CN107514088A - Integrated modular flat-top and its construction method - Google Patents

Integrated modular flat-top and its construction method Download PDF

Info

Publication number
CN107514088A
CN107514088A CN201710834896.7A CN201710834896A CN107514088A CN 107514088 A CN107514088 A CN 107514088A CN 201710834896 A CN201710834896 A CN 201710834896A CN 107514088 A CN107514088 A CN 107514088A
Authority
CN
China
Prior art keywords
keel
flat roof
wall
auxiliary
keels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710834896.7A
Other languages
Chinese (zh)
Other versions
CN107514088B (en
Inventor
韩合桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Hanshi Fenhe Building Material Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710834896.7A priority Critical patent/CN107514088B/en
Publication of CN107514088A publication Critical patent/CN107514088A/en
Application granted granted Critical
Publication of CN107514088B publication Critical patent/CN107514088B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • E04B9/241—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto with the slabs, panels, sheets or the like positioned on the upperside of the horizontal flanges of the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Finishing Walls (AREA)

Abstract

本发明涉及一种集成模块化平顶及其施工方法,属于石膏板吊顶技术领域,提供了一种结构简单,施工方便,能够有效提高工作效率,减少建筑垃圾的集成模块化平顶及其施工方法,所采用的技术方案为包括固定在墙体上的边龙骨及多个相互拼接的平顶模块,平顶模块通过平顶调节件固定在屋顶,平顶模块主要由横向副龙骨、纵向副龙骨、连接边龙骨和石膏板构成,横向副龙骨的一侧垂直布置有多根纵向副龙骨,横向副龙骨的另一侧固定有连接边龙骨,连接边龙骨的开口朝外,石膏板固定在横向副龙骨、纵向副龙骨和连接边龙骨上,靠近墙体的平顶模块的纵向副龙骨插入边龙骨内,其余平顶模块的纵向副龙骨插入对应的连接边龙骨的龙骨槽内;本发明广泛用于平顶的安装。

The invention relates to an integrated modular flat roof and its construction method, which belongs to the technical field of gypsum board suspended ceiling, and provides an integrated modular flat roof with simple structure, convenient construction, which can effectively improve work efficiency and reduce construction waste and its construction method, the adopted technical scheme includes side keels fixed on the wall and a plurality of flat roof modules spliced with each other. The keel, the connecting side keel and the gypsum board are composed of one side of the transverse sub keel vertically arranged with multiple longitudinal sub keels, the other side of the transverse sub keel is fixed with the connecting side keel, the opening of the connecting side keel faces outward, and the gypsum board is fixed on On the horizontal auxiliary keel, the longitudinal auxiliary keel and the connecting side keel, the longitudinal auxiliary keel of the flat top module close to the wall is inserted into the side keel, and the longitudinal auxiliary keels of the remaining flat top modules are inserted into the corresponding keel grooves of the connecting side keel; Widely used in flat roof installations.

Description

集成模块化平顶及其施工方法Integrated Modular Flat Roof and Its Construction Method

技术领域technical field

本发明涉及一种集成模块化平顶及其施工方法,属于石膏板吊顶技术领域。The invention relates to an integrated modular flat roof and a construction method thereof, belonging to the technical field of gypsum board suspended ceilings.

背景技术Background technique

家装吊顶是家装中常见的环节,吊顶根据装饰板的材料不同,分类也不相同。在整个居室装饰中占有相当重要的地位,对居室顶面作适当的装饰,不仅能美化室内环境,还能营造出丰富多彩的室内空间艺术形象,在选择吊顶装饰材料与设计方案时,要遵循既省材、牢 固、安全、又美观、实用的原则。Home improvement suspended ceiling is a common link in home decoration. The suspended ceiling is classified differently according to the material of the decorative panel. It occupies a very important position in the whole room decoration. Appropriate decoration on the top surface of the room can not only beautify the indoor environment, but also create a rich and colorful indoor space artistic image. When choosing ceiling decoration materials and design schemes, follow The principles of saving materials, firmness, safety, beauty and practicality.

现有的石膏板吊顶通常是工人根据装饰图纸造型的设计要求,通过由工人现场施工的老的安装方式,而在石膏板面层的吊顶施工中存在以下问题,施工现场施工时间长、材料种类多、材料堆放乱、施工垃圾多、施工质量因人而异、无法与其他工种交叉施工等诸多诟病;这样,使得现场施工不仅工作效率低,工人现场施工时间长,人力成本高,而且还存在施工复杂,不易操作,施工标准不统一,现场施工管理难度大,安装质量不一,石膏板的造型受到限制。The existing gypsum board ceiling is usually an old installation method that workers construct on-site according to the design requirements of the decorative drawing. However, the following problems exist in the construction of the gypsum board surface layer. The construction time is long and the type of material There are many criticisms such as excessive material stacking, excessive construction waste, different construction quality, and inability to cross-construction with other types of work; in this way, the on-site construction is not only low in efficiency, long in site construction time, and high in labor costs. The construction is complicated, difficult to operate, the construction standards are not uniform, the site construction management is difficult, the installation quality is different, and the shape of the gypsum board is limited.

发明内容Contents of the invention

为解决现有技术存在的技术问题,本发明提供了一种结构简单,施工方便,能够有效提高工作效率,减少建筑垃圾的集成模块化平顶及其施工方法。In order to solve the technical problems existing in the prior art, the present invention provides an integrated modular flat roof with simple structure, convenient construction, which can effectively improve work efficiency and reduce construction waste and its construction method.

为实现上述目的,本发明所采用的技术方案为集成模块化平顶,包括固定在墙体上的边龙骨及多个相互拼接的平顶模块,所述平顶模块通过平顶调节件固定在屋顶,所述平顶模块主要由横向副龙骨、纵向副龙骨、连接边龙骨和石膏板构成,所述横向副龙骨的一侧垂直布置有多根纵向副龙骨,所述横向副龙骨的另一侧固定有连接边龙骨,所述连接边龙骨的开口朝外,所述石膏板固定在横向副龙骨、纵向副龙骨和连接边龙骨上,靠近墙体的平顶模块的纵向副龙骨插入边龙骨内,其余平顶模块的纵向副龙骨插入对应的连接边龙骨的龙骨槽内。In order to achieve the above purpose, the technical solution adopted by the present invention is an integrated modular flat roof, including side keels fixed on the wall and a plurality of flat roof modules spliced with each other, and the flat roof modules are fixed on the For the roof, the flat roof module is mainly composed of transverse auxiliary keels, longitudinal auxiliary keels, connecting side keels and gypsum boards, one side of the transverse auxiliary keels is vertically arranged with multiple longitudinal auxiliary keels, and the other side of the transverse auxiliary keels The side is fixed with a connecting side joist, the opening of the connecting side joist is facing outward, the gypsum board is fixed on the horizontal sub-keel, the longitudinal sub-keel and the connecting side joist, and the longitudinal sub-keel of the flat top module close to the wall is inserted into the side keel Inside, the longitudinal auxiliary keels of the remaining flat top modules are inserted into the corresponding keel grooves connecting the side keels.

优选的,所述石膏板的长度比横向副龙骨长1-3cm,所述石膏板的边缘位于用于拼接端侧纵向副龙骨、横向副龙骨的1/2处。Preferably, the length of the gypsum board is 1-3 cm longer than the transverse sub-keel, and the edge of the gypsum board is located at 1/2 of the end-side longitudinal sub-keel and the transverse sub-keel.

优选的,所述平顶调节件包括用于固定在屋顶的上部连接件和用于连接龙骨的下部连接件,所述上部连接件主要由顶板和上部立板构成,所述上部立板固定在顶板的底部,所述上部立板上设置有多个定位孔,所述下部连接件主要由底板、侧板和下部立板构成,所述底板的底部两侧设置有侧板,所述侧板的两端设置有U型滑槽孔,所述底板的顶部竖直固定有下部立板,所述下部立板上设置有调节长孔。Preferably, the flat roof regulator includes an upper connecting piece for fixing on the roof and a lower connecting piece for connecting the keel, the upper connecting piece is mainly composed of a top plate and an upper vertical plate, and the upper vertical plate is fixed on At the bottom of the top plate, a plurality of positioning holes are arranged on the upper vertical plate, and the lower connecting piece is mainly composed of a bottom plate, a side plate and a lower vertical plate, side plates are arranged on both sides of the bottom of the bottom plate, and the side plates U-shaped chute holes are arranged at both ends of the bottom plate, and a lower vertical plate is vertically fixed on the top of the bottom plate, and a long adjustment hole is arranged on the lower vertical plate.

优选的,所述底板上还设置有与上部立板同宽的插槽。Preferably, the bottom plate is also provided with a slot with the same width as the upper vertical plate.

集成模块化平顶施工方法,包括集成模块化平顶,其特征在于:按照以下步骤进行操作,The integrated modular flat roof construction method, including the integrated modular flat roof, is characterized in that: the operation is performed according to the following steps,

a、测量屋顶尺寸,根据屋顶尺寸设计平顶模块,并在墙面进行弹线;a. Measure the size of the roof, design the flat roof module according to the size of the roof, and stretch the wires on the wall;

b、将边龙骨固定在墙面上,再将平顶调节件的上部连接件固定在屋顶的指定位置,将下部连接件卡在平顶模块的横向副龙骨内,然后再将第一块平顶模块前端的纵向副龙骨升起,使石膏板边缘贴住边龙骨边缘,边龙骨插入横向副龙骨和石膏板之间,后端找好水平,将上部连接件和下部连接件通过螺栓进行固定;b. Fix the side keel on the wall, then fix the upper connecting part of the flat roof adjustment part on the designated position of the roof, and clamp the lower connecting part in the horizontal auxiliary keel of the flat roof module, and then install the first flat The longitudinal auxiliary keel at the front end of the top module is raised so that the edge of the plasterboard sticks to the edge of the side keel, the side keel is inserted between the transverse auxiliary keel and the gypsum board, the rear end is leveled, and the upper and lower connecting parts are fixed by bolts ;

c、挂第二块平顶模块,固定上部连接件和下部连接件,然后将第二块平顶模块前端的纵向副龙骨升起,使石膏板边缘贴住连接边龙骨边缘,连接边龙骨插入横向副龙骨和石膏板之间,后端找好水平,将上部连接件和下部连接件通过螺栓进行固定,如此往复,吊顶收口位置直接采用石膏板进行封口,完成吊顶的施工。c. Hang the second flat roof module, fix the upper connector and the lower connector, then raise the longitudinal auxiliary keel at the front end of the second flat roof module, make the edge of the plasterboard stick to the edge of the connecting side keel, and insert the connecting side keel Between the horizontal auxiliary keel and the gypsum board, find a good level at the rear end, and fix the upper and lower connecting parts with bolts, and reciprocate in this way, the closing position of the suspended ceiling is directly sealed with gypsum board, and the construction of the suspended ceiling is completed.

优选的,在进行弹顶部中线时,离墙出来1000mm处弹横向第一条线,离墙出来2000mm处弹横向第二条线,以此类推;离墙出来300mm处弹纵向第一条线,距墙1100mm处弹纵向第二条线,距墙1300mm弹纵向第三条线,距墙2300mm弹纵向第四条线,以此类推。Preferably, when playing the top center line, the first horizontal line is played 1000mm away from the wall, the second horizontal line is played 2000mm away from the wall, and so on; the first vertical line is played 300mm away from the wall, Play the second vertical line at 1100mm from the wall, the third vertical line at 1300mm from the wall, the fourth vertical line at 2300mm from the wall, and so on.

与现有技术相比,本发明具有以下技术效果:本发明结构简单,使用方便, 根据客户屋顶的实际尺寸定制拼接单元,通过拼接单元的拼接完成整个吊顶的安装,安装方便,安装效率高,现场施工少,无施工垃圾,节能环保;同时配合多种连接件的 使用,使平顶安装更加便捷、方便,能够有效减少现场施工时间和施工难度,并且石膏板吊顶标准统一,质量可靠,无开裂情况。Compared with the prior art, the present invention has the following technical effects: the present invention is simple in structure and convenient to use, and the splicing unit can be customized according to the actual size of the customer's roof, and the installation of the entire suspended ceiling can be completed through the splicing of the splicing unit, which is convenient for installation and high in installation efficiency. There is less on-site construction, no construction waste, energy saving and environmental protection; at the same time, with the use of various connectors, the flat roof installation is more convenient and convenient, which can effectively reduce the on-site construction time and construction difficulty, and the gypsum board ceiling has uniform standards and reliable quality. cracking condition.

附图说明Description of drawings

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2为本发明中平顶模块的结构示意图。Fig. 2 is a schematic structural view of the flat top module in the present invention.

图3为本发明中边龙骨的安装结构示意图。Fig. 3 is a schematic diagram of the installation structure of the side keel in the present invention.

图4为本发明中上部连接件的结构示意图。Fig. 4 is a schematic structural view of the upper connecting piece in the present invention.

图5为本发明中下部连接件的结构示意图。Fig. 5 is a schematic structural view of the middle and lower connecting parts of the present invention.

具体实施方式detailed description

为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

如图1至图3所示,集成模块化平顶,包括固定在墙体上的边龙骨7及多个相互拼接的平顶模块1,平顶模块1通过平顶调节件2固定在屋顶,平顶模块1主要由横向副龙骨3、纵向副龙骨4、连接边龙骨5和石膏板6构成,横向副龙骨3的一侧通过连接件垂直连接有多根纵向副龙骨4,连接件一端固定在横向副龙骨3,另一端插装在纵向副龙骨4内,然后用龙骨钳进行卡死,使横向副龙骨与纵向副龙骨连接为一体,横向副龙骨3的另一侧固定有连接边龙骨5,连接边龙骨5的开口朝外,石膏板6固定在横向副龙骨3、纵向副龙骨4和连接边龙骨5上,靠近墙体的平顶模块的纵向副龙骨4插入边龙骨7内,其余平顶模块的纵向副龙骨4插入对应的连接边龙骨5的龙骨槽内。As shown in Figures 1 to 3, the integrated modular flat roof includes a side keel 7 fixed on the wall and a plurality of flat roof modules 1 spliced with each other. The flat roof module 1 is fixed on the roof through the flat roof regulator 2, The flat top module 1 is mainly composed of a transverse sub-keel 3, a longitudinal sub-keel 4, a connecting side joist 5 and a gypsum board 6, one side of the transverse sub-keel 3 is vertically connected to a plurality of longitudinal sub-keels 4 through a connector, and one end of the connector is fixed Insert the other end of the transverse sub-keel 3 into the longitudinal sub-keel 4, and then lock it with keel clamps, so that the transverse sub-keel and the longitudinal sub-keel are connected as one, and the other side of the transverse sub-keel 3 is fixed with a connecting side keel 5. The opening of the connecting side keel 5 faces outward, and the gypsum board 6 is fixed on the horizontal sub-keel 3, the longitudinal sub-keel 4 and the connecting side keel 5, and the longitudinal sub-keel 4 of the flat top module close to the wall is inserted into the side keel 7, The longitudinal sub-keels 4 of the remaining flat roof modules are inserted into the corresponding keel grooves connecting the side keels 5 .

其中,石膏板6的长度比横向副龙骨3长1-3cm,这样石膏板能够完全遮盖边龙骨,并且与墙体接缝也更加美观;石膏板6的边缘位于用于拼接端侧纵向副龙骨4、横向副龙骨3的1/2处,采用这种布置,能够使平顶模块之间拼接更加紧密,并且模块之间接缝小,结构也更加牢靠。平顶调节件2包括用于固定在屋顶的上部连接件18和用于连接龙骨的下部连接件8,上部连接件18主要由顶板9和上部立板10构成,上部立板10固定在顶板9的底部,上部立板10上设置有多个定位孔11,下部连接件8主要由底板12、侧板13和下部立板14构成,底板12的底部两侧设置有侧板13,侧板13的两端设置有U型滑槽孔15,底板12的顶部竖直固定有下部立板14,下部立板14上设置有调节长孔16,底板12上还设置有与上部立板同宽的插槽17,这样在连接时直接上部立板和下部立板螺栓连接,连接方便,并根据实际需要调整下部立板的连接位置,同时插槽能够增大调整位置,调整范围更大。Wherein, the length of gypsum board 6 is 1-3cm longer than the transverse auxiliary keel 3, so that the gypsum board can completely cover the side keel, and the seam with the wall is also more beautiful; 4. At 1/2 of the transverse sub-keel 3, this arrangement can make the splicing between the flat roof modules more compact, and the joints between the modules are small, and the structure is more reliable. The flat roof adjusting part 2 includes an upper connecting part 18 for fixing on the roof and a lower connecting part 8 for connecting the keel. The upper connecting part 18 is mainly composed of a top plate 9 and an upper vertical plate 10, and the upper vertical plate 10 is fixed on the top plate 9 The bottom of the upper vertical plate 10 is provided with a plurality of positioning holes 11, the lower connecting piece 8 is mainly composed of a bottom plate 12, a side plate 13 and a lower vertical plate 14, and the bottom sides of the bottom plate 12 are provided with side plates 13, side plates 13 U-shaped chute holes 15 are arranged at both ends of the bottom plate 12, a lower vertical plate 14 is vertically fixed on the top of the bottom plate 12, and the lower vertical plate 14 is provided with an adjusting long hole 16, and the bottom plate 12 is also provided with a Slot 17, when connecting, directly upper vertical board and lower vertical board bolt are connected like this, connect conveniently, and adjust the connection position of lower vertical board according to actual needs, slot can increase adjustment position simultaneously, and adjustment range is bigger.

具体施工方法,按照以下步骤进行操作,The specific construction method, according to the following steps to operate,

a、测量屋顶尺寸,根据屋顶尺寸设计平顶模块,并在墙面进行弹线,在进行弹顶部中线时,离墙出来1000mm处弹横向第一条线,离墙出来2000mm处弹横向第二条线,以此类推;离墙出来300mm处弹纵向第一条线,距墙1100mm处弹纵向第二条线,距墙1300mm弹纵向第三条线,距墙2300mm弹纵向第四条线,以此类推;a. Measure the size of the roof, design the flat roof module according to the size of the roof, and spring the line on the wall. When springing the center line of the top, spring the first horizontal line at 1000mm from the wall, and the second horizontal line at 2000mm from the wall. 300mm away from the wall, spring the first longitudinal line, 1100mm away from the wall, the second longitudinal line, 1300mm away from the wall, the third vertical line, and 2300mm away from the wall, the fourth vertical line, and so on;

b、将边龙骨固定在墙面上,再将平顶调节件的上部连接件固定在屋顶的指定位置,将下部连接件卡在平顶模块的横向副龙骨内,然后再将第一块平顶模块前端的纵向副龙骨升起,使石膏板边缘贴住边龙骨边缘,边龙骨插入横向副龙骨和石膏板之间,后端找好水平,将上部连接件和下部连接件通过螺栓进行固定;b. Fix the side keel on the wall, then fix the upper connecting part of the flat roof adjustment part on the designated position of the roof, and clamp the lower connecting part in the horizontal auxiliary keel of the flat roof module, and then install the first flat The longitudinal auxiliary keel at the front end of the top module is raised so that the edge of the plasterboard sticks to the edge of the side keel, the side keel is inserted between the transverse auxiliary keel and the gypsum board, the rear end is leveled, and the upper and lower connecting parts are fixed by bolts ;

c、挂第二块平顶模块,固定上部连接件和下部连接件,然后将第二块平顶模块前端的纵向副龙骨升起,使石膏板边缘贴住连接边龙骨边缘,连接边龙骨插入横向副龙骨和石膏板之间,后端找好水平,将上部连接件和下部连接件通过螺栓进行固定,如此往复,吊顶收口位置直接采用石膏板进行封口,完成吊顶的施工。c. Hang the second flat roof module, fix the upper connector and the lower connector, then raise the longitudinal auxiliary keel at the front end of the second flat roof module, make the edge of the plasterboard stick to the edge of the connecting side keel, and insert the connecting side keel Between the horizontal auxiliary keel and the gypsum board, find a good level at the rear end, and fix the upper and lower connecting parts with bolts, and reciprocate in this way, the closing position of the suspended ceiling is directly sealed with gypsum board, and the construction of the suspended ceiling is completed.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包在本发明范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included within the scope of the present invention .

Claims (6)

1.集成模块化平顶,其特征在于:包括固定在墙体上的边龙骨及多个相互拼接的平顶模块,所述平顶模块通过平顶调节件固定在屋顶,所述平顶模块主要由横向副龙骨、纵向副龙骨、连接边龙骨和石膏板构成,所述横向副龙骨的一侧垂直布置有多根纵向副龙骨,所述横向副龙骨的另一侧固定有连接边龙骨,所述连接边龙骨的开口朝外,所述石膏板固定在横向副龙骨、纵向副龙骨和连接边龙骨上,靠近墙体的平顶模块的纵向副龙骨插入边龙骨内,其余平顶模块的纵向副龙骨插入对应的连接边龙骨的龙骨槽内。1. integrated modular flat roof, it is characterized in that: comprise the side keel that is fixed on the body of wall and a plurality of flat roof modules spliced with each other, described flat roof module is fixed on roof by flat roof regulator, described flat roof module It is mainly composed of horizontal auxiliary keels, longitudinal auxiliary keels, connecting side keels and gypsum boards. One side of the horizontal auxiliary keels is vertically arranged with multiple longitudinal auxiliary keels, and the other side of the horizontal auxiliary keels is fixed with connecting side keels. The opening of the connecting side keel faces outward, the gypsum board is fixed on the horizontal sub keel, the longitudinal sub keel and the connecting side keel, the longitudinal sub keel of the flat top module close to the wall is inserted into the side keel, and the other flat top modules The longitudinal auxiliary keel is inserted into the corresponding keel groove connecting the side keels. 2.根据权利要求1所述的集成模块化平顶,其特征在于:所述石膏板的长度比横向副龙骨长1-3cm,所述石膏板的边缘位于用于拼接端侧纵向副龙骨、横向副龙骨的1/2处。2. integrated modular flat roof according to claim 1, it is characterized in that: the length of described gypsum board is longer 1-3cm than transverse auxiliary keel, and the edge of described gypsum board is positioned at for splicing end side vertical auxiliary keel, 1/2 of the transverse auxiliary keel. 3.根据权利要求1所述的集成模块化平顶,其特征在于:所述平顶调节件包括用于固定在屋顶的上部连接件和用于连接龙骨的下部连接件,所述上部连接件主要由顶板和上部立板构成,所述上部立板固定在顶板的底部,所述上部立板上设置有多个定位孔,所述下部连接件主要由底板、侧板和下部立板构成,所述底板的底部两侧设置有侧板,所述侧板的两端设置有U型滑槽孔,所述底板的顶部竖直固定有下部立板,所述下部立板上设置有调节长孔。3. The integrated modular flat roof according to claim 1, characterized in that: the flat roof regulator includes an upper connector for fixing on the roof and a lower connector for connecting the keel, the upper connector It is mainly composed of a top plate and an upper vertical plate. The upper vertical plate is fixed on the bottom of the top plate. A plurality of positioning holes are arranged on the upper vertical plate. The lower connecting piece is mainly composed of a bottom plate, a side plate and a lower vertical plate. The two sides of the bottom of the bottom plate are provided with side plates, and the two ends of the side plates are provided with U-shaped chute holes, and the top of the bottom plate is vertically fixed with a lower vertical plate, and an adjustable length hole. 4.根据权利要求3所述的集成模块化平顶,其特征在于:所述底板上还设置有与上部立板同宽的插槽。4. The integrated modular flat roof according to claim 3, characterized in that: the bottom plate is also provided with a slot with the same width as the upper vertical plate. 5.集成模块化平顶施工方法,包括集成模块化平顶,其特征在于:按照以下步骤进行操作,5. The construction method of the integrated modular flat roof, including the integrated modular flat roof, is characterized in that: the operation is carried out according to the following steps, a、测量屋顶尺寸,根据屋顶尺寸设计平顶模块,并在墙面进行弹线;a. Measure the size of the roof, design the flat roof module according to the size of the roof, and stretch the wires on the wall; b、将边龙骨固定在墙面上,再将平顶调节件的上部连接件固定在屋顶的指定位置,将下部连接件卡在平顶模块的横向副龙骨内,然后再将第一块平顶模块前端的纵向副龙骨升起,使石膏板边缘贴住边龙骨边缘,边龙骨插入横向副龙骨和石膏板之间,后端找好水平,将上部连接件和下部连接件通过螺栓进行固定;b. Fix the side keel on the wall, then fix the upper connecting part of the flat roof adjustment part on the designated position of the roof, and clamp the lower connecting part in the horizontal auxiliary keel of the flat roof module, and then install the first flat The longitudinal auxiliary keel at the front end of the top module is raised so that the edge of the plasterboard sticks to the edge of the side keel, the side keel is inserted between the transverse auxiliary keel and the gypsum board, the rear end is leveled, and the upper and lower connecting parts are fixed by bolts ; c、挂第二块平顶模块,固定上部连接件和下部连接件,然后将第二块平顶模块前端的纵向副龙骨升起,使石膏板边缘贴住连接边龙骨边缘,连接边龙骨插入横向副龙骨和石膏板之间,后端找好水平,将上部连接件和下部连接件通过螺栓进行固定,如此往复,吊顶收口位置直接采用石膏板进行封口,完成吊顶的施工。c. Hang the second flat roof module, fix the upper connector and the lower connector, then raise the longitudinal auxiliary keel at the front end of the second flat roof module, make the edge of the plasterboard stick to the edge of the connecting side keel, and insert the connecting side keel Between the horizontal auxiliary keel and the gypsum board, find a good level at the rear end, and fix the upper and lower connecting parts with bolts, and reciprocate in this way, the closing position of the suspended ceiling is directly sealed with gypsum board, and the construction of the suspended ceiling is completed. 6.根据权利要求5所述的集成模块化平顶施工方法,其特征在于:在进行弹顶部中线时,离墙出来1000mm处弹横向第一条线,离墙出来2000mm处弹横向第二条线,以此类推;离墙出来300mm处弹纵向第一条线,距墙1100mm处弹纵向第二条线,距墙1300mm弹纵向第三条线,距墙2300mm弹纵向第四条线,以此类推。6. The integrated modular flat roof construction method according to claim 5, characterized in that: when the center line of the top is projected, the first horizontal line is projected 1000 mm away from the wall, and the second horizontal line is projected 2000 mm away from the wall Lines, and so on; spring the first vertical line at 300mm from the wall, the second vertical line at 1100mm from the wall, the third vertical line at 1300mm from the wall, and the fourth vertical line at 2300mm from the wall. And so on.
CN201710834896.7A 2017-09-15 2017-09-15 Integrated modular flat top and construction method thereof Active CN107514088B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710834896.7A CN107514088B (en) 2017-09-15 2017-09-15 Integrated modular flat top and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710834896.7A CN107514088B (en) 2017-09-15 2017-09-15 Integrated modular flat top and construction method thereof

Publications (2)

Publication Number Publication Date
CN107514088A true CN107514088A (en) 2017-12-26
CN107514088B CN107514088B (en) 2022-10-14

Family

ID=60725432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710834896.7A Active CN107514088B (en) 2017-09-15 2017-09-15 Integrated modular flat top and construction method thereof

Country Status (1)

Country Link
CN (1) CN107514088B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385890A (en) * 2018-04-15 2018-08-10 青岛泰新岳建筑科技有限公司 A kind of method of plaster tablet suspended ceiling module assembled
US11566426B2 (en) 2019-11-26 2023-01-31 Bmic Llc Roofing panels with water shedding features
US11608640B2 (en) 2021-05-25 2023-03-21 Bmic Llc Panelized roofing system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3977144A (en) * 1974-01-11 1976-08-31 Chicago Metallic Corporation Suspended ceiling structure, particularly for dry-wall type panels
US20080276560A1 (en) * 2007-04-30 2008-11-13 Les Plafonds Embassy Inc. / Embassy Ceiling Inc. Suspended ceiling
EP2241698A1 (en) * 2009-04-03 2010-10-20 Chicago Metallic Continental Impact resistant suspended ceiling and attachment member therefor
CN103437475A (en) * 2013-08-30 2013-12-11 陕西建工集团总公司 Construction method of architectural structure gypsum board with paper surface hung ceiling
CN206174265U (en) * 2016-11-03 2017-05-17 韩合桥 A furred ceiling fixing device for gypsum board
CN106677404A (en) * 2016-12-15 2017-05-17 浙江亚厦装饰股份有限公司 Integrated suspended ceiling and installation method
CN207405849U (en) * 2017-09-15 2018-05-25 韩合桥 Integrated modular flat-top

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3977144A (en) * 1974-01-11 1976-08-31 Chicago Metallic Corporation Suspended ceiling structure, particularly for dry-wall type panels
US20080276560A1 (en) * 2007-04-30 2008-11-13 Les Plafonds Embassy Inc. / Embassy Ceiling Inc. Suspended ceiling
EP2241698A1 (en) * 2009-04-03 2010-10-20 Chicago Metallic Continental Impact resistant suspended ceiling and attachment member therefor
CN103437475A (en) * 2013-08-30 2013-12-11 陕西建工集团总公司 Construction method of architectural structure gypsum board with paper surface hung ceiling
CN206174265U (en) * 2016-11-03 2017-05-17 韩合桥 A furred ceiling fixing device for gypsum board
CN106677404A (en) * 2016-12-15 2017-05-17 浙江亚厦装饰股份有限公司 Integrated suspended ceiling and installation method
CN207405849U (en) * 2017-09-15 2018-05-25 韩合桥 Integrated modular flat-top

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385890A (en) * 2018-04-15 2018-08-10 青岛泰新岳建筑科技有限公司 A kind of method of plaster tablet suspended ceiling module assembled
US11566426B2 (en) 2019-11-26 2023-01-31 Bmic Llc Roofing panels with water shedding features
US12173507B2 (en) 2019-11-26 2024-12-24 Bmic Llc Roofing panels with water shedding features
US11608640B2 (en) 2021-05-25 2023-03-21 Bmic Llc Panelized roofing system
US11927019B2 (en) 2021-05-25 2024-03-12 Bmic Llc Panelized roofing system

Also Published As

Publication number Publication date
CN107514088B (en) 2022-10-14

Similar Documents

Publication Publication Date Title
CN202718340U (en) Indoor glass decoration plate wall face system
CN110173081B (en) An assembled dry finishing system
CN104929297A (en) Combined type ceiling hanging part and wood veneer ceiling installing process
CN219033884U (en) Mounting structure is hung futilely to assembled wall
CN103276870B (en) A kind of mounting structure of GRG decoration panel
WO2014135059A1 (en) Panel-type light steel beam irregularly-shaped dropped ceiling structure
CN107514088B (en) Integrated modular flat top and construction method thereof
CN112144787A (en) Veneer suitable for integral installation and installation method
CN219175577U (en) An Angle Adjustable Vertical Grid Connection System
CN204715602U (en) A kind of duplex integrated ceiling
CN202644804U (en) Ceiling keel structure
CN105133772A (en) Double-integrated-ceiling and mounting method thereof
CN208473060U (en) A kind of metal curtain wall
CN2242278Y (en) Mortise and tenon structure for multi-layer decoration board
CN217811874U (en) Aluminum alloy furred ceiling mounting structure convenient to installation
CN101302884A (en) Anti-deforming combined floor
CN104963476A (en) Widened decoration aluminum plate for house outer wall
CN207405849U (en) Integrated modular flat-top
CN204626853U (en) A kind of unit assembled mounting structure of special-shaped cambered surface moulding GRG decoration panel
CN204059847U (en) A wall decoration panel installation structure
CN205591394U (en) Pin -connected panel aluminium system abatvoix wall
CN212224372U (en) Mounting structure of prefabricated drop level furred ceiling of assembled
CN210395921U (en) Assembled dry-process fine-assembling system
CN207177046U (en) Slidingtype flat-top quick regulation part
CN204804136U (en) Mounting structure of inclined plane buckle and compound furred ceiling medium dip face

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250829

Address after: Room 5, 5th Floor, Chuangke Building, No. 8 Chunju South Road, Wanbailin District, Taiyuan City, Shanxi Province 030000

Patentee after: TAIYUAN HANSHI FENHE BUILDING MATERIAL TECHNOLOGY CO.,LTD.

Country or region after: China

Address before: No. 4-6, Xinmingzhu Decoration Square, Wanbailin District, Taiyuan, Shanxi 030024

Patentee before: Han Heqiao

Country or region before: China