CN108086571A - Receive side drop level furred ceiling - Google Patents
Receive side drop level furred ceiling Download PDFInfo
- Publication number
- CN108086571A CN108086571A CN201711485408.2A CN201711485408A CN108086571A CN 108086571 A CN108086571 A CN 108086571A CN 201711485408 A CN201711485408 A CN 201711485408A CN 108086571 A CN108086571 A CN 108086571A
- Authority
- CN
- China
- Prior art keywords
- riser
- surface plate
- plate
- drop level
- furred ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000465 moulding Methods 0.000 claims description 13
- 239000002023 wood Substances 0.000 claims description 11
- 238000005520 cutting process Methods 0.000 claims description 10
- 230000007704 transition Effects 0.000 claims description 7
- 230000037431 insertion Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 10
- 238000010276 construction Methods 0.000 description 13
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 230000006378 damage Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 238000005034 decoration Methods 0.000 description 4
- 238000011900 installation process Methods 0.000 description 3
- 238000010079 rubber tapping Methods 0.000 description 3
- 238000010923 batch production Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/30—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
Abstract
Side drop level furred ceiling is received the invention discloses a kind of, including:Load-bearing cantilever, the first end of the load-bearing cantilever are fixed on metope, and the second end of the load-bearing cantilever is extended towards the direction away from the metope;First surface plate, first surface plate is located at the lower section of the load-bearing cantilever, and the first end of first surface plate is fixed on the metope, and the second end of first surface plate is extended towards the direction away from metope;Drop level stile, the drop level stile includes extending in the same direction and the first riser connected in sequence, the second riser and the 3rd riser, first riser is oppositely arranged with the 3rd riser, first riser is hung on the load-bearing cantilever, and the end on the 3rd riser away from second riser and the second end of first surface plate are spliced.Using receipts side drop level furred ceiling provided by the present invention, can side quickly being hung panel, installation is complete.
Description
Technical field
The present invention relates to architecture indoor top surface fitting-up technical field, more particularly to a kind of receipts side drop level furred ceiling.
Background technology
It receives side drop level furred ceiling and generally includes two pieces or polylith level board, connected between level board with vertical plate, form step
The structure of shape.At present, in traditional receipts side drop level furred ceiling, every block of level board and vertical plate are required for individually vertical hanging bar
It is hung, the larger plate of some areas even may require that many vertical hanging bars just can guarantee the stabilization of hanging structure.
For this design, there are following defects:First, the weight of furred ceiling is larger, is hung by vertical pendant in top surface
Ceiling joist easily deforms in the position for connecting vertical pendant due to stress is concentrated when upper, the stability after installation of ceiling
Difference;Second, ceiling joist is mounted on furred ceiling, and after furred ceiling hanging is on top surface, the position of ceiling joist can not adjust, peace
It need to will be adjusted when taking on existing error after furred ceiling integral demounting, add workload, extend construction period, be unfavorable for standardization fast
Speed construction;3rd, the amount of deflection of sunpender is big reversely to be supported, it is necessary to open up multiple hole positions on the original concrete of top surface, right
The extent of the destruction of the original concrete of top surface is larger.
The content of the invention
In view of this, the present invention provides a kind of receipts side drop level furred ceilings, it is intended to the defects of overcoming in the presence of the prior art.
Receipts side drop level furred ceiling provided by the present invention includes:Load-bearing cantilever, the first end of the load-bearing cantilever are fixed on wall
On face, the second end of the load-bearing cantilever is extended towards the direction away from the metope;First surface plate, first plane
Plate is located at the lower section of the load-bearing cantilever, and the first end of first surface plate is fixed on the metope, and described first
The second end of surface plate is extended towards the direction away from metope;Drop level stile, the drop level stile include extending in the same direction and suitable
The first riser, the second riser and the 3rd riser of secondary connection, first riser are oppositely arranged with the 3rd riser, and described
One riser is hung on the load-bearing cantilever, the end on the 3rd riser away from second riser and first surface plate
Second end splicing.
It is as described above to receive side drop level furred ceiling, further, the second surface plate is further included, close to the on second surface plate
The plate face of one end is fitted and connected in the upper surface of first riser, and the second end of second surface plate is towards away from the metope
Direction be extended.
It is as described above to receive side drop level furred ceiling, further, wood moulding item is further included, the first end of first surface plate passes through
The wood moulding item is connected on the metope.
As described above to receive side drop level furred ceiling, further, the wood moulding item includes integrated molding and orthogonal two
Wood-plastic board a, wherein wood-plastic board is fitted and connected on the metope, close to the plate face of first end on first surface plate
It is fitted and connected in the lower surface of another wood-plastic board.
As described above to receive side drop level furred ceiling, further, the 3rd riser is spelled with first surface plate by cutting
It connects.
As described above to receive side drop level furred ceiling, further, the second end of first surface plate is offered along board direction
First buckling groove, the end away from second riser offers the second buckling groove along board direction on the 3rd riser, institute
It states the first buckling groove and second buckling groove is oppositely arranged, first buckling groove, opposite side are inserted into the one side of the cutting
It is inserted into second buckling groove.
It is as described above to receive side drop level furred ceiling, further, positive stop strip is provided in the cutting, the positive stop strip is clipped in institute
It states between the 3rd riser and first surface plate, limits the width in gap between the 3rd riser and first surface plate
Degree.
As described above to receive side drop level furred ceiling, further, the load-bearing cantilever includes connecting portion and supporting part, the connection
Portion is fixed on the surface of wall, and the connecting portion includes connecting plate, and the connecting plate is horizontally disposed with;The first end of the supporting part
It is fixed on the connecting plate, the second end of the supporting part is extended to towards the direction away from the metope outside the connecting plate;
First riser is hung on the supporting part.
It is as described above to receive side drop level furred ceiling, further, it is connected between first surface plate and the 3rd riser
Corner brace, the one side overlap joint of the corner brace are fixed on the upper surface of first surface plate, and the opposite side overlap joint of the corner brace is fixed
In the upper surface of the 3rd riser.
It is as described above to receive side drop level furred ceiling, further, the lower surface of first surface plate and first surface plate
The intersection arc transition of second end;And/or the lower surface of the 3rd riser and on the 3rd riser separate described second
The intersection arc transition of the end face of riser.
Using receipts side drop level furred ceiling provided by the present invention, vertical sunpender need not be specially set, reduced to top surface
The destruction of original concrete reduces the deformation of ceiling joist, ensures that ceiling joist position is adjustable, shortens construction period, favorably
In standardization rapid construction.Further, it is possible to ensure the aesthetics of receipts side decoration module, can panel quickly be hung on side and install
Into, while ensure, there are one the side platform sling in direction and the same length of top plate, to increase the utilization rate of on-gauge plate, the process for reducing bound edge.
Description of the drawings
Preferred embodiment in the present invention will be described in detail by attached drawing below, it will help understand the purpose of the present invention and excellent
Point, wherein:
Fig. 1 is the structure diagram that side drop level furred ceiling is received described in the embodiment of the present invention.
Fig. 2 is the partial enlarged view in Fig. 1.
Fig. 3 is the structure diagram of load-bearing cantilever described in the embodiment of the present invention.
Fig. 4 is the structure diagram of section components in Fig. 3.
Fig. 5 is the first surface plate and the matching chart of corner brace in Fig. 1.
Specific embodiment
With reference to embodiment, the present invention is described in detail.The identical reference numeral table of wherein identical parts
Show.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to attached drawing
In direction, word " interior " and " outer " are referred respectively to towards or away from the direction of particular elements geometric center.
Fig. 1 is the structure diagram that side drop level furred ceiling is received described in the embodiment of the present invention, and Fig. 2 is the partial enlargement in Fig. 1
Figure.As illustrated in fig. 1 and 2, the receipts side drop level furred ceiling that the embodiment of the present invention is provided includes:Load-bearing cantilever 100, the first surface plate
200 and drop level stile 300.
The first end of the load-bearing cantilever 100 is fixed on metope, for carrying the other structures of furred ceiling.The load-bearing is hanged
The second end of arm 100 is extended towards the direction away from the metope.The metope can be building masonry wall inner surface, described
Wall can be set during the intrinsic load bearing wall of interior of building or the decorations of interior of building later stage every
Wall.
First surface plate 200 is located at the lower section of the load-bearing cantilever 100, and the of first surface plate 200
One end is fixed on the metope, and the second end of first surface plate 200 is extended towards the direction away from metope.Specific
In embodiment, first surface plate 200 and the load-bearing cantilever 100 can be horizontally disposed with, and the two is each attached on metope.
The drop level stile 300 includes extending in the same direction and the first riser 310 connected in sequence, the second riser 320 and the 3rd
Riser 330, first riser 310 are oppositely arranged with the 3rd riser 330, and first riser 310 hangs over the load-bearing
On cantilever 100, the end and the second of first surface plate 200 on the 3rd riser 330 away from second riser 320
End matching connects.In a particular embodiment, the extending direction of the drop level stile 300 be perpendicular to the direction of paper in Fig. 1, it is described to fall
The shape of the cross section of grade stile 300 is U-shaped.Wherein, second riser 320 is vertically arranged, first riser 310
It is horizontally disposed with the 3rd riser 330.After 3rd riser 330 splices with first surface plate 200, the following table of the two
Face is concordant, so as to form drop level structure.The receipts side drop level furred ceiling that the embodiment of the present invention is provided is suitable for the installation of various panels,
It is especially suitable for installing less than the panel of 300mm width.
As shown in Figs. 1-2, the receipts side drop level furred ceiling that the embodiment of the present invention is provided further includes the second surface plate 400, described
Plate face on second surface plate 400 close to first end is fitted and connected in the upper surface of first riser 310, second plane
The second end of plate 400 is extended towards the direction away from the metope.Second surface plate 400, the drop level stile 300,
And a complete drop level structure is collectively formed in first surface plate 200.In specific implementation process, second plane
Plate 400 elongated can be handled, you can to extend on the strong wall of another side or extend on other components of furred ceiling.Described
Two surface plates 400 can be isometric with the drop level stile 300, i.e. in Fig. 1 on the direction of paper equal length.
In installation process, the load-bearing cantilever 100 and first surface plate 200 can be first fixed on metope,
Then the drop level stile 300 is installed, first riser 310 is made to be overlapped on the load-bearing cantilever 100, described
Three risers 330 splice on first surface plate 200, and second surface plate 400 then is fixed on the drop level stile
300 top.
Using receipts side drop level furred ceiling provided by the present invention, vertical sunpender need not be specially set, reduced to top surface
The destruction of original concrete reduces the deformation of ceiling joist, ensures that ceiling joist position is adjustable, shortens construction period, favorably
In standardization rapid construction.Further, it is possible to ensure the aesthetics of receipts side decoration module, can panel quickly be hung on side and install
Into, while ensure, there are one the side platform sling in direction and the same length of top plate, to increase the utilization rate of on-gauge plate, the process for reducing bound edge.
In an alternative embodiment, receipts side drop level furred ceiling provided by the present invention further includes wood moulding item 210, first plane
The first end of plate 200 is connected to by the wood moulding item 210 on the metope.The wood moulding item 210 can be L-type, including
Integrated molding and orthogonal two wood-plastic boards wherein a wood-plastic board is fitted and connected on the metope, and pass through certainly
Screw or expansion bolt are attacked to fix;Plate face on first surface plate 200 close to first end is fitted and connected in another wood strip
The lower surface of mould plate can be fixed by tapping screw.In this design, it is flat that wood moulding item 210 has been hidden in described first
The top of panel 200, takes into account bonding strength and beauty.In addition, it can be reserved between first surface plate 200 and the metope
Certain gap, while improving overall aesthetic degree, moreover it is possible to adapt to the deformation in 200 later stage of the first surface plate, avoid protrusion.
As shown in Figs. 1-2, the 3rd riser 330 is spliced with first surface plate 200 by cutting 501, described to insert
Item 501 can be T fonts.The second end of first surface plate 200 offers the first buckling groove 601, institute along board direction
It states the end away from second riser 320 on the 3rd riser 330 and offers the second buckling groove 602 along board direction, described the
One buckling groove 601 and second buckling groove 602 are oppositely arranged, and first buckling groove is inserted into the one side of the cutting 501
601st, opposite side is inserted into second buckling groove 602.Positive stop strip 502 is provided in the cutting 501, the positive stop strip 502 presss from both sides
Between the 3rd riser 330 and first surface plate 200, the 3rd riser 330 and first surface plate are limited
The width in gap between 200.In installation process, the first buckling groove 601 and the second buckling groove 602 can be alignd, then will
The splicing that first surface plate 200 and the 3rd riser 330 can be completed is inserted into the cutting 501.Installation is very simple
Fast, it is suitble to industrialization Fast Installation.Also, the positive stop strip 502 can limit the 3rd riser 330 and described first
The width in gap between surface plate 200 is consistent the width of the width and the positive stop strip 502, need not be by artificial
The mode of measurement goes reserving gaps, simplifies installation steps.
Further, the lower surface of first surface plate 200 and the intersection circular arc of 200 second end of the first surface plate
Transition;The friendship of the lower surface of 3rd riser 330 and the end face away from second riser 320 on the 3rd riser 330
Arc transition at boundary.On the one hand, the design of this arc transition is capable of providing whole aesthetics, on the other hand in installation process
In be not easy scratching fingers.
Fig. 3 is the structure diagram of load-bearing cantilever 100 described in the embodiment of the present invention;Fig. 4 is the structure of section components in Fig. 3
Schematic diagram.As shown in Figs 1-4, the load-bearing cantilever 100 includes connecting portion 110 and supporting part 120, and the supporting part 120 passes through
The connecting portion 110 is fixed on metope 130, to realize the function of load-bearing.
Specifically, the connecting portion 110 is fixed on metope 130, and the connecting portion 110 includes connecting plate 111, the connection
Plate 111 is horizontally disposed, and the upper surface of the connecting plate 111 can be used for being attached with the supporting part 120, so as to hold
State supporting part 120.The first end of the supporting part 120 is fixed on the connecting plate 111, the second end of the supporting part 120
It is extended to towards the direction away from the wall 130 outside the connecting plate 111.The second end of the supporting part 120 is to the metope
130 distance, more than the connecting plate 111 right end to the metope 130 distance.
Using the load-bearing cantilever 100 described in example is performed as described above, the various modular structures of Integral ceiling can be mounted directly
On the supporting part 120, vertical hanging bar need not be set.It, can also be on two sides in a specific application example
One load-bearing cantilever 100 being performed as described above described in example on opposite metope is installed respectively, then overlaps at the both ends of keel respectively
It is fixed on two supporting parts 120, then the various modular structures of Integral ceiling is directly installed on keel, are not required to
Vertical sunpender is specially set, reduces the destruction to the original concrete of top surface, reduces the deformation of ceiling joist, ensures furred ceiling
Keel position is adjustable, shortens construction period, is conducive to standardize rapid construction.
In embodiment as shown in Figs 1-4, the connecting portion 110 further includes fixed plate 112, the fixed plate 112 with
111 vertical connection of connecting plate, the fitting of fixed plate 112 are fixed on the metope 130, make the fixed plate 112 and institute
The contact area increase of metope 130 is stated, the fixed plate 112 can be fixed on the metope 130 by expansion bolt 140, be carried
High integrally-built coupling stiffness increases the whole load-bearing capacity of load-bearing cantilever 100.
In addition, the fixed plate 112 is fixed on the metope 130 by tapping screw.It, can be in institute when specifically used
It states with opening location hole in fixed plate 112, when installation only needs that automatic screw is screwed into wall 130 by location hole, you can real
The fixation of the existing fixed plate 112, removes drilling operation from, simplifies process, be particularly suitable for the less high portion of some load-bearing requirements
The lifting of part, such as:The lightweight components such as blind box cover, moulding.
As shown in Figs 1-4, the first end of the connecting plate 111 is connected to the top edge of the fixed plate 112, the connection
The second end of plate 111 is extended towards away from the direction of the wall 130, and the first end of the supporting part 120 is fixed on described
The upper surface of fixed plate 112.Preferably, the connecting portion 110 can be angle bar, and the two boards for forming angle bar are institute above respectively
The fixed plate 112 and connecting plate 111 stated.For this design, after fixed plate 112 is stably connected with metope 130, the company
Fishplate bar 111 is subject to the downward pressure from the supporting part 120, and the following of the fixed plate 112 is made to have towards wall
The trend of 130 movements, and wall 130 just can effectively support the following of the fixed plate 112.Therefore, it is this to set
Meter is very beneficial for providing integrally-built load-bearing capacity, and makes structure more firm.
Preferably, the supporting part 120 can be square steel, such as the square steel of 40mm*20mm.The supporting part 120 can be with
The upper surface of the fixed plate 112 is fixed on by fastening bolt 150.Specifically, the square steel can be along the connecting plate 111
Extending direction set, can be set on the square steel and on the connecting plate 111 matched with the fastening bolt 150
Then through hole, the axis of the through hole can be realized solid perpendicular to the square steel length direction by the fastening bolt 150
It is fixed.The various modular structures of Integral ceiling can be directly hung on square steel, and overall structure is very firm.
In one alternate embodiment, as shown in Figs 1-4, between the first end of the supporting part 120 and the metope 130
Leave gap.During furred ceiling is installed, the gap can be adjusted according to the accumulated error generated in the process is actually mounted
Width, avoid various problems caused by due to accumulated error, such as:Gap is too big between lofty uneven, the furred ceiling plate of furred ceiling
Deng.
The load-bearing cantilever 100 provided using the embodiment of the present invention, can be direct by the various modular structures of Integral ceiling
On load-bearing cantilever 100, vertical sunpender need not be specially set, the destruction to the original concrete of top surface is reduced, subtract
The deformation of small ceiling joist ensures that ceiling joist position is adjustable, shortens construction period, is conducive to standardize rapid construction.This
Outside, using the utility model, keel can be utilized to increase the support strength of cantilever support, can be also further added by after top surface installs
Cantilever load-carrying members are strengthened, and monoblock type batch production preparation, the mode of live direct-assembling installation also can also be used.Extend wall
The cantilever in face, due to the c-type special construction of drop level stile, keel have a certain range error margin (such as 40mm), to size
Required precision is not high;Secondary support system is done using metope, without hook rail structure.Compared to hook rail structure, reduce leveling spiral shell
The time of the installations such as silk, it ensure that installation effectiveness;Batch production directly produces accessory, and scene is mounted directly.
Fig. 5 is the first surface plate 200 and the matching chart of corner brace 701 in Fig. 1.With reference to shown in Fig. 1,2,5, described
It is connected with corner brace 701 between one surface plate 200 and the 3rd riser 330, the one side overlap joint of the corner brace 701 is fixed on described
The upper surface of first surface plate 200, the opposite side overlap joint of the corner brace 701 are fixed on the upper surface of the 3rd riser 330.One
Aspect, this design can provide whole structural stability;Two on the one hand, can by the upper surface of the first surface plate 200 and
The upper surface /V of 3rd riser 330 at grade, in the case where thickness is equal, it is only necessary to install corner brace 701, just
It can guarantee that the lower surface of the two is concordant, operation is very simple.
In another embodiment, the corner brace 701 includes being mutually perpendicular to and coplanar two panels steel plate is integrally formed, often
Two through holes are opened up on piece steel plate, a through hole is opened up in the junction of two panels steel plate.Pass through two panels steel plate by four screws
On four through holes, by corner brace 701 be mounted on first surface plate 200 on;The through hole of the junction of two panels steel plate and the 3rd
Riser 330 aligns, and tapping screw can be realized to the connection of 701 and the 3rd riser 330 of corner brace through the through hole, so as to fulfill institute
State the firm connection of the first surface plate 200 and the 3rd riser 330.
Using receipts side drop level furred ceiling provided by the present invention, vertical sunpender need not be specially set, reduced to top surface
The destruction of original concrete reduces the deformation of ceiling joist, ensures that ceiling joist position is adjustable, shortens construction period, favorably
In standardization rapid construction.Further, it is possible to ensure the aesthetics of receipts side decoration module, can panel quickly be hung on side and install
Into, while ensure, there are one the side platform sling in direction and the same length of top plate, to increase the utilization rate of on-gauge plate, the process for reducing bound edge.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used
To modify to the technical solution recorded in foregoing embodiments or carry out equivalent substitution to which part technical characteristic;
And these modifications or replacement, the essence of appropriate technical solution is not made to depart from the scope of various embodiments of the present invention technical solution.
Claims (10)
1. a kind of receipts side drop level furred ceiling, which is characterized in that including:
Load-bearing cantilever, the first end of the load-bearing cantilever are fixed on metope, and the second end of the load-bearing cantilever is towards away from described
The direction of metope is extended;
First surface plate, first surface plate are located at the lower section of the load-bearing cantilever, and the first of first surface plate
End is fixed on the metope, and the second end of first surface plate is extended towards the direction away from metope;
Drop level stile, the drop level stile includes extending in the same direction and the first riser connected in sequence, the second riser and the 3rd riser,
First riser is oppositely arranged with the 3rd riser, and first riser is hung on the load-bearing cantilever, and the described 3rd is vertical
End and the second end of first surface plate on plate away from second riser are spliced.
2. receipts side drop level furred ceiling according to claim 1, which is characterized in that further include the second surface plate, described second is flat
Plate face on panel close to first end is fitted and connected in the upper surface of first riser, the second end court of second surface plate
Direction away from the metope is extended.
3. receipts side drop level furred ceiling according to claim 1, which is characterized in that further include wood moulding item, first surface plate
First end be connected to by the wood moulding item on the metope.
4. receipts side drop level furred ceiling according to claim 3, which is characterized in that the wood moulding item includes being integrally formed and phase
Mutually vertical two wood-plastic boards a, wherein wood-plastic board is fitted and connected on the metope, close to the on first surface plate
The plate face of one end is fitted and connected in the lower surface of another wood-plastic board.
5. receipts side drop level furred ceiling according to claim 1, which is characterized in that the 3rd riser and first surface plate
Spliced by cutting.
6. receipts side drop level furred ceiling according to claim 5, which is characterized in that the second end of first surface plate is along plate face
Direction offers the first buckling groove, and the end away from second riser offers second along board direction on the 3rd riser
Buckling groove, first buckling groove and second buckling groove are oppositely arranged, one side insertion first clamping of the cutting
Slot, opposite side are inserted into second buckling groove.
7. receipts side drop level furred ceiling according to claim 6, which is characterized in that positive stop strip is provided in the cutting, it is described
Positive stop strip is clipped between the 3rd riser and first surface plate, limit the 3rd riser and first surface plate it
Between gap width.
8. receipts side drop level furred ceiling according to claim 1, which is characterized in that the load-bearing cantilever includes connecting portion and load-bearing
Part, the connecting portion are fixed on the surface of wall, and the connecting portion includes connecting plate, and the connecting plate is horizontally disposed with;It is described to hold
The first end of heavy mail is fixed on the connecting plate, and the second end of the supporting part extends to institute towards the direction away from the metope
It states outside connecting plate;First riser is hung on the supporting part.
9. receipts side drop level furred ceiling according to claim 1, which is characterized in that first surface plate and the 3rd riser
Between be connected with corner brace, the one side overlap joint of the corner brace is fixed on the upper surface of first surface plate, the corner brace it is another
Side overlaps the upper surface for being fixed on the 3rd riser.
10. according to receipts side drop level furred ceiling described in any one of claim 1-9, which is characterized in that first surface plate
Lower surface and the intersection arc transition of the first surface plate second end;And/or the lower surface of the 3rd riser with it is described
The intersection arc transition of end face away from second riser on 3rd riser.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711485408.2A CN108086571B (en) | 2017-12-30 | 2017-12-30 | Edge-closing drop-stage suspended ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711485408.2A CN108086571B (en) | 2017-12-30 | 2017-12-30 | Edge-closing drop-stage suspended ceiling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086571A true CN108086571A (en) | 2018-05-29 |
CN108086571B CN108086571B (en) | 2023-12-19 |
Family
ID=62181326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711485408.2A Active CN108086571B (en) | 2017-12-30 | 2017-12-30 | Edge-closing drop-stage suspended ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086571B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403531A (en) * | 2018-11-26 | 2019-03-01 | 浙江亚厦装饰股份有限公司 | Grate and wall side adjustment structure, light trough stile structure and drop level ceiling structure |
CN109469249A (en) * | 2018-11-26 | 2019-03-15 | 浙江亚厦装饰股份有限公司 | A kind of ceiling structure and its installation method |
CN109577541A (en) * | 2018-12-04 | 2019-04-05 | 浙江亚厦装饰股份有限公司 | Light trough and its installation method |
CN110241967A (en) * | 2019-04-29 | 2019-09-17 | 浙江亚厦装饰股份有限公司 | Assembled furred ceiling and installation method |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202006015586U1 (en) * | 2006-10-11 | 2008-02-21 | Wilhelm Layher Verwaltungs-Gmbh | Vertical frame element made of metal |
EP2241698A1 (en) * | 2009-04-03 | 2010-10-20 | Chicago Metallic Continental | Impact resistant suspended ceiling and attachment member therefor |
CN105569251A (en) * | 2016-02-04 | 2016-05-11 | 浙江亚厦装饰股份有限公司 | Device for split-level ceiling and installation method |
CN106013585A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Ceiling cascade device and installation method |
CN106284816A (en) * | 2016-08-31 | 2017-01-04 | 中山市施丹建材有限公司 | A kind of Combined multi-layer suspended ceiling |
CN205917952U (en) * | 2016-06-29 | 2017-02-01 | 浙江亚厦装饰股份有限公司 | Integrated furred ceiling device |
KR20170097478A (en) * | 2016-02-18 | 2017-08-28 | 송우용 | Inspection hole integrated ceiling structure |
CN107268866A (en) * | 2017-06-26 | 2017-10-20 | 浙江亚厦装饰股份有限公司 | A kind of combined type falls grade furred ceiling and installation method |
CN107313548A (en) * | 2017-06-26 | 2017-11-03 | 浙江未来加电子商务有限公司 | Adjustable wall hang device |
CN207988316U (en) * | 2017-12-30 | 2018-10-19 | 浙江亚厦装饰股份有限公司 | Receive side drop level furred ceiling |
-
2017
- 2017-12-30 CN CN201711485408.2A patent/CN108086571B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202006015586U1 (en) * | 2006-10-11 | 2008-02-21 | Wilhelm Layher Verwaltungs-Gmbh | Vertical frame element made of metal |
EP2241698A1 (en) * | 2009-04-03 | 2010-10-20 | Chicago Metallic Continental | Impact resistant suspended ceiling and attachment member therefor |
CN105569251A (en) * | 2016-02-04 | 2016-05-11 | 浙江亚厦装饰股份有限公司 | Device for split-level ceiling and installation method |
KR20170097478A (en) * | 2016-02-18 | 2017-08-28 | 송우용 | Inspection hole integrated ceiling structure |
CN106013585A (en) * | 2016-06-29 | 2016-10-12 | 浙江亚厦装饰股份有限公司 | Ceiling cascade device and installation method |
CN205917952U (en) * | 2016-06-29 | 2017-02-01 | 浙江亚厦装饰股份有限公司 | Integrated furred ceiling device |
CN106284816A (en) * | 2016-08-31 | 2017-01-04 | 中山市施丹建材有限公司 | A kind of Combined multi-layer suspended ceiling |
CN107268866A (en) * | 2017-06-26 | 2017-10-20 | 浙江亚厦装饰股份有限公司 | A kind of combined type falls grade furred ceiling and installation method |
CN107313548A (en) * | 2017-06-26 | 2017-11-03 | 浙江未来加电子商务有限公司 | Adjustable wall hang device |
CN207988316U (en) * | 2017-12-30 | 2018-10-19 | 浙江亚厦装饰股份有限公司 | Receive side drop level furred ceiling |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403531A (en) * | 2018-11-26 | 2019-03-01 | 浙江亚厦装饰股份有限公司 | Grate and wall side adjustment structure, light trough stile structure and drop level ceiling structure |
CN109469249A (en) * | 2018-11-26 | 2019-03-15 | 浙江亚厦装饰股份有限公司 | A kind of ceiling structure and its installation method |
CN109469249B (en) * | 2018-11-26 | 2023-09-19 | 浙江亚厦装饰股份有限公司 | Suspended ceiling structure and installation method thereof |
CN109577541A (en) * | 2018-12-04 | 2019-04-05 | 浙江亚厦装饰股份有限公司 | Light trough and its installation method |
CN110241967A (en) * | 2019-04-29 | 2019-09-17 | 浙江亚厦装饰股份有限公司 | Assembled furred ceiling and installation method |
Also Published As
Publication number | Publication date |
---|---|
CN108086571B (en) | 2023-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108086571A (en) | Receive side drop level furred ceiling | |
CN102493622B (en) | Wallboard installing component | |
CN204645336U (en) | A kind of mounting plug-in type aluminum facade | |
CN104929297A (en) | Combined type ceiling hanging part and wood veneer ceiling installing process | |
CN207988316U (en) | Receive side drop level furred ceiling | |
CN210621915U (en) | Multistage assembled lattice frame building structure | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN208456020U (en) | A kind of wallboard installing structure convenient for assembly | |
CN211396425U (en) | Assembled wall decoration back system | |
CN204850208U (en) | Modular furred ceiling pendant | |
CN210049468U (en) | Fast-assembling wall body smallpox binding off component and furred ceiling structure | |
CN216810450U (en) | Curtain wall construction for outdoor architectural decoration | |
CN207079858U (en) | It is interior to hang fast keel | |
CN206346352U (en) | Hangar system that stainless steel faceplate is seamless | |
CN205134691U (en) | Integrated furred ceiling of suspending free | |
CN105297993A (en) | Suspension-free integrated ceiling | |
CN214658097U (en) | Install building curtain wall construction fast | |
CN208122079U (en) | Furred ceiling load-bearing cantilever | |
CN215368154U (en) | Plane furred ceiling structure | |
CN216920948U (en) | Hooking type kneading bearing keel | |
CN211666033U (en) | Locating component for mounting curtain wall | |
CN210857679U (en) | Connecting structure of glass curtain wall decorative plate | |
CN212026740U (en) | Assembled curtain wall | |
CN217998552U (en) | Aluminum alloy curtain wall structure | |
CN216641060U (en) | Building curtain wall construction pendant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |