CN204940660U - Full suspended ceiling combines self-contained provision for disengagement - Google Patents

Full suspended ceiling combines self-contained provision for disengagement Download PDF

Info

Publication number
CN204940660U
CN204940660U CN201520662609.5U CN201520662609U CN204940660U CN 204940660 U CN204940660 U CN 204940660U CN 201520662609 U CN201520662609 U CN 201520662609U CN 204940660 U CN204940660 U CN 204940660U
Authority
CN
China
Prior art keywords
keel
plug
suspended ceiling
main keel
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520662609.5U
Other languages
Chinese (zh)
Inventor
周达
陈川
陈雪刚
陈万伟
陈晔
滑曦
陈昌勇
赵宁方
叶金康
刘静
孙玉高
邱烨
胡继荣
李翔
马晓华
潘旋
邹宏明
王昌虎
张卫东
葛孙翔
钱谨明
王辉
杨天武
金尉琪
张才红
陆争艳
马介明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Merud Building Decoration Co Ltd
Original Assignee
Suzhou Merud Building Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Merud Building Decoration Co Ltd filed Critical Suzhou Merud Building Decoration Co Ltd
Priority to CN201520662609.5U priority Critical patent/CN204940660U/en
Application granted granted Critical
Publication of CN204940660U publication Critical patent/CN204940660U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

本实用新型公开了一种全悬浮吊顶组合整装拆卸装置。这种全悬浮吊顶组合整装拆卸装置,包括主龙骨和烤漆龙骨,烤漆龙骨位于主龙骨下方且与主龙骨垂直交叉设置;所述主龙骨的凹槽内嵌设有T形的第一挂插件,第一挂插件顶端固定连接有吊挂件,吊挂件上固定安装有固定在屋顶的吊杆;所述主龙骨和烤漆龙骨之间通过第二挂插件连接。本实用新型结构简单,设计合理,操作方便,走廊通道等狭窄区域吊顶系统分别沿走廊的长度方向和宽度方向延伸主龙骨和烤漆龙骨,安装简单快捷,有利于缩短施工周期,同时悬浮吊顶的设计使得面板不予墙体结构有接触,有利于面板实现应力释放。

The utility model discloses a combined assembly and disassembly device for a full-suspension suspended ceiling. This fully-suspended suspended ceiling combined dismantling device includes a main keel and a painted keel. The painted keel is located below the main keel and is vertically intersected with the main keel; a T-shaped first hanging plug is embedded in the groove of the main keel. , the top of the first hanging plug-in is fixedly connected with a hanging piece, and the hanging piece is fixedly installed with a suspender fixed on the roof; the main keel and the paint keel are connected through the second hanging plug-in. The utility model has the advantages of simple structure, reasonable design, and convenient operation. The ceiling system in narrow areas such as corridors extends the main keel and the paint keel respectively along the length direction and width direction of the corridor. The installation is simple and fast, which is beneficial to shorten the construction period. The panel is not in contact with the wall structure, which is beneficial for the panel to realize stress release.

Description

全悬浮吊顶组合整装拆卸装置Fully suspended ceiling combined assembly and disassembly device

技术领域 technical field

本实用新型涉及吊顶安装技术领域,尤其一种在狭窄区域使用安装方便的全悬浮吊顶组合整装拆卸装置。 The utility model relates to the technical field of suspended ceiling installation, in particular to a fully-suspended suspended ceiling combined assembly and disassembly device which is convenient to use and install in a narrow area.

背景技术 Background technique

室内吊顶是建筑装饰中的重要组成部分,其作用除了美化装饰效果还有遮挡结构构件及各种设备管道和装置。装饰吊顶设计为室内装饰的一部分,总体而言应考虑装饰风格、空间条件等统筹考虑。现有的吊顶系统大部分均集中在大空间内,施工工艺也较为成熟。可是在狭窄的走道、走廊等空间内安装十分不方便。同时隐藏在吊顶内的各种设备、管线在后期维修也十分不方便。同时随着装饰施工大量的原现场加工转入到后场工厂制作,现场基层需要凑着后场之一原则也十分普遍了。为了达到理想的装饰效果和吊顶装饰质量的可控制,特研发全悬浮吊顶组合整装拆卸系统的研发。 Indoor ceiling is an important part of architectural decoration. Its function is not only to beautify the decorative effect, but also to block structural components, various equipment pipes and devices. The decorative ceiling design is a part of the interior decoration, and overall consideration should be given to the decoration style and space conditions. Most of the existing ceiling systems are concentrated in a large space, and the construction technology is relatively mature. However, it is very inconvenient to install in narrow aisles, corridors and other spaces. At the same time, it is very inconvenient to maintain various equipment and pipelines hidden in the ceiling in the later stage. At the same time, as a large amount of original on-site processing of decoration construction is transferred to the factory production in the back field, it is also very common that the basic level of the field needs to be one of the back field. In order to achieve the ideal decorative effect and the controllable quality of ceiling decoration, the development of a fully suspended ceiling combination disassembly system is specially developed.

实用新型内容 Utility model content

本实用新型要解决的技术问题是:克服现有技术的不足,提供一种结构简单,拆装方便的全悬浮吊顶组合整装拆卸装置。 The technical problem to be solved by the utility model is: to overcome the deficiencies of the prior art, and to provide a fully-suspended suspended ceiling assembly and disassembly device with simple structure and convenient disassembly.

本实用新型解决其技术问题所采用的技术方案是:一种全悬浮吊顶组合整装拆卸装置,包括主龙骨和烤漆龙骨,烤漆龙骨位于主龙骨下方且与主龙骨垂直交叉设置;所述主龙骨的凹槽内嵌设有T形的第一挂插件,第一挂插件顶端固定连接有吊挂件,吊挂件上固定安装有固定在屋顶的吊杆;所述主龙骨和烤漆龙骨之间通过第二挂插件连接,第二挂插件包括内嵌部和挂钩部,内嵌部嵌设在烤漆龙骨凹槽内,挂钩部挂在主龙骨的凸块上,内嵌部和挂钩部之间设有连接部,内嵌部、连接部和挂钩部为一体成型结构。烤漆龙骨上设置有吊顶面板。 The technical solution adopted by the utility model to solve the technical problems is: a fully suspended ceiling combined disassembly device, including a main keel and a paint keel, the paint keel is located below the main keel and vertically crossed with the main keel; the main keel A T-shaped first hanging plug-in is embedded in the groove of the first hanging plug-in, and a hanging piece is fixedly connected to the top of the first hanging piece, and a suspender fixed on the roof is fixedly installed on the hanging piece; the main keel and the painted keel pass through the first Two hanging plug-ins are connected. The second hanging plug-in includes an inlay part and a hook part. The inlay part is embedded in the groove of the paint keel. The connection part, the embedded part, the connection part and the hook part are integrally formed. The painted keel is provided with a ceiling panel.

进一步地,所述的第一挂插件通过铆钉与第一挂插件固定连接。 Further, the first hanging piece is fixedly connected with the first hanging piece through a rivet.

进一步地,所述的吊杆通过角铁与射钉相配合连接至屋顶。 Further, the hanging rod is connected to the roof through angle irons and nails.

本实用新型的有益效果是:本实用新型结构简单,设计合理,操作方便,走廊通道等狭窄区域吊顶系统分别沿走廊的长度方向和宽度方向延伸主龙骨和烤漆龙骨,安装简单快捷,有利于缩短施工周期,同时悬浮吊顶的设计使得面板不予墙体结构有接触,有利于面板实现应力释放。 The beneficial effects of the utility model are: the utility model has the advantages of simple structure, reasonable design, and convenient operation. The ceiling system in narrow areas such as corridor passages extends the main keel and the paint keel respectively along the length direction and width direction of the corridor. At the same time, the design of the suspended ceiling prevents the panel from contacting the wall structure, which is conducive to the stress release of the panel.

附图说明 Description of drawings

下面结合附图对本实用新型进一步说明。 Below in conjunction with accompanying drawing, the utility model is further described.

图1是本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2是图1中第二挂插件的结构示意图。 Fig. 2 is a schematic structural diagram of the second hanging plug in Fig. 1 .

其中:1.主龙骨,2.烤漆龙骨,3.第一挂插件,4.吊挂件,5.吊杆,6.角铁,7.第二挂插件,71.内嵌部,72.连接部,73.挂钩部。 Among them: 1. Main keel, 2. Painted keel, 3. First hanging plug-in, 4. Suspension piece, 5. Suspension rod, 6. Angle iron, 7. Second hanging plug-in, 71. Embedded part, 72. Connection Department, 73. Hook Department.

具体实施方式 detailed description

现在结合附图对本实用新型作进一步的说明。这些附图均为简化的示意图仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。 The utility model is described further in conjunction with accompanying drawing now. These drawings are simplified schematic diagrams only to illustrate the basic structure of the utility model in a schematic way, so they only show the configurations related to the utility model.

如图1和图2所示的全悬浮吊顶组合整装拆卸装置,包括主龙骨1和烤漆龙骨2,烤漆龙骨2位于主龙骨1下方且与主龙骨1垂直交叉设置;主龙骨1的凹槽内嵌设有T形的第一挂插件3,第一挂插件3顶端固定连接有吊挂件4,吊挂件4上固定安装有固定在屋顶的吊杆5;主龙骨1和烤漆龙骨2之间通过第二挂插件7连接,第二挂插件7包括内嵌部71和挂钩部73,内嵌部71嵌设在烤漆龙骨2凹槽内,挂钩部73挂在主龙骨1的凸块上,内嵌部71和挂钩部73之间设有连接部72,内嵌部71、连接部72和挂钩部73为一体成型结构。 As shown in Figure 1 and Figure 2, the combined assembly and disassembly device of the fully suspended ceiling includes the main keel 1 and the painted keel 2, the painted keel 2 is located below the main keel 1 and vertically intersects with the main keel 1; the groove of the main keel 1 Embedded with a T-shaped first hanging plug-in 3, the top of the first hanging plug-in 3 is fixedly connected with a hanging piece 4, and the hanging piece 4 is fixedly installed with a suspender 5 fixed on the roof; between the main keel 1 and the painted keel 2 Connected by the second hanging piece 7, the second hanging piece 7 includes an embedded part 71 and a hook part 73, the embedded part 71 is embedded in the groove of the paint keel 2, and the hook part 73 is hung on the protrusion of the main keel 1, A connection portion 72 is provided between the inlay portion 71 and the hook portion 73 , and the inlay portion 71 , the connection portion 72 and the hook portion 73 are integrally formed.

第一挂插件3通过铆钉与第一挂插件3固定连接;吊杆5通过角铁6与射钉相配合连接至屋顶。 The first hanger 3 is fixedly connected to the first hanger 3 by means of rivets; the suspender 5 is connected to the roof by matching the angle iron 6 with the nail.

将主龙骨1与吊杆5通过吊挂件4与第一挂插件3连接,在烤漆龙骨2与主龙骨1的交叉布置点,使用其配套的第二挂插件7将二者连接固定。 Connect the main keel 1 and the suspender 5 with the first hanging plug-in 3 through the hanging piece 4, and use the matching second hanging plug-in 7 to connect and fix the two at the intersection point of the painted keel 2 and the main keel 1.

这种结构简单,设计合理,操作方便,走廊通道等狭窄区域吊顶系统分别沿走廊的长度方向和宽度方向延伸主龙骨和烤漆龙骨,安装简单快捷,有利于缩短施工周期,同时悬浮吊顶的设计使得面板不予墙体结构有接触,有利于面板实现应力释放。 This kind of structure is simple, the design is reasonable, and the operation is convenient. The ceiling system in narrow areas such as corridors extends the main keel and the paint keel along the length direction and width direction of the corridor respectively. The installation is simple and fast, which is conducive to shortening the construction period. The panel does not have contact with the wall structure, which is conducive to the stress release of the panel.

以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。 Inspired by the above ideal embodiment according to the utility model, through the above description content, relevant staff can completely make various changes and modifications within the scope of not deviating from the technical idea of the utility model. The technical scope of this utility model is not limited to the content in the description, but must be determined according to the scope of the claims.

Claims (3)

1. a full suspended ceiling combines self-contained provision for disengagement, it is characterized in that: comprise main joist (1) and baked keel (2), baked keel (2) is positioned at main joist (1) below and arranges with main joist (1) square crossing; Be embedded with T-shaped in the groove of described main joist (1) first hangs plug-in unit (3), first hangs plug-in unit (3) top is fixedly connected with suspender member (4), suspender member (4) is installed with the suspension rod (5) being fixed on roof; Hang plug-in unit (7) by second between described main joist (1) and baked keel (2) to connect, second hangs plug-in unit (7) comprises insertion part (71) and hook portion (73), insertion part (71) is embedded in baked keel (2) groove, hook portion (73) hangs on the projection of main joist (1), be provided with connecting portion (72) between insertion part (71) and hook portion (73), insertion part (71), connecting portion (72) and hook portion (73) are formed in one structure.
2. full suspended ceiling according to claim 1 combines self-contained provision for disengagement, it is characterized in that: the first described extension plug-in unit (3) is hung plug-in unit (3) by rivet and first and is fixedly connected with.
3. full suspended ceiling according to claim 1 combines self-contained provision for disengagement, it is characterized in that: described suspension rod (5) is in mating connection to roof by angle bar (6) and nailing.
CN201520662609.5U 2015-08-28 2015-08-28 Full suspended ceiling combines self-contained provision for disengagement Expired - Fee Related CN204940660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520662609.5U CN204940660U (en) 2015-08-28 2015-08-28 Full suspended ceiling combines self-contained provision for disengagement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520662609.5U CN204940660U (en) 2015-08-28 2015-08-28 Full suspended ceiling combines self-contained provision for disengagement

Publications (1)

Publication Number Publication Date
CN204940660U true CN204940660U (en) 2016-01-06

Family

ID=55008101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520662609.5U Expired - Fee Related CN204940660U (en) 2015-08-28 2015-08-28 Full suspended ceiling combines self-contained provision for disengagement

Country Status (1)

Country Link
CN (1) CN204940660U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245840A (en) * 2016-09-29 2016-12-21 范柏联 A kind of overlap stable ceiling joist
CN106677404A (en) * 2016-12-15 2017-05-17 浙江亚厦装饰股份有限公司 Integrated suspended ceiling and installation method
CN107724588A (en) * 2017-12-08 2018-02-23 北京城建道桥建设集团有限公司 A kind of integrated form curved surface ceiling structure and its construction method
CN108049552A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Top hangs drop level furred ceiling and installation method
CN108060735A (en) * 2017-12-13 2018-05-22 郑州默尔电子信息技术有限公司 One kind can secured quick-installed suspended ceiling framework
CN108532820A (en) * 2018-04-20 2018-09-14 江苏华灿装饰工程有限公司 Catamaran type metal ceiling assists keel and its technique
KR101926096B1 (en) * 2018-01-25 2018-12-06 심재옥 lightweight steel frame structure for earthquake-proof construction

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245840A (en) * 2016-09-29 2016-12-21 范柏联 A kind of overlap stable ceiling joist
CN106677404A (en) * 2016-12-15 2017-05-17 浙江亚厦装饰股份有限公司 Integrated suspended ceiling and installation method
CN106677404B (en) * 2016-12-15 2022-10-04 浙江亚厦装饰股份有限公司 Integrated ceiling and mounting method
CN107724588A (en) * 2017-12-08 2018-02-23 北京城建道桥建设集团有限公司 A kind of integrated form curved surface ceiling structure and its construction method
CN108060735A (en) * 2017-12-13 2018-05-22 郑州默尔电子信息技术有限公司 One kind can secured quick-installed suspended ceiling framework
CN108049552A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Top hangs drop level furred ceiling and installation method
CN108049552B (en) * 2017-12-30 2023-11-10 浙江亚厦装饰股份有限公司 Top-mounted drop-grade ceiling and installation method
KR101926096B1 (en) * 2018-01-25 2018-12-06 심재옥 lightweight steel frame structure for earthquake-proof construction
JP2019127823A (en) * 2018-01-25 2019-08-01 グッド コンストラクション Structure of lightweight steel frame for earthquake resistance
CN108532820A (en) * 2018-04-20 2018-09-14 江苏华灿装饰工程有限公司 Catamaran type metal ceiling assists keel and its technique

Similar Documents

Publication Publication Date Title
CN204940660U (en) Full suspended ceiling combines self-contained provision for disengagement
CN102953454A (en) Novel combined partition wall and installation method thereof
CN202866099U (en) Universal keel hanging pieces for indoor ceiling
CN206487054U (en) One kind is oblique to gang up with formula ceiling structure
CN205399779U (en) Hyperbolic arc pendant
CN205557941U (en) Outer wall perforation aluminum curtain wall
CN205296536U (en) Joint formula keel connecting piece
CN203569771U (en) Light steel keel for interior decoration
CN206607739U (en) A kind of V-type hang type furred ceiling
CN204715603U (en) A kind of parallel wide keel smallpox
CN207092451U (en) A kind of faced wall mounting structure
CN204006342U (en) A kind of mounting structure of radiant panel
CN205100417U (en) Suspended ceiling keel
CN205189199U (en) Suspended ceiling keel articulates piece
CN209397813U (en) Ceiling mounting structure convenient to dismantle
CN205012539U (en) Lacing film lamp support
CN205475886U (en) Connection structure of curved surface curtain
CN203569766U (en) Inside and outside buckled type ceiling structure
CN205024927U (en) Multi -functional suspended ceiling
CN210288849U (en) a ceiling structure
CN207405852U (en) The mounting structure of ceiling
CN1873151B (en) Tie rod device for building suspended ceiling
CN207727814U (en) Modified open type aluminium plate curtain wall system
CN205116525U (en) Supporting lamp of square tube
CN206091029U (en) Second grade furred ceiling component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106