Prior art keywords
column
upright post
curtain wall
fixed
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211668751.1A
Other languages
Chinese (zh)
Other versions
CN115992561B (en
Inventor
黄瀚锋
高长明
邱光健
赵树军
管张伟
阚广志
任选
袁伟
李伟
王腾飞
李永波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Dongfang Taiyang Curtain Wall Co ltd
Original Assignee
Beijing Dongfang Taiyang Curtain Wall Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Dongfang Taiyang Curtain Wall Co ltd filed Critical Beijing Dongfang Taiyang Curtain Wall Co ltd
Priority to CN202211668751.1A priority Critical patent/CN115992561B/en
Publication of CN115992561A publication Critical patent/CN115992561A/en
Application granted granted Critical
Publication of CN115992561B publication Critical patent/CN115992561B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to a visual collaborative construction method of a curtain wall, which belongs to the technical field of curtain wall construction and comprises the following steps: s1, measuring and paying off a curtain wall upright post; s2, each base is correspondingly installed at a corresponding position on the ground through a fixing assembly; s3, fixing the bottom end of the upright post to a corresponding base; wherein, the upper surface of the base is fixed with the coaming, the bottom end of the upright post is inserted into the coaming, two opposite sides of the upright post horizontally slide and are provided with clamping plates, the upright post is provided with a positioning mechanism for pressing the clamping plates on the outer side of the coaming, and a plurality of connecting pieces for fixing the upright post and the clamping plates are arranged between the upright post and the clamping plates; s4, mounting the cross beam after the upright post is mounted; s5, mounting curtain wall plates; s6, cleaning and checking curtain walls. This application has the firm degree that increases between stand and the base to improve the effect of curtain security.

Description

Visual collaborative construction method for curtain wall
Technical Field
The application relates to the technical field of curtain wall construction, in particular to a curtain wall visual collaborative construction method.
Background
The building informatization model is a complete information model, can integrate engineering information, processes and resources of engineering projects at different stages in the whole life cycle into one model, and is convenient for each participant of the engineering projects to use. The real information of the building is simulated by the three-dimensional digital technology, and an information model with mutual coordination and internal consistency can be provided for engineering design and construction, so that the model achieves the integration of design and construction, and each professional cooperative work ensures that the engineering is finished on time according to quality.
The glass curtain wall is a building outer enclosure structure or a decorative structure which is characterized in that a supporting structure system can have certain displacement capacity relative to a main structure and does not share the action of the main structure. The wall body has two types of single-layer glass and double-layer glass. The glass curtain wall is a beautiful and novel building wall decorating method and is a remarkable characteristic of modern high-rise building times.
The existing curtain wall visualization collaborative construction method comprises the following steps: s1, measuring and paying off; s2, mounting a base; s3, installing the upright post, and fixing the bottom end of the upright post to a corresponding base; s4, mounting a cross beam; s5, installing a glass curtain wall; s6, cleaning and checking curtain walls; wherein, fix through two angle steel and a plurality of bolt between stand bottom and the base, the base upper surface is placed to the stand bottom, and two angle steel are placed the stand both sides, fix angle steel and base, angle steel and stand through a plurality of bolts.
Aiming at the related technology, the connection mode of the upright post and the base is not firm enough, the upright post is easy to deviate or incline relative to the base after a long time, and the safety is greatly reduced.
Disclosure of Invention
In order to increase the firmness between the upright posts and the base and improve the safety of the curtain wall, the application provides a visual collaborative construction method of the curtain wall.
The curtain wall visualization collaborative construction method provided by the application adopts the following technical scheme:
a curtain wall visual collaborative construction method comprises the following steps:
s1, measuring and paying off a curtain wall upright post;
s2, each base is correspondingly installed at a corresponding position on the ground through a fixing assembly;
s3, fixing the bottom end of the upright post to a corresponding base; wherein, the upper surface of the base is fixed with the coaming, the bottom end of the upright post is inserted into the coaming, two opposite sides of the upright post horizontally slide and are provided with clamping plates, the upright post is provided with a positioning mechanism for pressing the clamping plates on the outer side of the coaming, and a plurality of connecting pieces for fixing the upright post and the clamping plates are arranged between the upright post and the clamping plates;
s4, mounting the cross beam after the upright post is mounted;
s5, mounting curtain wall plates;
s6, cleaning and checking curtain walls.
Through adopting above-mentioned technical scheme, when carrying out the fixation of stand and base, insert the bounding wall with the stand bottom in, can realize the preliminary location of stand, positioning mechanism compresses tightly the splint outer end in the outside of bounding wall simultaneously, can give the positioning effect who further improves the stand, and is fixed splint, bounding wall and stand three through the connecting piece at last, has increased the firm degree between stand and the base, can avoid the stand to take place skew or slope, has improved curtain security.
Optionally, the positioning mechanism comprises a jacking column and a fixed spring, one end of the clamping plate is positioned at the outer part to jack the coaming tightly, the other end of the clamping plate is positioned in the upright column, and the jacking column is vertically and slidably connected in the upright column; both sides of the top end of the jacking column are obliquely arranged, the inner ends of the clamping plates are inclined planes matched with the inclined planes of the top end of the jacking column, and the fixed springs are fixed between the inclined planes of the two clamping plates; when the jacking column is positioned below the clamping plate, the bottom end of the jacking column is positioned below the upright post, and the outer end of the clamping plate is attached to the outer wall of the upright post; when the top end of the jacking column is positioned above the clamping plate, the fixed spring is in a stretching state, and the coaming is inserted between the outer end of the clamping plate and the outer wall of the upright post.
By adopting the technical scheme, before the upright post is installed, the outer ends of the clamping plates are attached to the outer wall of the upright post, so that the occupied space of the outer part of the upright post is reduced, and the upright post is more beneficial to stacking and carrying; when the stand is inserted in the bounding wall, the jack-prop bottom receives the extrusion earlier and upwards moves to extrude two splint inner, two splint all outwards move, make between splint outer end and the stand form and supply bounding wall male space, need not manual adjustment, after the stand inserts in the bounding wall, can install the connecting piece, improved operating efficiency.
Optionally, in S3, the connecting piece is a bolt, and one end of the connecting piece penetrates through the clamping plate and the coaming and is in threaded connection with the upright post.
Through adopting above-mentioned technical scheme, can make splint and stand press from both sides the coaming tight after the connecting piece installation, simple structure and simple operation.
Optionally, in S4, the lower surface of the lowermost beam is attached to the upper surface of the clamping plate.
Through adopting above-mentioned technical scheme, make splint can play the supporting role to the crossbeam of below to improve curtain security.
Optionally, the top column comprises an outer tube and an inner column vertically sliding in the outer tube, and a supporting spring positioned in the outer tube is fixed at the bottom end of the inner column; the end part of the bottommost cross beam is provided with a dismounting mechanism for extruding the inclined plane at the top end of the inner column to enable the inclined plane to descend; the inner column is separated from the clamping plate after being extruded to descend, and a connecting component which can automatically fix the inner column after the inner column descends is arranged between the outer tube and the inner column.
By adopting the technical scheme, when the upright post and the base are required to be disassembled, the top end of the inner post is extruded through the disassembling mechanism, so that the inner post descends in the outer pipe, the inner post is automatically fixed through the connecting component, and the inner post is separated from the clamping plate at the moment; when stand and base separation make splint and bounding wall separation, fixed spring drives two splint inwards to remove to automatic occupation space at the stand outside that reduces improves the simple operation nature.
Optionally, the connecting assembly comprises a connecting spring and a connecting block, one side of the inner column is provided with a containing groove, the connecting spring is fixed in the containing groove, and the connecting block slides in the containing groove and is fixed with the connecting spring; the draw-in groove that communicates in the holding tank has been seted up to the outer tube inner wall, and connecting spring is in the natural state, and the connecting block is located holding tank and draw-in groove simultaneously, and the connecting block is located the one end of draw-in groove and is circular-arc.
By adopting the technical scheme, when the inner column descends to enable the accommodating groove to be communicated with the clamping groove, the connecting spring can automatically insert the connecting block into the clamping groove, and the automatic fixing of the position of the inner column is completed; the setting of connecting block circular-arc tip can be after the stand is torn down, moves the inner column from the stand top inwards, makes the inner column reset in order to install next time.
Optionally, the detaching mechanism includes extrusion post and drive assembly, and extrusion post horizontal sliding connection is in the crossbeam of below, and inside the stand was inserted to one end, and the end on extrusion post towards interior post top is the inclined plane, and drive assembly installs on the crossbeam of below to be used for driving extrusion post and slide.
By adopting the technical scheme, after the upright post and the cross beam are installed, one end of the extrusion column is inserted into the upright post through the driving assembly, so that the firmness between the upright post and the cross beam can be improved; when the stand column and the base are required to be disassembled, the extrusion column slides in the stand column through the driving assembly, and after the extrusion column extrudes the inner column, the extrusion column is completely retracted into the cross beam through the driving assembly, so that the disassembly efficiency of the inner column and the cross beam is improved.
Optionally, the drive assembly includes pivot, gear and rack, and the pivot rotates to be connected on the crossbeam, and the gear is coaxial to be fixed in the pivot and be located the crossbeam, and the rack is fixed and with the extrusion post meshing with the gear.
Through adopting above-mentioned technical scheme, rotate the pivot and make the gear rotate, can drive the extrusion stem through the rack and rotate.
Optionally, the lateral wall of outer tube is fixed with the slider, and the spout has been seted up vertically to the stand inside wall, and the slider slides in the spout.
Through adopting above-mentioned technical scheme, during the stand installation, the outer tube receives the base extrusion and upwards moves, and the slider moves up in the spout simultaneously, has improved the sliding stability of outer tube and inner column.
Optionally, the fixed subassembly includes a plurality of pre-buried screw rods and nut, and the pre-buried screw rod is vertical to be fixed in ground and run through the base, and nut threaded connection compresses tightly the base on the pre-buried screw rod.
Through adopting above-mentioned technical scheme, after the subaerial is placed to the base, a plurality of pre-buried screw rods run through the base, screw up the nut again on the pre-buried screw rod, can realize the fixed of base, simple structure and simple operation.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the bottom end of the upright post is inserted into the coaming, the initial positioning of the upright post can be realized, meanwhile, the outer end of the clamping plate is pressed on the outer side of the coaming by the positioning mechanism, the positioning effect of the upright post can be further improved, and finally, the clamping plate, the coaming and the upright post are fixed through the connecting piece, so that the firmness degree between the upright post and the base is improved, the offset or inclination of the upright post can be avoided, and the safety of the curtain wall is improved;
2. before the upright post is installed, the outer ends of the clamping plates are attached to the outer wall of the upright post, so that the occupied space of the outer part of the upright post is reduced, and the upright post is more beneficial to stacking and carrying; when the upright post is inserted into the coaming, the jacking posts extrude the inner ends of the two clamping plates, so that a space for the coaming to be inserted is formed between the outer ends of the clamping plates and the upright post, manual adjustment is not needed, and the operation efficiency is improved;
3. the top end of the inner column is extruded through the dismounting mechanism, so that the inner column descends in the outer tube, the inner column is automatically fixed through the connecting component, and the inner column is separated from the clamping plate at the moment; when stand and base separation make splint and bounding wall separation, fixed spring drives two splint inwards to remove to automatic occupation space at the stand outside that reduces improves the simple operation nature.
Drawings
FIG. 1 is a partial cross-sectional view of an embodiment of the present application;
fig. 2 is an enlarged view of a portion a of fig. 1 showing a connection assembly.
In the figure, 1, a base; 12. coaming plate; 2. a column; 21. a clamping plate; 22. a chute; 3. a positioning mechanism; 31. a top column; 311. an outer tube; 3111. a support spring; 3112. a slide block; 3113. a clamping groove; 312. an inner column; 3121. a receiving groove; 32. a fixed spring; 4. a connecting piece; 5. a cross beam; 6. a connection assembly; 61. a connecting spring; 62. a connecting block; 7. a dismounting mechanism; 71. an extrusion column; 72. a drive assembly; 721. a rotating shaft; 722. a gear; 723. a rack; 8. a fixing assembly; 81. embedding a screw; 82. and (3) a nut.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-2.
The embodiment of the application discloses a curtain wall visualization collaborative construction method.
The visual collaborative construction method of the curtain wall comprises the following steps:
s1, measuring and paying-off of the curtain wall upright posts 2.
S2, referring to FIG. 1, each base 1 is correspondingly installed at a corresponding position on the ground through a plurality of groups of fixing assemblies 8; the fixing assembly 8 comprises an embedded screw 81 vertically fixed on the ground and two nuts 82 in threaded connection with the embedded screw 81, the embedded screw 81 penetrates through the base 1, and the nuts 82 are pressed on the base 1.
S3, referring to FIG. 1, the bottom end of the upright post 2 is fixed on the corresponding base 1; wherein, the vertical bounding wall 12 that is fixed with of base 1 upper surface, in the bounding wall 12 was inserted to stand 2 bottom, the opposite both sides horizontal slip of stand 2 had the symmetry to set up and be the splint 21 of L shape, is equipped with on the stand 2 and is used for making splint 21 compress tightly the positioning mechanism 3 in the bounding wall 12 outside, is equipped with a plurality of connecting pieces 4 fixed with both between stand 2 and the splint 21, and connecting piece 4 is the bolt, and connecting piece 4 runs through splint 21 and bounding wall 12 back and screw up with stand 2 screw thread in proper order.
After the bottom end of the upright post 2 is inserted into the coaming 12, preliminary positioning is realized, and meanwhile, the positioning mechanism 3 enables the two clamping plates 21 to be tightly pressed on the inner side of the coaming 12, and the clamping plates 21, the coaming 12 and the upright post 2 are fixed through the connecting piece 4, so that the firmness between the upright post 2 and the base 1 is increased, the deflection or inclination of the upright post 2 can be avoided, and the safety of the curtain wall is improved.
Referring to fig. 1, the positioning mechanism 3 includes a top column 31 located in the column 2 and disposed vertically, and a fixing spring 32 located in the column 2 and fixed horizontally between the two clamping plates 21; the top column 31 comprises an outer tube 311 and an inner column 312 sliding in the outer tube 311, the outer tube 311 is positioned below the inner column 312, and a supporting spring 3111 positioned in the outer tube 311 is fixed at the bottom end of the inner column 312; the top ends of the inner posts 312 are inclined toward the side walls of the clamping plates 21, and the end parts of the clamping plates 21, which face the top ends of the inner posts 312, are provided with inclined surfaces matched with the inclined surfaces of the top ends of the inner posts 312. Before the upright post 2 is installed, the bottom ends of the outer tube 311 and the supporting spring 3111 are both positioned below the upright post 2, the inner column 312 does not squeeze the clamping plate 21, the fixed spring 32 is in a natural state, and the outer end of the clamping plate 21 is attached to the outer wall of the upright post 2; after the upright post 2 is inserted into the coaming 12, the inner post 312 moves upwards to push the movable clamping plate 21, the fixed spring 32 stretches, and a space for the coaming 12 to be inserted is formed between the outer end of the clamping plate 21 and the outer wall of the upright post 2.
Before the upright post 2 is installed, the outer ends of the clamping plates 21 are attached to the outer wall of the upright post 2, so that the occupied space of the outer part of the upright post 2 is reduced, and the upright post 2 is more beneficial to stacking and carrying; when the upright post 2 is installed, the inner column 312 automatically extrudes the two clamping plates 21 outwards, so that the coaming 12 is inserted between the outer wall of the upright post 2 and the outer end of the clamping plates 21, manual adjustment is not needed, and the operation convenience is improved.
Referring to fig. 1, the sliding blocks 3112 are fixed on two opposite sides of the outer tube 311, the sliding grooves 22 are vertically formed on opposite inner walls of the upright post 2, and the sliding blocks 3112 slide in the corresponding sliding grooves 22, so that sliding stability of the outer tube 311 is improved.
S4, referring to fig. 1 and 2, after the upright post 2 is installed, the cross beam 5 is installed; the outer bottom wall of the bottommost cross beam 5 is attached to the upper surface of the clamping plate 21, and the end part of the bottommost cross beam 5 is provided with a dismounting mechanism 7 for extruding the top inclined plane of the inner column 312 to enable the top inclined plane to descend to be separated from the clamping plate 21; a connecting component 6 which can automatically fix the inner column 312 after the inner column 312 descends is arranged between the outer tube 311 and the inner column 312. If disassembly between the upright post 2 and the base 1 is required, the top end of the inner column 312 is extruded through the disassembly mechanism 7, so that the inner column 312 descends in the outer tube 311, meanwhile, the inner column 312 is automatically fixed by the connecting component 6, the inner column 312 and the clamping plates 21 are in a separated state, when the upright post 2 is separated from the base 1, the clamping plates 21 are separated from the coaming 12, the fixing springs 32 drive the two clamping plates 21 to move inwards, the occupied space of the clamping plates 21 outside the upright post 2 is automatically reduced, and subsequent transportation and stacking are facilitated.
Referring to fig. 2, an accommodating groove 3121 is horizontally opened at one side of the inner column 312, and a clamping groove 3113 for communicating with the accommodating groove 3121 is opened at the inner side of the outer tube 311; the connection assembly 6 includes a connection spring 61 horizontally fixed in the receiving groove 3121, a connection block 62 sliding in the receiving groove 3121 and fixed with the connection spring 61; after the disassembly mechanism 7 extrudes the inner column 312 downwards, the accommodating groove 3121 is communicated with the clamping groove 3113, and at the moment, the connecting spring 61 pushes one end of the connecting block 62 into the clamping groove 3113, so that the automatic fixing of the position of the inner column 312 is realized; and one end of the connecting block 62, which is positioned in the clamping groove 3113, is arc-shaped, so that the subsequent resetting of the inner column 312 is facilitated.
Referring to fig. 1, the dismounting mechanism 7 includes a squeeze column 71 horizontally slid in the lowermost cross beam 5, a driving assembly 72 for driving the squeeze column 71 to horizontally move; one end of the extrusion column 71 is inserted into the upright post 2, and the other end is positioned in the cross beam 5, so that the firmness between the upright post 2 and the cross beam 5 can be improved; the end of the extrusion column 71 in the upright column 2 is provided with an inclined plane matched with the inclined plane at the top end of the inner column 312; the driving assembly 72 includes a rotary shaft 721 horizontally rotatably connected to the cross member 5, a gear 722 coaxially fixed to the rotary shaft 721 and located in the cross member 5, and a rack 723 horizontally fixed to the extrusion column 71 and engaged with the gear 722; the reciprocating movement of the extrusion column 71 can be realized by rotating the rotating shaft 721, and the disassembly efficiency of the cross beam 5 and the upright column 2 is improved.
S5, mounting curtain wall glass plates.
S6, cleaning and checking curtain walls.
The embodiments of the present invention are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in this way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (10)

1. A visual collaborative construction method of curtain wall is characterized in that: the method comprises the following steps:
s1, measuring and paying-off of curtain wall upright posts (2);
s2, each base (1) is correspondingly installed at a corresponding position on the ground through a fixing assembly (8);
s3, fixing the bottom end of the upright post (2) to the corresponding base (1); wherein, the upper surface of the base (1) is fixed with a coaming (12), the bottom end of the upright post (2) is inserted into the coaming (12), two opposite sides of the upright post (2) horizontally slide with clamping plates (21), the upright post (2) is provided with a positioning mechanism (3) for tightly pressing the clamping plates (21) on the outer side of the coaming (12), and a plurality of connecting pieces (4) for fixing the upright post (2) and the clamping plates (21) are arranged between the upright post (2) and the clamping plates;
s4, after the upright post (2) is installed, the cross beam (5) is installed;
s5, mounting curtain wall plates;
s6, cleaning and checking curtain walls.
2. The curtain wall visualization cooperative construction method according to claim 1, wherein the method comprises the following steps: the positioning mechanism (3) comprises a jacking column (31) and a fixed spring (32), one end of the clamping plate (21) is positioned at the outer jacking coaming (12), the other end of the clamping plate is positioned in the upright column (2), and the jacking column (31) is vertically and slidably connected in the upright column (2); both sides of the top end of the jacking column (31) are obliquely arranged, the inner end of the clamping plate (21) is provided with an inclined plane matched with the inclined plane of the top end of the jacking column (31), and the fixed spring (32) is fixed between the inclined planes of the two clamping plates (21); when the jacking column (31) is positioned below the clamping plate (21), the bottom end of the jacking column (31) is positioned below the upright post (2), and the outer end of the clamping plate (21) is attached to the outer wall of the upright post (2); when the top end of the top column (31) is positioned above the clamping plate (21), the fixed spring (32) is in a stretching state, and the coaming (12) is inserted between the outer end of the clamping plate (21) and the outer wall of the upright post (2).
3. The curtain wall visualization cooperative construction method according to claim 1, wherein the method comprises the following steps: in S3, the connecting piece (4) is a bolt, and one end of the connecting piece (4) penetrates through the clamping plate (21) and the coaming (12) and then is in threaded connection with the upright post (2).
4. The curtain wall visualization cooperative construction method according to claim 2, wherein the method comprises the following steps: in S4, the lower surface of the lowest cross beam (5) is attached to the upper surface of the clamping plate (21).
5. The visual collaborative construction method for the curtain wall according to claim 4, which is characterized in that: the top column (31) comprises an outer tube (311) and an inner column (312) vertically sliding in the outer tube (311), and a supporting spring (3111) positioned in the outer tube (311) is fixed at the bottom end of the inner column (312); the end part of the beam (5) at the lowest part is provided with a dismounting mechanism (7) for extruding the top inclined surface of the inner column (312) to enable the inner column to descend; the inner column (312) is separated from the clamping plate (21) after being extruded and lowered, and a connecting component (6) which can automatically fix the inner column (312) after the inner column (312) is lowered is arranged between the outer tube (311) and the inner column (312).
6. The visual collaborative construction method for curtain wall according to claim 5, which is characterized in that: the connecting assembly (6) comprises a connecting spring (61) and a connecting block (62), wherein a containing groove (3121) is formed in one side of the inner column (312), the connecting spring (61) is fixed in the containing groove (3121), and the connecting block (62) slides in the containing groove (3121) and is fixed with the connecting spring (61); the inner wall of the outer tube (311) is provided with a clamping groove (3113) communicated with the accommodating groove (3121), when the connecting spring (61) is in a natural state, the connecting block (62) is simultaneously positioned in the accommodating groove (3121) and the clamping groove (3113), and one end of the connecting block (62) positioned in the clamping groove (3113) is arc-shaped.
7. The visual collaborative construction method for curtain wall according to claim 5, which is characterized in that: the disassembly body (7) comprises an extrusion column (71) and a driving assembly (72), wherein the extrusion column (71) is horizontally and slidably connected in the bottommost cross beam (5), one end of the extrusion column is inserted into the upright column (2), the end part of the extrusion column (71) facing the top end of the inner column (312) is an inclined plane, and the driving assembly (72) is installed on the bottommost cross beam (5) and used for driving the extrusion column (71) to slide.
8. The curtain wall visualization cooperative construction method according to claim 7, wherein: the driving assembly (72) comprises a rotating shaft (721), a gear (722) and a rack (723), the rotating shaft (721) is rotatably connected to the cross beam (5), the gear (722) is coaxially fixed on the rotating shaft (721) and positioned in the cross beam (5), and the rack (723) is fixed with the extrusion column (71) and meshed with the gear (722).
9. The visual collaborative construction method for curtain wall according to claim 5, which is characterized in that: the outer side wall of the outer tube (311) is fixed with a sliding block (3112), a sliding groove (22) is vertically formed in the inner side wall of the upright post (2), and the sliding block (3112) slides in the sliding groove (22).
10. The curtain wall visualization cooperative construction method according to claim 1, wherein the method comprises the following steps: the fixing assembly (8) comprises a plurality of embedded screws (81) and nuts (82), wherein the embedded screws (81) are vertically fixed in the ground and penetrate through the base (1), and the nuts (82) are in threaded connection with the embedded screws (81) and compress the base (1).
CN202211668751.1A 2022-12-24 2022-12-24 Visual collaborative construction method for curtain wall Active CN115992561B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211668751.1A CN115992561B (en) 2022-12-24 2022-12-24 Visual collaborative construction method for curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211668751.1A CN115992561B (en) 2022-12-24 2022-12-24 Visual collaborative construction method for curtain wall

Publications (2)

Publication Number Publication Date
CN115992561A true CN115992561A (en) 2023-04-21
CN115992561B CN115992561B (en) 2023-07-14

Family

ID=85991599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211668751.1A Active CN115992561B (en) 2022-12-24 2022-12-24 Visual collaborative construction method for curtain wall

Country Status (1)

Country Link
CN (1) CN115992561B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07217214A (en) * 1994-02-09 1995-08-15 Fujita Corp Assembling device of exterior curtain wall
CN105178479A (en) * 2015-06-15 2015-12-23 深圳市科源建设集团有限公司 Construction method of super high-rise component type smart glass curtain wall
CN204983281U (en) * 2015-07-30 2016-01-20 南通新华幕墙门窗有限公司 Splint formula fixture of curtain stand
CN207727816U (en) * 2017-12-04 2018-08-14 山东泰信幕墙工程有限公司 Pedestal blot lock for glass of building curtain wall
CN210508474U (en) * 2019-06-05 2020-05-12 中建八局第三建设有限公司 Integral curtain wall node connecting device for reconstruction project
CN214531391U (en) * 2021-04-27 2021-10-29 中机工程有限公司 Outer facade curtain decorative structure of old building
CN215630884U (en) * 2021-01-26 2022-01-25 江苏澳威德幕墙装饰有限公司 Curtain wall upright post clamping device
CN217400012U (en) * 2021-10-26 2022-09-09 中建八局天津建设工程有限公司 Building outer curtain wall fixed mounting equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07217214A (en) * 1994-02-09 1995-08-15 Fujita Corp Assembling device of exterior curtain wall
CN105178479A (en) * 2015-06-15 2015-12-23 深圳市科源建设集团有限公司 Construction method of super high-rise component type smart glass curtain wall
CN204983281U (en) * 2015-07-30 2016-01-20 南通新华幕墙门窗有限公司 Splint formula fixture of curtain stand
CN207727816U (en) * 2017-12-04 2018-08-14 山东泰信幕墙工程有限公司 Pedestal blot lock for glass of building curtain wall
CN210508474U (en) * 2019-06-05 2020-05-12 中建八局第三建设有限公司 Integral curtain wall node connecting device for reconstruction project
CN215630884U (en) * 2021-01-26 2022-01-25 江苏澳威德幕墙装饰有限公司 Curtain wall upright post clamping device
CN214531391U (en) * 2021-04-27 2021-10-29 中机工程有限公司 Outer facade curtain decorative structure of old building
CN217400012U (en) * 2021-10-26 2022-09-09 中建八局天津建设工程有限公司 Building outer curtain wall fixed mounting equipment

Also Published As

Publication number Publication date
CN115992561B (en) 2023-07-14

Similar Documents

Publication Publication Date Title
CN111075128B (en) Assembled wallboard coupling assembling
CN115992561B (en) Visual collaborative construction method for curtain wall
CN113738100B (en) Early-support later-fixing early-dismantling formwork system and construction method thereof
CN110501001B (en) Laser level meter bracket
CN113857296A (en) Sheet metal flattening straightener
CN113530121A (en) Aluminum-plastic panel mounting structure for architectural decoration
CN117359761A (en) Automatic side form opening and closing mechanism and prefabricated component group vertical die
CN219443041U (en) Stamping die capable of adjusting stamping angle
CN213859831U (en) Brick production mould permeates water
CN113389371B (en) Early-dismantling formwork system and construction method thereof
CN220576206U (en) Concrete examination mould preparation facilities
CN114622759B (en) Sliding formwork construction method for wall column with different-deformation cross-section structure of granary
CN112227737A (en) Wallboard fixing bracket with splicing structure for constructional engineering
CN220395261U (en) Supporting frame for building structure wall
CN220363029U (en) Tablet press with clearance structure
CN217528944U (en) Aluminum mould production is with compression fittings that has location structure
CN220539281U (en) Safety protection device for prefabricated stairway opening
CN221362695U (en) Iron powder core magnetic ring hydraulic press capable of improving demolding stability
CN117021657B (en) Intelligent metal wave tooth graphite composite gasket production system and use method
CN220739154U (en) Aluminum profile extrusion die
CN220685781U (en) Steel fireproof railing
CN219825603U (en) Steel construction convenient to tensile height-adjusting
CN219081630U (en) Hydraulic support stand dismouting equipment
CN220994862U (en) Inspection shaft steel mould applicable to different heights
CN220623547U (en) Assembled steel structure support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant