CN106677404A - Integrated suspended ceiling and installation method - Google Patents
Integrated suspended ceiling and installation method Download PDFInfo
- Publication number
- CN106677404A CN106677404A CN201611162963.7A CN201611162963A CN106677404A CN 106677404 A CN106677404 A CN 106677404A CN 201611162963 A CN201611162963 A CN 201611162963A CN 106677404 A CN106677404 A CN 106677404A
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- draconis
- top surface
- top board
- shackle member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Connection Of Plates (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses an integrated suspended ceiling and an installation method. The integrated suspended ceiling comprises a first top plate and the second top plate; a clamping groove is formed in one end of the first top plate, and the first top plate comprises a first top face; an inserting portion is installed at one end of the second top plate, and the second top plate comprises a second top face; a positioning inserting piece comprises a first connecting plate and a second connecting plate, and the first connecting plate and the inserting portion are jointly connected into the clamping groove in a clamped mode; a keel comprises installation faces, the installation faces are installed on the first top face and the second top face in an attached mode, and the second connecting plate is fixed to the corresponding installation face in an attached mode; the first end of a first clamping piece is fixed to the first top face, and the second end of the first clamping piece is connected to the keel in a clamping mode; and the first end of a second clamping piece is fixed to the second top face, and the second end of the second clamping piece is connected to the keel in a clamping mode. The installation method is used for installing the integrated suspended ceiling. According to the integrated suspended ceiling and the installation method, the connecting structure between the keel and the top plates is simplified, the adjusting period is shortened, construction efficiency is improved, and stability of the connecting structure between the adjacent top plates is improved.
Description
Technical field
The present invention relates to building decoration technology field, more particularly to a kind of integrated furred ceiling and installation method.
Background technology
The furred ceiling of interior architecture is arranged on wall top, to wall jack-up to the effect for modifying and hanging lamp component, general furred ceiling
It is spliced successively by multiple top boards.
In prior art, top board is fixed on wall top by Os Draconis, is typically connected by spiral shell between Os Draconis and top board, on
State connected mode to have the following disadvantages:First, connect between Os Draconis and top board and dismounting is more difficult, increased the difficulty of construction
Degree;Second, the adjustment cycle is long, during the splicing between top board and top board, the process for adjusting inevitably occurs, now
Need to be dismantled between Os Draconis and top board and reconnected, said process is arduously bothersome, extends construction period, reduces
Efficiency of construction;3rd, the gap between adjacent top board is larger, junction structural instability;4th, loaded down with trivial details a, dragon of constructing
Bone on top board, needs to dismantle one by one or install typically by multiple bolts or clamp connection in work progress, increases
The labor intensity of job site, increased cost of labor.
Therefore, it is necessary to solve above-mentioned technical problem.
The content of the invention
The present invention provides a kind of integrated furred ceiling and installation method, to solve problems of the prior art, simplifies dragon
Attachment structure between bone and top board, shortens the adjustment cycle, improves efficiency of construction, and attachment structure is steady between the adjacent top board of raising
It is qualitative, reduce labor intensity, reduce cost of labor.
The invention provides a kind of integrated furred ceiling, including the first top board and the second top board that mutually splice, first top
Buckling groove is offered on the end face of one end of plate, first top board includes the first top surface;The end of one end of second top board
Plug Division is provided with face, second top board includes the second top surface, and first top surface is located at same with second top surface
In plane;Positioning plug-in unit, the positioning plug-in unit includes the first connecting plate and the second connecting plate being oppositely arranged, first connection
Plate is connected in the buckling groove jointly with the Plug Division;Os Draconis, the Os Draconis include mounting surface, and the mounting surface is along described
The length direction of Os Draconis is fitted be fixed on first top surface and second top surface successively, second connecting plate dorsad institute
The surface laminating for stating the first connecting plate is fixed on the mounting surface;First shackle member, the first end of first shackle member is consolidated
It is scheduled on first top surface, the second end of first shackle member is connected on the Os Draconis;Second shackle member, described second
The first end of shackle member is fixed on second top surface, and the second end of second shackle member is connected on the Os Draconis.
Alternatively, first connecting plate is connected with second connecting plate by the 3rd connecting plate, and described first connects
, respectively positioned at the both sides of the 3rd connecting plate, the 3rd connecting plate is connected to described first for fishplate bar and second connecting plate
In gap between top board and second top board.
Alternatively, first shackle member includes base and Access Division, and the base includes the surfaces of revolution, carries on the back on the base
It is connected on first top surface to the side of the surfaces of revolution, the first end of the Access Division is rotatably connected in the surfaces of revolution
On, the rotation axiss between the Access Division and the surfaces of revolution are perpendicular to the surfaces of revolution, the second end card of the Access Division
It is connected on the Os Draconis.
Alternatively, rotating shaft is connected with the surfaces of revolution, the first end of the Access Division offers rotating hole, the rotation
Borehole jack is located in the rotating shaft.
Alternatively, the second end of the Access Division offers the stopper slot of both ends open setting, the notch of the stopper slot
Arrange towards first top surface, the Os Draconis are connected in the space that the stopper slot is limited with first top surface.
Alternatively, the stopper slot is connected with towing plate, the towing plate away from the outer wall of the first end of the Access Division
Direction towards the first end away from the Access Division is extended.
Alternatively, second shackle member includes location-plate and the holding section being integrally formed, and the location-plate is fixed on institute
On the second top surface stated, support slot is offered on the holding section, the notch of the support slot is arranged towards second top surface,
The Os Draconis are limited in the space that the support slot is limited with second top surface.
Alternatively, multiple first shackle members are provided with first top surface, multiple first shackle members are along institute
State the length direction spread configuration of Os Draconis;It is provided with multiple second shackle members on second top surface, multiple described second
Length direction spread configuration of the shackle member along the Os Draconis.
Based on same inventive concept, present invention also offers a kind of installation method of integrated furred ceiling, it is characterised in that bag
Include following steps:A. the first top board and the second top board are spliced;Wherein, clamping is offered on the end face of one end of first top board
Groove, first top board includes the first top surface;Access Division, second top are provided with the end face of one end of second top board
Plate includes the second top surface, and first top surface is in the same plane with second top surface;B. will positioning plug-in unit, described second
Top board and the first top board grafting;Wherein, the positioning plug-in unit includes the first connecting plate and the second connecting plate being oppositely arranged,
First connecting plate enters in the buckling groove with the common clamping in the Access Division;C., Os Draconis are installed, the Os Draconis include installing
Face, the mounting surface is fitted in successively on first top surface and second top surface along the length direction of the Os Draconis, and second
Connecting plate dorsad first connecting plate surface laminating be fixed on the mounting surface;D., first shackle member is installed, will be described
The first end of the first shackle member is fixed on first top surface, and the second end of first shackle member is connected to the Os Draconis
On;E., second shackle member is installed, the first end of second shackle member is fixed on second top surface, second clamping
Second end of part is connected on the Os Draconis.
Alternatively, first connecting plate is connected with second connecting plate by the 3rd connecting plate, and described first connects
, respectively positioned at the both sides of the 3rd connecting plate, the 3rd connecting plate is connected to described first for fishplate bar and second connecting plate
In gap between top board and second top board.
Integrated furred ceiling and installation method that the present invention is provided, by the first connecting plate in positioning plug-in unit buckling groove is connected to
It is interior, the effect of efficiently locating can be played to the first top board, prevent the first top board from loosening during splicing.First clamping
Part is connected to Os Draconis on the first top board, and the second shackle member is connected to Os Draconis on the second top board, saves Os Draconis and the first top
The space that in the vertical direction takes between plate, Os Draconis and the second top board, increased the utilization rate in space, while in factory process
During, the first shackle member can be directly anchored on the first top board, and the second shackle member can be directly anchored on the second top board,
Subsequently at the construction field (site), Os Draconis clamping is entered in the first shackle member or the second shackle member, improves installation effectiveness, reduced
Labor intensity, has saved production cost.
Description of the drawings
Preferred embodiment in the present invention will be described in detail by accompanying drawing below, it will help understand the purpose of the present invention and excellent
Point, wherein:
The first structural representation for the integrated furred ceiling that Fig. 1 is provided for the preferred embodiment of the present invention.
Fig. 2 is the partial enlarged drawing of A in Fig. 1.
Fig. 3 is the structural representation of the first shackle member.
Second structural representation of the integrated furred ceiling that Fig. 4 is provided for the preferred embodiment of the present invention.
Fig. 5 is the partial enlarged drawing of B in Fig. 4.
Fig. 6 is the structural representation of the second shackle member.
Fig. 7 is the structural representation that multiple second shackle members are arranged on the second top board.
The top view of the integrated furred ceiling that Fig. 8 preferred embodiment of the present invention is provided.
Fig. 9 is the partial enlarged drawing of C in Fig. 8.
The structural representation of the positioning plug-in unit that Figure 10 is provided for the preferred embodiment of the present invention.
Specific embodiment
With reference to embodiment, the present invention is described in detail.Wherein identical parts identical reference table
Show.It should be noted that the word "front", "rear", "left", "right", "up" and "down" used in describing below refers to accompanying drawing
In direction, word " interior " and " outward " refer respectively to the direction towards or away from particular elements geometric center.
The first structural representation for the integrated furred ceiling that Fig. 1 is provided for the preferred embodiment of the present invention, Fig. 2 is A in Fig. 1
Partial enlarged drawing, Fig. 3 is the structural representation of the first shackle member, the integrated furred ceiling that Fig. 4 is provided for the preferred embodiment of the present invention
Second structural representation, Fig. 5 be Fig. 4 in B partial enlarged drawing, Fig. 6 is the structural representation of the second shackle member, and Fig. 7 is
Multiple second shackle members are arranged on the structural representation on the second top board 6, integrated the hanging of Fig. 8 preferred embodiment of the present invention offer
The top view on top, Fig. 9 be Fig. 8 in C partial enlarged drawing, Figure 10 be the preferred embodiment of the present invention provide position plug-in unit structure
Schematic diagram.
As shown in Figures 1 to 10, the invention provides a kind of integrated furred ceiling, including the first top board 5 for mutually splicing and
Two top boards 6, positioning plug-in unit 1, Os Draconis 4, the first shackle member 3 and the second shackle member 2.
Referring to Fig. 1 to Figure 10, buckling groove is offered on the end face of one end of first top board 5, described first
Top board 5 includes the first top surface;Plug Division 61 is provided with the end face of one end of second top board 6, second top board 6 includes
Second top surface, first top surface is in the same plane with second top surface, advantageously ensures that the smooth of integrated furred ceiling
Property.The positioning plug-in unit 1 includes the first connecting plate 12 and the second connecting plate 11, first connecting plate 12 and the institute being oppositely arranged
State Plug Division 61 to be connected to jointly in the buckling groove.The Os Draconis 4 include mounting surface, and the mounting surface is along the Os Draconis 4
Length direction is fitted be fixed on first top surface and second top surface successively, the second connecting plate 11 dorsad it is described first connect
The surface laminating of fishplate bar 12 is fixed on the mounting surface, and positioning plug-in unit 1 is fixed on Os Draconis 4 by the second connecting plate 11, is led to
Cross the first connecting plate 12 to be plugged in the buckling groove of the first top board 5.The first end of first shackle member 3 is fixed on described first
On top surface, the second end of first shackle member 3 is connected on the Os Draconis 4, and Os Draconis 4 are fixed on first by the first shackle member 3
On top surface.The first end of second shackle member 2 is fixed on second top surface, the second end card of second shackle member 2
It is connected on the Os Draconis 4, second shackle member 2 is fixed on Os Draconis 4 on second top surface.
Alternatively, first connecting plate 12 is connected with second connecting plate 11 by the 3rd connecting plate 13, described
First connecting plate 12 and second connecting plate 11 are respectively positioned at the both sides of the 3rd connecting plate 13, the 3rd connecting plate 13
It is connected in the gap between first top board 5 and second top board 6.
Specifically, connecting hole 14 can be provided with second connecting plate 11, the shape of connecting hole 14 can be square
Shape or rectangle etc., the wherein a line for defining the connecting hole 14 is connection side 15.As shown in Figure 10, connecting hole 14 is opened up
On the right side of the second connecting plate 11, it can be positioned at a line of the leftmost side in connecting hole 14 to connect side 15.3rd connection
The first end of plate 13 is connected on the connection side 15, and the second end of the 3rd connecting plate 13 is along away from second connecting plate
11 direction is extended.One end of first connecting plate 12 is connected to the second end of the 3rd connecting plate 13, and second connects
The distance between connecting plate 12 of fishplate bar 11 and first is more than zero, and described the with connecting plate 12 just to the connecting hole 14.3rd
13 pairs of the first top boards 5 of connecting plate play good spacing effect, prevent the first top board 5 from loosening during splicing.
Alternatively, location hole 16 is offered on the second connecting plate 11, the second connecting plate 11 can pass through the bolt of location hole 16
It is easy to connect or mode connects for screw is on Os Draconis 4, it is easy to disassemble.
It is preferred that first connecting plate 12, second connecting plate 11 and the 3rd connecting plate 13 can one
Molding.First connecting plate 12, the second connecting plate 11 and the integrated punching molding of the 3rd connecting plate 13 can be set, the first connecting plate is made
12 are departed from and are connected on the second connecting plate 11 by the 3rd connecting plate 13 from the position of connecting hole 14 with the second connecting plate 11.
After punching press on the bearing of trend on the connection side 15, the width of the connecting hole 14, the width of the 3rd connecting plate 13, with
And the width all same of first connecting plate 12;The length of the connecting hole 14 be equal to the 3rd connecting plate 13 length with
The length sum of first connecting plate 12, above-mentioned set-up mode has saved production material, has significantly reduced production cost.
It is preferred that first shackle member 3 includes base 31 and Access Division 32, the base 31 includes the surfaces of revolution, described
Dorsad the side of the surfaces of revolution is connected on first top surface on base 31, can be bolt connection or bonding, described
The first end of Access Division 32 is rotatably connected on the surfaces of revolution, the rotation axiss between the Access Division 32 and the surfaces of revolution
Perpendicular to the surfaces of revolution, the second end of the Access Division 32 is connected on the Os Draconis 4.
Alternatively, the Access Division 32 includes swivel plate 33, rebound 34 and the limiting plate 35 being sequentially connected, described
Swivel plate 33 is oppositely arranged and respectively positioned at the both sides of the rebound 34 with the limiting plate 35;The swivel plate 33 is rotatable
Be fitted and connected on the surfaces of revolution, the line of rotary shaft 37 between the swivel plate 33 and the surfaces of revolution is perpendicular to the rotation
Turn face.The rotation of swivel plate 33 can drive limiting plate 35 to turn to the side for being provided with Os Draconis 4, be easy to next step to fix Os Draconis 4.
Further, rotating shaft 37 is connected with the surfaces of revolution, the first end of the Access Division 32 offers rotating hole, institute
State rotating hole to be set in the rotating shaft 37, ensure that limiting plate 35 can be revolved around rotating shaft 37 by the way of shaft hole matching
Turn.
Alternatively, the second end of the Access Division 32 offers the stopper slot of both ends open setting, the groove of the stopper slot
Mouth is arranged towards first top surface, and the Os Draconis 4 are connected in the space that the stopper slot is limited with first top surface.Institute
State on limiting plate 35 and the first spacing preiection 36 is provided with towards on the surface of the rebound 34, first spacing preiection 36,
The limiting plate 35 and the rebound 34 define to form stopper slot jointly, and Os Draconis 4 are located in stopper slot and are capable of achieving Os Draconis 4
The technique effect being fixed on the first top board 5.Further, first spacing preiection 36 is shaped as strip, and the of strip
One spacing preiection 36, with the direction setting of rebound 34 and the handing-over line of limiting plate 35, can make the first spacing preiection along parallel
36 inner side table increases with the contact area of Os Draconis 4, is conducive to increasing the stability for abutting.
Further, open up along the length direction of the base 31 towards on the surface of swivel plate 33 on the base 31
There is the link slot 38 that both ends open is arranged, the side on the surfaces of revolution near the rebound 34 is provided with the second spacing preiection
39, the distance of second spacing preiection 39 and the rotating shaft 37 be equal between the rotating shaft 37 and the link slot 38 away from
From.When stopper slot is connected on Os Draconis, the second spacing preiection 39 is rotated to link slot 38, and the second spacing preiection 39 is fixed
In link slot 38, by the second spacing preiection 39 and the restriction effect of link slot 38, it is ensured that stopper slot is firmly connected to dragon
On bone.Further, the quantity of the link slot 38 is two, and two link slots 38 be arranged in parallel and are located at respectively described
The both sides of rotating shaft 37, it is ensured that stopper slot can be limited at both direction and position, increased the position that stopper slot is fixed
Multiformity.
Used as a preferred embodiment, the stopper slot is connected with away from the outer wall of the first end of the Access Division 32 and leads
Corbel back slab 321, the towing plate 321 is extended towards the direction of the first end away from the Access Division 32, by towing plate 321
Draw, can drive Access Division 32 to be rotated around rotating shaft 37.Further, insertion is opened up on the towing plate 321
The towing pad 322 of the towing plate 321, in work progress, even if exist and manually cannot touch towing plate 321 or touch
Towing plate 321, also cannot drive towing plate 321 to rotate with because space limits, and now can be located in by draught line and be led
Draw in hole 322, rotated therewith by the towing plate 321 that rotarily drives of draught line.
It is preferred that second shackle member 2 includes location-plate 22 and the holding section 21 being integrally formed, the location-plate 22 is consolidated
It is scheduled on the second described top surface, offers support slot 24 on the holding section 21, the notch of the support slot 24 is towards described
Second top surface is arranged, and the Os Draconis 4 are limited in the space that the support slot 24 is limited with second top surface.
Alternatively, two sides for defining the notch of the support slot 24 are respectively the first trough rim 25 and the second trough rim 26,
First trough rim 25 and the second trough rim 26 are respectively positioned at the both sides of the notch of support slot 24, and the distance between the second trough rim 26 and bottom land
Less than the distance between the first trough rim 25 and bottom land, towards the second top board 6, Os Draconis 4 are located in support slot to the notch of support slot 24
24 inside.The first end of the location-plate 22 is connected to first trough rim 25, the second end of the location-plate 22 along away from
The direction of second trough rim 26 is extended, and dorsad the surface laminating of the bottom land of the support slot 24 is solid on the location-plate 22
It is scheduled on the second top board 6 and is provided with the surface of Os Draconis 4.Second trough rim 26 is connected with fastening plates 23, and the one of fastening plates 23
End is connected on the second trough rim 26, and the second end of the fastening plates 23 is extended along the direction away from first trough rim 25,
In the fastening plates 23 dorsad the distance between bottom land described in the surface of the bottom land less than the dorsad bottom land of the location-plate 22
The distance between surface and described bottom land, the Os Draconis 4 that fastening plates 23 pairs are arranged on inside support slot 24 have what is withheld and fasten
Effect, prevents Os Draconis 4 from loosening.
Further, multiple first shackle members 3, multiple first shackle members 3 are provided with first top surface
Along the length direction spread configuration of the Os Draconis 4;It is provided with multiple second shackle members 2 on second top surface, multiple described
Length direction spread configuration of two shackle members 2 along the Os Draconis 4.During factory process, can arrange on the first top board 5
Multiple first shackle members 3, arrange multiple second shackle members 2 on the second top board 6.In at the construction field (site), Os Draconis 4 are directly connected to
It is convenient succinct in first shackle member 3 or the second shackle member 2, it is convenient to carry out.
Based on same inventive concept, present invention also offers a kind of installation method of integrated furred ceiling, it is characterised in that bag
Include following steps:A. the first top board 5 and the second top board 6 are spliced;Wherein, offer on the end face of one end of first top board 5
Buckling groove, first top board 5 includes the first top surface;Plug Division is provided with the end face of one end of second top board 6, it is described
Second top board 6 includes the second top surface, and first top surface is in the same plane with second top surface;B. will positioning plug-in unit 1,
Second top board 6 and first top board 5 grafting;Wherein, the positioning plug-in unit 1 includes the first connecting plate 12 being oppositely arranged
With the second connecting plate 11, first connecting plate 12 enters in the buckling groove with the common clamping in the Plug Division;C., Os Draconis are installed
4, the Os Draconis 4 include mounting surface, the mounting surface along the length direction of the Os Draconis 4 be fitted in successively first top surface and
On second top surface, the second connecting plate 11 dorsad first connecting plate 12 surface laminating be fixed on the mounting surface;
D., first shackle member 3 is installed, the first end of first shackle member 3 is fixed on first top surface, first clamping
Second end of part 3 is connected on the Os Draconis 4.E., second shackle member 2 is installed, the first end of second shackle member 2 is fixed
On second top surface, the second end of second shackle member 2 is connected on the Os Draconis 4.
First connecting plate 12 is connected with second connecting plate 11 by the 3rd connecting plate 13, first connection
, respectively positioned at the both sides of the 3rd connecting plate 13, the 3rd connecting plate 13 is connected to institute for plate 12 and second connecting plate 11
In stating the gap between the first top board 5 and second top board 6.
Specifically, connecting hole 14 can be provided with second connecting plate 11, the shape of connecting hole 14 can be square
Shape or rectangle etc., the wherein a line for defining the connecting hole 14 is connection side 15.As shown in Figure 10, connecting hole 14 is opened up
On the right side of the second connecting plate 11, it can be positioned at a line of the leftmost side in connecting hole 14 to connect side 15.3rd connection
The first end of plate 13 is connected on the connection side 15, and the second end of the 3rd connecting plate 13 is along away from second connecting plate
11 direction is extended.One end of first connecting plate 12 is connected to the second end of the 3rd connecting plate 13, and second connects
The distance between connecting plate 12 of fishplate bar 11 and first is more than zero, and described the with connecting plate 12 just to the connecting hole 14.3rd
13 pairs of the first top boards 5 of connecting plate play good spacing effect, prevent the first top board 5 from loosening during splicing.
Certainly, integrated furred ceiling can also install following methods and be installed:Os Draconis 4 are by design requirement suspension rod and expansion
Building top is bolted to, in advance the first shackle member 3 row is arranged on the first top surface according to the spacing of Os Draconis 4, by second
Shackle member 2 arranges a piece of on the second top surface, then by the first top board 5.After completing the installation of the first top board 5, inserted with positioning plug-in unit 1
It is connected in the buckling groove of the first top board 5, subsequently positioning plug-in unit 1 is fixed on Os Draconis 4, it is ensured that positioning plug-in unit 1 is connected to card
The notch of access slot applies the push-tight power of horizontal direction to the first top board 5, so as to ensure the installation quality of the first top board 5.With such
Push away, complete the installation of the second furred ceiling 6.
Integrated furred ceiling provided in an embodiment of the present invention and installation method, are blocked by the first connecting plate 12 in positioning plug-in unit 1
It is connected in buckling groove, the effect of efficiently locating can be played to the first top board 5, prevents the first top board 5 from occurring during splicing
Loosen.First shackle member 3 is connected to Os Draconis 4 on first top board 5, and the second shackle member 2 is connected to Os Draconis 4 on second top board 6,
The space that in the vertical direction takes between the top board 5 of Os Draconis 4 and first, the top board 6 of Os Draconis 4 and second is saved, space is increased
Utilization rate, while during factory process, the first shackle member 3 can be directly anchored on the first top board 5, the second shackle member
2 can be directly anchored on the second top board 6, subsequently at the construction field (site), the clamping of Os Draconis 4 be entered into the first shackle member 3 or the second card
In fitting 2, installation effectiveness is improve, reduce labor intensity, saved production cost.
Finally it should be noted that:Above example only to illustrate technical scheme, rather than a limitation;Although
The present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used
To modify to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic;
And these modifications or replacement, do not make the scope of the essence disengaging various embodiments of the present invention technical scheme of appropriate technical solution.
Claims (10)
1. a kind of integrated furred ceiling, it is characterised in that include:
Mutually first top board and the second top board of splicing, offers buckling groove on the end face of one end of first top board, and described the
One top board includes the first top surface;It is provided with Plug Division on the end face of one end of second top board, second top board includes the
Two top surfaces, first top surface is in the same plane with second top surface;
Positioning plug-in unit, the positioning plug-in unit includes the first connecting plate and the second connecting plate being oppositely arranged, first connecting plate
It is connected to jointly in the buckling groove with the Plug Division;
Os Draconis, the Os Draconis include mounting surface, the mounting surface fit successively along the length direction of the Os Draconis be fixed on it is described
On first top surface and second top surface, the surface laminating of second connecting plate dorsad first connecting plate is fixed on described
On mounting surface;
First shackle member, the first end of first shackle member is fixed on first top surface, and the of first shackle member
Two ends are connected on the Os Draconis;
Second shackle member, the first end of second shackle member is fixed on second top surface, and the of second shackle member
Two ends are connected on the Os Draconis.
2. integrated furred ceiling according to claim 1, it is characterised in that first connecting plate and second connecting plate
It is connected by the 3rd connecting plate, first connecting plate and second connecting plate are respectively positioned at the two of the 3rd connecting plate
Side, the 3rd connecting plate is connected in the gap between first top board and second top board.
3. integrated furred ceiling according to claim 2, it is characterised in that first shackle member includes base and clamping
Portion, the base includes the surfaces of revolution, and dorsad the side of the surfaces of revolution is connected on first top surface on the base, described
The first end of Access Division is rotatably connected on the surfaces of revolution, and the rotation axiss between the Access Division and the surfaces of revolution are vertical
In the surfaces of revolution, the second end of the Access Division is connected on the Os Draconis.
4. integrated furred ceiling according to claim 3, it is characterised in that rotating shaft, the card are connected with the surfaces of revolution
The first end of socket part offers rotating hole, and the rotating hole is set in the rotating shaft.
5. integrated furred ceiling according to claim 4, it is characterised in that the second end of the Access Division offers two ends and opens
The stopper slot that mouth is arranged, the notch of the stopper slot is arranged towards first top surface, and the Os Draconis are connected to the stopper slot
In the space limited with first top surface.
6. integrated furred ceiling according to claim 5, it is characterised in that the stopper slot away from the Access Division first
The outer wall at end is connected with towing plate, and the towing plate is extended towards the direction of the first end away from the Access Division.
7. integrated furred ceiling according to claim 1, it is characterised in that second shackle member includes integrally formed determining
Position plate and holding section, the location-plate is fixed on the second described top surface, and support slot, the card are offered on the holding section
The notch for holding groove is arranged towards second top surface, and the Os Draconis are limited to the sky that the support slot is limited with second top surface
It is interior.
8. the integrated furred ceiling according to claim 1-7 any one, it is characterised in that be provided with first top surface
Multiple first shackle members, length direction spread configuration of multiple first shackle members along the Os Draconis;Second top
Multiple second shackle members, length direction spread configuration of multiple second shackle members along the Os Draconis are provided with face.
9. a kind of installation method of integrated furred ceiling, it is characterised in that comprise the following steps:
A. the first top board and the second top board are spliced;Wherein, buckling groove is offered on the end face of one end of first top board, it is described
First top board includes the first top surface;Access Division is provided with the end face of one end of second top board, second top board includes
Second top surface, first top surface is in the same plane with second top surface;
B. will positioning plug-in unit, second top board and the first top board grafting;Wherein, the positioning plug-in unit includes being oppositely arranged
The first connecting plate and the second connecting plate, first connecting plate enters in the buckling groove with the common clamping in the Access Division;
C., Os Draconis are installed, the Os Draconis include mounting surface, and the mounting surface is fitted in successively institute along the length direction of the Os Draconis
State on the first top surface and second top surface, the second connecting plate dorsad first connecting plate surface laminating be fixed on the peace
On dress face;
D., first shackle member is installed, the first end of first shackle member is fixed on first top surface, first card
Second end of fitting is connected on the Os Draconis;
E., second shackle member is installed, the first end of second shackle member is fixed on second top surface, second card
Second end of fitting is connected on the Os Draconis.
10. installation method according to claim 9, it is characterised in that first connecting plate and second connecting plate
It is connected by the 3rd connecting plate, first connecting plate and second connecting plate are respectively positioned at the two of the 3rd connecting plate
Side, the 3rd connecting plate is connected in the gap between first top board and second top board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611162963.7A CN106677404B (en) | 2016-12-15 | 2016-12-15 | Integrated ceiling and mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611162963.7A CN106677404B (en) | 2016-12-15 | 2016-12-15 | Integrated ceiling and mounting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106677404A true CN106677404A (en) | 2017-05-17 |
CN106677404B CN106677404B (en) | 2022-10-04 |
Family
ID=58868158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611162963.7A Active CN106677404B (en) | 2016-12-15 | 2016-12-15 | Integrated ceiling and mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677404B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107514088A (en) * | 2017-09-15 | 2017-12-26 | 韩合桥 | Integrated modular flat-top and its construction method |
CN107558650A (en) * | 2017-08-01 | 2018-01-09 | 浙江未来加电子商务有限公司 | A kind of integrated bathroom ceiling structure and its installation method |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10159242A (en) * | 1996-11-27 | 1998-06-16 | Sumida Naisou:Kk | Mounting structure of ceiling board and ceiling board device used therefor and mounting method of ceiling board |
JP2001049789A (en) * | 1999-08-09 | 2001-02-20 | Nankai Plywood Co Ltd | Ceiling plate metal fitting |
EP1132539A1 (en) * | 2000-03-10 | 2001-09-12 | Rockwool International A/S | A set of ceiling panels and a method of installing said set of ceiling panels |
TWM341720U (en) * | 2008-04-23 | 2008-10-01 | xi-wang Li | Testing device for ceiling orifice |
EP2103753A2 (en) * | 2008-03-18 | 2009-09-23 | Armstrong World Industries, Inc. | Up-tight surface covering and attachment system |
EP2241698A1 (en) * | 2009-04-03 | 2010-10-20 | Chicago Metallic Continental | Impact resistant suspended ceiling and attachment member therefor |
CN103306429A (en) * | 2012-12-24 | 2013-09-18 | 上海钢之杰钢结构建筑有限公司 | Wind-proof cushion for rock wool composite plate |
WO2014094387A1 (en) * | 2012-12-17 | 2014-06-26 | Yang Dongzuo | Assembled construction structure, house, and toilet |
CN204826365U (en) * | 2015-08-03 | 2015-12-02 | 深圳市宝鹰建设集团股份有限公司 | Compound mirror surface smallpox pendant structure |
CN204940660U (en) * | 2015-08-28 | 2016-01-06 | 苏州美瑞德建筑装饰有限公司 | Full suspended ceiling combines self-contained provision for disengagement |
CN205024934U (en) * | 2015-09-17 | 2016-02-10 | 广东华途仕建材实业有限公司 | Triangle -shaped section bar lappet suspended ceiling system |
CN205369649U (en) * | 2016-02-03 | 2016-07-06 | 广州帝森建材有限公司 | Novel ripple suspended ceiling |
CN106013585A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Ceiling cascade device and installation method |
CN106013584A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Modular ceiling cascade device and mounting method |
CN206319473U (en) * | 2016-12-15 | 2017-07-11 | 浙江亚厦装饰股份有限公司 | Integrated furred ceiling |
-
2016
- 2016-12-15 CN CN201611162963.7A patent/CN106677404B/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10159242A (en) * | 1996-11-27 | 1998-06-16 | Sumida Naisou:Kk | Mounting structure of ceiling board and ceiling board device used therefor and mounting method of ceiling board |
JP2001049789A (en) * | 1999-08-09 | 2001-02-20 | Nankai Plywood Co Ltd | Ceiling plate metal fitting |
EP1132539A1 (en) * | 2000-03-10 | 2001-09-12 | Rockwool International A/S | A set of ceiling panels and a method of installing said set of ceiling panels |
EP2103753A2 (en) * | 2008-03-18 | 2009-09-23 | Armstrong World Industries, Inc. | Up-tight surface covering and attachment system |
TWM341720U (en) * | 2008-04-23 | 2008-10-01 | xi-wang Li | Testing device for ceiling orifice |
EP2241698A1 (en) * | 2009-04-03 | 2010-10-20 | Chicago Metallic Continental | Impact resistant suspended ceiling and attachment member therefor |
WO2014094387A1 (en) * | 2012-12-17 | 2014-06-26 | Yang Dongzuo | Assembled construction structure, house, and toilet |
CN103306429A (en) * | 2012-12-24 | 2013-09-18 | 上海钢之杰钢结构建筑有限公司 | Wind-proof cushion for rock wool composite plate |
CN204826365U (en) * | 2015-08-03 | 2015-12-02 | 深圳市宝鹰建设集团股份有限公司 | Compound mirror surface smallpox pendant structure |
CN204940660U (en) * | 2015-08-28 | 2016-01-06 | 苏州美瑞德建筑装饰有限公司 | Full suspended ceiling combines self-contained provision for disengagement |
CN205024934U (en) * | 2015-09-17 | 2016-02-10 | 广东华途仕建材实业有限公司 | Triangle -shaped section bar lappet suspended ceiling system |
CN205369649U (en) * | 2016-02-03 | 2016-07-06 | 广州帝森建材有限公司 | Novel ripple suspended ceiling |
CN106013585A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Ceiling cascade device and installation method |
CN106013584A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Modular ceiling cascade device and mounting method |
CN206319473U (en) * | 2016-12-15 | 2017-07-11 | 浙江亚厦装饰股份有限公司 | Integrated furred ceiling |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558650A (en) * | 2017-08-01 | 2018-01-09 | 浙江未来加电子商务有限公司 | A kind of integrated bathroom ceiling structure and its installation method |
CN107514088A (en) * | 2017-09-15 | 2017-12-26 | 韩合桥 | Integrated modular flat-top and its construction method |
Also Published As
Publication number | Publication date |
---|---|
CN106677404B (en) | 2022-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677404A (en) | Integrated suspended ceiling and installation method | |
CN206319473U (en) | Integrated furred ceiling | |
CN109322428B (en) | Window wall system unit type curtain wall and installation method thereof | |
CN210288789U (en) | Quick assembly's assembled partition wall mounting structure | |
CN212836455U (en) | Assembled keel connecting piece for wall | |
CN2499464Y (en) | Dovetail hanging piece for stone curtain wall | |
CN201411783Y (en) | Box type combined house with convenient disassembly and assembly | |
CN216921252U (en) | Scaffold | |
CN214402562U (en) | Aluminum composite panel mounting structure capable of being rapidly disassembled and assembled | |
CN216810762U (en) | Keel profile and keel frame system convenient for mounting and dismounting veneer | |
CN215888817U (en) | Overturning connecting piece for quick installation of ceiling board | |
CN108643419A (en) | A kind of curtain wall installing structure | |
CN212271693U (en) | Strutting arrangement is used in building engineering construction | |
CN216920948U (en) | Hooking type kneading bearing keel | |
CN113530153B (en) | Integrated grade-falling clamping external corner fitting and mounting mode | |
CN215670731U (en) | Coupling assembling convenient to dismouting | |
CN214461700U (en) | Ceiling structure for building engineering construction | |
CN106677403A (en) | Suspended ceiling made of bamboo wood fibre plates and installation method | |
CN201499904U (en) | Sectional material assembly and sectional material | |
CN114809485B (en) | Workpiece unit, curved surface canopy grid structure and installation method of curved surface canopy grid structure | |
CN218244866U (en) | Assembled flower nursery | |
CN110507123B (en) | Foldable display rack convenient to mount and processing method | |
CN105433664A (en) | Portable exhibition cabinet | |
CN215716800U (en) | Building outer wall hangs stone material fixing device futilely | |
CN212962256U (en) | Solar energy system anchor clamps |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |