CN105088937A - 铰缝有相对凹槽的空心板桥及其建造方法 - Google Patents
铰缝有相对凹槽的空心板桥及其建造方法 Download PDFInfo
- Publication number
- CN105088937A CN105088937A CN201410192351.7A CN201410192351A CN105088937A CN 105088937 A CN105088937 A CN 105088937A CN 201410192351 A CN201410192351 A CN 201410192351A CN 105088937 A CN105088937 A CN 105088937A
- Authority
- CN
- China
- Prior art keywords
- hollow slab
- hollow
- hinge joint
- ribs
- grooves
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title description 5
- 239000004567 concrete Substances 0.000 claims abstract description 31
- 238000009415 formwork Methods 0.000 claims abstract description 30
- 238000010276 construction Methods 0.000 claims abstract description 21
- 230000002787 reinforcement Effects 0.000 claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 239000004570 mortar (masonry) Substances 0.000 claims description 5
- 239000000843 powder Substances 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 3
- 239000010410 layer Substances 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 3
- 238000005452 bending Methods 0.000 abstract description 8
- 238000005336 cracking Methods 0.000 abstract 2
- 230000000149 penetrating effect Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 7
- 238000009417 prefabrication Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000011376 self-consolidating concrete Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000012916 structural analysis Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410192351.7A CN105088937B (zh) | 2014-05-08 | 2014-05-08 | 铰缝有相对凹槽的空心板桥及其建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410192351.7A CN105088937B (zh) | 2014-05-08 | 2014-05-08 | 铰缝有相对凹槽的空心板桥及其建造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105088937A true CN105088937A (zh) | 2015-11-25 |
CN105088937B CN105088937B (zh) | 2017-04-12 |
Family
ID=54570203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410192351.7A Expired - Fee Related CN105088937B (zh) | 2014-05-08 | 2014-05-08 | 铰缝有相对凹槽的空心板桥及其建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105088937B (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544743A (zh) * | 2015-12-10 | 2016-05-04 | 中国十七冶集团有限公司 | 一种轻质墙板预应力连接方法 |
CN105544385A (zh) * | 2015-12-04 | 2016-05-04 | 郑州大学 | 一种预制节段式混凝土桥梁的接缝构造 |
CN106498847A (zh) * | 2016-12-19 | 2017-03-15 | 上海应用技术大学 | 一种预制盖梁和预制立柱的连接结构和连接方法 |
CN106988203A (zh) * | 2017-05-19 | 2017-07-28 | 重庆工商职业学院 | 具有横向加强桥面铺装层的混凝土空心板桥 |
CN108049311A (zh) * | 2018-01-19 | 2018-05-18 | 湖南大学 | 增强型补偿收缩超高性能混凝土空心板铰缝结构 |
CN108086145A (zh) * | 2017-12-27 | 2018-05-29 | 沈阳建筑大学 | 一种铰缝纵向抗弯钢筋配筋数量的计算方法 |
CN108999078A (zh) * | 2018-07-23 | 2018-12-14 | 株洲时代新材料科技股份有限公司 | 一种桥梁支座 |
CN109235287A (zh) * | 2018-11-15 | 2019-01-18 | 天津城建大学 | 节段预制悬臂拼装桥梁预制剪力键结构及剪力键施工方法 |
CN110344323A (zh) * | 2019-07-02 | 2019-10-18 | 南京梦联桥传感科技有限公司 | 一种超早强高性能湿接缝结构及施工工艺 |
CN110700089A (zh) * | 2019-10-22 | 2020-01-17 | 湖南大学 | 一种现浇湿接缝结构及桥梁 |
CN116289521A (zh) * | 2023-05-12 | 2023-06-23 | 湖南省交通规划勘察设计院有限公司 | 一种分片预制拼装桥梁及其施工方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518599A (zh) * | 2018-12-17 | 2019-03-26 | 扬州大学 | 一种铰缝倾斜的空心板桥 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008121287A (ja) * | 2006-11-13 | 2008-05-29 | Fuji Ps Corp | 鋼コンクリート複合桁および鋼コンクリート複合桁の施工方法 |
CN102635060A (zh) * | 2012-05-02 | 2012-08-15 | 周劲宇 | 用横向钢梁加固的混凝土空心板桥 |
KR20130083410A (ko) * | 2012-01-12 | 2013-07-22 | (주)태영이씨엠 | 하천횡단용 변단면 프리캐스트 콘크리트 중공 슬래브(slab)형 횡방향 연결 박스 거더 및 이를 이용한 교량시공방법 |
CN103726439A (zh) * | 2014-01-02 | 2014-04-16 | 东南大学 | 一种铰缝的钢筋结构 |
