CN105113626A - 现浇柱预制梁板结构施工方法 - Google Patents
现浇柱预制梁板结构施工方法 Download PDFInfo
- Publication number
- CN105113626A CN105113626A CN201510508975.XA CN201510508975A CN105113626A CN 105113626 A CN105113626 A CN 105113626A CN 201510508975 A CN201510508975 A CN 201510508975A CN 105113626 A CN105113626 A CN 105113626A
- Authority
- CN
- China
- Prior art keywords
- girder
- precast
- plate
- secondary beam
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 42
- 239000011440 grout Substances 0.000 claims description 10
- 230000010412 perfusion Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 210000003976 gap junction Anatomy 0.000 claims description 3
- 238000012856 packing Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 230000007547 defect Effects 0.000 abstract description 4
- 239000000463 material Substances 0.000 description 3
- 235000010627 Phaseolus vulgaris Nutrition 0.000 description 2
- 244000046052 Phaseolus vulgaris Species 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开一种现浇柱预制梁板结构施工方法,包括框架柱、梁、牛腿、板和高强螺栓预埋件;所述的框架柱在施工途中现场浇注形成,所述的梁和板预先制作形成预制梁和预制板,预制梁包括预制的主梁和次梁;框架柱和主梁连接处在柱子上伸出牛腿,所述的牛腿和主梁的梁头连接,主梁设置几字形接口,次梁梁头设置搭接口,主梁侧面与预制板的连接处,做成“凸”形,使预制板支承在主梁的侧面上。本发明施工方法解决柱与主梁、主梁与次梁、梁与板的结构连接接头快速连接的问题,达到快速高效施工,缩短施工工期,节省施工成本,同时满足提高抗震要求,避免连接的繁琐、复杂及连接处的质量缺陷隐患。
Description
技术领域
本发明涉及建筑工程技术领域,特别涉及一种现浇柱预制梁板结构施工方法。
背景技术
现有的高层建筑框架结构施工方法是柱、梁、板全现浇和柱、梁、板全预制;全现浇施工体系施工工期长,模板支撑系统所采用的材料耗材多,成本高;而全预制施工体系,梁柱接头处抗震施工要求比较高且繁琐复杂,容易造成施工质量缺陷隐患。而采用现浇柱预制梁板结构施工体系可有效克服了全预制框架梁柱结构施工繁琐及复杂的困难,而且大大的提高了建筑的抗震性能,将施工程序简化,缩短了施工工期,解决了全现浇和全预制施工体系的施工难题。但现有的现浇柱预制梁板结构施工过程中存在着柱与主梁、主梁与次梁、梁与板的结构连接接头繁琐、复杂,连接出易产生质量问题,严重影响工程质量,这成为了限制现浇柱预制梁板结构施工方法进一步发展的一大难题。
发明内容
本发明的目的是为了解决柱与主梁、主梁与次梁、梁与板的结构连接接头,达到快速高效施工,缩短施工工期,节省施工成本,同时满足提高抗震要求,避免连接的繁琐、复杂及连接处的质量缺陷隐患。为实现本发明目的所使用的技术方案为:
一种现浇柱预制梁板结构施工方法,包括框架柱、梁、牛腿、板和高强螺栓;所述的框架柱在施工途中现场浇注形成,所述的梁和板预先制作形成预制梁和预制板,预制梁包括预制的主梁和次梁;
第一步,框架柱在施工现场浇筑形成,框架柱和主梁连接处在柱子上伸出牛腿,所述的牛腿和主梁的梁头连接,在牛腿的支撑面上预埋三个连接高强螺栓预埋件;主梁的梁头设置三个连接孔洞,设置的三个连接孔洞与三个高强螺栓预埋件相匹配,预制梁设置两个吊装钩;
第二步,主梁与次梁连接,在主梁与次梁连接处,主梁设置几字形接口,次梁梁头设置搭接口,次梁梁头伸进主梁里,如为连续次梁,侧次梁头伸到主梁中,如为非连续次梁,则伸进主梁不少于2/3宽度,连接处采用高强灌浆料灌填密实,同时使用次梁顶标高比主梁顶标高低一个板的厚度;
第三步,主梁、次梁与预制板的连接,主梁侧面与预制板的连接处,做成“凸”形,使预制板支承在主梁的侧面上;次梁与预制板的连接,因次梁比主梁低一个板厚,预制板直接支承在次梁上;板缝与板缝的连接,板缝连接处做成“V”字形,所有连接处的空间、缝隙均采用高强灌浆料填补灌注密实。
所述的牛腿的支撑面上预埋品字形的三个连接高强螺栓预埋件,主梁的梁头设置三个连接孔洞与品字形的三个连接高强螺栓预埋件相匹配,高强螺栓预埋件穿进孔洞中,孔洞的空隙采用高强度灌浆料灌注密实。
所述的主梁与牛腿的连接,是将预制好的主梁通过吊装钩吊装到牛腿上安装,使牛腿上的高强螺栓预埋件穿过预制梁浇筑时预留的螺栓孔,仪器调平后,在螺栓孔上灌注高强灌浆料。
本发明的有益效果为:解决柱与主梁、主梁与次梁、梁与板的结构连接接头快速连接的问题,达到快速高效施工,缩短施工工期,节省施工成本,同时满足提高抗震要求,避免连接的繁琐、复杂及连接处的质量缺陷隐患,降低工程造价和安全风险系数,梁柱节点连接相比传统预制梁板柱拼接施工方法更加牢固,梁柱节点传力性能提高,框架结构整体性强,抗震性能有保障。
附图说明
图1为框架柱、牛腿和高强螺栓预埋件结构图。
图2为框架柱与主梁、主梁与次梁连接图,截面A-B为主梁和次梁的侧面连接图。
图3为预制板与主梁的连接图。
图4为预制板与次梁的连接图。
图5为预制板之间的连接图。
其中1、框架柱,2、牛腿,3、高强螺栓预埋件,4、孔洞,5、主梁,6、次梁,7、几字形接口,8、预制板,9、“V”字形板缝。
具体实施方式
实施例1
第一步,框架柱1在施工现场浇筑形成,框架柱1和主梁5连接处在柱子上伸出牛腿2,所述的牛腿2和主梁5的梁头连接,在牛腿2的支撑面上预埋品字形的三个连接高强螺栓预埋件3;主梁5的梁头设置三个连接孔洞4,设置的三个连接孔洞4与三个高强螺栓预埋件3相匹配,预制梁在预制时预留两个吊装钩,预制梁吊装时,高强螺栓预埋件3穿进预留孔洞4里,孔内的空隙采用高强度的灌浆料灌注密实,确保满足抗震要求。
第二步,解决主梁5与次梁6连接,在预制主梁5时,在主梁5与次梁6连接处,主梁5设置几字形接口,次梁6梁头设置搭接口,以便次梁6梁头伸进主梁5里,如为连续次梁,侧次梁头伸到主梁5中,如为非连续次梁,则伸进主梁5不少于2/3宽度,连接处采用高强灌浆料灌填密实,同时使用次梁6顶标高比主梁5顶标高低一个板的厚度,便于预制板8的安装。
第三步,解决主梁5、次梁6与预制板8的连接,主梁5侧面与预制板8的连接处,做成“凸”形,使预制板8支承在主梁5的侧面上;次梁6与预制板8的连接,因次梁6比主梁5低一个板厚,预制板8直接支承在次梁6上;板缝与板缝的连接,板缝连接处做成“V”字形9,所有连接处的空间、缝隙均采用高强灌浆料填补灌注密实。
Claims (3)
1.一种现浇柱预制梁板结构施工方法,其特征在于,包括框架柱(1)、梁、牛腿(2)、板和高强螺栓预埋件(3);所述的框架柱(1)在施工途中现场浇注形成,所述的梁和板预先制作形成预制梁和预制板(8),预制梁包括预制的主梁(5)和次梁(6);
第一步,框架柱(1)在施工现场浇筑形成,框架柱(1)和主梁(5)连接处在柱子上伸出牛腿(2),所述的牛腿(2)和主梁(5)的梁头连接,在牛腿(2)的支撑面上预埋三个连接高强螺栓预埋件(3);主梁(5)的梁头设置三个连接孔洞(4),设置的三个连接孔洞(4)与三个高强螺栓预埋件(3)相匹配,预制梁设置两个吊装钩;
第二步,主梁(5)与次梁(6)连接,在主梁(5)与次梁(6)连接处,主梁(5)设置几字形接口(7),次梁(6)梁头设置搭接口,次梁(6)梁头伸进主梁(5)里,如为连续次梁,侧次梁头伸到主梁(5)中,如为非连续次梁,则伸进主梁(5)不少于2/3宽度,连接处采用高强灌浆料灌填密实,同时使用次梁(6)顶标高比主梁(5)顶标高低一个板的厚度;
第三步,主梁(5)、次梁(6)与预制板(8)的连接,主梁(5)侧面与预制板(8)的连接处,做成“凸”形,使预制板(8)支承在主梁(5)的侧面上;次梁(6)与预制板(8)的连接,因次梁(6)比主梁(5)低一个板厚,预制板(8)直接支承在次梁(6)上;板缝与板缝的连接,板缝连接处做成“V”字形(9),所有连接处的空间、缝隙均采用高强灌浆料填补灌注密实。
2.根据权利要求1所述的现浇柱预制梁板结构施工方法,其特征在于,所述的牛腿(2)的支撑面上预埋品字形的三个连接高强螺栓预埋件(3),主梁(5)的梁头设置三个连接孔洞(4)与品字形的三个连接高强螺栓预埋件(3)相匹配,高强螺栓预埋件(3)穿进孔洞(4)中,孔洞(4)的空隙采用高强度灌浆料灌注密实。
3.根据权利要求1所述的现浇柱预制梁板结构施工方法,其特征在于,所述的主梁(5)与牛腿(2)的连接,是将预制好的主梁(5)通过吊装钩吊装到牛腿(2)上安装,使牛腿(2)上的高强螺栓预埋件(3)穿过预制梁浇筑时预留的螺栓孔,仪器调平后,在螺栓孔上灌注高强灌浆料。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510508975.XA CN105113626B (zh) | 2015-08-19 | 2015-08-19 | 现浇柱预制梁板结构施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510508975.XA CN105113626B (zh) | 2015-08-19 | 2015-08-19 | 现浇柱预制梁板结构施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105113626A true CN105113626A (zh) | 2015-12-02 |
CN105113626B CN105113626B (zh) | 2018-01-05 |
Family
ID=54661718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510508975.XA Expired - Fee Related CN105113626B (zh) | 2015-08-19 | 2015-08-19 | 现浇柱预制梁板结构施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105113626B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638683A (zh) * | 2017-01-26 | 2017-05-10 | 上海建工二建集团有限公司 | 逆作法取土口快速封闭施工连接节点及施工方法 |
CN109183986A (zh) * | 2018-11-08 | 2019-01-11 | 安徽建筑大学 | 一种装配式框架结构梁柱连接节点及施工方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005180162A (ja) * | 2003-12-23 | 2005-07-07 | Dongyang Construction Co Ltd | スチールブラケットによるi型プレストレストコンクリートビームの接続構造及び接続方法 |
CN101294419A (zh) * | 2007-04-27 | 2008-10-29 | 丁公权 | 用预制柱、梁、板快速组装低成本节能房屋新方法 |
CN101660327A (zh) * | 2008-08-29 | 2010-03-03 | 万科企业股份有限公司 | 预制混凝土次梁与主梁的连接结构、施工方法及建筑 |
JP4636538B2 (ja) * | 2005-03-24 | 2011-02-23 | 株式会社フジタ | プレキャスト鉄筋コンクリート造建築物の構築方法 |
CN102418385A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及施工方法 |
CN103046645A (zh) * | 2012-08-16 | 2013-04-17 | 杨众 | 一种大跨度预制整浇结构及施工方法 |
CN202969586U (zh) * | 2012-12-10 | 2013-06-05 | 谌丹 | 预置混凝土梁柱锚焊复合结构 |
CN203393848U (zh) * | 2013-08-09 | 2014-01-15 | 鸿鑫建设集团有限公司 | 一种钢筋混凝土柱与工字钢梁连接节点结构 |
CN103774755A (zh) * | 2014-01-07 | 2014-05-07 | 同济大学 | 一种预应力预制ecc-rc组合梁柱节点构件 |
KR101411033B1 (ko) * | 2008-04-01 | 2014-06-30 | 인스티튜트 오브 인터내셔널 인바이런먼트 | 건물의 건축방법 |
CN204098215U (zh) * | 2014-07-22 | 2015-01-14 | 中国航天建设集团有限公司 | 一种新型预制混凝土建筑结构 |
CN104746643A (zh) * | 2015-01-30 | 2015-07-01 | 柳忠东 | 一种混凝土大跨度框架结构体系及其装配方法 |
CN105113636A (zh) * | 2015-08-18 | 2015-12-02 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种吊车梁与牛腿的连接结构及其施工方法 |
-
2015
- 2015-08-19 CN CN201510508975.XA patent/CN105113626B/zh not_active Expired - Fee Related
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005180162A (ja) * | 2003-12-23 | 2005-07-07 | Dongyang Construction Co Ltd | スチールブラケットによるi型プレストレストコンクリートビームの接続構造及び接続方法 |
JP4636538B2 (ja) * | 2005-03-24 | 2011-02-23 | 株式会社フジタ | プレキャスト鉄筋コンクリート造建築物の構築方法 |
CN101294419A (zh) * | 2007-04-27 | 2008-10-29 | 丁公权 | 用预制柱、梁、板快速组装低成本节能房屋新方法 |
KR101411033B1 (ko) * | 2008-04-01 | 2014-06-30 | 인스티튜트 오브 인터내셔널 인바이런먼트 | 건물의 건축방법 |
CN101660327A (zh) * | 2008-08-29 | 2010-03-03 | 万科企业股份有限公司 | 预制混凝土次梁与主梁的连接结构、施工方法及建筑 |
CN102418385A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及施工方法 |
CN103046645A (zh) * | 2012-08-16 | 2013-04-17 | 杨众 | 一种大跨度预制整浇结构及施工方法 |
CN202969586U (zh) * | 2012-12-10 | 2013-06-05 | 谌丹 | 预置混凝土梁柱锚焊复合结构 |
CN203393848U (zh) * | 2013-08-09 | 2014-01-15 | 鸿鑫建设集团有限公司 | 一种钢筋混凝土柱与工字钢梁连接节点结构 |
CN103774755A (zh) * | 2014-01-07 | 2014-05-07 | 同济大学 | 一种预应力预制ecc-rc组合梁柱节点构件 |
CN204098215U (zh) * | 2014-07-22 | 2015-01-14 | 中国航天建设集团有限公司 | 一种新型预制混凝土建筑结构 |
CN104746643A (zh) * | 2015-01-30 | 2015-07-01 | 柳忠东 | 一种混凝土大跨度框架结构体系及其装配方法 |
CN105113636A (zh) * | 2015-08-18 | 2015-12-02 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种吊车梁与牛腿的连接结构及其施工方法 |
Non-Patent Citations (4)
Title |
---|
北京建筑工程学院建筑技术教研组: "《装配式建筑设计》", 30 June 1983 * |
叶炳麟: "预制现浇框架施工工艺", 《施工技术》 * |
阎元海: "现浇柱预制梁框架的几种施工方法", 《建筑技术》 * |
魏松等: "《建筑识图与构造 第2版》", 28 February 2014 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638683A (zh) * | 2017-01-26 | 2017-05-10 | 上海建工二建集团有限公司 | 逆作法取土口快速封闭施工连接节点及施工方法 |
CN106638683B (zh) * | 2017-01-26 | 2019-04-05 | 上海建工二建集团有限公司 | 逆作法取土口快速封闭施工连接节点及施工方法 |
CN109183986A (zh) * | 2018-11-08 | 2019-01-11 | 安徽建筑大学 | 一种装配式框架结构梁柱连接节点及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105113626B (zh) | 2018-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908869B (zh) | 基于3d打印填充墙体所形成的构造柱结构 | |
CN203834739U (zh) | 端部钢板连接定位装配式剪力墙结构 | |
CN103556749A (zh) | 一种预制混凝土填充墙悬挂式柔性连接 | |
CN107859169A (zh) | 一种承插式梁柱节点及施工方法 | |
CN206448364U (zh) | 一种承插式梁柱节点 | |
CN205712137U (zh) | 基坑支护结构 | |
CN108086344A (zh) | 一种格构式塔吊基础结构及施工方法 | |
CN111636625A (zh) | 一种适用于装配式建筑的钢筋套筒灌浆连接工艺 | |
CN203487664U (zh) | 一种预制混凝土填充墙悬挂式柔性连接 | |
CN109680835A (zh) | 一种自承式预制混凝土墙板、混凝土墙、结构体系及工法 | |
CN108999076A (zh) | 一种立柱与相邻构件的类承插连接结构及其施工方法 | |
CN106012851A (zh) | 钢箱梁与混凝土墩柱同步施工方法 | |
CN103469803A (zh) | 用于基坑支护的桩梁竖锚支护体系及其施工方法 | |
CN207812741U (zh) | 预制钢构叠合剪力墙 | |
CN105113514B (zh) | 以地下连续墙作为竖向悬臂支点的基坑围护体系及施工方法 | |
CN106437033A (zh) | 一种钢管混凝土柱埋入式柱脚 | |
CN105113626A (zh) | 现浇柱预制梁板结构施工方法 | |
CN109914589A (zh) | 一种预应力钢筋混凝土预制柱竖向连接结构及其施工方法 | |
CN206956979U (zh) | 一种带顶柱的一字型剪力墙 | |
CN106149878A (zh) | 混凝土框架结构预制柱与梁板节点处的连接结构及方法 | |
CN204475714U (zh) | 一种快装式预制楼梯 | |
CN110424566A (zh) | 一种内浇加强型预制混凝土墙板、混凝土墙、结构体系及工法 | |
CN107620314A (zh) | 一种混凝土柱脚的施工方法及混凝土柱脚结构 | |
CN206000021U (zh) | 混凝土框架结构预制柱与梁板节点处的连接结构 | |
CN208907211U (zh) | 一种钢管拱吊装用提升架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |