CN212689321U - Assembled Jinbang board outer wall - Google Patents

Assembled Jinbang board outer wall Download PDF

Info

Publication number
CN212689321U
CN212689321U CN202021250842.XU CN202021250842U CN212689321U CN 212689321 U CN212689321 U CN 212689321U CN 202021250842 U CN202021250842 U CN 202021250842U CN 212689321 U CN212689321 U CN 212689321U
Authority
CN
China
Prior art keywords
keels
wall
keel
plate
split
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021250842.XU
Other languages
Chinese (zh)
Inventor
李海朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bnbm Green Residential Co ltd
Original Assignee
Bnbm Green Residential Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bnbm Green Residential Co ltd filed Critical Bnbm Green Residential Co ltd
Priority to CN202021250842.XU priority Critical patent/CN212689321U/en
Application granted granted Critical
Publication of CN212689321U publication Critical patent/CN212689321U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembled Jinbang plate outer wall, which comprises an outer wall frame and a hoisting bracket, wherein the outer wall frame comprises upright posts and cross-brace keels, and a plurality of layers of hanging plate keels which are connected through connecting keels, the cross brace keels and each layer of hanging plate keel are all arranged on the upright post through auxiliary supports, one ends of the hanging plate keels and the cross brace keels are connected with the auxiliary supports, a plurality of groups of positioning components which are in one-to-one correspondence are arranged on the auxiliary supports and the connecting keels, the hanging plate keels and the cross brace keels are all connected with the positioning components, the heights of the corresponding positioning components on the auxiliary supports and the connecting keels are adjusted, the installation levelness of each layer of hanging plate keel and each layer of cross brace keel is ensured, and the hanging plate keel and, the problem that the position of the hanging plate keel and the cross brace keel is not adjusted and the adjusting precision is not high is solved, and the building efficiency and the precision of the outer wall of the Jinbang plate are improved, so that the structural strength and the attractiveness of the outer wall of the Jinbang plate are guaranteed.

Description

Assembled Jinbang board outer wall
Technical Field
The embodiment of the utility model provides a gold nation board outer wall technical field, concretely relates to assembled gold nation board outer wall is related to.
Background
The Jinbang plate is a vacuum extrusion-molded thin plate taking cement as a base material, is compact in material, and has the characteristics of good moisture absorption and desorption performance, anti-condensation performance, good impermeability, small dry-wet deformation and the like; meanwhile, the indoor space can be saved, and the Jinbang plates are often adopted in the underground engineering wall surface decoration system in a large quantity and can be better suitable for the decoration of the outer wall and the outer wall surface of a building.
The outer wall of the Jinbang plate usually comprises upright columns, cross brace keels connected with adjacent upright columns, a galvanized steel plate of a sealing layer arranged on the cross brace keels, hanging plate keels arranged on one side of the upright columns and used for installing the Jinbang plate, and connecting keels used for reinforcing the hanging plate keel structure.
In the prior art, when the outer wall of the Jinbang plate is built, all parts are sequentially installed and welded on a construction site, more construction steps need to be carried out on an outer wall hanging basket or a scaffold, potential safety hazards exist, only one or two persons can be allowed to operate due to limited space of the hanging basket, and building materials need to be carried upwards for many times, so that the working efficiency is low; and, when stull fossil fragments and link plate fossil fragments installation, rely on the manual position adjustment that carries on completely, further reduced work efficiency, and be difficult to guarantee the levelness after stull fossil fragments and the adjustment of link plate fossil fragments, there is because of stull fossil fragments and link plate fossil fragments mounted position deviation, and the structural strength who leads to the gold nation board exterior wall descends and the problem of not aesthetic.
SUMMERY OF THE UTILITY MODEL
Therefore, the embodiment of the utility model provides an assembled gold nation board outer wall to among the solution prior art, because each part installation and the inconvenient problem that the installation effectiveness is low and the installation accuracy is low that leads to of adjustment among the gold nation board outer wall construction process.
In order to achieve the above object, the embodiment of the present invention discloses the following technical solutions:
an assembled type Jinbang plate outer wall comprises an outer wall framework and a hoisting support connected with the outer wall framework, wherein the outer wall framework comprises a plurality of stand columns, cross-brace keels connected with the adjacent stand columns, and a plurality of layers of hanging plate keels installed on the stand columns and used for installing Jinbang plates, and the hanging plate keels are connected through connecting keels;
the utility model discloses a set up the link plate fossil fragments, including link plate fossil fragments and connection fossil fragments, the stand is equipped with the link plate fossil fragments and is connected with the link plate fossil fragments, the link plate fossil fragments and every layer the link plate fossil fragments all install through auxiliary stand on the stand, the one end of link plate fossil fragments and stull fossil fragments with the auxiliary stand is connected, install a plurality of groups locating component of one-to-one on auxiliary stand and the connection fossil fragments, link plate fossil fragments and stull fossil.
As a preferred scheme of the utility model, locating component includes layer board, cotter plate and set screw, both ends of stull fossil fragments and connection fossil fragments all seted up with the locating hole that the cotter plate matches with, stull fossil fragments and connection fossil fragments all pass through set screw and corresponding the cotter plate is connected, all seted up on the lateral wall of stull fossil fragments and connection fossil fragments with the screw hole that set screw matches with.
As a preferred scheme of the utility model, it includes the components of a whole that can function independently fossil fragments that the multisection pegs graft in proper order, and is adjacent the components of a whole that can function independently fossil fragments pass through components of a whole that can function independently bolted connection, all run through on the lateral wall at components of a whole that can function independently fossil fragments both ends seted up with components of a whole that can function independently bolt matched with screw hole, the auxiliary stand includes that the multisection is installed in proper order components of a whole that can function independently support on the stand, every section all install on components.
As a preferred scheme of the utility model, the components of a whole that can function independently support passes through fixing bolt to be installed on the stand lateral wall, all seted up on components of a whole that can function independently support and the stand a plurality of with fixing bolt match the screw hole with.
As an optimized scheme of the utility model, prolong its length direction on the stand lateral wall and seted up the heavy groove, the heavy groove cell wall is the wedge of outside expansion, components of a whole that can function independently support appearance with the heavy groove profile suits.
The utility model discloses an embodiment has following advantage:
adjust the height of the corresponding locating component on auxiliary stand and the connection fossil fragments, ensure the levelness of every layer of link plate fossil fragments and stull fossil fragments installation, avoid in the construction process, the inconvenient and not high problem of adjustment precision of link plate fossil fragments and stull fossil fragments position adjustment, improve the construction efficiency and the precision of golden nation board exterior wall to guarantee golden nation board exterior wall's structural strength and pleasing to the eye.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
The structure, ratio, size and the like shown in the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention has no technical essential significance, and any structure modification, ratio relationship change or size adjustment should still fall within the scope which can be covered by the technical content disclosed by the present invention without affecting the efficacy and the achievable purpose of the present invention.
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
fig. 2 is a schematic structural view of a connecting keel according to an embodiment of the invention;
fig. 3 is a schematic structural view of an auxiliary stand according to an embodiment of the present invention;
fig. 4 is a schematic view of a column structure according to an embodiment of the present invention.
In the figure:
1-hoisting a bracket; 2-upright post; 3-horizontal keel supporting; 4-hanging a keel plate; 5-connecting a keel; 6-auxiliary support; 7-a supporting plate; 8-pin plate; 9-a set screw; 10-positioning holes; 11-fixing the bolt;
501-split keel; 601-split support.
Detailed Description
The present invention is described in terms of specific embodiments, and other advantages and benefits of the present invention will become apparent to those skilled in the art from the following disclosure. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 4, the utility model discloses an assembled type Jinbang plate outer wall, which comprises an outer wall frame provided with a Jinbang plate and a sealing layer galvanized steel plate, and a hoisting support 1 connected with the outer wall frame, wherein the outer wall frame comprises a plurality of upright posts 2, cross-brace keels 3 connected with adjacent upright posts 2, and a plurality of layers of hanging plate keels 4 arranged on the upright posts 2, and the plurality of layers of hanging plate keels 4 are connected through connecting keels 5; stull fossil fragments 3 and every layer of link plate fossil fragments 4 all install on stand 2 through auxiliary stand 6, and the one end and the auxiliary stand 6 of link plate fossil fragments 4 and stull fossil fragments 3 are connected, installs a plurality of groups positioning component of one-to-one on auxiliary stand 6 and the connection fossil fragments 5, and link plate fossil fragments 4 and stull fossil fragments 3 all are connected with positioning component.
After each layer of hanging plate keel 4 is assembled by an auxiliary support 6, the hanging plate keel 4 is sequentially arranged on an upright post 2 and a connecting keel 5, the auxiliary support 6 and the connecting keel 5 are provided with positioning components which are in one-to-one correspondence with each layer of hanging plate keel 4, after the installation height of each layer of hanging plate keel 4 is determined, the height of the corresponding positioning components on the auxiliary support 6 and the connecting keel 5 is adjusted, the installation levelness of each layer of hanging plate keel 4 is ensured, the installation mode of the cross-brace keel 3 is the same, after the cross-brace keel 3, the hanging plate keel 4 and the connecting keel 5 are assembled, a Jinbang plate and a closed layer galvanized steel plate are respectively arranged on the hanging plate keel 4 and the cross-brace keel 3, the hoisting support 1 is connected with the upright post 2, the keel 4 and the cross-brace keel 3 by installation modes such as a lifting hook or a fastening piece, after the assembly of an outer wall frame, the Jinbang plate and the closed layer galvanized, the assembled outer wall of the Jinbang plate is integrally transported to a construction site to be installed, so that the installation of the outer wall of the Jinbang plate is facilitated, the construction efficiency of the outer wall of the Jinbang plate is improved, and meanwhile, the installation precision of the Jinbang plate is improved, and therefore the structural strength and attractiveness of the outer wall of the Jinbang plate are guaranteed.
Wherein, locating component includes layer board 7, cotter plate 8 and set screw 9, and the locating hole 10 that matches with cotter plate 8 is all seted up at the both ends of stull fossil fragments 3 and connection fossil fragments 5, and stull fossil fragments 3 and connection fossil fragments 5 all are connected with corresponding cotter plate 8 through set screw 9, all set up on the lateral wall of stull fossil fragments 3 and connection fossil fragments 5 with set screw 9 match the screw hole.
Specifically, the length of a steel upright post 2 is determined according to the marking height of each layer of cross brace keels 3 and hanging plate keels 4, the position of a steel adaptor is determined according to the position of a plate embedding position of a structural main body, bolt hole positions are arranged on the upright post 2 according to the positions of strip holes in the steel adaptor, the bottom of the upright post 2 is fixed on a rigid adaptor on the embedded plate through bolts, the height positions of positioning components of an auxiliary support 6 and a connecting keel 5 at each layer of mounting positions are adjusted according to the marking height of each layer of cross brace keels 3 and hanging plate keels 4, namely after the auxiliary support 6 is mounted on the upright post 2 and the connecting keels 5 are vertically erected, the corresponding support plates 7 on the auxiliary support 6 and the connecting keel 5 are positioned on the same horizontal plane, then positioning holes 10 at two ends of the hanging plate keels 4 and the cross brace keels 3 are inserted into pin plates 8 on the corresponding support plates 7, and the hanging plate keels 4, install link plate fossil fragments 4 and stull fossil fragments 3 with this mode successive layer, then install respectively on stull fossil fragments 3 and link plate fossil fragments 4 with sealing layer galvanized steel sheet and gold nation board.
Through the high position of adjusting positioning assembly in advance, the problem that the regulation that has avoided adjusting link plate fossil fragments 4 and stull fossil fragments 3 positions and lead to when the assembly is inconvenient with the regulation precision is low has especially reduced link plate fossil fragments 4's the assembly degree of difficulty, be favorable to improving link plate fossil fragments 4's installation effectiveness and installation precision, be favorable to preventing because link plate fossil fragments 4 assemble improper and lead to stand 2 and link plate fossil fragments 4 to take place crooked and crooked condition emergence, the structural strength of the outer wall of Jinbang board and the pleasing to the eye of Jinbang board installation have been guaranteed.
Further, the connecting keel 5 comprises a plurality of sections of split keels 501 sequentially spliced, adjacent split keels 501 are connected through split bolts 502, threaded holes matched with the split bolts 502 are formed in the side walls of the two ends of the split keels 501 in a penetrating mode, the auxiliary support 6 comprises a plurality of sections of split supports 601 sequentially installed on the stand column 2, and each section of split keel 501 and each section of split support 601 are provided with a positioning assembly.
Each section of the split support 601 and the split keel 501 correspond to each layer of the cross brace keel 3 and the hanging plate keel 4, each layer of the hanging plate keel 4, the split support 601 and the split keel 501 are assembled, then the assembled upper layer frame is lifted, the bottom of the split keel 501 of the upper layer frame is aligned with the top of the split keel 501 of the lower layer frame and then put down, the two butted split keels 501 are fixed through split bolts 502, the split support 601 is fixed on the corresponding mounting position of the upright post 2, the layer-by-layer assembly of the outer wall frame is realized through the multi-section assembled connecting keel 5 and the auxiliary support 6, materials do not need to be repeatedly carried in the assembly process, the assembly flow is further simplified, and the assembly efficiency of the outer wall frame is further improved.
The split support 601 is mounted on the side wall of the upright post 2 through the fixing bolt 11, a plurality of threaded holes matched with the fixing bolt 11 are formed in the split support 601 and the upright post 2, and each threaded hole in the split support 601 corresponds to a plurality of threaded holes in the upright post 2, so that the requirements of different mounting heights of the split support 601 are met.
In addition, the side wall of the upright post 2 is provided with a sunken groove 201 along the length direction, the split support 601 is embedded in the sunken groove 201, the condition that the split support 601 protrudes out of the upright post 2 to affect the appearance is avoided, the fixing effect of the upright post 2 on the split support 601 in the horizontal direction is enhanced, in order to facilitate the split support 601 to be installed in the sunken groove 201, the groove wall of the sunken groove 201 is in a wedge shape expanding outwards, and the appearance of the split support 601 is matched with the contour of the sunken groove 201.
Although the invention has been described in detail with respect to the general description and the specific embodiments, it will be apparent to those skilled in the art that modifications and improvements can be made based on the invention. Therefore, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (5)

1. The assembled type Jinbang plate outer wall is characterized by comprising an outer wall framework and a hoisting support (1) connected with the outer wall framework, wherein the outer wall framework comprises a plurality of stand columns (2), cross brace keels (3) connected with the adjacent stand columns (2), and a plurality of layers of hanging plate keels (4) which are arranged on the stand columns (2) and used for installing Jinbang plates, and the hanging plate keels (4) are connected through connecting keels (5);
stull fossil fragments (3) and every layer link plate fossil fragments (4) all are installed through auxiliary stand (6) on stand (2), the one end of link plate fossil fragments (4) and stull fossil fragments (3) with auxiliary stand (6) are connected, a plurality of groups locating component of one-to-one are installed on auxiliary stand (6) and connection fossil fragments (5), link plate fossil fragments (4) and stull fossil fragments (3) all with locating component connects.
2. The assembled type Jinbang board outer wall according to claim 1, wherein the positioning assembly comprises a supporting plate (7), a pin plate (8) and a positioning screw (9), both ends of the cross-brace keel (3) and the connecting keel (5) are provided with positioning holes (10) matched with the pin plate (8), the cross-brace keel (3) and the connecting keel (5) are connected with the pin plate (8) through the positioning screw (9), and the side walls of the cross-brace keel (3) and the connecting keel (5) are provided with threaded holes matched with the positioning screw (9).
3. The assembled Jinbang exterior wall of claim 2, wherein the connection keel (5) comprises a plurality of split keels (501) which are sequentially connected in a multi-section manner, the split keels (501) are connected through split bolts (502), threaded holes matched with the split bolts (502) are formed in the side walls of the two ends of the split keels (501) in a penetrating manner, the auxiliary support (6) comprises a plurality of sections which are sequentially installed on the split support (601) on the column (2), and each section of the split keel (501) and the split support (601) are provided with the positioning assembly.
4. The assembled type Jinbang panel outer wall according to claim 3, wherein the split bracket (601) is installed on the side wall of the upright post (2) through a fixing bolt (11), and a plurality of threaded holes matched with the fixing bolt (11) are formed in the split bracket (601) and the upright post (2).
5. The assembled type Jinbang plate outer wall according to claim 4, wherein the side wall of the upright post (2) is provided with a sinking groove (201) along the length direction thereof, the groove wall of the sinking groove (201) is in a wedge shape expanding outwards, and the shape of the split bracket (601) is adapted to the contour of the sinking groove (201).
CN202021250842.XU 2020-06-30 2020-06-30 Assembled Jinbang board outer wall Active CN212689321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021250842.XU CN212689321U (en) 2020-06-30 2020-06-30 Assembled Jinbang board outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021250842.XU CN212689321U (en) 2020-06-30 2020-06-30 Assembled Jinbang board outer wall

Publications (1)

Publication Number Publication Date
CN212689321U true CN212689321U (en) 2021-03-12

Family

ID=74895005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021250842.XU Active CN212689321U (en) 2020-06-30 2020-06-30 Assembled Jinbang board outer wall

Country Status (1)

Country Link
CN (1) CN212689321U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309262A (en) * 2021-04-30 2021-08-27 江苏建筑职业技术学院 Safety sound-proof and fireproof assembled partition wall and construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309262A (en) * 2021-04-30 2021-08-27 江苏建筑职业技术学院 Safety sound-proof and fireproof assembled partition wall and construction process

Similar Documents

Publication Publication Date Title
CN2921130Y (en) Dismounting light steel structure movable storied building
CN1055513C (en) Improved building techniques
CN107700852A (en) Drag-line and frame structure combination process construction technology in a kind of curtain wall construction
CN212689321U (en) Assembled Jinbang board outer wall
CN113719002B (en) Integrated canopy unit type glass curtain wall
CN106592456A (en) Railway line subsidiary facilities and mounting method thereof
CN201024724Y (en) Assembled type steel structure fence unit
CN110565941A (en) PC aluminum formwork system for prefabricated building and construction method thereof
CN113756558A (en) High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof
RU2003106142A (en) METHOD FOR PREPARING A BUILDING FOR LIFT ADJUSTMENT, WALL PANEL AND ELEVATOR SHAFT
CN200949905Y (en) Up-down type air-conditioning support
CN209194772U (en) A kind of frame prefabricated panel
CN208604911U (en) A kind of novel suspention beam bracket
CN112282403A (en) Outer hanging protection frame of high-rise steel construction regularization of assembled
CN207988356U (en) A kind of waterproof connecting structure of shaped steel column and wallboard
JP4171350B2 (en) Outdoor staircase and construction method of outdoor staircase
CN1515763A (en) Shaped channel steel upright column tension link connected type mobile house
CN110984627A (en) Industrial assembled house
CN215905652U (en) Elevator shaft frame
CN205875483U (en) Safe exposed frame curtain wall system that can indoor or outdoor installation glass
CN213597400U (en) Elevator shaft
CN213976574U (en) Upright post structure for steel structure elevator
CN213923662U (en) A stand structure for steel construction elevator
CN211922959U (en) Integral prefabricated balcony module suitable for through-beam type steel frame
CN213927262U (en) Assembled is exterior wallboard keel structure for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant