- CN207988316U CN207988316U CN201721923577.5U CN201721923577U CN207988316U CN 207988316 U CN207988316 U CN 207988316U CN 201721923577 U CN201721923577 U CN 201721923577U CN 207988316 U CN207988316 U CN 207988316U
- Authority
- CN
- China
- Prior art keywords
- riser
- surface plate
- drop level
- plate
- metope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000000465 moulding Methods 0.000 claims description 14
- 238000005520 cutting process Methods 0.000 claims description 10
- 239000002023 wood Substances 0.000 claims description 10
- 230000007704 transition Effects 0.000 claims description 7
- 238000009434 installation Methods 0.000 abstract description 12
- 238000010276 construction Methods 0.000 description 12
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000010586 diagram Methods 0.000 description 6
- 230000006378 damage Effects 0.000 description 5
- 238000005034 decoration Methods 0.000 description 4
- 238000010079 rubber tapping Methods 0.000 description 4
- 238000011900 installation process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010923 batch production Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Abstract
The utility model discloses a kind of receipts side drop level furred ceilings, including:The first end of load-bearing cantilever, the load-bearing cantilever is fixed on metope, and the second end of the load-bearing cantilever is extended towards the direction far from the metope;First surface plate, first surface plate is located at the lower section of the load-bearing cantilever, and the first end of first surface plate is fixed on the metope, and the second end of first surface plate is extended towards the direction far from metope;Drop level stile, the drop level stile includes extending in the same direction and the first riser connected in sequence, the second riser and third riser, first riser is oppositely arranged with the third riser, first riser is hung on the load-bearing cantilever, and the end on the third riser far from second riser and the second end of first surface plate are spliced.Using receipts side provided by the utility model drop level furred ceiling, can panel quickly being hung on side, installation is complete.
Description
Technical field
The utility model is related to architecture indoor top surface fitting-up technical fields, are hung more particularly to a kind of receipts side drop level
Top.
Background technology
It receives side drop level furred ceiling and generally includes two pieces or polylith level board, connected with vertical plate between level board, form step
The structure of shape.Currently, in traditional receipts side drop level furred ceiling, every block of level board and vertical plate are required for individually vertical hanging bar
It is hung, the larger plate of some areas even may require that many vertical hanging bars just can guarantee the stabilization of hanging structure.
For this design, have the following defects:First, the weight of furred ceiling is larger, is hung in top surface by vertical pendant
Ceiling joist is easy to deform because stress is concentrated in the position for connecting vertical pendant when upper, the stability after installation of ceiling
Difference;Second, ceiling joist is mounted on furred ceiling, and after furred ceiling hanging is on top surface, the position of ceiling joist can not adjust, peace
It need to will be adjusted after furred ceiling integral demounting when taking on existing error, increase workload, extend construction period, be unfavorable for standardization fast
Speed construction;The amount of deflection of third, sunpender is big, needs to open up multiple holes positions on the original concrete of top surface and is reversely supported, right
The extent of the destruction of the original concrete of top surface is larger.
Utility model content
In view of this, the utility model provides a kind of receipts side drop level furred ceiling, it is intended in the presence of overcoming the prior art
Defect.
Receipts side provided by the utility model drop level furred ceiling includes:The first end of load-bearing cantilever, the load-bearing cantilever is fixed
On metope, the second end of the load-bearing cantilever is extended towards the direction far from the metope;First surface plate, described first
Surface plate is located at the lower section of the load-bearing cantilever, and the first end of first surface plate is fixed on the metope, described
The second end of first surface plate is extended towards the direction far from metope;Drop level stile, the drop level stile include extending in the same direction
And the first riser connected in sequence, the second riser and third riser, first riser are oppositely arranged with the third riser, institute
It states the first riser to hang on the load-bearing cantilever, the end and described first on the third riser far from second riser are flat
The second end of panel is spliced.
As described above side drop level furred ceiling of receiving further includes further the second surface plate, close to the on second surface plate
The plate face of one end is fitted and connected in the upper surface of first riser, and the second end of second surface plate is towards far from the metope
Direction be extended.
Side drop level furred ceiling as described above of receiving further includes further wood moulding item, and the first end of first surface plate passes through
The wood moulding item is connected on the metope.
As described above to receive side drop level furred ceiling, further, the wood moulding item includes integrated molding and orthogonal two
Wood-plastic board a, wherein wood-plastic board is fitted and connected on the metope, close to the plate face of first end on first surface plate
It is fitted and connected in the lower surface of another wood-plastic board.
As described above to receive side drop level furred ceiling, further, the third riser is spelled with first surface plate by cutting
It connects.
As described above to receive side drop level furred ceiling, further, the second end of first surface plate is offered along board direction
First buckling groove, the end far from second riser offers the second buckling groove, institute along board direction on the third riser
It states the first buckling groove and second buckling groove is oppositely arranged, first buckling groove, the other side are inserted into the side of the cutting
It is inserted into second buckling groove.
Side drop level furred ceiling as described above of receiving further is provided with positive stop strip in the cutting, the positive stop strip is clipped in institute
It states between third riser and first surface plate, limits the width in gap between the third riser and first surface plate
Degree.
As described above to receive side drop level furred ceiling, further, the load-bearing cantilever includes interconnecting piece and supporting part, the connection
Portion is fixed on the surface of wall, and the interconnecting piece includes connecting plate, and the connecting plate is horizontally disposed;The first end of the supporting part
It is fixed on the connecting plate, the second end of the supporting part is extended to towards the direction far from the metope outside the connecting plate;
First riser is hung on the supporting part.
Side drop level furred ceiling as described above of receiving further is connected between first surface plate and the third riser
Corner brace, the side overlap joint of the corner brace are fixed on the upper surface of first surface plate, and the other side overlap joint of the corner brace is fixed
In the upper surface of the third riser.
It is as described above to receive side drop level furred ceiling, further, the lower surface of first surface plate and first surface plate
The intersection arc transition of second end;The lower surface of the third riser and on the third riser separate described second and/or
The intersection arc transition of the end face of riser.
Using receipts side provided by the utility model drop level furred ceiling, vertical sunpender need not be specially set, reduced to top
The destruction of the original concrete in face reduces the deformation of ceiling joist, ensures that ceiling joist position is adjustable, shortens construction period,
Be conducive to standardize rapid construction.Further, it is possible to ensure the aesthetics of receipts side decoration module, can panel installation quickly be hung on side
It completes, while ensureing, there are one the side platform sling in direction and the same length of top plate, to increase the utilization rate of on-gauge plate, reduce the work of bound edge
Sequence.
Description of the drawings
Preferred embodiment in the utility model will be described in detail by attached drawing below, it will help understand the utility model
Objects and advantages, wherein:
Fig. 1 is the structural schematic diagram that side drop level furred ceiling is received described in the utility model embodiment.
Fig. 2 is the partial enlarged view in Fig. 1.
Fig. 3 is the structural schematic diagram of load-bearing cantilever described in the utility model embodiment.
Fig. 4 is the structural schematic diagram of section components in Fig. 3.
Fig. 5 is the matching chart of the first surface plate and corner brace in Fig. 1.
Specific implementation mode
The utility model is described in detail with reference to embodiment.The identical attached drawing mark of wherein identical parts
Note indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to
Direction in attached drawing, word "inner" and "outside" refer respectively to the direction towards or away from geometric center of specific component.
Fig. 1 is the structural schematic diagram that side drop level furred ceiling is received described in the utility model embodiment, and Fig. 2 is that the part in Fig. 1 is put
Big figure.As illustrated in fig. 1 and 2, the receipts side drop level furred ceiling that the utility model embodiment is provided includes:Load-bearing cantilever 100, first is flat
Panel 200 and drop level stile 300.
The first end of the load-bearing cantilever 100 is fixed on metope, the other structures for carrying furred ceiling.The load-bearing is outstanding
The second end of arm 100 is extended towards the direction far from the metope.The metope can be building masonry wall inner surface, described
Wall can be the intrinsic load bearing wall of interior of building, can also be arranged during the decorations of interior of building later stage every
Wall.
First surface plate 200 is located at the lower section of the load-bearing cantilever 100, and the of first surface plate 200
One end is fixed on the metope, and the second end of first surface plate 200 is extended towards the direction far from metope.Specific
In embodiment, first surface plate 200 and the load-bearing cantilever 100 can be horizontally disposed with, and the two is each attached on metope.
The drop level stile 300 includes extending in the same direction and the first riser 310 connected in sequence, the second riser 320 and third
Riser 330, first riser 310 are oppositely arranged with the third riser 330, and first riser 310 hangs over the load-bearing
On cantilever 100, the end and the second of first surface plate 200 far from second riser 320 on the third riser 330
End matching connects.In a particular embodiment, the extending direction of the drop level stile 300 is the direction in Fig. 1 perpendicular to paper, described to fall
The shape of the cross section of grade stile 300 is U-shaped.Wherein, second riser 320 is vertically arranged, 310 He of the first riser
The third riser 330 is horizontally disposed.After the third riser 330 splices with first surface plate 200, the lower surface of the two
Concordantly, to form drop level structure.The receipts side drop level furred ceiling that the utility model embodiment is provided is suitable for the peace of various panels
Dress is especially suitable for installing less than the panel of 300mm width.
As shown in Figs. 1-2, the receipts side drop level furred ceiling that the utility model embodiment is provided further includes the second surface plate 400,
It is fitted and connected in the upper surface of first riser 310 close to the plate face of first end on second surface plate 400, described second
The second end of surface plate 400 is extended towards the direction far from the metope.Second surface plate 400, the drop level stile
300 and first surface plate 200 a complete drop level structure is collectively formed.In specific implementation process, described second
Surface plate 400 elongated can be handled, you can to extend on the strong wall of another side, or be extended on other components of furred ceiling.Institute
Stating the second surface plate 400 can be isometric with the drop level stile 300, i.e. in Fig. 1 on the direction of paper equal length.
During the installation process, the load-bearing cantilever 100 and first surface plate 200 can be first fixed on metope,
Then the drop level stile 300 is installed, so that first riser 310 is overlapped on the load-bearing cantilever 100, the third
Riser 330 splices on first surface plate 200, and second surface plate 400 is then fixed on the drop level stile 300
Top.
Using receipts side provided by the utility model drop level furred ceiling, vertical sunpender need not be specially set, reduced to top
The destruction of the original concrete in face reduces the deformation of ceiling joist, ensures that ceiling joist position is adjustable, shortens construction period,
Be conducive to standardize rapid construction.Further, it is possible to ensure the aesthetics of receipts side decoration module, can panel installation quickly be hung on side
It completes, while ensureing, there are one the side platform sling in direction and the same length of top plate, to increase the utilization rate of on-gauge plate, reduce the work of bound edge
Sequence.
In an alternative embodiment, receipts side provided by the utility model drop level furred ceiling further includes wood moulding item 210, and described first
The first end of surface plate 200 is connected to by the wood moulding item 210 on the metope.The wood moulding item 210 can be L-type,
Including integrated molding and orthogonal two wood-plastic boards, wherein a wood-plastic board is fitted and connected on the metope, and lead to
Tapping screw or expansion bolt are crossed to fix;Plate face on first surface plate 200 close to first end is fitted and connected another
The lower surface of wood-plastic board, can be fixed by tapping screw.In this design, wood moulding article 210 has been hidden in described
The top of one surface plate 200, takes into account bonding strength and beauty.In addition, can be between first surface plate 200 and the metope
Reserved certain gap, while improving overall aesthetic degree, moreover it is possible to which the deformation for adapting to 200 later stage of the first surface plate avoids protrusion.
As shown in Figs. 1-2, the third riser 330 is spliced with first surface plate 200 by cutting 501, described to insert
Item 501 can be T fonts.The second end of first surface plate 200 offers the first buckling groove 601, institute along board direction
It states on third riser 330 end far from second riser 320 and offers the second buckling groove 602 along board direction, described the
One buckling groove 601 and second buckling groove 602 are oppositely arranged, and first buckling groove is inserted into the side of the cutting 501
601, second buckling groove 602 is inserted into the other side.Positive stop strip 502 is provided in the cutting 501, the positive stop strip 502 presss from both sides
Between the third riser 330 and first surface plate 200, the third riser 330 and first surface plate are limited
The width in gap between 200.During the installation process, the first buckling groove 601 and the second buckling groove 602 can be aligned, then will
The splicing that first surface plate 200 and the third riser 330 can be completed is inserted into the cutting 501.Installation is very simple
Fast, it is suitble to industrialization Fast Installation.Also, the positive stop strip 502 can limit the third riser 330 and described first flat
The width in gap between panel 200 makes the width and the width of the positive stop strip 502 be consistent, need not be by manually surveying
The mode of amount goes reserving gaps, simplifies installation steps.
Further, the intersection circular arc of the lower surface of first surface plate 200 and 200 second end of the first surface plate
Transition;The friendship of the lower surface of the third riser 330 and the end face far from second riser 320 on the third riser 330
Arc transition at boundary.On the one hand, the design of this arc transition is capable of providing whole aesthetics, on the other hand in installation process
In be not easy scratching fingers.
Fig. 3 is the structural schematic diagram of load-bearing cantilever 100 described in the utility model embodiment;Fig. 4 is section components in Fig. 3
Structural schematic diagram.As shown in Figs 1-4, the load-bearing cantilever 100 includes interconnecting piece 110 and supporting part 120, the supporting part 120
It is fixed on metope 130 by the interconnecting piece 110, to realize the function of load-bearing.
Specifically, the interconnecting piece 110 is fixed on metope 130, and the interconnecting piece 110 includes connecting plate 111, the connection
Plate 111 is horizontally disposed, and the upper surface of the connecting plate 111 can be used for being attached with the supporting part 120, to hold
State supporting part 120.The first end of the supporting part 120 is fixed on the connecting plate 111, the second end of the supporting part 120
It is extended to outside the connecting plate 111 towards the direction far from the wall 130.The second end of the supporting part 120 is to the metope
130 distance is more than the right end of the connecting plate 111 to the distance of the metope 130.
Using the load-bearing cantilever 100 described in embodiment as above, the various modular structures of Integral ceiling can be mounted directly
On the supporting part 120, vertical hanging bar need not be set.It, can also be on two sides in a specific application example
Load-bearing cantilever 100 described in one embodiment as above is installed respectively on opposite metope, then overlaps at the both ends of keel respectively
It is fixed on two supporting parts 120, then the various modular structures of Integral ceiling is directly installed on keel, are not needed
Vertical sunpender is specially set, the destruction to the original concrete of top surface is reduced, reduces the deformation of ceiling joist, ensures furred ceiling dragon
The position of bone is set adjustable, shortens construction period, is conducive to standardize rapid construction.
In embodiment as shown in Figs 1-4, the interconnecting piece 110 further includes fixed plate 112, the fixed plate 112 with
111 vertical connection of the connecting plate, the fitting of the fixed plate 112 are fixed on the metope 130, make the fixed plate 112 and institute
The contact area for stating metope 130 increases, and the fixed plate 112 can be fixed on the metope 130 by expansion bolt 140, carry
High integrally-built coupling stiffness, increases the whole load-bearing capacity of load-bearing cantilever 100.
In addition, the fixed plate 112 is fixed on the metope 130 by tapping screw.It, can be in institute when specifically used
State in fixed plate 112 with open location hole, when installation, only needs that automatic screw is screwed into wall 130 by location hole, you can real
The fixation of the existing fixed plate 112, removes drilling operation from, simplifies process, is particularly suitable for the less high portion of some load-bearing requirements
The lifting of part, such as:The lightweight components such as blind box cover, moulding.
As shown in Figs 1-4, the first end of the connecting plate 111 is connected to the top edge of the fixed plate 112, the connection
The second end of plate 111 is extended towards the direction far from the wall 130, and the first end of the supporting part 120 is fixed on described
The upper surface of fixed plate 112.Preferably, the interconnecting piece 110 can be angle bar, and the two boards for forming angle bar are institute above respectively
The fixed plate 112 and connecting plate 111 stated.For this design, after fixed plate 112 is stably connected with metope 130, the connection
Plate 111 is made the following of the fixed plate 112 have towards the fortune of wall 130 by the downward pressure from the supporting part 120
Dynamic trend, and wall 130 just can effectively support the following of the fixed plate 112.Therefore, this to design very
It is conducive to provide integrally-built load-bearing capacity, and keeps structure more firm.
Preferably, the supporting part 120 can be square steel, such as the square steel of 40mm*20mm.The supporting part 120 can be with
The upper surface of the fixed plate 112 is fixed on by fastening bolt 150.Specifically, the square steel can be along the connecting plate 111
Extending direction setting, can be arranged on the square steel and on the connecting plate 111 matched with the fastening bolt 150
Then the axis of through-hole, the through-hole can be realized solid perpendicular to the square steel length direction by the fastening bolt 150
It is fixed.The various modular structures of Integral ceiling can directly be hung on square steel, and overall structure is very firm.
In one alternate embodiment, as shown in Figs 1-4, between the first end of the supporting part 120 and the metope 130
There are gaps.During furred ceiling is installed, the gap can be adjusted according to the accumulated error generated in the process is actually mounted
Width, avoid various problems caused by due to accumulated error, such as:Gap is too big between lofty uneven, the furred ceiling plate of furred ceiling
Deng.
The load-bearing cantilever 100 provided using the utility model embodiment, can be by the various modular structures of Integral ceiling
It is directly installed on load-bearing cantilever 100, vertical sunpender need not be specially set, reduce to the broken of the original concrete of top surface
It is bad, reduce the deformation of ceiling joist, ensure that ceiling joist position is adjustable, shorten construction period, is conducive to standardization and quickly applies
Work.In addition, using the utility model, keel can be utilized to increase the support strength of cantilever support, it also can be after top surface installs
Cantilever load-carrying members are further added by reinforce, monoblock type batch production preparation, the mode of live direct-assembling installation also can also be used.Prolong
The cantilever of metope is stretched out, due to the c-type special construction of drop level stile, keel have a certain range error margin (such as 40mm),
It is not high to dimension precision requirement;Secondary support system is done using metope, is not necessarily to hook rail structure.Compared to hook rail structure, reduce
The time of the installations such as leveling serew, it ensure that installation effectiveness;Batch production directly produces accessory, and scene is mounted directly.
Fig. 5 is the matching chart of the first surface plate 200 and corner brace 701 in Fig. 1.In conjunction with shown in Fig. 1,2,5, described first
It is connected with corner brace 701 between surface plate 200 and the third riser 330, the side overlap joint of the corner brace 701 is fixed on described the
The upper surface of one surface plate 200, the other side overlap joint of the corner brace 701 are fixed on the upper surface of the third riser 330.One side
Face, this design can provide whole structural stability;Two on the one hand, can be by the upper surface of the first surface plate 200 and the
The upper surface of three risers 330 limits in the same plane, in the case where thickness is equal, it is only necessary to install corner brace 701, energy
Ensure that the lower surface of the two is concordant, operation is very simple.
In another embodiment, the corner brace 701 includes being mutually perpendicular to and coplanar two panels steel plate is integrally formed, often
Two through-holes are opened up on piece steel plate, and a through-hole is opened up in the junction of two panels steel plate.Pass through two panels steel plate by four screws
On four through-holes, by corner brace 701 be mounted on first surface plate 200 on;The through-hole and third of the junction of two panels steel plate
Riser 330 is aligned, and can pass through tapping screw the through-hole to realize the connection of corner brace 701 and third riser 330, to realize
State being bonded for the first surface plate 200 and third riser 330.
Using receipts side provided by the utility model drop level furred ceiling, vertical sunpender need not be specially set, reduced to top
The destruction of the original concrete in face reduces the deformation of ceiling joist, ensures that ceiling joist position is adjustable, shortens construction period,
Be conducive to standardize rapid construction.Further, it is possible to ensure the aesthetics of receipts side decoration module, can panel installation quickly be hung on side
It completes, while ensureing, there are one the side platform sling in direction and the same length of top plate, to increase the utilization rate of on-gauge plate, reduce the work of bound edge
Sequence.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
With replacement;And these modifications or replacements, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (10)
1. a kind of receipts side drop level furred ceiling, which is characterized in that including:
The first end of load-bearing cantilever, the load-bearing cantilever is fixed on metope, and the second end of the load-bearing cantilever is towards far from described
The direction of metope is extended;
First surface plate, first surface plate are located at the lower section of the load-bearing cantilever, and the first of first surface plate
End is fixed on the metope, and the second end of first surface plate is extended towards the direction far from metope;
Drop level stile, the drop level stile include extending in the same direction and the first riser connected in sequence, the second riser and third riser,
First riser is oppositely arranged with the third riser, and first riser is hung on the load-bearing cantilever, and the third is vertical
End and the second end of first surface plate on plate far from second riser are spliced.
2. receipts side according to claim 1 drop level furred ceiling, which is characterized in that further include the second surface plate, described second is flat
Plate face on panel close to first end is fitted and connected in the upper surface of first riser, the second end court of second surface plate
Direction far from the metope is extended.
3. receipts side according to claim 1 drop level furred ceiling, which is characterized in that further include wood moulding item, first surface plate
First end be connected on the metope by the wood moulding item.
4. receipts side according to claim 3 drop level furred ceiling, which is characterized in that the wood moulding item includes integrated molding and phase
Mutually vertical two wood-plastic boards a, wherein wood-plastic board is fitted and connected on the metope, close to the on first surface plate
The plate face of one end is fitted and connected in the lower surface of another wood-plastic board.
5. receipts side according to claim 1 drop level furred ceiling, which is characterized in that the third riser and first surface plate
Spliced by cutting.
6. receipts side according to claim 5 drop level furred ceiling, which is characterized in that the second end of first surface plate is along plate face
Direction offers the first buckling groove, and the end far from second riser offers second along board direction on the third riser
Buckling groove, first buckling groove and second buckling groove are oppositely arranged, and first clamping is inserted into the side of the cutting
Second buckling groove is inserted into slot, the other side.
7. receipts side according to claim 6 drop level furred ceiling, which is characterized in that positive stop strip is provided in the cutting, it is described
Positive stop strip is clipped between the third riser and first surface plate, limit the third riser and first surface plate it
Between gap width.
8. receipts side according to claim 1 drop level furred ceiling, which is characterized in that the load-bearing cantilever includes interconnecting piece and load-bearing
Part, the interconnecting piece are fixed on the surface of wall, and the interconnecting piece includes connecting plate, and the connecting plate is horizontally disposed;It is described to hold
The first end of heavy mail is fixed on the connecting plate, and the second end of the supporting part extends to institute towards the direction far from the metope
It states outside connecting plate;First riser is hung on the supporting part.
9. receipts side according to claim 1 drop level furred ceiling, which is characterized in that first surface plate and the third riser
Between be connected with corner brace, the side overlap joint of the corner brace is fixed on the upper surface of first surface plate, the corner brace it is another
Side overlaps the upper surface for being fixed on the third riser.
10. according to receipts side described in any one of claim 1-9 drop level furred ceiling, which is characterized in that first surface plate
The intersection arc transition of lower surface and the first surface plate second end;And/or the lower surface of the third riser with it is described
The intersection arc transition of end face far from second riser on third riser.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721923577.5U CN207988316U (en) | 2017-12-30 | 2017-12-30 | Receive side drop level furred ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721923577.5U CN207988316U (en) | 2017-12-30 | 2017-12-30 | Receive side drop level furred ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207988316U true CN207988316U (en) | 2018-10-19 |
Family
ID=63818667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721923577.5U Withdrawn - After Issue CN207988316U (en) | 2017-12-30 | 2017-12-30 | Receive side drop level furred ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207988316U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086571A (en) * | 2017-12-30 | 2018-05-29 | 浙江亚厦装饰股份有限公司 | Receive side drop level furred ceiling |
CN109594705A (en) * | 2018-12-04 | 2019-04-09 | 浙江亚厦装饰股份有限公司 | A kind of ceiling structure and its assemble method |
CN109594705B (en) * | 2018-12-04 | 2024-04-12 | 浙江亚厦装饰股份有限公司 | Suspended ceiling structure and assembling method thereof |
-
2017
- 2017-12-30 CN CN201721923577.5U patent/CN207988316U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086571A (en) * | 2017-12-30 | 2018-05-29 | 浙江亚厦装饰股份有限公司 | Receive side drop level furred ceiling |
CN108086571B (en) * | 2017-12-30 | 2023-12-19 | 浙江亚厦装饰股份有限公司 | Edge-closing drop-stage suspended ceiling |
CN109594705A (en) * | 2018-12-04 | 2019-04-09 | 浙江亚厦装饰股份有限公司 | A kind of ceiling structure and its assemble method |
CN109594705B (en) * | 2018-12-04 | 2024-04-12 | 浙江亚厦装饰股份有限公司 | Suspended ceiling structure and assembling method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7861986B2 (en) | Bracket and method for supporting a cubicle wall on a movable wall having horizontal mounting channels | |
CN108086571A (en) | Receive side drop level furred ceiling | |
CN106013585A (en) | Ceiling cascade device and installation method | |
CN104929297A (en) | Combined type ceiling hanging part and wood veneer ceiling installing process | |
CN207988316U (en) | Receive side drop level furred ceiling | |
CN210316353U (en) | Wall surface leveling-free wallboard assembly | |
CN211523646U (en) | Panel connector and hanging type partition wall applied to same | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN107514088A (en) | Integrated modular flat-top and its construction method | |
US20090294612A1 (en) | Bracket and method for supporting hanging components on a movable wall having horizontal mounting channels | |
CN216713553U (en) | Fireproof environment-friendly curtain box | |
CN216195894U (en) | Light trough structure and suspended ceiling | |
CN115822160A (en) | Design structure of quick-mounting type arc ceiling decorative surface layer | |
CN210049468U (en) | Fast-assembling wall body smallpox binding off component and furred ceiling structure | |
CN205444782U (en) | Install pendant structure of wall ceramic tile fast | |
CN209958669U (en) | Suspension type dalle installation device | |
CN114412046A (en) | Anti-deformation anti-falling assembled buckle suspended ceiling | |
CN211817640U (en) | Detachable plug-in type pendant structure | |
CN113833196A (en) | Light trough structure and suspended ceiling | |
CN207176988U (en) | It is easy to the combined partition body of handling | |
CN109914728B (en) | Hanging structure of wallboard and laminate | |
CN208122079U (en) | Furred ceiling load-bearing cantilever | |
CN112144807A (en) | Wallboard mounting structure and mounting method thereof | |
CN207827663U (en) | A kind of single-row staircase decorative board mounting structure and staircase | |
CN216239459U (en) | Curved surface decorative board mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20181019 Effective date of abandoning: 20231219 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20181019 Effective date of abandoning: 20231219 |
|
AV01 | Patent right actively abandoned | ||