑和快速封井示意图;Fig. 5 is a schematic diagram of floor concrete pouring and rapid well closure;
图6是法兰环板结构示意图。Fig. 6 is a schematic diagram of the structure of the flange ring plate.
附图标记:1-缩颈套管;2-大直径段;3-小直径段;4-法兰环板;5-防水胶垫;6-法兰盲板;7-螺栓;8-自吸式水泵;9-水管;10-降水井井壁;11-油麻;12-干硬性防水混凝土;13-基础垫层;14-砂浆;15-防水层;16-防水保护层;17-垫块;18-底板钢筋;19-基础底板层;20-螺栓孔。Reference signs: 1-neck sleeve; 2-large diameter section; 3-small diameter section; 4-flange ring plate; 5-waterproof rubber pad; 6-flange blind plate; 7-bolt; 8-automatic Suction pump; 9-water pipe; 10-wall of dewatering well; 11-linseed oil; 12-dry hard waterproof concrete; 13-foundation cushion; 14-mortar; 15-waterproof layer; 16-waterproof protective layer; 17- Pad block; 18-bottom plate reinforcement; 19-foundation bottom plate layer; 20-bolt hole.
具体实施方式Detailed ways
如图1和图6所示,一种闭水阀装置、封井结构及其施工方法,闭水阀装置包含缩颈套管1、以及焊接在缩颈套1管管口的法兰环板4、法兰环板4通过螺栓7依次连接的防水胶垫5和法兰盲板6;所述缩颈套管1包含下部大直径段2和大直径段2顶端焊接的小直径段3,大直径段2底端开口,大直径段2和小直径段3两者相通、且中轴重合。As shown in Fig. 1 and Fig. 6, a shut-off valve device, well sealing structure and construction method thereof, the shut-off valve device includes a necking sleeve 1 and a flange ring plate welded to the mouth of the necking sleeve 1 4. The flange ring plate 4 is connected with the waterproof rubber pad 5 and the flange blind plate 6 in turn through the bolt 7; the necking sleeve 1 includes the lower large diameter section 2 and the small diameter section 3 welded at the top of the large diameter section 2, The bottom end of the large-diameter section 2 is open, the large-diameter section 2 and the small-diameter section 3 communicate with each other, and their central axes coincide.
其中缩颈套管1采用钢材构制,大直径段2直径为300~500mm;小直径段3直径小于底板钢筋18网格尺寸,直径为100~200mm;缩颈套管1壁厚6~12mm,材质等级为Q235或Q345级。大直径段2长450~1200mm,小直径段3长300~500mm;所述法兰环板4和法兰盲板6规格相同、材质与缩颈套管1相同,防水胶垫5厚度为4mm。Among them, the necking sleeve 1 is made of steel, and the diameter of the large diameter section 2 is 300-500mm; the diameter of the small diameter section 3 is smaller than the grid size of the steel bar 18 of the bottom plate, and the diameter is 100-200mm; the wall thickness of the necking sleeve 1 is 6-12mm , the material grade is Q235 or Q345. The large-diameter section 2 is 450-1200mm long, and the small-diameter section 3 is 300-500mm long; the flange ring plate 4 and the flange blind plate 6 have the same specifications and materials as the necking sleeve 1, and the waterproof rubber pad 5 has a thickness of 4mm .
螺栓7规格采用直径为8~14mm的大六角普通螺栓;法兰环板4、防水胶垫5、法兰盲板6上十字正对设置4个螺栓孔20,孔径位置对应,孔径比所采用的螺栓7直径大2~5mm;螺栓孔20中心距离缩颈套管1外壁和法兰环板4边缘均应≥25mm。上述构件规格尺寸均为方便实施说明,并不仅限制于此,可根据实际实施情况进行调整。Bolt 7 specifications adopt large hexagonal ordinary bolts with a diameter of 8 to 14mm; flange ring plate 4, waterproof rubber pad 5, and flange blind plate 6 are provided with four bolt holes 20 facing the cross. The aperture positions correspond to the aperture ratios adopted. The diameter of the bolt 7 is 2-5mm larger; the distance between the center of the bolt hole 20 and the outer wall of the necking sleeve 1 and the edge of the flange ring plate 4 should be ≥ 25mm. The specifications and dimensions of the above-mentioned components are all convenient implementation descriptions, and are not limited thereto, and can be adjusted according to actual implementation conditions.
为了满足基础施工对降水的要求,同时保证降水井安全有效的闭水封井,提高封井质量,主要应用步骤为:1)基于实施工程概况、降水井的尺寸和地下水情况,设计闭水阀装置规格尺寸,确定所需闭水阀装置件数以及自吸式水泵8、水管9等配套设备用量。In order to meet the requirements of foundation construction for dewatering, and at the same time ensure the safe and effective sealing of dewatering wells and improve the quality of well sealing, the main application steps are: 1) Based on the general situation of the implementation project, the size of the dewatering well and the groundwater condition, design the water closing valve The size of the device specifications determines the number of required shut-off valve devices and the amount of supporting equipment such as self-priming water pumps 8 and water pipes 9.
2)结合图2所示,安装和固定闭水阀装置,确保大直径段2顶部的高度与基础垫层13齐平或略高10~30mm,大直径段2与降水井井壁10之间使用油麻11封底,封底后剩余空间使用干硬性防水混凝土12密封;防水胶垫5和法兰盲板6为打开状态,使用自吸式水泵8通过水管9连接小直径段3,对降水井内的地下水进行排水。2) As shown in Figure 2, install and fix the shut-off valve device to ensure that the height of the top of the large-diameter section 2 is flush with the foundation cushion 13 or slightly higher by 10-30mm, and that the distance between the large-diameter section 2 and the well wall 10 of the dewatering well is Use linoleum 11 for the back cover, and the remaining space after the back cover is sealed with dry hard waterproof concrete 12; the waterproof rubber pad 5 and the flange blind plate 6 are in an open state, and the self-priming water pump 8 is used to connect the small diameter section 3 through the water pipe 9, and the water in the dewatering well groundwater for drainage.
3)结合图3所示,在降水井排水状态下,完成底板垫层施工,底板与缩颈套管1交接部位使用砂浆14抹成圆弧与垫层顺接,在小直径段3做防水工作的细部处理,并进行顺接收口。3) As shown in Figure 3, under the dewatering state of the dewatering well, the construction of the floor cushion is completed, and the joint between the bottom plate and the necking sleeve 1 is made into a circular arc with mortar 14 to connect with the cushion, and the small diameter section 3 is waterproofed The details of the work are handled, and the reception is carried out smoothly.
4)结合图4所示,在降水井排水状态下,进行降水井上部及小直径段3周边的底板工程施工,先开展垫层上部防水层15和防水保护层16的铺设,进而进行底板钢筋18的绑扎,底板钢筋18与防水保护层16间安设有垫块17。4) As shown in Figure 4, under the drainage state of the dewatering well, carry out the construction of the bottom plate on the upper part of the dewatering well and around the small-diameter section 3, first lay the waterproof layer 15 and the waterproof protective layer 16 on the upper part of the cushion, and then carry out the reinforcement of the bottom plate 18 binding, between the bottom plate steel bar 18 and the waterproof protective layer 16, cushion block 17 is installed.
5)结合图5所示,完成底板钢筋18施工,验收合格后进行混凝土的浇筑,当混凝土的整体浇筑高度将达到缩颈套管1管口顶部标高时,取出抽水水管9,向套管内填充混凝土,进行闭水直至填满;而后将防水胶垫5和法兰盲板6使用螺栓7固定在法兰环板4上,完成封井作业,继续进行底板混凝土的浇筑,直至完成基础底板层19施工。5) As shown in Figure 5, complete the construction of the steel bar 18 on the bottom plate, and pour the concrete after passing the acceptance. When the overall pouring height of the concrete will reach the top elevation of the nozzle of the necking sleeve 1, take out the water pumping pipe 9 and fill it into the sleeve Concrete, close the water until it is filled; then fix the waterproof rubber pad 5 and the flange blind plate 6 on the flange ring plate 4 with bolts 7, complete the well sealing operation, and continue to pour concrete for the base plate until the base plate layer is completed 19 Construction.
显然,上述实施例仅是为清楚地说明本发明的突出特点所作的阐释,而并非是对本发明实施方式的限定;对于所属领域的技术人员而言,在上述说明的使用基础上仍可以做出其它不同形式的变化或变动,若未对其进行创造性改进,均属于本发明的保护范围。Apparently, the above-mentioned embodiments are only explanations for clearly illustrating the outstanding features of the present invention, rather than limiting the implementation of the present invention; for those skilled in the art, it is still possible to make Other changes or changes in different forms, if no creative improvement is made to it, all belong to the protection scope of the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810911192.XA CN109024640A (en) | 2018-08-10 | 2018-08-10 | One kind closing water valve device, shut-in well structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810911192.XA CN109024640A (en) | 2018-08-10 | 2018-08-10 | One kind closing water valve device, shut-in well structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109024640A true CN109024640A (en) | 2018-12-18 |
Family
ID=64633656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810911192.XA Pending CN109024640A (en) | 2018-08-10 | 2018-08-10 | One kind closing water valve device, shut-in well structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024640A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982461A (en) * | 2019-12-14 | 2021-06-18 | 浙江建腾建设有限公司 | Pipe well precipitation combined reducing steel sleeve plugging construction method |
CN113832952A (en) * | 2021-09-25 | 2021-12-24 | 浙江省浙南综合工程勘察测绘院有限公司 | Soft soil foundation reinforcing method |
CN114351740A (en) * | 2022-01-14 | 2022-04-15 | 成都华阳建筑股份有限公司 | Plugging method for high-water-level basement pressure-bearing dewatering well |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1348452A1 (en) * | 1986-02-06 | 1987-10-30 | Украинский Государственный Институт По Проектированию Металлургических Заводов | Water level lowering well |
JPH1060957A (en) * | 1996-08-21 | 1998-03-03 | Oyo Corp | Aquifer cutoff construction method for existing well |
CN101148884A (en) * | 2007-10-30 | 2008-03-26 | 山东天齐置业集团股份有限公司 | Waterproof and plugging construction method for precipitation well in foundation pit |
CN104196045A (en) * | 2014-08-28 | 2014-12-10 | 青岛海川建设集团有限公司 | Well mouth sealing device and method for deep well and dewatering well in underground garage foundation pit |
CN204703180U (en) * | 2015-05-15 | 2015-10-14 | 中国新兴建设开发总公司 | A kind of foundation pit dewatering well-sealing device |
CN204940314U (en) * | 2015-07-08 | 2016-01-06 | 上海建工二建集团有限公司 | A kind of bellend pressure reduction well and deep foundation ditch structure thereof |
CN106522252A (en) * | 2016-12-07 | 2017-03-22 | 山西省第三建筑工程公司 | Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well |
CN206956753U (en) * | 2017-01-22 | 2018-02-02 | 天津一建建筑工程有限公司 | Reducing shut-in well sleeve with trapped well |
CN209508995U (en) * | 2018-08-10 | 2019-10-18 | 中建一局集团建设发展有限公司 | One kind closing water valve device and its shut-in well structure |
-
2018
- 2018-08-10 CN CN201810911192.XA patent/CN109024640A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1348452A1 (en) * | 1986-02-06 | 1987-10-30 | Украинский Государственный Институт По Проектированию Металлургических Заводов | Water level lowering well |
JPH1060957A (en) * | 1996-08-21 | 1998-03-03 | Oyo Corp | Aquifer cutoff construction method for existing well |
CN101148884A (en) * | 2007-10-30 | 2008-03-26 | 山东天齐置业集团股份有限公司 | Waterproof and plugging construction method for precipitation well in foundation pit |
CN104196045A (en) * | 2014-08-28 | 2014-12-10 | 青岛海川建设集团有限公司 | Well mouth sealing device and method for deep well and dewatering well in underground garage foundation pit |
CN204703180U (en) * | 2015-05-15 | 2015-10-14 | 中国新兴建设开发总公司 | A kind of foundation pit dewatering well-sealing device |
CN204940314U (en) * | 2015-07-08 | 2016-01-06 | 上海建工二建集团有限公司 | A kind of bellend pressure reduction well and deep foundation ditch structure thereof |
CN106522252A (en) * | 2016-12-07 | 2017-03-22 | 山西省第三建筑工程公司 | Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well |
CN206956753U (en) * | 2017-01-22 | 2018-02-02 | 天津一建建筑工程有限公司 | Reducing shut-in well sleeve with trapped well |
CN209508995U (en) * | 2018-08-10 | 2019-10-18 | 中建一局集团建设发展有限公司 | One kind closing water valve device and its shut-in well structure |
Non-Patent Citations (1)
Title |
---|
王明艳;周义宝;: "深基坑大水量降水井封堵施工技术", 科技视界, no. 22 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982461A (en) * | 2019-12-14 | 2021-06-18 | 浙江建腾建设有限公司 | Pipe well precipitation combined reducing steel sleeve plugging construction method |
CN113832952A (en) * | 2021-09-25 | 2021-12-24 | 浙江省浙南综合工程勘察测绘院有限公司 | Soft soil foundation reinforcing method |
CN113832952B (en) * | 2021-09-25 | 2022-09-30 | 浙江省浙南综合工程勘察测绘院有限公司 | Soft soil foundation reinforcing method |
CN114351740A (en) * | 2022-01-14 | 2022-04-15 | 成都华阳建筑股份有限公司 | Plugging method for high-water-level basement pressure-bearing dewatering well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204343312U (en) | Plugging device of precipitation well in foundation pit | |
CN104929143B (en) | A kind of bottom of foundation ditch dewatering well shut-in well method | |
CN107620312A (en) | High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation | |
CN207727600U (en) | Plugging dewatering well device | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN104099946B (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN108661078B (en) | A comprehensive tunnel design and construction method | |
CN108590681A (en) | Shield well reserving hole quick blocking system and its construction method | |
CN109024640A (en) | One kind closing water valve device, shut-in well structure and its construction method | |
CN206408655U (en) | The top plate sidewall structure of covered back-digging construction | |
CN107288141B (en) | A kind of seamless flexible water construction technology of contrary sequence method | |
CN110863502A (en) | Construction method and plugging structure for dynamically adjusting foundation pit dewatering and plugging dewatering well | |
CN102995647B (en) | A Groundwater Control Method for Pile Hole Grouting and Seepage Isolation | |
CN110258660A (en) | The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN105926665B (en) | Prefabricated large-sized building block assembly type concrete drainage pipeline base and construction method thereof | |
CN108571330A (en) | Method for treating leakage water of post-cast strip of subway bottom plate | |
CN209603062U (en) | Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery | |
CN211172024U (en) | A block structure for foundation ditch precipitation well | |
CN110144918A (en) | Construction method of anti-seepage and plugging of underground building dewatering well | |
CN206512759U (en) | A kind of ground-connecting-wall G type joints of pre-buried repeatable Grouting Pipe | |
CN105133719B (en) | The dislocation of a kind of quick improvement rain pipe is leaked sand, is gushed the construction method of sand | |
CN209508995U (en) | One kind closing water valve device and its shut-in well structure | |
CN204080861U (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN203960881U (en) | The inner pressure-bearing dewatering well of foundation ditch steel sleeve flange connecting apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
RJ01 | Rejection of invention patent application after publication |