CN105092222A - 一种钢梁整体稳定承载力试验的加载装置 - Google Patents

一种钢梁整体稳定承载力试验的加载装置 Download PDF

Info

Publication number
CN105092222A
CN105092222A CN201510344326.0A CN201510344326A CN105092222A CN 105092222 A CN105092222 A CN 105092222A CN 201510344326 A CN201510344326 A CN 201510344326A CN 105092222 A CN105092222 A CN 105092222A
Authority
CN
China
Prior art keywords
girder steel
loading
rigid body
loading frame
charger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510344326.0A
Other languages
English (en)
Other versions
CN105092222B (zh
Inventor
熊刚
杨波
周淑容
聂诗东
徐国友
胡鹰
陈永庆
游泽政
孟凡涛
张筠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University General Institute Of Architectural Planning And Design Co ltd
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201510344326.0A priority Critical patent/CN105092222B/zh
Publication of CN105092222A publication Critical patent/CN105092222A/zh
Application granted granted Critical
Publication of CN105092222B publication Critical patent/CN105092222B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种钢梁整体稳定承载力试验的加载装置:包括四连杆机构、过渡装置、千斤顶、加载框、力传感器加载球铰。所述四连杆机构包括地梁、斜杆和三角形刚体;所述过渡装置与所述四连杆机构与千斤顶连接,将千斤顶的荷载传递给四连杆机构。所述加载框为金属制成的矩形框。所述加载球铰由一个凹球面和一个凸球面组成。本发明的有益效果在于能很好的模拟无侧向约束钢梁整体稳定试验中,加载点处钢梁的约束情况,使试验结果更加准确。具体来讲,本发明通过四连杆机构的侧向变形释放对钢梁侧向位移的约束,并保持荷载竖直向下;通过加载球铰中凹球面与凸球面之间的相对转动释放对钢梁扭转约束。

Description

一种钢梁整体稳定承载力试验的加载装置
技术领域
本发明涉及钢结构技术领域,特别涉及一种跨中单点加载作用下钢梁整体稳定承载力试验的加载装置。
背景技术
钢结构具有良好、丰富的建筑艺术表现力,受到建筑师们的普遍青睐;钢结构所使用的钢材具有强度高、塑性韧性好、抗震性能优的特点,可以减小构件截面,降低结构重量;钢结构更便于实现工业化生产,材料又可回收利用,被认为是一种环保、节能的结构体系。国内外一系列大型钢结构工程的应用,推动了钢结构学科的快速发展。
钢梁作为钢结构体系中一种重要的结构构件,在横向荷载作用下,其极限承载力往往由整体稳定控制,钢梁的整体稳定承载力的试验研究成为结构工程中最具活力的研究方向之一。
对于如图1所示跨中有一个集中荷载作用的简支梁,其整体失稳后的变形如图1中的虚线所示。图2为荷载作用点处梁截面的变形示意图,图2(b)中虚线部分为失稳前的截面,从图2可以,梁整体失稳后,截面将发生侧向位移并伴随扭转,所施加的荷载要随截面侧向移动,但方向仍然保持垂直。换言之,试验用的加载装置不允许对试验梁的侧向位移及扭转产生约束,这使得此类试验变得十分困难。
传统的钢梁整体稳定试验有千斤顶加载和吊挂加载两种方案。
千斤顶加载方案具有以下缺点:①压紧后的千斤顶具有较大的侧向刚度,对钢梁的侧向弯曲具有较强的约束;②千斤顶上的球铰转动刚度较大,对钢梁的扭转产生约束。以上缺点导致试验结果不准确。
吊挂加载方案具有以下缺点:①仅适用于荷载较小的钢梁试验,当钢梁的稳定极限荷载较大时很难解决吊挂重物的问题;②梁整体失稳时,吊挂重物会突然掉落,对施加荷载的人员造成安全隐患。
发明内容
本发明的目的是解决钢梁整体稳定试验研究中加载装置存在的问题,提供一种能安全、可靠、能适应钢梁侧向位移和扭转变形的加载装置。
为实现本发明目的而采用的技术方案是这样的,一种钢梁整体稳定承载力试验的加载装置,其特征在于:包括四连杆机构、过渡装置、拉力千斤顶、加载框、力传感器、加载球铰、试验钢梁。
所述四连杆机构包括锚固于地面上的地梁、斜杆和三角形刚体:
所述地梁通过地锚栓固定于地面,其长度方向与所述试验钢梁垂直,上表面焊接有4个连接耳板,耳板与所述地梁长度方向平行;所述三角形刚体为钢板焊接组合而成的空心刚体,位于两侧的钢板上分别有三个孔洞,顶部两个用于连接斜杆,底部孔洞用于连接过渡装置;所述斜杆为钢连杆,下端通过销钉分别铰接于所述地梁上部的耳板,上端通过销钉铰接于所述三角形刚体侧板上部圆孔。
所述过渡装置包含一槽型金属件和两个滚子轴承,槽型金属件顶部焊接一螺杆,用于连接所述拉力千斤顶,槽型金属件的两个侧板开圆孔,所述滚子轴承安装于槽型金属件的侧板圆孔内。
所述拉力千斤顶用于施加竖向荷载,下部与所述过渡装置连接,上部与所述加载框下横梁上的耳板连接。
所述加载框为金属制成的矩形框,包括上下横梁与左右立柱,,下横梁上焊接耳板,用于连接所述拉力千斤顶。
所述试验钢梁穿过加载框的中部。
所述力传感器位于所述加载框上横梁与所述加载球铰之间,通过连接螺杆与所述加载框上横梁连接,用于测量施加到所述试验钢梁上的荷载。
所述加载球铰由放置于所述试验钢梁上表面的凹球面和固定于所述加载框上横梁,位于所述力传感器下方的凸球面组成:
所述凹球面为下表面水平,上表面具有球窝的金属圆块;所述凸球面是连接于钢板上具有球头的金属短柱,通过连接螺杆与所述加载框上横梁连接。
进一步,除加载点采用本发明的装置加载外,所述试验钢梁的两端被固定在支座上。定义钢梁的长度方向为z轴,与之垂直的水平方向为x轴,垂直于xoy面的轴为y轴。位于钢梁的两端的支座应符合夹支条件,即两端支座能约束钢梁绕z轴扭转和沿x、y轴方向的移动,但不能约束钢梁沿x、y轴的转动及沿z轴的移动。
进一步,所述三角形刚体由两侧侧板与连接钢板焊接而成的空心刚体,两侧板之间的距离略大于过渡装置宽度。
进一步,所述斜杆与所述地梁耳板、三角形刚体之间的连接采用销轴连接,间隙配合。
进一步,所述拉力千斤顶通过过渡装置与所述四连杆机构中的三角形刚体上的。
进一步,所述拉力千斤顶上端是通过销轴与所述加载框下横梁上的耳板连接。
进一步,所述加载球铰的凸球面直径略小于凹球面直径,之间涂油膏以减小两者之间的摩擦力。
进一步,安装时,所述加载球铰的凹球面放置与所述试验钢梁上表面的中点,其轴线与凸球面、力传感器、拉力千斤顶的轴线重合。
本加载装置发明的有益效果是:
1.所述试验钢梁侧向位移时,所述四连杆结构发生侧向变形,拉力千斤顶跟随所述四连杆机构发生水平位移,并保持竖直,释放加载装置对钢梁侧向位移的约束;
2.所述试验钢梁发生扭转时,所述加载球铰的凹球面与凸球面之间发生转动,释放加载装置对所述试验钢梁扭转的约束;
3.调整所述加载球铰凹球面及凸球面的直径,该装置可用于不同规格钢梁整体稳定性能的试验,特别是承载力较大的钢梁;
4.本套加载装置能适应不同截面形式、规格的试验钢梁,且可以重复利用,减小试验成本。
附图说明
图1是钢梁整体失稳后的变形示意图
图2荷载作用点处梁截面的变形示意图
图3是钢梁失稳前加载装置示意图;
图4是钢梁变形后加载装置示意图;
图5是球铰转动示意图
图6是加载装置透视图
图中:四连杆结构10、地梁11、斜杆12、三角形刚体13、过渡装置20、拉力千斤顶30、加载框40、力传感器50、加载球铰60、试验钢梁70、连接螺杆80。
具体实施方式
下面结合附图对本发明作进一步说明,但不应该理解为本发明上述主题范围仅限于下述实施例。在不脱离本发明上述技术思想的情况下,根据本领域普通技术知识和惯用手段,做出各种替换和变更,均应包括在本发明的保护范围内。
参见图3~图6,一种钢梁整体稳定承载力试验的加载装置,其特征在于:包括四连杆机构10、过渡装置20、拉力千斤顶30、加载框40、力传感器50、加载球铰60、试验钢梁70。
所述四连杆机构10包括锚固于地面上的地梁11、斜杆12和三角形刚体13:
所述地梁11通过地锚栓固定于地面,其长度方向与所述试验钢梁70垂直,上表面焊接有4个连接耳板,耳板与所述地梁11长度方向平行;所述三角形刚体13为钢板焊接组合而成的空心刚体,位于两侧的钢板上分别有三个孔洞,顶部两个用于连接斜杆12,底部孔洞用于连接过渡装置20;所述斜杆12为钢连杆,下端通过销钉分别铰接于所述地梁11上部的耳板,上端通过销钉铰接于所述三角形刚体13侧板上部圆孔。
所述过渡装置20包含一槽型金属件和两个滚子轴承,槽型金属件顶部焊接一螺杆,用于连接所述拉力千斤顶30,槽型金属件的两个侧板开圆孔,所述滚子轴承安装于槽型金属件的侧板圆孔内。
所述拉力千斤顶30用于施加竖向荷载,下部与所述过渡装置20连接,上部与所述加载框40下横梁上的耳板连接。
所述加载框40为金属制成的矩形框,包括上下横梁与左右立柱,,下横梁上焊接耳板,用于连接所述拉力千斤顶30。
所述试验钢梁70穿过加载框的中部。
所述力传感器50位于所述加载框40上横梁与所述加载球铰60之间,通过连接螺杆80与所述加载框40上横梁连接,用于测量施加到所述试验钢梁70上的荷载。
所述加载球铰60由放置于所述试验钢梁上表面的凹球面和固定于所述加载框40上横梁,位于所述力传感器50下方的凸球面组成:
所述凹球面为下表面水平,上表面具有球窝的金属圆块;所述凸球面是连接于钢板上具有球头的金属短柱,通过连接螺杆80与所述加载框40上横梁连接。
工作原理
参见图2,当梁整体失稳时,加载点处截面要发生侧向移动及扭转,试验的加载装置必须能适应这种变形,同时保证所施加的荷载竖直向下。
本发明设计了一个四连杆机构10,如图3所示,所述实验钢梁70失稳前,所述加载球铰60、力传感器50、拉力千斤顶30、四连杆机构11的轴线重合,所述斜杆12轴线延长线交点位于所述拉力千斤顶30轴线上,所述拉力千斤顶30竖直向下。当所述实验钢梁70整体失稳发生侧移时,如图4所示,所述实验钢梁70带动所述加载框40和所述拉力千斤顶30侧向位移,所述四连杆机构10的各杆件发生相对转动,以适应所述加载框40的侧移。同时,所述斜杆12轴线线延长线交点依然位于所述拉力千斤顶30轴线上,但位置发生变化,所述拉力千斤顶30轴线发生倾斜,但当所述四连杆机构10各杆件及所述三角形刚体13的几何尺寸选择适当时,所述拉力千斤顶30轴线会发生倾斜角极小,从而保证荷载竖直向下。
本发明还设计了一个加载球铰60,其工作原理如图6,当所述实验钢梁70整体失稳而发生扭转时,所述加载球铰60的凸球面与凹球面发生相对转动,由于凸球面半径略小于凹球面,接触面积小,且凹球面内涂油脂,使得凸球面与凹球面之间的转动刚度极小,从而释放了对所述试验钢梁70的扭转约束。

Claims (6)

1.一种钢梁整体稳定承载力试验的加载装置,其特征在于:包括四连杆机构(10)、过渡装置(20)、拉力千斤顶(30)、加载框(40)、力传感器(50)、加载球铰(60)、试验钢梁(70)。
所述四连杆机构(10)包括锚固于地面上的地梁(11)、斜杆(12)和三角形刚体(13):
所述地梁(11)通过地锚栓固定于地面,其长度方向与所述试验钢梁(70)垂直,上表面焊接有4个连接耳板,耳板与所述地梁(11)长度方向平行;所述三角形刚体(13)为钢板焊接组合而成的空心刚体,位于两侧的钢板上分别有三个孔洞,顶部两个用于连接斜杆(12),底部孔洞用于连接过渡装置(20);所述斜杆(12)为钢连杆,下端通过销钉分别铰接于所述地梁(11)上部的耳板,上端通过销钉铰接于所述三角形刚体(13)侧板上部圆孔。
所述过渡装置(20)包含一槽型金属件和两个滚子轴承,槽型金属件顶部焊接一螺杆,用于连接所述拉力千斤顶(30),槽型金属件的两个侧板开圆孔,所述滚子轴承安装于槽型金属件的侧板圆孔内。
所述拉力千斤顶(30)用于施加竖向荷载,下部与所述过渡装置(20)连接,上部与所述加载框(40)下横梁上的耳板连接。
所述加载框(40)为金属制成的矩形框,包括上下横梁与左右立柱,,下横梁上焊接耳板,用于连接所述拉力千斤顶(30)。
所述试验钢梁(70)穿过加载框的中部。
所述力传感器(50)位于所述加载框(40)上横梁与所述加载球铰(60)之间,通过连接螺杆(80)与所述加载框(40)上横梁连接,用于测量施加到所述试验钢梁(70)上的荷载。
所述加载球铰(60)由放置于所述试验钢梁上表面的凹球面和固定于所述加载框(40)上横梁,位于所述力传感器(50)下方的凸球面组成:
所述凹球面为下表面水平,上表面具有球窝的金属圆块;所述凸球面是连接于钢板上具有球头的金属短柱,通过连接螺杆(80)与所述加载框(40)上横梁连接。
2.根据权利要求1所述的一种钢梁整体稳定承载力试验的加载装置,其特征在于:所述三角形刚体(13)由两侧侧板与连接钢板焊接而成的空心刚体,两侧板之间的距离略大于所述过渡装置(20)宽度。
3.根据权利要求1所述的一种钢梁整体稳定承载力试验的加载装置,其特征在于:所述斜杆(12)与所述地梁(11)耳板、三角形刚体(13)之间的连接采用销轴连接,间隙配合。
4.根据权利要求1所述的一种钢梁整体稳定承载力试验的加载装置,其特征在于:所述拉力千斤顶(30)通过所述过渡装置(20)与所述四连杆机构(10)中的三角形刚体(13)上的。
5.根据权利要求1所述的一种钢梁整体稳定承载力试验的加载装置,其特征在于:所述拉力千斤顶(30)上端是通过销轴与所述加载框(40)下横梁上的耳板连接。
6.根据权利要求1所述的一种钢梁整体稳定承载力试验的加载装置,其特征在于:所述加载球铰(60)的凸球面直径略小于凹球面直径。
CN201510344326.0A 2015-06-19 2015-06-19 一种钢梁整体稳定承载力试验的加载装置 Expired - Fee Related CN105092222B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510344326.0A CN105092222B (zh) 2015-06-19 2015-06-19 一种钢梁整体稳定承载力试验的加载装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510344326.0A CN105092222B (zh) 2015-06-19 2015-06-19 一种钢梁整体稳定承载力试验的加载装置

Publications (2)

Publication Number Publication Date
CN105092222A true CN105092222A (zh) 2015-11-25
CN105092222B CN105092222B (zh) 2017-08-29

Family

ID=54573153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510344326.0A Expired - Fee Related CN105092222B (zh) 2015-06-19 2015-06-19 一种钢梁整体稳定承载力试验的加载装置

Country Status (1)

Country Link
CN (1) CN105092222B (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105973576A (zh) * 2016-03-28 2016-09-28 合肥工业大学 应用于铰支构件手动加载受压试验的简易装置
CN106768992A (zh) * 2017-03-13 2017-05-31 天津城建大学 一种适用墙体试验的地梁固定支座
CN107238494A (zh) * 2017-07-21 2017-10-10 西安建筑科技大学 一种适用于面外失稳框架结构的竖向荷载加载装置及方法
CN107246976A (zh) * 2017-07-21 2017-10-13 西安建筑科技大学 一种框架结构的等效竖向分布荷载加载装置及加载方法
CN107917785A (zh) * 2017-10-24 2018-04-17 华南理工大学 一种基于杠杆原理的钢梁稳定试验集中荷载加载装置
CN108469378A (zh) * 2018-06-06 2018-08-31 重庆大学 一种杠杆式预埋件斜向拉拔试验装置及其试验方法
CN109406184A (zh) * 2018-11-29 2019-03-01 华侨大学 一种单孔沉管隧道顶板耐火性能试验加载装置
CN109883815A (zh) * 2019-03-28 2019-06-14 长安大学 一种用于单梁加载试验的防倾斜装置
CN110095349A (zh) * 2019-05-22 2019-08-06 太原理工大学 一种适用于弯扭失稳的空间加载系统和方法
CN110657931A (zh) * 2019-08-22 2020-01-07 广西大学 一种偏拉工况下竖向构件抗震性能试验的加载装置
CN111351603A (zh) * 2020-01-15 2020-06-30 大连理工大学 一种斜面结构的冰荷载直接测量装置
CN111413273A (zh) * 2020-04-22 2020-07-14 吉林大学 一种水平转体球铰界面摩阻力的测定装置及测试方法
CN111766154A (zh) * 2020-06-17 2020-10-13 中国飞机强度研究所 一种曲板直边约束加载装置
CN112067219A (zh) * 2020-08-31 2020-12-11 扬州大学 一种用于抗震试验的梁端活动铰接试验装置及其试验方法
CN112781982A (zh) * 2020-12-09 2021-05-11 大连中远海运重工有限公司 死绳限位器强度试验工装

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2175933Y (zh) * 1993-11-24 1994-08-31 卢丽莎 深基础平板载荷试验仪
CN101498625A (zh) * 2009-03-13 2009-08-05 北京工业大学 一种构件压扭实验装置及方法
JP4354077B2 (ja) * 2000-03-14 2009-10-28 株式会社竹中工務店 杭の載荷試験方法及び載荷試験装置
CN102162774A (zh) * 2010-12-28 2011-08-24 北京中铁房山桥梁有限公司 钢结构分配梁式双线整孔箱梁静载试验装置及其施工方法
JP2011257355A (ja) * 2010-06-11 2011-12-22 Kobelco Kaken:Kk 曲げ試験装置および曲げ試験方法
CN103063509A (zh) * 2012-12-29 2013-04-24 西安建筑科技大学 一种烧结页岩砌体双向自平衡剪压加载装置及试验方法
CN103411758A (zh) * 2013-07-11 2013-11-27 中冶天工上海十三冶建设有限公司 一种贝雷架静载试验反力架装置
CN204718787U (zh) * 2015-06-19 2015-10-21 重庆大学 一种钢梁整体稳定承载力试验的加载装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2175933Y (zh) * 1993-11-24 1994-08-31 卢丽莎 深基础平板载荷试验仪
JP4354077B2 (ja) * 2000-03-14 2009-10-28 株式会社竹中工務店 杭の載荷試験方法及び載荷試験装置
CN101498625A (zh) * 2009-03-13 2009-08-05 北京工业大学 一种构件压扭实验装置及方法
JP2011257355A (ja) * 2010-06-11 2011-12-22 Kobelco Kaken:Kk 曲げ試験装置および曲げ試験方法
CN102162774A (zh) * 2010-12-28 2011-08-24 北京中铁房山桥梁有限公司 钢结构分配梁式双线整孔箱梁静载试验装置及其施工方法
CN103063509A (zh) * 2012-12-29 2013-04-24 西安建筑科技大学 一种烧结页岩砌体双向自平衡剪压加载装置及试验方法
CN103411758A (zh) * 2013-07-11 2013-11-27 中冶天工上海十三冶建设有限公司 一种贝雷架静载试验反力架装置
CN204718787U (zh) * 2015-06-19 2015-10-21 重庆大学 一种钢梁整体稳定承载力试验的加载装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
熊刚等: "大跨度钢箱梁斜拉桥索梁锚固结构的发展与应用", 《预应力技术》 *
胡鹰等: "钢结构构件轴心受压稳定性研究综述", 《钢结构》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105973576A (zh) * 2016-03-28 2016-09-28 合肥工业大学 应用于铰支构件手动加载受压试验的简易装置
CN106768992A (zh) * 2017-03-13 2017-05-31 天津城建大学 一种适用墙体试验的地梁固定支座
CN106768992B (zh) * 2017-03-13 2023-11-24 天津城建大学 一种适用墙体试验的地梁固定支座
CN107238494A (zh) * 2017-07-21 2017-10-10 西安建筑科技大学 一种适用于面外失稳框架结构的竖向荷载加载装置及方法
CN107246976A (zh) * 2017-07-21 2017-10-13 西安建筑科技大学 一种框架结构的等效竖向分布荷载加载装置及加载方法
CN107917785B (zh) * 2017-10-24 2019-08-20 华南理工大学 一种基于杠杆原理的钢梁稳定试验集中荷载加载装置
CN107917785A (zh) * 2017-10-24 2018-04-17 华南理工大学 一种基于杠杆原理的钢梁稳定试验集中荷载加载装置
CN108469378A (zh) * 2018-06-06 2018-08-31 重庆大学 一种杠杆式预埋件斜向拉拔试验装置及其试验方法
CN108469378B (zh) * 2018-06-06 2024-01-09 重庆大学 一种杠杆式预埋件斜向拉拔试验装置及其试验方法
CN109406184A (zh) * 2018-11-29 2019-03-01 华侨大学 一种单孔沉管隧道顶板耐火性能试验加载装置
CN109406184B (zh) * 2018-11-29 2023-08-29 华侨大学 一种单孔沉管隧道顶板耐火性能试验加载装置
CN109883815A (zh) * 2019-03-28 2019-06-14 长安大学 一种用于单梁加载试验的防倾斜装置
CN109883815B (zh) * 2019-03-28 2022-06-21 长安大学 一种用于单梁加载试验的防倾斜装置
CN110095349A (zh) * 2019-05-22 2019-08-06 太原理工大学 一种适用于弯扭失稳的空间加载系统和方法
CN110657931A (zh) * 2019-08-22 2020-01-07 广西大学 一种偏拉工况下竖向构件抗震性能试验的加载装置
CN111351603A (zh) * 2020-01-15 2020-06-30 大连理工大学 一种斜面结构的冰荷载直接测量装置
CN111413273A (zh) * 2020-04-22 2020-07-14 吉林大学 一种水平转体球铰界面摩阻力的测定装置及测试方法
CN111413273B (zh) * 2020-04-22 2024-05-14 吉林大学 一种水平转体球铰界面摩阻力的测定装置及测试方法
CN111766154B (zh) * 2020-06-17 2023-01-13 中国飞机强度研究所 一种曲板直边约束加载装置
CN111766154A (zh) * 2020-06-17 2020-10-13 中国飞机强度研究所 一种曲板直边约束加载装置
CN112067219A (zh) * 2020-08-31 2020-12-11 扬州大学 一种用于抗震试验的梁端活动铰接试验装置及其试验方法
CN112781982A (zh) * 2020-12-09 2021-05-11 大连中远海运重工有限公司 死绳限位器强度试验工装

Also Published As

Publication number Publication date
CN105092222B (zh) 2017-08-29

Similar Documents

Publication Publication Date Title
CN105092222A (zh) 一种钢梁整体稳定承载力试验的加载装置
CN204718787U (zh) 一种钢梁整体稳定承载力试验的加载装置
CN108487624B (zh) 附着式升降脚手架
CN102079489A (zh) 塔式起重机悬爬式支护系统
CN201664691U (zh) 一种高刚度短应力万能轧机
CN114263289A (zh) 一种具备耗能承载双功能的抗震构件及缓冲器
CN102303821A (zh) 基于钢绳牵引变幅的吊臂平衡式动臂塔机
CN201334770Y (zh) 附墙支座
CN201971549U (zh) 用于塔式起重机悬爬式支护系统的主梁
CN105401560B (zh) 一种自动退出的闸门锁定装置及闸门控制系统
CN109519025B (zh) 一种剪刀撑机构伸臂桁架消能减震系统
CN111622377A (zh) 一种剪力墙结构
CN209066901U (zh) 一种钢结构滑移机构
CN217105630U (zh) 一种具备耗能承载双功能的抗震构件及缓冲器
CN104034547A (zh) 一种结构倒塌试验中模拟构件失效的支撑释放装置
CN204691301U (zh) 一种钢筋混凝土框架结构节点加固装置
CN204575311U (zh) 铁路t梁静载试验桁架
CN112160231B (zh) 一种简支梁桥的连接结构
CN201738561U (zh) 附着式升降脚手架防倾防坠装置
CN210480692U (zh) 塔式起重机变副结构和具有其的塔式起重机
CN211571982U (zh) 一种厂房钢结构支撑柱连接装置
CN204080848U (zh) 输电线路双杆门型杆塔自调基础
CN110185144A (zh) 一种建筑钢结构
CN106368322A (zh) 一种用于超高层建筑转换层之间的双向对称倾斜钢柱的安装方法
CN103359634A (zh) 塔机环形顶升横梁装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210122

Address after: No.83, Shabei street, Shapingba District, Chongqing 400044

Patentee after: Chongqing University General Institute of architectural planning and Design Co.,Ltd.

Address before: 400044 No. 174 Sha Jie street, Shapingba District, Chongqing

Patentee before: Chongqing University

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170829