CN103758033A (zh) * | 2013-12-30 | 2014-04-30 | 郑州大学 | 一种装配整体式空心板桥及其建造方法 |
CN203890868U (zh) * | 2014-05-08 | 2014-10-22 | 郑州大学 | 铰缝有相对凹槽的空心板桥 |
-
2014
- 2014-05-08 CN CN201410192351.7A patent/CN105088937B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008121287A (ja) * | 2006-11-13 | 2008-05-29 | Fuji Ps Corp | 鋼コンクリート複合桁および鋼コンクリート複合桁の施工方法 |
KR20130083410A (ko) * | 2012-01-12 | 2013-07-22 | (주)태영이씨엠 | 하천횡단용 변단면 프리캐스트 콘크리트 중공 슬래브(slab)형 횡방향 연결 박스 거더 및 이를 이용한 교량시공방법 |
CN102635060A (zh) * | 2012-05-02 | 2012-08-15 | 周劲宇 | 用横向钢梁加固的混凝土空心板桥 |
CN103758033A (zh) * | 2013-12-30 | 2014-04-30 | 郑州大学 | 一种装配整体式空心板桥及其建造方法 |
CN103726439A (zh) * | 2014-01-02 | 2014-04-16 | 东南大学 | 一种铰缝的钢筋结构 |
CN203890868U (zh) * | 2014-05-08 | 2014-10-22 | 郑州大学 | 铰缝有相对凹槽的空心板桥 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544385A (zh) * | 2015-12-04 | 2016-05-04 | 郑州大学 | 一种预制节段式混凝土桥梁的接缝构造 |
CN105544743A (zh) * | 2015-12-10 | 2016-05-04 | 中国十七冶集团有限公司 | 一种轻质墙板预应力连接方法 |
CN106498847A (zh) * | 2016-12-19 | 2017-03-15 | 上海应用技术大学 | 一种预制盖梁和预制立柱的连接结构和连接方法 |
CN106988203A (zh) * | 2017-05-19 | 2017-07-28 | 重庆工商职业学院 | 具有横向加强桥面铺装层的混凝土空心板桥 |
CN108086145A (zh) * | 2017-12-27 | 2018-05-29 | 沈阳建筑大学 | 一种铰缝纵向抗弯钢筋配筋数量的计算方法 |
CN108086145B (zh) * | 2017-12-27 | 2019-05-21 | 沈阳建筑大学 | 一种铰缝纵向抗弯钢筋配筋数量的计算方法 |
CN108049311A (zh) * | 2018-01-19 | 2018-05-18 | 湖南大学 | 增强型补偿收缩超高性能混凝土空心板铰缝结构 |
CN108999078A (zh) * | 2018-07-23 | 2018-12-14 | 株洲时代新材料科技股份有限公司 | 一种桥梁支座 |
CN109235287A (zh) * | 2018-11-15 | 2019-01-18 | 天津城建大学 | 节段预制悬臂拼装桥梁预制剪力键结构及剪力键施工方法 |
CN110344323A (zh) * | 2019-07-02 | 2019-10-18 | 南京梦联桥传感科技有限公司 | 一种超早强高性能湿接缝结构及施工工艺 |
CN110700089A (zh) * | 2019-10-22 | 2020-01-17 | 湖南大学 | 一种现浇湿接缝结构及桥梁 |
CN116289521A (zh) * | 2023-05-12 | 2023-06-23 | 湖南省交通规划勘察设计院有限公司 | 一种分片预制拼装桥梁及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105088937B (zh) | 2017-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105088937A (zh) | 铰缝有相对凹槽的空心板桥及其建造方法 | |
CN102146658B (zh) | 局部不组合的悬索桥钢-混凝土组合桥面系及其施工方法 | |
CN104389261B (zh) | 预制超高性能混凝土π形梁单元、桥梁结构及其施工方法 | |
CN101768916A (zh) | 下翼缘改进型波形钢腹板组合箱梁及其施工方法 | |
CN203411898U (zh) | 一种钢与混凝土组合结构的桥面板 | |
CN104831617A (zh) | 基于肋板式桥面的钢-超高性能混凝土组合梁及施工方法 | |
CN101748682A (zh) | 采用波形钢腹板的钢-混凝土叠合板组合梁及其施工方法 | |
CN103628404B (zh) | 一种带延伸钢筋的铰缝构造及其施工方法 | |
CN204185765U (zh) | 钢-超高性能纤维混凝土轻型组合梁的接缝结构 | |
CN104762871A (zh) | 一种预应力混凝土-钢槽梁结合梁连续梁桥 | |
CN103541305B (zh) | 一种带整体化铺装层的空心板桥构造的施工方法 | |
CN106988200A (zh) | 纵向不抗剪开孔钢板抗拔连接件及其施工方法 | |
CN109518858A (zh) | 装配式梁板连接结构及其施工方法 | |
CN102561169A (zh) | 一种空心板桥及其建造方法 | |
CN104264594A (zh) | 一种用于提高psc连续箱梁桥承载力的自平衡系杆拱体系及运用其加固的方法 | |
CN107090908B (zh) | 一种竖向预制构件节点连接方法 | |
CN108104284A (zh) | 剪力墙钢臂嵌入楼板的墙板连接结构及装配方法 | |
CN203065951U (zh) | 预制空心板梁的连接构造 | |
CN207660132U (zh) | 一种剪力墙外伸钢臂嵌入楼板端部的墙板连接结构 | |
CN203890868U (zh) | 铰缝有相对凹槽的空心板桥 | |
CN204491412U (zh) | 一种新型空心板铰缝结构 | |
CN103205930A (zh) | 一种既有简支空心板梁桥连续化改造的结构及其施工方法 | |
CN105088933B (zh) | 铰缝倾斜的空心板桥及其建造方法 | |
CN104074131B (zh) | 一种装配式倒t形板桥构造及其施工方法 | |
CN206205236U (zh) | 一种预应力钢筋桁架空心叠合板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wei Jiandong Inventor after: Zhao Yicheng Inventor after: Hou Shijie Inventor after: Gong Yading Inventor after: Zhang Angang Inventor after: Gao Minfu Inventor after: Li Yanke Inventor after: Shi Guangfeng Inventor after: Zhang Yabin Inventor after: Jin Junbao Inventor after: Ren Zhihao Inventor after: Wang Xiaoyang Inventor after: Liu Dexin Inventor before: Wei Jiandong Inventor before: Liu Zhongyu Inventor before: Wang Li |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 Termination date: 20210508 |
|