CN105756102A - Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall - Google Patents

Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall Download PDF

Info

Publication number
CN105756102A
CN105756102A CN201610240835.3A CN201610240835A CN105756102A CN 105756102 A CN105756102 A CN 105756102A CN 201610240835 A CN201610240835 A CN 201610240835A CN 105756102 A CN105756102 A CN 105756102A
Authority
CN
China
Prior art keywords
wall
basement
diaphram
waterproof
glued membrane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610240835.3A
Other languages
Chinese (zh)
Inventor
肖永
穆麒鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201610240835.3A priority Critical patent/CN105756102A/en
Publication of CN105756102A publication Critical patent/CN105756102A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/04Watertight packings for use under hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0021Mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0098Bitumen
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets
    • E02D2450/10Membranes
    • E02D2450/105Membranes impermeable
    • E02D2450/106Membranes impermeable for liquids

Abstract

The invention discloses a waterproof structure and process of integrated underground diaphragm wall and basement exterior wall. The waterproof structure comprises an underground diaphragm wall, a basement exterior wall with a reserved hole and a tensioning rib, wherein the tensioning rib is penetrated into the reserved hole of the basement exterior wall and used for connecting the underground diaphragm wall with the basement exterior wall; a layer of macromolecule self-adhered membrane waterproof roll is paved and bonded between the underground diaphragm wall and the basement exterior wall. The present invention aims to deal with the waterproof work of a part connected by the tensioning rib between the basement exterior wall and the underground diaphragm wall.

Description

The waterproof construction of diaphram wall and the unification of outer wall of basement two wall and technique
Technical field
The present invention relates to building foundation engineering field, it is specifically related to waterproof construction and the technique of a kind of diaphram wall and the unification of outer wall of basement two wall, especially a kind of technique for reverse construction diaphram wall and outer wall of basement " two walls are unified " tension rib node place water-proofing treatment and structure.
Background technology
At present, in the underground structure reverse construction of industry and civil building engineering, generally adopt foundation ditch diaphram wall and the version with the unification of outer wall of basement (or being referred to as underground structure inwall) two wall, as a kind of integrating gear soil, sealing, preventing that the building enclosure pattern blending basement structure outer wall has very significant technology and economic effect.In two wall unification structures, diaphram wall need to be attached by tension rib with outer wall of basement, herein owing to tension rib needs guiding through inwall, therefore inwall needs reserving hole, very easily there is seepage in structure herein, reduce construction quality, increasing later stage processing cost, this problem annoyings building operation always person, how handling this structure place leakage problems well becomes engineering significant concern point.
For the structure that outer wall of basement and diaphram wall two wall are unified, the waterproof work how handling outer wall of basement and diaphram wall dependence tension rib connecting portion well is the emphasis of engineering.
Summary of the invention
The present invention seeks to: for above-mentioned technical problem, the present invention proposes waterproof construction and the waterproof technology of a kind of diaphram wall and the unification of outer wall of basement two wall, to handle outer wall of basement and the waterproof work of diaphram wall dependence tension rib connecting portion well.
The technical scheme is that the waterproof construction of a kind of diaphram wall and the unification of outer wall of basement two wall, this structure includes diaphram wall, with the outer wall of basement of reserving hole, the tension rib that is located in the reserving hole of described outer wall of basement and described diaphram wall and outer wall of basement are linked together, between described diaphram wall and outer wall of basement, be affixed with a floor height molecule from glued membrane waterproof roll.
The waterproof construction that this diaphram wall of the present invention and outer wall of basement two wall are unified, on the basis of technique scheme, also includes following preferred version:
Described macromolecule from the PV100 macromolecule that glued membrane waterproof roll is 1.2mm thickness from glued membrane waterproof roll.
Being coated with concrete protective oxidant layer on the side wall of described diaphram wall, described macromolecule is arranged between described concrete protective oxidant layer and outer wall of basement from glued membrane waterproof roll.
Rubber-asphalt waterproof encapsulant it is marked with in the reserving hole of described outer wall of basement.
A kind of diaphram wall and the waterproof technology of outer wall of basement two wall unification, comprise the following steps:
Step one, lay steel fabric sheet at the side wall of described diaphram wall, and use cement mortar screeding after metope is whitewashed;
Step 2, form concrete protective oxidant layer at the side wall gunning concrete protective agent of described diaphram wall;
Step 3, according to the spacing of reserved steel bar on described diaphram wall, macromolecule is punched from glued membrane waterproof roll;
Step 4, by macromolecule on the side wall that glued membrane waterproof roll is laid on described diaphram wall;
Step 5, in the reserving hole of described outer wall of basement, uniformly pouring into rubber-asphalt waterproof encapsulant, tension rib being penetrated in the reserving hole of structure inwall described in underground, thus utilizing tension rib described diaphram wall and outer wall of basement to be coupled together.
The waterproof technology that this diaphram wall of the present invention and outer wall of basement two wall are unified, on the basis of technique scheme, also includes following preferred version:
Before described step one carries out, described diaphram wall first being carried out basal plane process work, smooth, clean, dry to keep basal plane, without loose pitted skin and floating assorted dirt, straight circular arc is made at negative and positive angle.
In described step one, in described cement mortar, the weight ratio of cement and sand is 1:2.
In described step 4, described macromolecule from the PV100 macromolecule that glued membrane waterproof roll is 1.2mm thickness from glued membrane waterproof roll.
The degree of depth in reserving hole is poured at more than 30mm at described step 5, described rubber-asphalt waterproof encapsulant.
The invention have the advantage that
1, pv100 macromolecule can form permanent combining closely with concrete from glued membrane waterproof roll, it is simple to construction, speed of application is fast, efficiency of construction is high, be easier to reach completely completely to glue requirement.
2, carry out injecting and guarantee to seal for rubber-asphalt waterproof encapsulant in the reserving hole of tension rib traverse, it is greatly improved the sealing property of tension rib junction, even if breakage occurs in waterproof layer, also can effectively prevent water at the gap crossfire penetrated between coil waterproof layer and structure.
3, pre-laid method paving pv100 macromolecule is from glued membrane waterproof roll, and can be laid on bed course by coiled material directly sky, and during construction, the non-bituminous base adhesive layer of coiled material is towards operator, is conducive to site operation personnel to be operated, and speed of application is fast, and efficiency of construction is high.
4, paving pv100 macromolecule need not apply protective layer again after glued membrane waterproof roll, after coiled material has been constructed, can help to wire-tie, and pours into a mould underground structure concrete.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the invention will be described further:
Fig. 1 is the overall structure profile of this diaphram wall of the embodiment of the present invention and outer wall of basement two wall unification waterproof construction;
Fig. 2 is this diaphram wall of the embodiment of the present invention and outer wall of basement two wall unification waterproof construction structural representation of diaphram wall in work progress;
Fig. 3 is this diaphram wall of the embodiment of the present invention and outer wall of basement two wall unification waterproof construction structural representation of outer wall of basement in work progress;
Wherein: 1-diaphram wall, 2-outer wall of basement, 3-tension rib, 4-macromolecule is from glued membrane waterproof roll, 5-rubber-asphalt waterproof encapsulant.
Detailed description of the invention
Fig. 1~Fig. 3 illustrates a specific embodiment of this diaphram wall of the present invention and the waterproof construction of outer wall of basement two wall unification, identical with traditional structure, this structure also includes diaphram wall 1, with the outer wall of basement 2 (or being referred to as underground structure inwall) of reserving hole, the tension rib 3 that is located in the reserving hole of described outer wall of basement and described diaphram wall and outer wall of basement linked together.Specifically, it is internal that one end of tension rib 3 is anchored at diaphram wall 1, and the other end is located in the reserving hole of outer wall of basement 2 and fixes, thus described diaphram wall and outer wall of basement being linked together.
The crucial reconstruction of the present embodiment is in that: is affixed with a floor height molecule between described diaphram wall 1 and outer wall of basement 2 from glued membrane waterproof roll 4, is also marked with rubber-asphalt waterproof encapsulant in the reserving hole of described outer wall of basement 2 simultaneously.
Described macromolecule is preferably the pv100 macromolecule of 1.2mm thickness from glued membrane waterproof roll from glued membrane waterproof roll 4.
In this example, the side wall of described diaphram wall 1 being coated with concrete protective oxidant layer, described macromolecule is specifically arranged in from glued membrane waterproof roll 4 between concrete protective oxidant layer and the described outer wall of basement 2 of this diaphram wall 1 sidepiece.
Referring again to shown in Fig. 1~Fig. 3, the existing waterproof technology by this for the present embodiment diaphram wall with the unification of outer wall of basement two wall is described below, and this technique comprises the following steps:
Step one, lay steel fabric sheet at the side wall of described diaphram wall 1, and use cement mortar screeding after metope is whitewashed.In described cement mortar, the weight ratio of cement and sand is preferably 1:2.
In order to ensure the laying fixed effect of steel fabric sheet in above-mentioned steps one, before this step one carries out, diaphram wall 1 first can be carried out basal plane process work by workmen, smooth, clean, dry to keep basal plane, without loose pitted skin and floating assorted dirt, and straight circular arc is made at negative and positive angle.
Step 2, then form concrete protective oxidant layer at the side wall gunning concrete protective agent of described diaphram wall 1.
Step 3, according to the spacing of reserved steel bar on described diaphram wall 1, macromolecule is punched from glued membrane waterproof roll 4.Punch position is wanted accurately, in order to following macromolecule is from the intact laying of glued membrane waterproof roll.
Step 4, by macromolecule on the side wall that glued membrane waterproof roll 4 is laid on diaphram wall 1.The paving of this coiled material to accomplish that coiled material seam is closely knit, without damaged, fracture, different shape bonding, without defects such as alices.Described macromolecule is preferably the PV100 macromolecule of 1.2mm thickness from glued membrane waterproof roll from glued membrane waterproof roll 4.
Step 5, in the reserving hole of described outer wall of basement, uniformly pour into rubber-asphalt waterproof encapsulant 5, tension rib 3 is penetrated in the reserving hole of structure inwall 2 described in underground, thus utilizing tension rib 3 described diaphram wall 1 and outer wall of basement 2 to be coupled together.Preferably ensureing that the degree of depth that described rubber-asphalt waterproof encapsulant pours in reserving hole is at more than 30mm, and guarantee that whole circle rubber-asphalt waterproof encapsulant is without coherent hole, it is careful about dead angle to accomplish to seal, such as Fig. 3.
Certainly, above-described embodiment only for technology design and the feature of the present invention are described, its object is to allow people will appreciate that present disclosure and to implement according to this, can not limit the scope of the invention with this.All equivalent transformations done according to the spirit of main technical schemes of the present invention or modification, all should be encompassed within protection scope of the present invention.

Claims (9)

1. the waterproof construction that a diaphram wall is unified with outer wall of basement two wall, this structure includes diaphram wall (1), with the outer wall of basement (2) of reserving hole, the tension rib (3) that is located in the reserving hole of described outer wall of basement and described diaphram wall and outer wall of basement linked together, it is characterised in that: between described diaphram wall (1) and outer wall of basement (2), it is affixed with a floor height molecule from glued membrane waterproof roll (4).
2. the waterproof construction of diaphram wall as claimed in claim 1 and the unification of outer wall of basement two wall, it is characterised in that: described macromolecule from glued membrane waterproof roll (4) be 1.2mm thickness pv100 macromolecule from glued membrane waterproof roll.
3. the waterproof construction that diaphram wall as claimed in claim 2 is unified with outer wall of basement two wall; it is characterized in that: be coated with concrete protective oxidant layer on the side wall of described diaphram wall (1), described macromolecule is arranged between described concrete protective oxidant layer and outer wall of basement (2) from glued membrane waterproof roll (4).
4. the waterproof construction that diaphram wall as claimed in claim 1 is unified with outer wall of basement two wall, it is characterised in that: in the reserving hole of described outer wall of basement (2), it is marked with rubber-asphalt waterproof encapsulant (5).
5. the waterproof technology that a diaphram wall is unified with outer wall of basement two wall, it is characterised in that this technique comprises the following steps:
Step one, lay steel fabric sheet at the side wall of described diaphram wall (1), and use cement mortar screeding after metope is whitewashed;
Step 2, form concrete protective oxidant layer at the side wall gunning concrete protective agent of described diaphram wall (1);
Step 3, spacing according to the upper reserved steel bar of described diaphram wall (1), punch from glued membrane waterproof roll (4) to macromolecule;
Step 4, macromolecule is laid on the side wall of described diaphram wall (1) from glued membrane waterproof roll (4);
Step 5, in the reserving hole of described outer wall of basement (2), uniformly pour into rubber-asphalt waterproof encapsulant, tension rib (3) is penetrated in the reserving hole of structure inwall (2) described in underground, thus utilizing tension rib (3) described diaphram wall (1) and outer wall of basement (2) to be coupled together.
6. the waterproof technology that diaphram wall as claimed in claim 5 is unified with outer wall of basement two wall, it is characterized in that: before described step one carries out, first described diaphram wall (1) is carried out basal plane process work, smooth, clean, dry to keep basal plane, without loose pitted skin and floating assorted dirt, straight circular arc is made at negative and positive angle.
7. the waterproof technology that diaphram wall as claimed in claim 5 is unified with outer wall of basement two wall, it is characterised in that: in described step one, in described cement mortar, the weight ratio of cement and sand is 1:2.
8. the waterproof technology that diaphram wall as claimed in claim 5 is unified with outer wall of basement two wall, it is characterized in that: in described step 4, described macromolecule from glued membrane waterproof roll (4) be 1.2mm thickness PV100 macromolecule from glued membrane waterproof roll.
9. the waterproof technology that diaphram wall as claimed in claim 5 is unified with outer wall of basement two wall, it is characterised in that: pour into the degree of depth in reserving hole at more than 30mm at described step 5, described rubber-asphalt waterproof encapsulant.
CN201610240835.3A 2016-04-18 2016-04-18 Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall Pending CN105756102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610240835.3A CN105756102A (en) 2016-04-18 2016-04-18 Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610240835.3A CN105756102A (en) 2016-04-18 2016-04-18 Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall

Publications (1)

Publication Number Publication Date
CN105756102A true CN105756102A (en) 2016-07-13

Family

ID=56335279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610240835.3A Pending CN105756102A (en) 2016-04-18 2016-04-18 Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall

Country Status (1)

Country Link
CN (1) CN105756102A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071118A (en) * 2018-01-12 2018-05-25 上海岩土工程勘察设计研究院有限公司 A kind of supporting construction and its construction method and the overlapping piling wall for also serving as supporting construction
CN108894248A (en) * 2018-08-14 2018-11-27 中建五局土木工程有限公司 Underground structure and ground-connecting-wall attachment device and method
CN109371957A (en) * 2018-12-04 2019-02-22 广东建诚监理咨询有限公司 Braced wall and two wall combined structure of structural wall
CN112281886A (en) * 2020-10-13 2021-01-29 中国建筑第八工程局有限公司 Waterproof and structure integration construction structure of two-in-one interior lining wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009121204A (en) * 2007-11-19 2009-06-04 Taisei Corp Underground structure
CN203256809U (en) * 2013-01-11 2013-10-30 李�杰 Waterproof structure at connecting position of concrete floor and underground continuous wall
CN203684293U (en) * 2013-12-26 2014-07-02 上海建工二建集团有限公司 Antiseep structure of underground diaphragm wall
CN205557606U (en) * 2016-04-18 2016-09-07 上海建工二建集团有限公司 Waterproof construction of two walls of underground continuous wall and basement outer wall unification

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009121204A (en) * 2007-11-19 2009-06-04 Taisei Corp Underground structure
CN203256809U (en) * 2013-01-11 2013-10-30 李�杰 Waterproof structure at connecting position of concrete floor and underground continuous wall
CN203684293U (en) * 2013-12-26 2014-07-02 上海建工二建集团有限公司 Antiseep structure of underground diaphragm wall
CN205557606U (en) * 2016-04-18 2016-09-07 上海建工二建集团有限公司 Waterproof construction of two walls of underground continuous wall and basement outer wall unification

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴腾达: "地下连续墙叠合内衬墙可调式单侧模板施工技术探讨", 《福建建筑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071118A (en) * 2018-01-12 2018-05-25 上海岩土工程勘察设计研究院有限公司 A kind of supporting construction and its construction method and the overlapping piling wall for also serving as supporting construction
CN108894248A (en) * 2018-08-14 2018-11-27 中建五局土木工程有限公司 Underground structure and ground-connecting-wall attachment device and method
CN109371957A (en) * 2018-12-04 2019-02-22 广东建诚监理咨询有限公司 Braced wall and two wall combined structure of structural wall
CN112281886A (en) * 2020-10-13 2021-01-29 中国建筑第八工程局有限公司 Waterproof and structure integration construction structure of two-in-one interior lining wall

Similar Documents

Publication Publication Date Title
WO2014139252A1 (en) Method for constructing large raft foundation in high-temperature environment
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN105756102A (en) Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall
CN107059946A (en) A kind of basement drain plate and its construction
CN203256816U (en) Pile foundation bottom plate pile head waterproof structure
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN106593470A (en) High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN104975614B (en) Shaped steel combination formula single side formwork strengthening construction engineering method
CN105369826A (en) Basement bearing platform side mold construction method
CN105239729B (en) It has constructed the construction method of poling reparation of punching after roofing
CN110593321B (en) Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system
CN108149682A (en) A kind of slip casting casing device and the pile foundation drilling construction method using the casing device
CN103437789A (en) Method for constructing water proof structure and constructing underground construction in water proof mode
CN109667607B (en) Tunnel partition waterproof construction process
CN207685961U (en) Spliced gutter based on bellows
CN102912945A (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN207862925U (en) A kind of slip casting casing device
CN204059417U (en) A kind of complete inverse impervious node structure of method wall beam
CN205557606U (en) Waterproof construction of two walls of underground continuous wall and basement outer wall unification
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN207727733U (en) The spliced gutter that can be had enough to meet the need
CN103628506B (en) Construction method for waterproof positions of foundation platform and pile head
CN206607675U (en) A kind of basement composite external wall anti-cracking and seepage control structure construction
CN106051316B (en) A kind of pipeline wears the construction method in pond

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160713

WD01 Invention patent application deemed withdrawn after publication