CN211523693U - Vertical lines curtain system of cell cube aluminum plate - Google Patents
Vertical lines curtain system of cell cube aluminum plate Download PDFInfo
- Publication number
- CN211523693U CN211523693U CN201922345086.2U CN201922345086U CN211523693U CN 211523693 U CN211523693 U CN 211523693U CN 201922345086 U CN201922345086 U CN 201922345086U CN 211523693 U CN211523693 U CN 211523693U
- Authority
- CN
- China
- Prior art keywords
- vertical
- curtain wall
- connecting piece
- vertical keel
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to a small cell body aluminum plate vertical line curtain wall system, which relates to the technical field of curtain wall installation and comprises curtain wall units and decoration units arranged between adjacent curtain wall units; the curtain wall unit comprises upright posts, cross beams fixedly arranged between the adjacent upright posts and glass curtain walls arranged on the upright posts and the cross beams; the decoration unit includes horizontal fossil fragments, sets firmly first vertical keel between horizontal fossil fragments, sets firmly the second vertical keel at horizontal fossil fragments both ends respectively and sets firmly the aluminium veneer on first vertical keel and second vertical keel, the second fossil fragments pass through coupling assembling and are connected with the stand. The utility model has the advantages of the installation effectiveness is high, practice thrift time limit for a project and the quality controllability is strong.
Description
Technical Field
The utility model belongs to the technical field of the technique of curtain installation and specifically relates to a vertical lines curtain system of cell cube aluminum plate is related to.
Background
The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, and is a light wall with a decorative effect commonly used by modern large-scale and high-rise buildings. At present, with the rapid development of economy and the acceleration of urbanization process in China, the requirements of people on the shape of a building structure are higher and higher. The form of the building curtain wall is also complicated and changeable, and two or more curtain wall forms are mixed and matched.
At present, refer to fig. 1, the mounting means of the vertical lines glass curtain wall of aluminum plate, including the glass curtain wall 13 that vertical interval set up and the aluminium veneer 3 of setting between glass curtain wall 13, glass curtain wall 13 is fixed through stand 11 and the crossbeam 12 of drawing with the building alone, aluminium veneer 3 is fixed through stand 6 and the horizontal keel 21 of drawing with former building alone, during the installation, need alone to stand 11, crossbeam 12 and stand 6, horizontal keel 21 fix a position the unwrapping wire → pre-buried steel sheet → install stand 11, crossbeam 12 and stand 6, horizontal keel 21 respectively, adopt this kind of mounting method, the installation procedure is many, the construction cycle is long.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a vertical lines curtain system of cell cube aluminum plate has the advantage that the installation effectiveness is high, practice thrift the time limit for a project.
The utility model discloses a utility model purpose can realize through following technical scheme:
a small cell aluminum plate vertical line curtain wall system comprises curtain wall units and decoration units arranged between the adjacent curtain wall units;
the curtain wall unit comprises upright posts, cross beams fixedly arranged between the adjacent upright posts and glass curtain walls arranged on the upright posts and the cross beams;
the decoration unit includes horizontal fossil fragments, sets firmly first vertical keel between horizontal fossil fragments, sets firmly the second vertical keel at horizontal fossil fragments both ends respectively and sets firmly the aluminium veneer on first vertical keel and second vertical keel, the second fossil fragments pass through coupling assembling and are connected with the stand.
Through adopting above-mentioned technical scheme, through installing the curtain unit earlier, then the mill will cross keel, first vertical keel, second vertical keel and aluminium veneer equipment prefabrication form the decoration unit, when the installation, will decorate the unit hoist and mount to between the adjacent curtain unit, will decorate the unit through coupling assembling and fix on the stand, reduced the on-the-spot and fix a position the cross keel of aluminium veneer, the step of installation, it is high to have the installation effectiveness, practice thrift time limit for a project and mill's processing, quality controllability is strong advantage.
The utility model discloses further set up to: coupling assembling sets firmly the second connecting piece on second vertical keel including setting firmly the first connecting piece on the stand, the fixed slot has been seted up on the first connecting piece, the draw-in groove has been seted up on the second connecting piece, the draw-in groove card is gone into the fixed slot and is fixed second vertical keel on the stand.
Through adopting above-mentioned technical scheme, will decorate the unit and carry out fixed connection with the stand through the mode of the mutual joint of first connecting piece and second connecting piece, it is more convenient to install, and is quick, improves the efficiency of construction.
The utility model discloses further set up to: the first bolt sliding groove with an outward opening is fixedly arranged in the upright column along the length direction of the upright column, a first positioning bolt which penetrates through a first connecting piece to position the first positioning bolt is arranged in the first bolt sliding groove, and a first self-tapping screw which fixes the first positioning bolt on the upright column is further arranged on the first connecting piece.
Through adopting above-mentioned technical scheme, can fix first connecting piece prepositioning on the stand through first positioning bolt, after decorating the unit installation, can adjust first connecting piece to accurate position through first positioning bolt, fix first connecting piece on the stand through first self-tapping screw at last, the installation accuracy is high, stability is good.
The utility model discloses further set up to: and a second bolt sliding groove with an outward opening is formed in the second vertical keel, a second positioning bolt for positioning the second connecting piece is arranged in the second bolt sliding groove, and a second self-tapping screw for fixing the second connecting piece on the second vertical keel is further arranged on the second connecting piece.
Through adopting above-mentioned technical scheme, can fix second connecting piece prepositioning on second vertical keel through second positioning bolt, after decorating the unit installation, can adjust the second connecting piece to the accurate position through second positioning bolt, fix the second connecting piece on second vertical keel through second self-tapping screw at last, the installation accuracy is high, stability is good.
The utility model discloses further set up to: first vertical keel and second vertical keel have set firmly the third bolt spout respectively towards one side of horizontal fossil fragments, set firmly first vertical keel and second vertical keel respectively on horizontal fossil fragments through bolt and angle aluminium.
Through adopting above-mentioned technical scheme, through setting up third bolt spout, be convenient for connect horizontal keel and vertical keel, require lowly, simple to operate to installation accuracy between them.
The utility model discloses further set up to: the aluminum single plate is internally folded at the upper end and the lower end to form flanges, and stiffening ribs are fixedly arranged between the flanges and the aluminum single plate.
Through adopting above-mentioned technical scheme, guarantee the intensity of aluminium veneer concatenation department through setting up the stiffening rib, prevent that it from taking place to warp.
The utility model discloses further set up to: and sealant is filled between the upper and lower adjacent flanges.
By adopting the technical scheme, the attractiveness and the sealing performance between the upper aluminum veneer and the lower aluminum veneer are ensured.
The utility model discloses further set up to: the upright post is fixedly arranged on an embedded steel plate through an L-shaped connecting piece, and the embedded steel plate is fixedly arranged on a building.
To sum up, the utility model discloses a beneficial technological effect does:
1. the curtain wall unit is constructed firstly, the decoration units are machined in advance in a factory, when the curtain wall unit is installed, the decoration units are transported to a construction site and hoisted, and the decoration units are hung on the upright posts through the matching of the first connecting piece and the second connecting piece, so that the installation is more convenient and the efficiency is high, the transverse keel and the vertical keel of the aluminum veneer do not need to be positioned and installed on site, the construction steps are reduced, a large amount of work is completed in the factory, the quality controllability is strong, the site is directly hoisted, the installation efficiency is high, the period is saved, and the labor cost on site is reduced;
2. by arranging the first positioning bolt, the second positioning bolt, the first self-tapping screw and the second self-tapping screw, when the decorative unit is installed, the first connecting piece and the second connecting piece are respectively pre-positioned on the upright post and the second vertical keel by the first positioning bolt and the second positioning bolt, the decorative unit is hoisted, so that the first connecting piece and the second connecting piece are matched with each other, then the first connecting piece and the second connecting piece are respectively subjected to position adjustment by the first positioning bolt and the second positioning bolt, after the adjustment is finished, the first positioning bolt and the second positioning bolt are screwed, and the first connecting piece and the second connecting piece are respectively fixedly connected with the corresponding upright post and the corresponding second vertical keel by the first self-tapping screw and the second self-tapping screw, so that the installation accuracy and stability of the decorative unit are ensured;
3. through setting up the stiffening rib, guarantee the intensity of aluminium veneer concatenation department, prevent that it from taking place to warp.
Drawings
FIG. 1 is a schematic structural diagram of the background art of the present invention;
FIG. 2 is a front view of the curtain wall unit and the decoration unit of the present invention;
fig. 3 is a schematic cross-sectional view of the present invention;
FIG. 4 is a schematic cross-sectional view of 1-1 of FIG. 3;
FIG. 5 is an enlarged partial schematic view of portion A of FIG. 3;
FIG. 6 is a side view of the first and second connectors of the present invention mated;
fig. 7 is a schematic cross-sectional view of 2-2 of fig. 3.
In the figure, 1, a curtain wall unit; 11. a column; 111. a first bolt chute; 112. a first positioning bolt; 113. a first tapping screw; 12. a cross beam; 13. a glass curtain wall; 2. a decoration unit; 21. a transverse keel; 22. a first vertical keel; 221. a third bolt chute; 23. a second vertical keel; 231. a second bolt chute; 232. a second positioning bolt; 233. a second tapping screw; 3. an aluminum veneer; 31. flanging; 4. a connecting assembly; 41. a first connecting member; 42. a second connecting member; 5. a stiffening rib; 6. a vertical keel.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Refer to fig. 2, do the utility model discloses a vertical lines curtain system of cell cube aluminum plate, including the curtain unit 1 that vertical interval set up, install the polylith between the adjacent curtain unit 1 and decorate unit 2.
Referring to fig. 3, the curtain wall unit 1 includes two left and right parallel columns 11, the columns 11 are fixed on the embedded steel plate through the L-shaped connecting member, the embedded steel plate is anchored on the building through the anchor bolt, a plurality of beams 12 are arranged between the two columns 11 at intervals, and the beams 12 are fixedly connected with the columns 11 through the connecting member and the bolt set. Glass curtain walls 13 are mounted on the vertical columns 11 and the transverse beams 12, and the glass curtain walls 13 are respectively fixed with the vertical columns 11 and the transverse beams 12 through auxiliary frames on the glass curtain walls.
Referring to fig. 3 and 4, the decoration unit 2 includes cross members 21 arranged in parallel up and down, first furring channels 22 are fixedly provided between the cross members 21 at the outer sides thereof, and the first furring channels 22 are provided at the middle positions of the cross members 21. The both ends at horizontal fossil fragments 21 are fixed respectively and are provided with second vertical keel 23, second vertical keel 23 respectively with two horizontal fossil fragments 21 rigid couplings from top to bottom, horizontal fossil fragments 21, the combination of first vertical keel 22 and second vertical keel 23 forms the skeleton of decorating unit 2, be provided with aluminium veneer 3 outside the skeleton, aluminium veneer 3 sets firmly respectively on first vertical keel 22 and second vertical keel 23, aluminium veneer 3 is unsmooth form simultaneously, increases aluminium veneer 3's spatiality and aesthetic property. The second stud 23 is connected to the upright 11 by means of the connecting assembly 4, so as to fix the decorative unit 2 to the upright 11. After the curtain wall unit 1 is installed, the decoration unit 2 is processed and assembled in advance in a factory, and then is transported to a construction site to be directly hoisted to the position between the curtain wall unit 1 to be fixedly connected with the upright post 11 through the connecting component 4. The decorative unit 2 does not need to be installed for measurement and paying-off and field assembly, construction steps are saved, installation is convenient, and the period is saved.
Combine fig. 5 and fig. 6, coupling assembling 4 includes first connecting piece 41 and second connecting piece 42, first connecting piece 41 is fixed to be set up in one side that stand 11 is close to aluminium veneer 3, second connecting piece 42 sets firmly in one side that second vertical keel 23 is close to stand 11, the opening fixed slot up has been seted up on first connecting piece 41 simultaneously, opening draw-in groove down has been seted up on second connecting piece 42, the draw-in groove card is gone into in the fixed slot and is set up the U-shaped cushion between the two, second vertical keel 23 is hung through second connecting piece 42 and is established on stand 11, will decorate unit 2 and fix on stand 11, the mode through coupling assembling 4 joint will decorate unit 2 and carry out fixed connection with stand 11, it is more convenient to install, it is quick, and the construction efficiency is improved.
A first bolt sliding groove 111 with an outward opening is integrally formed in the upright post 11 along the length direction of the upright post 11, the first bolt sliding groove 111 is arranged on one side, away from the building, of the upright post 11, a first positioning bolt 112 is slidably arranged in the first bolt sliding groove 111, one end of the first positioning bolt 112 extends out of the first bolt sliding groove 111, penetrates through the first connecting piece 41, fixes the position of the first connecting piece 41 by screwing a nut, and after the first connecting piece 41 is positioned, the first connecting piece 41 is fixedly connected with the upright post 11 by using a first self-tapping screw 113.
Along the length direction of second vertical keel 23 and its inside integrated into one piece have the second bolt spout 231 that the opening is outside, and one side that second bolt spout 231 is close to stand 11 sets up, is provided with the second positioning bolt 232 with the location of second connecting piece 42 in the second bolt spout 231, and second connecting piece 42 passes through second self-tapping screw 233 with its and second vertical keel 23 fixed connection simultaneously. During installation, the first connecting piece 41 and the second connecting piece 42 are respectively positioned on the upright post 11 and the second vertical keel 23 in advance by using the first positioning bolt 112 and the second positioning bolt 232, the decoration unit 2 is hoisted, the first connecting piece 41 and the second connecting piece 42 are matched with each other, if the positions of the first connecting piece 41 and the second connecting piece 42 have errors, the first connecting piece 41 and the second connecting piece 42 are respectively adjusted by using the first positioning bolt 112 and the second positioning bolt 232, after the adjustment is completed, the first positioning bolt 112 and the second positioning bolt 232 are screwed, and the first connecting piece 41 and the second connecting piece 42 are respectively fixedly connected with the corresponding upright post 11 and the corresponding second vertical keel 23 by using the first self-tapping screw 113 and the second self-tapping screw 233, so that the installation accuracy and stability are ensured.
At first vertical keel 22 and second vertical keel 23 towards one side of horizontal keel 21 one side respectively integrated into one piece have third bolt spout 221, and third bolt spout 221 opening sets up outwards, through bolt group and angle aluminium with first vertical keel 22 and second vertical keel 23 fixed respectively set up on horizontal keel 21, through setting up third bolt spout 221, be convenient for connect horizontal keel 21 and vertical keel, require lowly, simple to operate to installation accuracy between them.
Referring to fig. 7, further, in order to increase the strength of the aluminum single plate 3 and avoid deformation of the aluminum single plate at the joint, the upper and lower ends of the aluminum single plate 3 are respectively folded inwards to form flanges 31, and a stiffening rib 5 is arranged between the flanges 31 and the aluminum single plate 3, the cross section of the stiffening rib 5 is U-shaped, one side of the stiffening rib 5 is attached to the flanges 31 and is nailed together with the flanges, and the other side of the stiffening rib 5 is folded to form an edge attached to the aluminum single plate 3 and is nailed together with the aluminum single plate 3. The strength of the splicing part of the aluminum veneer 3 is ensured by arranging the stiffening ribs 5, so that the aluminum veneer is prevented from deforming.
Meanwhile, in order to ensure the beauty and the sealing performance between the upper aluminum veneer 3 and the lower aluminum veneer 3, sealant is filled between the adjacent flanges 31 on the upper aluminum veneer 3 and the lower aluminum veneer 3.
The construction process is as follows:
and S1, assembling the decorative units 2 in a factory, determining the size of each decorative unit 2, positioning and fixing the first vertical keel 22 and the second vertical keel 23 on the cross keel 21 through angle aluminum and bolt groups respectively, installing the aluminum veneer 3, and fixing the end part of the aluminum veneer 3 with the first vertical keel 22 and the second vertical keel 23 respectively. And simultaneously, stiffening ribs 5 are fixedly arranged at the upper end and the lower end of the aluminum veneer 3.
S2, according to the modeling, the size and the drawing requirements of the glass curtain wall 13, positioning and arranging an embedded steel plate on an interlayer structure of a building, anchoring the embedded steel plate on the building through anchor bolts, positioning and paying off the position of the upright post 11, fixing the upright post 11 on the embedded steel plate through an L-shaped connecting piece, and ensuring that the upright post 11 is vertical during installation. Meanwhile, the core column is arranged at the splicing position of the upper and lower upright columns 11, and a gap is reserved between the core column and the splicing position, so that the deformation requirement of the upright columns 11 during expansion with heat and contraction with cold is met.
The elevation position of each beam 12 on the vertical columns 11 is determined, and the beam 12 is fixed between the two vertical columns 11 by using a connecting piece and a bolt set. The glass curtain wall 13 with the attached frame is mounted to the uprights 11 and cross-members 12.
S3, transporting the assembled decoration units 2 to a construction site, correspondingly temporarily fixing the first connecting pieces 41 on the upright posts 11 through the first positioning bolts 112, temporarily fixing the second connecting pieces 42 on the second vertical keels 23, hoisting the decoration units 2 to the positions between the adjacent curtain wall units 1, arranging rubber pads in the fixing grooves, and clamping the clamping grooves into the fixing grooves.
S4, adjusting the first connecting piece 41 and the second connecting piece 42 to precise positions by the first positioning bolt 112 and the second positioning bolt 232, respectively, screwing the first positioning bolt 112 and the second positioning bolt 232, and finally fixing the positions of the first connecting piece 41 and the second connecting piece 42 on the upright 11 and the second vertical keel 23 by the first self-tapping screw 113 and the second self-tapping screw 233, respectively.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a vertical lines curtain system of cell cube aluminum plate which characterized in that: comprises curtain wall units (1) and decorative units (2) arranged between the adjacent curtain wall units (1);
the curtain wall unit (1) comprises upright posts (11), a cross beam (12) fixedly arranged between the adjacent upright posts (11) and glass curtain walls (13) arranged on the upright posts (11) and the cross beam (12);
the decoration unit (2) comprises transverse keels (21), first vertical keels (22) fixedly arranged between the transverse keels (21), second vertical keels (23) fixedly arranged at two ends of the transverse keels (21) respectively, and aluminum veneers (3) fixedly arranged on the first vertical keels (22) and the second vertical keels (23), wherein the second vertical keels (23) are connected with the stand columns (11) through connecting assemblies (4).
2. The small cell aluminum plate vertical line curtain wall system of claim 1, wherein: coupling assembling (4) including set firmly first connecting piece (41) on stand (11) and set firmly second connecting piece (42) on second vertical keel (23), the fixed slot has been seted up on first connecting piece (41), the draw-in groove has been seted up on second connecting piece (42), the draw-in groove card is gone into the fixed slot and is fixed second vertical keel (23) on stand (11).
3. The small cell aluminum plate vertical line curtain wall system of claim 2, wherein: a first bolt sliding groove (111) with an outward opening is fixedly formed in the vertical column (11) along the length direction of the vertical column (11), a first positioning bolt (112) penetrating through a first connecting piece (41) to position the first positioning bolt is arranged in the first bolt sliding groove (111), and a first self-tapping screw (113) fixing the first positioning bolt on the vertical column (11) is further arranged on the first connecting piece (41).
4. The small cell aluminum plate vertical line curtain wall system of claim 2, wherein: the second vertical keel (23) is provided with a second bolt sliding groove (231) with an outward opening, a second positioning bolt (232) for positioning the second connecting piece (42) is arranged in the second bolt sliding groove (231), and the second connecting piece (42) is further provided with a second self-tapping screw (233) for fixing the second self-tapping screw on the second vertical keel (23).
5. The small cell aluminum plate vertical line curtain wall system of claim 1, wherein: first vertical keel (22) and second vertical keel (23) have set firmly third bolt spout (221) respectively towards one side of horizontal fossil fragments (21), set firmly first vertical keel (22) and second vertical keel (23) respectively on horizontal fossil fragments (21) through bolt and angle aluminium.
6. The small cell aluminum plate vertical line curtain wall system of claim 1, wherein: the aluminum veneer (3) is internally folded at the upper end and the lower end to form a flanging (31), and a stiffening rib (5) is fixedly arranged between the flanging (31) and the aluminum veneer (3).
7. The small cell aluminum plate vertical line curtain wall system of claim 6, wherein: and sealant is filled between the upper and lower adjacent flanges (31).
8. The small cell aluminum plate vertical line curtain wall system of claim 1, wherein: the upright post (11) is fixedly arranged on an embedded steel plate through an L-shaped connecting piece, and the embedded steel plate is fixedly arranged on a building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922345086.2U CN211523693U (en) | 2019-12-24 | 2019-12-24 | Vertical lines curtain system of cell cube aluminum plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922345086.2U CN211523693U (en) | 2019-12-24 | 2019-12-24 | Vertical lines curtain system of cell cube aluminum plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211523693U true CN211523693U (en) | 2020-09-18 |
Family
ID=72466557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922345086.2U Active CN211523693U (en) | 2019-12-24 | 2019-12-24 | Vertical lines curtain system of cell cube aluminum plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211523693U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965684A (en) * | 2019-12-24 | 2020-04-07 | 北京凌云宏达幕墙工程有限公司 | A small unit body aluminum plate vertical line curtain wall system and its installation method |
CN112644638A (en) * | 2020-12-03 | 2021-04-13 | 江南造船(集团)有限责任公司 | Marine laboratory leg plate structure |
CN112796445A (en) * | 2021-01-29 | 2021-05-14 | 中建东方装饰有限公司 | Concave upper transverse structure aiming at step difference of unit bodies of building curtain wall |
CN114482357A (en) * | 2022-02-24 | 2022-05-13 | 武汉凌云建筑装饰工程有限公司 | Super-large unit curtain wall with variable-cross-section stainless steel lines and construction method |
-
2019
- 2019-12-24 CN CN201922345086.2U patent/CN211523693U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965684A (en) * | 2019-12-24 | 2020-04-07 | 北京凌云宏达幕墙工程有限公司 | A small unit body aluminum plate vertical line curtain wall system and its installation method |
CN110965684B (en) * | 2019-12-24 | 2025-01-28 | 北京凌云宏达幕墙工程有限公司 | A small unit aluminum plate vertical line curtain wall system and its installation method |
CN112644638A (en) * | 2020-12-03 | 2021-04-13 | 江南造船(集团)有限责任公司 | Marine laboratory leg plate structure |
CN112796445A (en) * | 2021-01-29 | 2021-05-14 | 中建东方装饰有限公司 | Concave upper transverse structure aiming at step difference of unit bodies of building curtain wall |
CN114482357A (en) * | 2022-02-24 | 2022-05-13 | 武汉凌云建筑装饰工程有限公司 | Super-large unit curtain wall with variable-cross-section stainless steel lines and construction method |
CN114482357B (en) * | 2022-02-24 | 2023-11-28 | 武汉凌云建筑装饰工程有限公司 | Oversized unit curtain wall with variable-section stainless steel lines and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211523693U (en) | Vertical lines curtain system of cell cube aluminum plate | |
CN109837992B (en) | Spliced light steel frame structure building system | |
CN112112332B (en) | Glass curtain wall with external stepped decorative box and construction method thereof | |
CN209837410U (en) | Frame curtain wall erection joint structure in entrance to a cave and system thereof | |
CN102003056B (en) | Wall connecting part of insertion type integrated insulation board and application method thereof | |
CN105178479A (en) | Construction method of super high-rise component type smart glass curtain wall | |
CN104120811A (en) | Metal panel unitized curtain wall system | |
CN110965684B (en) | A small unit aluminum plate vertical line curtain wall system and its installation method | |
CN211523694U (en) | Vertical lines curtain steelframe system of cell cube aluminum plate | |
CN110565941A (en) | PC aluminum formwork system for prefabricated building and construction method thereof | |
CN210194991U (en) | Mounting structure of aluminum plate curtain wall | |
CN201901995U (en) | Wall body connecting member of insert-connection type heat insulating integrated board | |
CN108222339B (en) | High-precision unit system easy to construct | |
CN215519392U (en) | Assembled frame curtain wall | |
CN210917887U (en) | Connecting structure for middle cross beam and upright post of glass curtain wall | |
CN211774890U (en) | Corner flying wing unit plate component | |
CN114934673A (en) | Construction method of glass curtain wall of wood structure system | |
CN202913528U (en) | Wall connecting piece for quickly installing building partition wall | |
CN209129226U (en) | A kind of novel corner fastener structure | |
CN108999318B (en) | Unit curtain wall side buried single pendant structure, unit body with side buried single pendant and unit curtain wall mounting method | |
CN206205212U (en) | A kind of facade attachment structure for being applied to prefabricated embedded house | |
CN112112273A (en) | Connecting piece | |
CN219638190U (en) | Building engineering external decoration curtain wall | |
CN217480555U (en) | Adjustable glass of semi-hidden frame glass curtain wall attaches frame structure | |
CN205077671U (en) | Outer containment system of unit assembly type structure with strip window |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |