CN105178479A - Construction method of super high-rise component type smart glass curtain wall - Google Patents

Construction method of super high-rise component type smart glass curtain wall Download PDF

Info

Publication number
CN105178479A
CN105178479A CN201510333439.0A CN201510333439A CN105178479A CN 105178479 A CN105178479 A CN 105178479A CN 201510333439 A CN201510333439 A CN 201510333439A CN 105178479 A CN105178479 A CN 105178479A
Authority
CN
China
Prior art keywords
curtain wall
column
wall panel
bearing
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510333439.0A
Other languages
Chinese (zh)
Other versions
CN105178479B (en
Inventor
张清会
石峰
黄伟栈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Keyuan Construction Group Co., Ltd.
Original Assignee
SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd filed Critical SHENZHEN KEYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201510333439.0A priority Critical patent/CN105178479B/en
Publication of CN105178479A publication Critical patent/CN105178479A/en
Application granted granted Critical
Publication of CN105178479B publication Critical patent/CN105178479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a super high-rise glass curtain wall which is short in construction period, high in air pressure resistance, easy to mount and convenient to use and repair in days later. A construction method of the super high-rise glass curtain wall comprises the following steps of (1) embedding embedded pieces; (2) mounting a support; (3) mounting upright columns; (4) mounting a lightning strip; (5) mounting cross beams; (6) mounting a secondary support; (7) mounting fireproof plates among floors; (8) mounting a curtain wall panel; and (9) mounting pressing strips. Compared with the prior art, the super high-rise glass curtain wall has the advantages that the cross beams are connected with the upright columns by bolt type structures, glass plates which are small single units are inlaid in slots of the cross beams and the upright columns, the unit type curtain wall is mounted quickly and resists wind pressure, waterproofness is high, and the super high-rise glass curtain is convenient to repair. The super high-rise glass curtain wall does not need to be hoisted by large machinery.

Description

The construction method of the intelligent curtain wall of Super High element type
Technical field
The present invention relates to a kind of curtain wall field, the construction method of the intelligent curtain wall of especially a kind of Super High element type.
Background technology
Along with the expanding economy of China and the quickening of process of industrialization, the national strategy of urbanization promotes population and concentrates to city, cause land used nervous, building is had to high level development, and curtain wall also as exterior wall enclosed structure need be developed in each side such as technical quality effects and improve.Existing most of super highrise building curtain wall adopts unit type curtain wall, but in existing curtain wall construction, its anti-wind pressure effect is excessively poor, and the problem such as maintenance and waterproof can't well solve.
Summary of the invention
The object of this invention is to provide a kind of curtain wall with buckle press strip, the technical problem that solve is that the construction period is short, and Wind-Pressure Resistance ability is strong, installs simple, and is convenient to use technology in the future.
For solving the problem, the present invention realizes by the following technical solutions: the construction method of the intelligent curtain wall of a kind of Super High element type, comprise the following steps: one, pre-buried built-in fitting, the outer overhang layer of building and the load bearing cross beam in building outside carry out surveying setting-out according to the size of curtain wall panel, and according to the result of surveying setting-out, the outer overhang layer of building and the load bearing cross beam in building outside arrange pre-buried first built-in fitting, the second built-in fitting;
Two, erection support, first bearing of a L-type is installed respectively in the left and right sides of each first built-in fitting, first bearing wherein while upper, be provided with the first bolt hole with the bolt position corresponding section on the first built-in fitting, first bearing is by being enclosed within the bolt on the first built-in fitting by the first bolt hole, and be connected with bolt thread by nut, make two the first bearings be fixed on outer overhang layer, the another side of the first bearing arranges the first adjustment groove;
Three, column is installed, between the first bearing column being placed in the left and right sides, two the first bearings are made to be clipped in the left and right sides of column, bolt is inserted through column through regulating groove and is connected with bolt thread by nut, make column be fixed on the first bearing, the filleting between column and the first bearing carries out weather proofing sealant encapsulation process;
Four, lighting proof strip is installed, in the first built-in fitting, draws down lead, be connected with the down lead of the agent structure of building;
Five, crossbeam is installed, vertical separation according to curtain wall panel on the length direction of column is provided with pin-and-hole, pin-and-hole is arranged on the relative side side of adjacent two root posts, and the two ends of crossbeam is plugged with latch, and crossbeam is inserted in pin-and-hole by latch and fixes with column grafting;
Six, secondary bearing is installed, second built-in fitting is installed the second bearing of L-type respectively, wherein one side of two the second bearings is provided with the second bolt hole, second bearing is by being enclosed within the screw rod of the second built-in fitting by the second bolt hole, and be connected by the screw flight of nut with the second built-in fitting, the second bearing is made to be fixed on building bearing crossbeam, the another side of two the second bearings is arranged the second adjustment groove, between two the second bearings, secondary bar is installed, the rear end of secondary bar regulates groove and the second bearing to be connected and fixed by screw through second, the front end of secondary bar is clipped on column by holder, the left and right sides that holder is relative is respectively equipped with holder bolt hole, on the left and right sides side of column, upstanding studs hole is provided with corresponding section, holder bolt hole position, holder bolt hole is passed by bolt between holder and column, upstanding studs hole, and be connected with bolt thread with nut, holder and column are connected and fixed,
Seven, interlayer installs PLASTIC LAMINATED, architectural lower two-layer between, the lower end of secondary bar installs PLASTIC LAMINATED, the front end of PLASTIC LAMINATED extends to column place, and the rear end of PLASTIC LAMINATED extends on load bearing cross beam, and fills Waterproof gum at the gap place of the surrounding of PLASTIC LAMINATED;
Eight, install curtain wall panel, curtain wall panel is moved to need install curtain wall panel crossbeam on, curtain wall panel is first placed on crossbeam position to the left, is inserted by the draw-in groove of aluminum alloy frame upper/lower terminal end in the grab of upper and lower two crossbeams from top to bottom; Again by curtain wall panel translation from left to right, by the grab clamping of the draw-in groove of the aluminum alloy frame left and right sides and column, between draw-in groove and grab, be provided with waterproof adhesive tape; Curtain wall panel after installing is finely tuned, makes the aluminum alloy frame of curtain wall panel and crossbeam, side, side that column is relative keeps horizontal and vertical, installation bracket between neighbouring two pieces of curtain wall panel, on crossbeam; The rear end of described bracket is fixedly connected with crossbeam, and the front end of bracket extends to aligns with the external surface of curtain wall panel, places limited block after installing firm non-loosening between bracket and aluminum alloy frame, after installing, carries out the installation of right side curtain wall panel; Successively from left to right, order is installed from bottom to up, and the gap filling between adjacent two pieces of curtain wall panel has silicone sealant in the installation of curtain wall panel;
Nine, install press strip, install press strip at the gap place of upper and lower two pieces of curtain wall panel, press strip is connected and fixed by the front end of self-tapping screw and bracket, between press strip and curtain wall panel, fill waterproof gasket cement, completes the installation of curtain wall.
When there is upper-lower position drift condition in the first built-in fitting of the present invention, the board-like embedded part of a full weld 10mm on the first built-in fitting.
Latch of the present invention is spring catch, and spring catch comprises back seat, spring and front inserted link, and back seat is locked in the jack at crossbeam two ends, and front inserted link inserts in the pin-and-hole of column.
Curtain wall panel of the present invention is made up of glass plate and the aluminum alloy frame being pasted onto glass plate surrounding, mutually bonding by double-sided tape between glass plate with aluminum alloy frame.
Bracket of the present invention is provided with fixed part and support portion; Support portion is made up of the first gripper shoe and the second gripper shoe, first gripper shoe is obliquely installed, the front end of the first gripper shoe is connected with the front lower ends of fixed part, and the rear end of the first gripper shoe is connected with the lower end of the second gripper shoe, and the upper end of the second gripper shoe is connected with fixed part; On crossbeam, be positioned at cradle and be provided with buckling groove, the trough rim place of the both sides up and down of buckling groove is respectively equipped with the first outstanding edge; The rear end of fixed part is provided with outstanding hook downwards, and forms a hook portion, the rear end of the first gripper shoe extends to outside the second gripper shoe, links up with and is arranged in buckling groove, and with the first edge clamping; The rear end of the first gripper shoe withstands on crossbeam; Chock is clogged between the upper end and buckling groove of hook.
The present invention compared with prior art, adopts socket type structural to be connected with column by crossbeam, and glass plate forms single small unit type inlay card on the draw-in groove of crossbeam and column, both unit type curtain wall had been met quick for installation, the characteristics such as resistance to blast, overcome water resistance again, keep in repair convenient requirement of Denging.And without the need to carrying out big machinery lifting.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention welds a board-like embedded part on the first built-in fitting 1.
Fig. 2 is the mounting structure schematic diagram of the first built-in fitting 1 of the present invention and the second built-in fitting.
Fig. 3 is the syndeton schematic diagram of the first bearing of the present invention and the first built-in fitting 1.
Fig. 4 is the structural representation of the present invention first bearing.
Fig. 5 is transverse sectional view of the present invention.
Fig. 6 is the structural representation of latch of the present invention.
Fig. 7 is the mounting structure schematic diagram one of the secondary bar of the present invention.
Fig. 8 is the mounting structure schematic diagram two of the secondary bar of the present invention.
Fig. 9 is longitudinal sectional view of the present invention.
Figure 10 is the syndeton schematic diagram of supporting plate of the present invention and crossbeam.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
The construction method of the intelligent curtain wall of Super High element type of the present invention comprises the following steps:
One, pre-buried built-in fitting, the outer overhang layer 104 of building and the load bearing cross beam 105 in building outside carry out surveying setting-out according to the size of curtain wall panel, and according to the result of surveying setting-out, the outer overhang layer 104 of building and the load bearing cross beam 105 in building outside arrange pre-buried first built-in fitting 1, second built-in fitting 11 (as shown in Figure 2), the first built-in fitting 1 on outer overhang layer 104 and load bearing cross beam 105, second built-in fitting 11 position is corresponding, first built-in fitting 1 and the second built-in fitting 2 are slot type embedded part, after first built-in fitting 1 and the second built-in fitting 11 installation, first built-in fitting 1 is adjusted,
If there is left and right drift condition in the first built-in fitting 1, due to the particularity of slot type embedded part form, connect the first built-in fitting 1 significantly to offset left and right in the chute of slot type embedded part with the bolt of curtain wall support, therefore offseting about embedded part position does not affect embedded part and normally uses, and does not need to rectify a deviation.
If the first built-in fitting 1 upper-lower position drift condition, for the correction of this kind of situation, the then board-like embedded part 101 of a full weld 10mm on the first built-in fitting 1, shown in (as Fig. 1), board-like embedded part 101 is made up of the chemical bolt 103 that the steel plate 102 mended afterwards on the first built-in fitting 1 and steel plate 102 are arranged;
If the first built-in fitting 1 passes in and out biased moving: if side-play amount is little, then do not need correction, error regulates by T-shaped bolt; If when side-play amount exceeds T-shaped bolt adjustable extent, then the first built-in fitting 1 is welded with bearing.
Two, erection support, as shown in Figure 3, first bearing 2 of a L-type is installed respectively in the left and right sides of each first built-in fitting 1, two the first bearings 2 are symmetrical arranged, first bearing 2 (parallel with the first built-in fitting 1 while be horizontal edge 21 wherein on one side, vertical with the first built-in fitting 1 while be vertical edges 22) fit with the first built-in fitting 1, on horizontal edge 21, the first bolt hole 23 is provided with the bolt position corresponding section on the first built-in fitting 1, first bearing 2 is enclosed within the bolt on the first built-in fitting 1 by the first bolt hole 23 on horizontal edge 21, and be connected with bolt thread by nut, two the first bearings 2 are made to be fixed on outer overhang layer 104, vertical edges 22 is provided with the first adjustment groove 24 (as shown in Figure 4),
Three, column is installed, between the first bearing 2 column 3 being placed in the left and right sides, the vertical edges 22 of two the first bearings 2 is made to be clipped in the left and right sides of column 3, bolt is inserted through column 3 and after stretching out from the adjustment groove 24 of the first bearing 2 of opposite side from the adjustment groove 24 of the first bearing 2 of side, be connected with bolt thread by nut, column 3 is made to be fixed on the first bearing 2, now set screw, to guarantee column, beam support installation level and turnover position, hold error is less than 1mm, filleting between column 3 and the first bearing 2 carries out weather proofing sealant encapsulation process,
Four, install lighting proof strip, in the first built-in fitting 1, draw down lead, be connected with the down lead of the agent structure of building, in the installation conventionally of lighting proof strip, lightning-arrest specification is carried out;
Five, crossbeam is installed, as shown in Figure 5, the length direction of column 3 is provided with pin-and-hole 41 according to the vertical separation of curtain wall panel 8, pin-and-hole 41 is arranged on the relative side side of adjacent two root posts 3, the two ends of crossbeam 4 is plugged with latch 42, as shown in Figure 6, latch 42 is spring catch, spring catch comprises back seat 421, spring 422 and front inserted link 423, back seat 421 is locked in the jack at crossbeam 4 two ends, front inserted link 423 inserts in the pin-and-hole 41 of column, the thrust of spring 422 makes front inserted link 423 can not deviate from pin-and-hole 41, during installation, by inserted link before the night bolt 423 alignment post pin-and-hole 41 that milling is good, the other end pins plunger, move on to hole milling 41 place of another column 3 abreast, after alignment pin holes 41, the tension force of spring 422 pushes front inserted link 423 to pin-and-hole 41,
Six, secondary bearing is installed, as shown in Figure 7 and Figure 8, on the second built-in fitting 11, symmetry installs the second bearing 5 of a L-type respectively, the structure of the second bearing 5 is identical with the structure of the first bearing 2, the horizontal edge 51 of two the second bearings 5 and the second built-in fitting 11 are fitted, the horizontal edge 51 of the second bearing 5 is provided with the second bolt hole 54, second bearing 5 is by being enclosed within the screw rod of the second built-in fitting 11 by the second bolt hole 54, and be connected by the screw flight of nut with the second built-in fitting 11, the second bearing 5 is made to be fixed on building bearing crossbeam 105, the vertical edges 52 of two the second bearings 5 is vertical with the second built-in fitting 11, vertical edges 52 is provided with the second adjustment groove 53, between the second bearing 5, secondary bar 6 is installed, the rear end of secondary bar 6 regulates groove 52 and the second bearing 5 to be connected and fixed by screw through second, the front end of secondary bar 6 is clipped on column 3 by holder 61, the left and right sides that holder 61 is relative is respectively equipped with holder bolt hole 62, on the left and right sides side of column 3, upstanding studs hole 31 is provided with corresponding section, holder bolt hole 62 position, holder bolt hole 62 is passed by bolt between holder 61 and column 3, upstanding studs hole 31, and be connected with bolt thread with nut, holder 61 and column 3 are connected and fixed,
Seven, interlayer installs PLASTIC LAMINATED, architectural lower two-layer between, the lower end of secondary bar 6 installs PLASTIC LAMINATED 7, the front end of PLASTIC LAMINATED 7 extends to column 3 place, the rear end of PLASTIC LAMINATED 7 extends on the load bearing cross beam in building outside, and PLASTIC LAMINATED 7 surrounding (namely PLASTIC LAMINATED 7 and column 3, build outside load bearing cross beam and construction wall between gap place fill Waterproof gum;
Eight, install curtain wall panel, as shown in figs. 5 and 9, every block curtain wall panel 8 is made up of glass plate 81 and the aluminum alloy frame 82 being pasted onto glass plate 81 surrounding, mutually bonding by double-sided tape between glass plate 81 with aluminum alloy frame 82; As shown in Figure 5, Figure 9, aluminum alloy frame 82 arranges draw-in groove 31, column 3 and crossbeam 4 are provided with the grab 11 corresponding with draw-in groove 31, and the opening direction each column 3 and crossbeam 4 being arranged two grabs, 11, two grabs 11 is identical;
Curtain wall panel 8 is moved to need install curtain wall panel 8 crossbeam 4 on, curtain wall panel 8 is first placed on crossbeam 4 position to the left, inserts in the grab 11 of upper and lower two crossbeams 4 from top to bottom by the draw-in groove 31 of aluminum alloy frame 82 upper/lower terminal end; Again by curtain wall panel 8 translation from left to right, by the draw-in groove 31 of the aluminum alloy frame left and right sides and grab 11 clamping of column, between draw-in groove 31 and grab 11, be provided with waterproof adhesive tape 311; Curtain wall panel 8 after installing is finely tuned, makes the aluminum alloy frame 82 of curtain wall panel 8 and crossbeam 4, side, side that column 3 is relative keeps horizontal and vertical, installation bracket 9 between neighbouring two pieces of curtain wall panel 8, on crossbeam 4; The rear end of described bracket 9 is fixedly connected with crossbeam 4, and the front end of bracket 9 extends to aligns with the external surface of curtain wall panel 8, places limited block 10 after installing firm non-loosening between bracket 9 and aluminum alloy frame 82, after installing, carries out the installation of right side curtain wall panel 8; Under normal circumstances successively from left to right, order is installed from bottom to up, and the gap filling between adjacent two pieces of curtain wall panel 8 has silicone sealant.
Nine, install press strip, install press strip 101 at the gap place of upper and lower two pieces of curtain wall panel 8, press strip 101 is connected and fixed by the front end of self-tapping screw and bracket 9, fills waterproof gasket cement 312 between press strip 101 and curtain wall panel 8, finally completes the installation of curtain wall.
Press strip 101 is as to functions such as the additional reinforcement effect of curtain wall panel and decoration LED mounting seat.It is installed as button edge formula and hangs on hook.
Bracket 9 of the present invention can be adopted and conventional be connected with crossbeam 4 by self-tapping screw or adopt following structure to realize, and as shown in Figure 10, bracket 9 is provided with fixed part 91 and support portion 92; Support portion 91 is made up of the first gripper shoe 93 and the second gripper shoe 94, first gripper shoe 93 is obliquely installed, the front end of the first gripper shoe 93 is connected with the front lower ends of fixed part 91, the rear end of the first gripper shoe 93 is connected with the lower end of the second gripper shoe 94, and the upper end of the second gripper shoe 94 is connected with fixed part 91; On crossbeam 4, be positioned at bracket 9 place and be provided with buckling groove 41, the trough rim place of the both sides up and down of buckling groove 41 is respectively equipped with the first outstanding edge 42; The rear end of fixed part 91 is provided with outstanding hook 95 downwards, and forms a hook portion, the rear end of the first gripper shoe 93 extends to outside the second gripper shoe 94, links up with 95 and is arranged in buckling groove 41, and with the first edge 42 clamping; The rear end of the first gripper shoe 94 withstands on crossbeam 4; Chock 96 is clogged between the upper end of hook 95 and buckling groove 41.
Glass plate of the present invention adopts the two tempering hollow glass of the two silver of 10Low-E+12A+8mm plane ultrawhite;
Column 3 and crossbeam 4 adopt intelligent hook aluminium extruded sections, and the chemical composition of aluminium extruded sections, mechanical property and dimensional accuracy should meet the regulation of existing national standards " aluminum alloy building section part 1 base material " (GB5237.1-2008).Aluminium extruded sections cross sectional dimensions allows partially should differ from and reaches high-precision level or superelevation essence level; The aluminium alloys trade mark is 6063, Surface of profile process: outdoor is exposed aluminium extruded sections and is metal fluorocarbon spray treatment (three are coated with), and indoor are exposed aluminium extruded sections and are powder spray, and it is anodic oxidation that indoor and outdoor hides aluminium extruded sections.

Claims (5)

1. the construction method of the intelligent curtain wall of Super High element type, comprise the following steps: one, pre-buried built-in fitting, the outer overhang layer (104) of building and the load bearing cross beam (105) in building outside carry out surveying setting-out according to the size of curtain wall panel, and according to the result of surveying setting-out, the outer overhang layer (104) of building and the load bearing cross beam (105) in building outside arrange pre-buried first built-in fitting (1), the second built-in fitting (11);
Two, erection support, first bearing (2) of a L-type is installed respectively in the left and right sides of each first built-in fitting (1), on wherein one side of first bearing (2), the first bolt hole (23) is provided with the bolt position corresponding section on the first built-in fitting (1), first bearing (2) is by being enclosed within the bolt on the first built-in fitting (1) by the first bolt hole (23), and be connected with bolt thread by nut, two the first bearings (2) are made to be fixed on outer overhang layer (104), the another side of the first bearing (2) arranges the first adjustment groove (24),
Three, column is installed, between the first bearing (2) column (3) being placed in the left and right sides, two the first bearings (2) are made to be clipped in the left and right sides of column (3), bolt is inserted through column (3) through regulating groove (24) and is connected with bolt thread by nut, make column (3) be fixed on the first bearing (2), the filleting between column (3) and the first bearing (2) carries out weather proofing sealant encapsulation process;
Four, lighting proof strip is installed, in the first built-in fitting (1), draws down lead, be connected with the down lead of the agent structure of building;
Five, crossbeam is installed, the length direction of column 3 is provided with pin-and-hole (41) according to the vertical separation of curtain wall panel (8), pin-and-hole (41) is arranged on the relative side side of adjacent two root posts (3), the two ends of crossbeam (4) is plugged with latch (42), and crossbeam (4) is inserted in pin-and-hole (41) by latch (42) and fixes with column (3) grafting;
Six, secondary bearing is installed, second built-in fitting (11) is installed second bearing (5) of L-type respectively, wherein one side of two the second bearings (5) is provided with the second bolt hole (54), second bearing (5) is by being enclosed within the screw rod of the second built-in fitting (11) by the second bolt hole (54), and be connected by the screw flight of nut with the second built-in fitting (11), the second bearing (5) is made to be fixed on building bearing crossbeam (105), the another side of two the second bearings (5) is arranged the second adjustment groove (53), secondary bar (6) is installed between two the second bearings (5), the rear end of secondary bar (6) regulates groove (52) and the second bearing (5) to be connected and fixed by screw through second, the front end of secondary bar (6) is clipped on column (3) by holder (61), the left and right sides that holder (61) is relative is respectively equipped with holder bolt hole (62), on the left and right sides side of column (3), upstanding studs hole (31) is provided with holder bolt hole (62) corresponding section, position, holder bolt hole (62) is passed by bolt between holder (61) and column (3), upstanding studs hole (31), and be connected with bolt thread with nut, holder (61) and column (3) are connected and fixed,
Seven, interlayer installs PLASTIC LAMINATED, architectural lower two-layer between, the lower end of secondary bar (6) installs PLASTIC LAMINATED (7), the front end of PLASTIC LAMINATED (7) extends to column (3) place, the rear end of PLASTIC LAMINATED (7) extends on load bearing cross beam (105), and fills Waterproof gum at the gap place of the surrounding of PLASTIC LAMINATED (7);
Eight, curtain wall panel is installed, curtain wall panel (8) is moved to need install curtain wall panel (8) crossbeam (4) on, curtain wall panel (8) is first placed on crossbeam (4) position to the left, is inserted by the draw-in groove (31) of aluminum alloy frame (82) upper/lower terminal end in the grab (11) of upper and lower two crossbeams (4) from top to bottom; Again by curtain wall panel (8) translation from left to right, by the draw-in groove (31) of the aluminum alloy frame left and right sides and grab (11) clamping of column, between draw-in groove (31) and grab (11), be provided with waterproof adhesive tape (311); Curtain wall panel (8) after installing is finely tuned, make the aluminum alloy frame of curtain wall panel (8) (82) and crossbeam (4), side, side that column (3) is relative keeps horizontal and vertical, between neighbouring two pieces of curtain wall panel (8), the upper installation bracket (9) of crossbeam (4); The rear end of described bracket (9) is fixedly connected with crossbeam (4), the front end of bracket (9) extends to aligns with the external surface of curtain wall panel (8), between bracket (9) and aluminum alloy frame (82), limited block (10) is placed after firm non-loosening is installed, after installing, carry out the installation on right side curtain wall panel (8); Successively from left to right, order is installed from bottom to up, and the gap filling between adjacent two pieces of curtain wall panel (8) has silicone sealant in the installation of curtain wall panel;
Nine, press strip is installed, at the gap place of upper and lower two pieces of curtain wall panel (8), press strip (101) is installed, press strip (101) is connected and fixed by the front end of self-tapping screw and bracket (9), between press strip (101) and curtain wall panel (8), fill waterproof gasket cement (312), complete the installation of curtain wall.
2. the construction method of the intelligent curtain wall of Super High element type according to claim 1, it is characterized in that: when upper-lower position drift condition appears in described first built-in fitting (1), at the board-like embedded part (101) of the upper full weld 10mm of the first built-in fitting (1).
3. the construction method of the intelligent curtain wall of Super High element type according to claim 2, it is characterized in that: described latch (42) is spring catch, spring catch comprises back seat (421), spring (422) and front inserted link (423), back seat (421) is locked in the jack at crossbeam (4) two ends, and front inserted link (423) inserts in the pin-and-hole (41) of column.
4. the construction method of the intelligent curtain wall of Super High element type according to claim 3, it is characterized in that: described curtain wall panel (8) is made up of glass plate (81) and the aluminum alloy frame (82) that is pasted onto glass plate (81) surrounding, mutually bonding by double-sided tape between glass plate (81) with aluminum alloy frame (82).
5. the construction method of the intelligent curtain wall of Super High element type according to claim 4, is characterized in that: described bracket (9) is provided with fixed part (91) and support portion (92); Support portion (91) is made up of the first gripper shoe (93) and the second gripper shoe (94), first gripper shoe (93) is obliquely installed, the front end of the first gripper shoe (93) is connected with the front lower ends of fixed part (91), the rear end of the first gripper shoe (93) is connected with the lower end of the second gripper shoe (94), and the upper end of the second gripper shoe (94) is connected with fixed part (91); Crossbeam (4) is gone up, be positioned at bracket (9) place is provided with buckling groove (41), and the trough rim place of the both sides up and down of buckling groove (41) is respectively equipped with outstanding the first edge (42); The rear end of fixed part (91) is provided with outstanding hook (95) downwards, form a hook portion, the rear end of the first gripper shoe (93) extends to the second gripper shoe (94) outward, hook (95) be arranged in buckling groove (41), and with the first edge (42) clamping; The rear end of the first gripper shoe (94) withstands on crossbeam (4); Chock (96) is clogged between the upper end and buckling groove (41) of hook (95).
CN201510333439.0A 2015-06-15 2015-06-15 The construction method of the intelligent glass curtain wall of Super High element type Active CN105178479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510333439.0A CN105178479B (en) 2015-06-15 2015-06-15 The construction method of the intelligent glass curtain wall of Super High element type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510333439.0A CN105178479B (en) 2015-06-15 2015-06-15 The construction method of the intelligent glass curtain wall of Super High element type

Publications (2)

Publication Number Publication Date
CN105178479A true CN105178479A (en) 2015-12-23
CN105178479B CN105178479B (en) 2017-07-28

Family

ID=54900863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510333439.0A Active CN105178479B (en) 2015-06-15 2015-06-15 The construction method of the intelligent glass curtain wall of Super High element type

Country Status (1)

Country Link
CN (1) CN105178479B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049589A (en) * 2017-11-14 2018-05-18 平潭诚信智创科技有限公司 A kind of decorating outer wall of building engineering stone thermal insulating wall body structure
CN108166654A (en) * 2017-12-14 2018-06-15 金马日晖幕墙装饰有限公司 A kind of intelligent glass curtain wall of Super High element type and its construction method
CN108343180A (en) * 2018-02-24 2018-07-31 佛山市知而行信息科技有限公司 High-rise building unit glass curtain wall installation engineering method
CN108519196A (en) * 2018-04-11 2018-09-11 安徽众锐质量检测有限公司 A kind of novel seal installation method of curtain wall performance experiment test specimen
CN109184056A (en) * 2018-10-24 2019-01-11 中建二局第二建筑工程有限公司 Curtain wall construction and its construction method with light trough
CN109440984A (en) * 2018-12-14 2019-03-08 重庆迈高电梯有限公司 A kind of elevator shaft waterproof curtain wall device
CN111119386A (en) * 2020-01-14 2020-05-08 中铁建工集团有限公司 Lower sitting type unit curtain wall for inner layer of balcony
CN111945774A (en) * 2020-08-21 2020-11-17 方志兰 Installation and construction method for embedded part of large steel structure fixed foundation
CN115434526A (en) * 2022-09-26 2022-12-06 北京城建远东建设投资集团有限公司 Assembly type building PCF board installation and positioning construction method
CN115961790A (en) * 2022-12-29 2023-04-14 北京城建集团有限责任公司 Installation method of glass curtain wall for building
CN115992561A (en) * 2022-12-24 2023-04-21 北京东方泰洋幕墙股份有限公司 Visual collaborative construction method for curtain wall
CN117661868A (en) * 2024-02-01 2024-03-08 江苏泛佳钢结构工程有限公司 Steel construction prefab erection equipment of rectifying
CN117803116A (en) * 2024-02-29 2024-04-02 山东铭城环保新材料科技有限公司 Assembled curtain wall structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164757A (en) * 1999-12-06 2001-06-19 Shimizu Corp Work method for building
CN103758355A (en) * 2014-02-20 2014-04-30 成军 Hollow glass no-auxiliary-frame installation method of hidden frame glass curtain wall
CN103806577A (en) * 2012-11-06 2014-05-21 南通四建装饰工程有限公司 Installation method for super-large-area unit type slabstone curtain wall
CN104213659A (en) * 2014-09-18 2014-12-17 深圳市华南装饰设计工程有限公司 Curtain wall installation system
CN204174810U (en) * 2014-10-27 2015-02-25 中铁建工集团有限公司 A kind of curtain wall
CN104453042A (en) * 2014-12-20 2015-03-25 深圳市科源建设集团有限公司 Skirting structure for glass curtain wall outer overhanging layer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164757A (en) * 1999-12-06 2001-06-19 Shimizu Corp Work method for building
CN103806577A (en) * 2012-11-06 2014-05-21 南通四建装饰工程有限公司 Installation method for super-large-area unit type slabstone curtain wall
CN103758355A (en) * 2014-02-20 2014-04-30 成军 Hollow glass no-auxiliary-frame installation method of hidden frame glass curtain wall
CN104213659A (en) * 2014-09-18 2014-12-17 深圳市华南装饰设计工程有限公司 Curtain wall installation system
CN204174810U (en) * 2014-10-27 2015-02-25 中铁建工集团有限公司 A kind of curtain wall
CN104453042A (en) * 2014-12-20 2015-03-25 深圳市科源建设集团有限公司 Skirting structure for glass curtain wall outer overhanging layer

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵挺生: "《建筑施工过程安全管理手册》", 28 February 2011 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049589A (en) * 2017-11-14 2018-05-18 平潭诚信智创科技有限公司 A kind of decorating outer wall of building engineering stone thermal insulating wall body structure
CN108166654A (en) * 2017-12-14 2018-06-15 金马日晖幕墙装饰有限公司 A kind of intelligent glass curtain wall of Super High element type and its construction method
CN108343180A (en) * 2018-02-24 2018-07-31 佛山市知而行信息科技有限公司 High-rise building unit glass curtain wall installation engineering method
CN108519196A (en) * 2018-04-11 2018-09-11 安徽众锐质量检测有限公司 A kind of novel seal installation method of curtain wall performance experiment test specimen
CN109184056A (en) * 2018-10-24 2019-01-11 中建二局第二建筑工程有限公司 Curtain wall construction and its construction method with light trough
CN109440984B (en) * 2018-12-14 2023-12-29 重庆迈高电梯有限公司 Waterproof curtain wall device of elevator well
CN109440984A (en) * 2018-12-14 2019-03-08 重庆迈高电梯有限公司 A kind of elevator shaft waterproof curtain wall device
CN111119386A (en) * 2020-01-14 2020-05-08 中铁建工集团有限公司 Lower sitting type unit curtain wall for inner layer of balcony
CN111945774A (en) * 2020-08-21 2020-11-17 方志兰 Installation and construction method for embedded part of large steel structure fixed foundation
CN115434526A (en) * 2022-09-26 2022-12-06 北京城建远东建设投资集团有限公司 Assembly type building PCF board installation and positioning construction method
CN115992561A (en) * 2022-12-24 2023-04-21 北京东方泰洋幕墙股份有限公司 Visual collaborative construction method for curtain wall
CN115961790A (en) * 2022-12-29 2023-04-14 北京城建集团有限责任公司 Installation method of glass curtain wall for building
CN117661868A (en) * 2024-02-01 2024-03-08 江苏泛佳钢结构工程有限公司 Steel construction prefab erection equipment of rectifying
CN117661868B (en) * 2024-02-01 2024-06-11 江苏泛佳钢结构工程有限公司 Steel construction prefab erection equipment of rectifying
CN117803116A (en) * 2024-02-29 2024-04-02 山东铭城环保新材料科技有限公司 Assembled curtain wall structure and construction method thereof
CN117803116B (en) * 2024-02-29 2024-05-07 山东铭城环保新材料科技有限公司 Assembled curtain wall structure and construction method thereof

Also Published As

Publication number Publication date
CN105178479B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN105178479A (en) Construction method of super high-rise component type smart glass curtain wall
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN211523693U (en) Vertical lines curtain system of cell cube aluminum plate
CN205171782U (en) Frame curtain system between stone material edge list
CN109184056B (en) Curtain wall structure with lamp groove and construction method thereof
CN204609074U (en) The staggered modular window wall curtain wall system of thin and thick and modular window wall wherein
CN213653927U (en) Dislocation fish scale aluminum plate curtain wall structure
CN110629913B (en) Curtain wall structure adopting red brick decoration panel and construction method thereof
CN110965684A (en) Small cell body aluminum plate vertical line curtain wall system and installation method thereof
CN107514088A (en) Integrated modular flat-top and its construction method
CN211523694U (en) Vertical lines curtain steelframe system of cell cube aluminum plate
CN218406152U (en) Self-leveling panel without upright posts
CN113503030B (en) Construction method for modularized prefabrication of arc cornice and interval hoisting of arc cornice
CN212689321U (en) Assembled Jinbang board outer wall
CN211774890U (en) Corner flying wing unit plate component
CN205669285U (en) Interlayer Os Draconis glass
CN103572879B (en) For the sky well construction of Integral ceiling
CN211172608U (en) Keel of cold-bending glass curtain wall
CN113605581A (en) Unit plate glass curtain wall roof and construction method thereof
CN209179268U (en) Window wall system type unitized curtain wall
CN208533805U (en) The connector of curtain wall round bar and main structure
CN201924963U (en) Flat plate type evacuation platform
CN203487680U (en) Courtyard structure for integrated suspended ceiling
CN212176209U (en) Big glass cable curtain wall of vestibule
CN213926759U (en) Arc-shaped fen-Hafen channel of subway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 518000 three storehouse 302-03 3, Taoyuan Road, No. 231 Taoyuan Road, Luohu District Sungang street, Shenzhen, Guangdong

Patentee after: Shenzhen Keyuan Construction Group Co., Ltd.

Address before: 518031 twelve floor, Trade Union Mansion, Shang Bu Zhong Road, Futian District, Shenzhen, Guangdong.

Patentee before: Shenzhen Keyuan Construction Group Co., Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 302-03, No. 3, No. 231 Taoyuan Road, Shoot Hill Street, Luohu District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Keyuan Construction Group Co., Ltd.

Address before: 518000 three storehouse 302-03 3, Taoyuan Road, No. 231 Taoyuan Road, Luohu District Sungang street, Shenzhen, Guangdong

Patentee before: Shenzhen Keyuan Construction Group Co., Ltd.