CN105064372B - 一种基坑回填砂震动密实方法 - Google Patents

一种基坑回填砂震动密实方法 Download PDF

Info

Publication number
CN105064372B
CN105064372B CN201510484424.4A CN201510484424A CN105064372B CN 105064372 B CN105064372 B CN 105064372B CN 201510484424 A CN201510484424 A CN 201510484424A CN 105064372 B CN105064372 B CN 105064372B
Authority
CN
China
Prior art keywords
sand
filling
cast
steel sheet
situ piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510484424.4A
Other languages
English (en)
Other versions
CN105064372A (zh
Inventor
殷良君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510484424.4A priority Critical patent/CN105064372B/zh
Publication of CN105064372A publication Critical patent/CN105064372A/zh
Application granted granted Critical
Publication of CN105064372B publication Critical patent/CN105064372B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种基坑回填砂震动密实方法,包括以下步骤:1)打钢板桩;2)通过围檩和支撑杆对一对钢板桩之间进行支撑;3)开挖基坑;4)管廊结构施工放置在基坑中;5)管廊两侧以及顶部进行一次回填砂;6)向基坑内的回填砂灌水初步密实;7)拆除围檩和支撑杆;8)采用振动锤夹持钢板桩,振动拔除钢板桩,利用拔桩振动力密实回填砂;9)一次检测回填砂密实度;10)表土回填,完工。利用机械密实替代人力夯实,避免了在较差环境下的人工作业,改善工作环境;一次回填砂,减少了工序多次转换,加快了施工进度,省去分层检测,降低了成本。

Description

一种基坑回填砂震动密实方法
技术领域
本发明涉及建筑施工技术领域,尤其是涉及一种基坑回填砂震动密实方法。
背景技术
现有的基坑回填砂密实通常采用分层夯实法,分层夯实法存在以下不足:1、由于综合管廊与钢板桩基坑壁的间距仅1米左右,采用传统的人工手扶跳夯,作业空间狭窄,容易发生碰伤等安全事故,作业环境潮湿,人工作业质量难以控制;2、采用传统的人工夯实能量小,分层平整夯实,分层检测,检测合格后,才能填上层砂,工序转换多,效率低下;3、一般填砂分层大于20层,分层进行检测,检测费用较高;4、通过人工夯实方法分层分次密实和检测密实度,下道工序拔桩,拔出桩会带出泥,回填砂受震动液化重新排列组合,将重新密实,密实度随之改变,并且检测密实度并不是最终状态的密实度,检测失去应有的意义。
发明内容
本发明所要解决的技术问题是提供一种基坑回填砂震动密实方法,以达到提高填砂密实施工效率和质量的目的。
为了解决上述技术问题,本发明所采用的技术方案为:
一种基坑回填砂震动密实方法,包括以下步骤:
1)打钢板桩;
2)通过围檩和支撑杆对一对钢板桩之间进行支撑;
3)开挖基坑;
4)管廊结构施工放置在基坑中;
5)管廊两侧以及顶部进行一次回填砂;
6)向基坑内的回填砂灌水初步密实;
7)拆除围檩和支撑杆;
8)采用振动锤夹持钢板桩,振动拔除钢板桩,利用拔桩振动力密实回填砂;
9)一次检测回填砂密实度;
10)表土回填,完工。
进一步的,所述步骤4)与步骤5)之间对管廊结构进行防水处理。
所述步骤6)中,灌水达到饱和状态,以回填砂表面存有水为准。
所述步骤8)中,振动锤夹持钢板桩,振动使达到钢板桩共振。
所述钢板桩的高度大于回填砂的厚度。
所述回填砂为中粗砂,并且中粗砂含泥量小于3%。
本发明与现有技术相比,具有以下优点:
1、利用机械密实替代人力夯实,避免了在较差环境下的人工作业,改善工作环境;
2、一次回填砂,减少了工序多次转换,加快了施工进度,省去分层检测,降低了成本;
3、采用振动锤机械密实,回填砂密实均匀,质量可控;
4、采用振动拔除钢板桩的振动力密实回填砂,一举多得;振动半径大,多次重迭振实,不会漏工,密实质量均匀可靠。
附图说明
下面对本说明书各幅附图所表达的内容及图中的标记作简要说明:
图1为发明钢板桩基坑及管廊回填断面示意图。
图2为发明钢板桩基坑及管廊回填平面示意图。
图中:1.钢板桩、2.围檩、3.支撑杆、4.管廊、5.回填砂。
具体实施方式
通过对实施例的描述,对本发明的具体实施方式作进一步详细的说明,以帮助本领域的技术人员对本发明的发明构思、技术方案有更完整、准确和深入的理解。
如图1和2所示,该基坑回填砂震动密实方法,包括以下步骤:打一对钢板桩1→通过围檩2和支撑杆3对一对钢板桩之间进行支撑→开挖基坑→管廊4结构施工放置在基坑中→对管廊结构进行防水处理→管廊两侧以及顶部进行一次回填砂5→向基坑内的回填砂灌水初步密实→拆除围檩和支撑杆→采用振动锤夹持钢板桩,振动拔除钢板桩,利用拔桩振动力密实回填砂→一次检测回填砂密实度→表土回填,完工。
其中,向基坑内的回填砂5灌水要达到饱和条件,以达到砂表面存有水为标准;初步灌水饱和密实:为减少拆除围檩2、支撑杆3后的钢板桩1回复变形,减轻基坑外土体沉降。
振动锤夹持钢板桩振动拔桩,通过其拔桩振动力足够可以密实中粗砂;由于拔桩的大功率振动锤夹持钢板桩1共振,在饱和状态条件下,使桩周土体振动液化,砂体颗粒重新排列组合,从而达到密实。
钢板桩1的高度≥12m远大于回填砂的厚度,拔桩时的大功率(>90KW)振动锤有感振动达5m以上,长时间(>10min)振动,促使回填砂振动密实。回填砂为中粗砂,并且中粗砂含泥量小于3%。
管廊主体结构施工完成后,在两侧和顶部回填中粗砂,其中,位于机动车道区域压实度95%,位于其他区域压实度90%,钢板桩与管廊结构的间距为1米,管廊高度3.5米,按照常规做法,必须在这狭窄的空间进行分层夯实作业,分层压实度检测试验。本发明利用回填砂后面的工序,振动锤拔桩工序,巧妙利用其大功率的振动力密实中粗砂,减少了工序多次转换,加快了施工进度,省去分层检测,降低了成本。
上面结合附图对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种非实质性的改进,或未经改进将本发明的构思和技术方案直接应用于其它场合的,均在本发明的保护范围之内。

Claims (4)

1.一种基坑回填砂震动密实方法,其特征在于:所述密实方法包括以下步骤:
1)打钢板桩;
2)通过围檩和支撑杆对一对钢板桩之间进行支撑;
3)开挖基坑;
4)管廊结构施工放置在基坑中;
5)管廊两侧以及顶部进行一次回填砂;
6)向基坑内的回填砂灌水初步密实;
7)拆除围檩和支撑杆;
8)采用振动锤夹持钢板桩,振动拔除钢板桩,利用拔桩振动力密实回填砂;
9)一次检测回填砂密实度;
10)表土回填,完工;
其中,
所述步骤4)与步骤5)之间对管廊结构进行防水处理;
所述步骤6)中,灌水达到饱和状态,以回填砂表面存有水为准。
2.如权利要求1所述的基坑回填砂震动密实方法,其特征在于:所述步骤8)中,振动锤夹持钢板桩,振动使达到钢板桩共振。
3.如权利要求1所述的基坑回填砂震动密实方法,其特征在于:所述钢板桩的高度大于回填砂的厚度。
4.如权利要求1所述的基坑回填砂震动密实方法,其特征在于:所述回填砂为中粗砂,并且中粗砂含泥量小于3%。
CN201510484424.4A 2015-08-04 2015-08-04 一种基坑回填砂震动密实方法 Active CN105064372B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510484424.4A CN105064372B (zh) 2015-08-04 2015-08-04 一种基坑回填砂震动密实方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510484424.4A CN105064372B (zh) 2015-08-04 2015-08-04 一种基坑回填砂震动密实方法

Publications (2)

Publication Number Publication Date
CN105064372A CN105064372A (zh) 2015-11-18
CN105064372B true CN105064372B (zh) 2017-06-23

Family

ID=54493859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510484424.4A Active CN105064372B (zh) 2015-08-04 2015-08-04 一种基坑回填砂震动密实方法

Country Status (1)

Country Link
CN (1) CN105064372B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887945B (zh) * 2016-06-03 2018-06-15 天津大学 一种振动拔桩试验装置
CN106592608A (zh) * 2016-12-21 2017-04-26 东南大学 一种地下综合管廊新地基与老路基差异沉降控制方法
CN106884433A (zh) * 2017-03-02 2017-06-23 中交二航局第四工程有限公司 控制震动拔桩导致地下构筑物沉陷的结构及控制沉陷方法
CN108049416A (zh) * 2017-11-28 2018-05-18 中铁四局集团第四工程有限公司 一种地下综合管廊基坑回填砂压实的施工方法
CN109372013B (zh) * 2018-10-25 2021-06-04 南京吉欧地下空间科技有限公司 一种回填eps混合土的软弱地基上综合管廊及施工方法
CN110331729A (zh) * 2019-07-09 2019-10-15 深圳市市政工程总公司 基坑管沟的振动水密回填方法
CN110886317B (zh) * 2019-12-10 2020-10-02 中国十七冶集团有限公司 一种城市综合管廊钢板桩支护结构基槽土方回填施工方法
CN111236250A (zh) * 2020-01-17 2020-06-05 中铁第六勘察设计院集团有限公司 一种沉管隧道岸上段接头处基坑支撑的快速拆除方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1434096A (en) * 1972-05-31 1976-04-28 Rollmaplast Ag Method of placing buried plastic pipes
CN101787690A (zh) * 2010-03-08 2010-07-28 东南大学 共振法加固液化地基的操作方法
CN203066055U (zh) * 2013-01-30 2013-07-17 高远 一种宕渣土振动密实装置
CN103352456A (zh) * 2013-07-22 2013-10-16 中国化学工程第一岩土工程有限公司 一种干砂预密振动地基加固方法
CN103953067A (zh) * 2014-04-14 2014-07-30 上海市政工程设计研究总院(集团)有限公司 基坑围护与地下箱型主体结构一体化结构及其建造方法
JP2014145157A (ja) * 2013-01-28 2014-08-14 Penta Ocean Construction Co Ltd 砂層の振動締固め工法およびその管理方法
CN104234056A (zh) * 2014-09-15 2014-12-24 上海市政工程设计研究总院(集团)有限公司 用于防止高水位液化地区地下综合管廊变形的施工方法
CN104674847A (zh) * 2015-03-05 2015-06-03 东北大学 一种新型装配式预制混凝土城市综合管廊及其施工方法
CN104790373A (zh) * 2015-05-06 2015-07-22 中化岩土工程股份有限公司 沉管激振密实法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1434096A (en) * 1972-05-31 1976-04-28 Rollmaplast Ag Method of placing buried plastic pipes
CN101787690A (zh) * 2010-03-08 2010-07-28 东南大学 共振法加固液化地基的操作方法
JP2014145157A (ja) * 2013-01-28 2014-08-14 Penta Ocean Construction Co Ltd 砂層の振動締固め工法およびその管理方法
CN203066055U (zh) * 2013-01-30 2013-07-17 高远 一种宕渣土振动密实装置
CN103352456A (zh) * 2013-07-22 2013-10-16 中国化学工程第一岩土工程有限公司 一种干砂预密振动地基加固方法
CN103953067A (zh) * 2014-04-14 2014-07-30 上海市政工程设计研究总院(集团)有限公司 基坑围护与地下箱型主体结构一体化结构及其建造方法
CN104234056A (zh) * 2014-09-15 2014-12-24 上海市政工程设计研究总院(集团)有限公司 用于防止高水位液化地区地下综合管廊变形的施工方法
CN104674847A (zh) * 2015-03-05 2015-06-03 东北大学 一种新型装配式预制混凝土城市综合管廊及其施工方法
CN104790373A (zh) * 2015-05-06 2015-07-22 中化岩土工程股份有限公司 沉管激振密实法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《拉森钢板桩支护在市政管线深槽施工中的应用》;付洪岭;《市政技术》;20120531;第30卷(第S1期);第92-94,接132页 *
《浅谈拉森板桩支护设计及施工实践》;梅君;《市政技术》;20100131;第28卷(第1期);第119-123页 *

Also Published As

Publication number Publication date
CN105064372A (zh) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105064372B (zh) 一种基坑回填砂震动密实方法
CN101016740B (zh) 多重增压快速固结密实软土地基处理方法
CN102011391B (zh) 一种软弱地基的加固处理方法
CN101130952A (zh) 一种无密封快速真空预压强夯法
CN105804007B (zh) 一种基于滩涂软基的加筋土岸墙结构
CN102660936A (zh) 一种用聚氯乙烯膜进行坝墙防渗的方法
CN102251512A (zh) 振动碾压与强夯联合压实黄土高填方体的施工方法
CN103061328A (zh) 一种带砂墙翼板的后注浆碎石桩及施工方法
CN110761264A (zh) 一种滨海淤泥软土地基二次强夯碎石置换加固方法
CN109680671A (zh) 一种基于建筑垃圾的液化地基处理方法
CN202881926U (zh) 破碎锤式打夯装置
CN103215950B (zh) 回填区桩基接长施工方法
CN108277794B (zh) 一种吹填软土地基真空动力固结复合排水系统
CN207659986U (zh) 一种建筑物或构筑物地基加固托换墩
CN110144872B (zh) 水平动力固结排水装置及施工方法
CN102966109A (zh) 软土地基带状深基坑封底施工方法
CN101285302A (zh) 一种混凝土大坝沉箱加固方法
CN211057836U (zh) 一种承台基础回填结构
CN115198806A (zh) 地下墙体后浇带模板加固及安装施工方法
CN204982857U (zh) 低位负压立体多通道排水组合夯实装置
CN102635044A (zh) 一种强夯对路床挖方路基的处理方法
CN220202700U (zh) 基础临边平台均匀沉降的集成装置
CN103195077A (zh) 一种坝基加固框架结构和坝基加固方法
CN109205984B (zh) 一种高含水工程污泥快速资源化方法与装置
CN203129163U (zh) 一种坝基加固框架结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant