CN1050421A - 灌注-预制复合桩的成桩方法 - Google Patents

灌注-预制复合桩的成桩方法 Download PDF

Info

Publication number
CN1050421A
CN1050421A CN 90108927 CN90108927A CN1050421A CN 1050421 A CN1050421 A CN 1050421A CN 90108927 CN90108927 CN 90108927 CN 90108927 A CN90108927 A CN 90108927A CN 1050421 A CN1050421 A CN 1050421A
Authority
CN
China
Prior art keywords
pile
center
perfusion
piling method
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 90108927
Other languages
English (en)
Inventor
张祖闻
陈维玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Department Of Scientific Research And Design Chinese Architecture Scienc
Original Assignee
Zhuhai Department Of Scientific Research And Design Chinese Architecture Scienc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Department Of Scientific Research And Design Chinese Architecture Scienc filed Critical Zhuhai Department Of Scientific Research And Design Chinese Architecture Scienc
Priority to CN 90108927 priority Critical patent/CN1050421A/zh
Publication of CN1050421A publication Critical patent/CN1050421A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种灌注-预制复合桩的成桩方法,是先用钢管 将预制桩尖打入土中,直达设计标高,灌注混凝土,然 后拔出钢管,形成沉管灌注桩,其特征是在灌注的混 凝土初凝前,在中心打入一根预制桩芯,开挖基坑后, 从预制桩上焊出连接钢筋。这种成桩方法避免了断 桩和缩颈事故,即使灌注桩某处意外地断开,预制桩 芯仍能传递设计荷载。

Description

本发明属于一种建筑物基础工程中桩的成桩方法。
在软土地基的建筑基础中,应用最广泛的是沉管灌注桩。但其最大的问题是成桩质量不能保证,约有10~20%的桩达不到要求,特别是在软土层或近地面的填土层中容易发生断桩、缩颈。迫使设计人员把单桩承载力定得偏低,以确保工程安全,这无疑造成很大浪费。即使这样,全部工程桩报废的情况时有所闻,部分补桩、加固处理的问题常有发生。这不仅增加了工程费用,还延误了工期。因此,提高成桩质量是一个迫切需要解决的问题。
为了确保成桩质量,最常用的方法是复打。复打把桩截面扩大一倍后,可以消除大部分断桩问题。但同时产生的问题是桩基工程费用大幅度增加,每立方米桩基混凝土提供的承载能力很低,很不经济。
近年来,国外发展了多种形式的成桩技术,其中有一种复合桩,是用预制桩身将较大的桩尖打入土中,再在预制桩身与土之间的空隙注入砂浆填满。这种方法的缺陷在于:预制桩身需有较大承受打桩动载的能力,配筋要加强;注入砂浆层难以密实,缺少对孔壁的支护能力。
本发明的目的是提供一种新的灌注-预制复合桩的成桩方法,在沉管灌注桩施工中,拔出钢管,打入预制桩芯,以挤密混凝土,提高桩土之间挤压力和桩侧摩擦阻力。
本发明的灌注-预制复合桩的成桩方法有以下几个步骤:(1)用钢管将预制桩尖打入土中,直达设计标高;(2)灌注混凝土,并拔出钢管,形成沉管灌注桩;其特征在于:(3)在灌注的混凝土初凝前,在中心打入一根预制桩芯;(4)开挖基坑后,从预制桩上焊出连接钢筋。
本发明具有如下优点:
打入的预制桩芯对灌入的混凝土起振捣作用,使混凝土和桩土之间严紧密实,增加了桩的摩擦阻力,避免了断桩和缩颈事故,即使灌注桩某处意外地完全断开,预制桩芯仍能传递荷载,因此保证了成桩质量,大幅度地提高了单桩设计承载能力。
由于本发明的预制桩芯不是直接打入地基土层中,而是打入尚未初凝的混凝土中,用不大的锤击或振动就可将预制桩芯贯入。因此,桩芯不需要配较多的钢筋以抵抗通常打桩时的冲击应力与拉力波,配筋只考虑桩在起吊运输时的自重应力就行了。由于灌注的混凝土中不再配筋,只在预制桩中配筋,使总用钢量减少。另外,预制桩芯的混凝土用料比复打灌注桩的用料省很多,虽然增加了制作费用,但成桩质量好,可靠性增加,单桩承载力大大提高,使综合经济效益提高。
下面结合实施例及附图对该发明作进一步介绍:
附图是本灌注-预制复合桩的成桩方法步骤:
(1)和(2)个步骤是按通常沉管灌注桩的工艺施工;(1)用桩管将桩尖1打入到预定深度;(2)灌注混凝土,并拔出钢管,形成灌注桩2;(3)打入预制桩芯3,并送桩芯到基底标高(设计时,预制桩芯长度视地质情况而定);(4)开挖基坑后,从预制桩上焊出连接钢筋4。
图中原沉管灌注桩设计直径φ480毫米,从地面起L=15米;中心打入的预制桩芯断面为200×200毫米,L=12米,通常配4φ16钢筋。

Claims (1)

1、一种灌注一预制复合桩的成桩方法有以下工序:
(1)用钢管将预制桩尖打入土中,直达设计标高;
(2)灌注混凝土,并拔出钢管,形成沉管灌注桩;
其特征在于:
(3)在灌注的混凝土初凝前,在中心打入一根预制桩芯;
(4)开挖基坑后,从预制桩上焊出连接钢筋。
CN 90108927 1990-11-12 1990-11-12 灌注-预制复合桩的成桩方法 Pending CN1050421A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90108927 CN1050421A (zh) 1990-11-12 1990-11-12 灌注-预制复合桩的成桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90108927 CN1050421A (zh) 1990-11-12 1990-11-12 灌注-预制复合桩的成桩方法

Publications (1)

Publication Number Publication Date
CN1050421A true CN1050421A (zh) 1991-04-03

Family

ID=4881204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90108927 Pending CN1050421A (zh) 1990-11-12 1990-11-12 灌注-预制复合桩的成桩方法

Country Status (1)

Country Link
CN (1) CN1050421A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320214C (zh) * 2004-12-29 2007-06-06 雷玉华 长螺旋压灌混凝土插芯组合桩及其施工方法
CN100363563C (zh) * 2005-02-05 2008-01-23 王常青 钻孔预制复合桩的方法
CN100507161C (zh) * 2006-04-28 2009-07-01 饶之帆 混凝土长芯水泥土复合桩建筑地基处理方法
CN102518125A (zh) * 2011-12-29 2012-06-27 福建永强岩土工程有限公司 全套管插芯灌注桩施工方法
CN102704468A (zh) * 2012-06-11 2012-10-03 宫能和 沉管加灌注桩的施工方法
CN103590393A (zh) * 2013-11-21 2014-02-19 朱建新 复合桩的施工方法
CN104074183A (zh) * 2014-07-03 2014-10-01 国鼎(南通)管桩有限公司 一种钻孔及根部注入砼的组合桩植桩结构及施工方法
CN106480877A (zh) * 2015-08-28 2017-03-08 毕建东 沉管压灌复合桩的成桩方法
CN108797585A (zh) * 2018-05-23 2018-11-13 毕建宏 沉管植桩的方法和装置及其使用方法
CN112921958A (zh) * 2021-01-29 2021-06-08 徐州八方建筑工程有限公司 高压旋喷引孔静压桩施工方法
CN114482034A (zh) * 2022-02-15 2022-05-13 赵坤 一种耐腐蚀的预应力混凝土管桩
CN115506341A (zh) * 2022-10-28 2022-12-23 千易建设集团有限公司 水泥土复合桩及施工设备

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320214C (zh) * 2004-12-29 2007-06-06 雷玉华 长螺旋压灌混凝土插芯组合桩及其施工方法
CN100363563C (zh) * 2005-02-05 2008-01-23 王常青 钻孔预制复合桩的方法
CN100507161C (zh) * 2006-04-28 2009-07-01 饶之帆 混凝土长芯水泥土复合桩建筑地基处理方法
CN102518125A (zh) * 2011-12-29 2012-06-27 福建永强岩土工程有限公司 全套管插芯灌注桩施工方法
CN102704468B (zh) * 2012-06-11 2015-05-20 宫能和 沉管加灌注桩的施工方法
CN102704468A (zh) * 2012-06-11 2012-10-03 宫能和 沉管加灌注桩的施工方法
CN103590393A (zh) * 2013-11-21 2014-02-19 朱建新 复合桩的施工方法
CN104074183A (zh) * 2014-07-03 2014-10-01 国鼎(南通)管桩有限公司 一种钻孔及根部注入砼的组合桩植桩结构及施工方法
CN106480877A (zh) * 2015-08-28 2017-03-08 毕建东 沉管压灌复合桩的成桩方法
CN108797585A (zh) * 2018-05-23 2018-11-13 毕建宏 沉管植桩的方法和装置及其使用方法
CN112921958A (zh) * 2021-01-29 2021-06-08 徐州八方建筑工程有限公司 高压旋喷引孔静压桩施工方法
CN114482034A (zh) * 2022-02-15 2022-05-13 赵坤 一种耐腐蚀的预应力混凝土管桩
CN115506341A (zh) * 2022-10-28 2022-12-23 千易建设集团有限公司 水泥土复合桩及施工设备

Similar Documents

Publication Publication Date Title
CN100577923C (zh) 一种预应力混凝土钢管叠合桩及其制作和施工方法
CN206784372U (zh) 注浆成型扩底桩
CN1050421A (zh) 灌注-预制复合桩的成桩方法
CN106996104A (zh) 注浆成型扩底桩及其施工方法
CN101936004A (zh) 一种预制挤扩桩及其施工方法与施工机械设备
CN209243732U (zh) 一种高效微型钢管桩施工结构
CN216839384U (zh) 一种预制混凝土桩的扩大端板
CN109056747A (zh) 一种高效微型钢管桩施工结构、方法
CN201762705U (zh) 一种预制挤扩桩
CN114525781A (zh) 预应力杆芯囊袋注浆组合抗浮构件及施工方法
CN208039240U (zh) 一种组合桩
CN2153578Y (zh) 高效地桩
CN111172971A (zh) 一种管内灌浆挤扩根固桩的施工方法
CN111395319A (zh) 一种全夯式二次挤土单头扩底桩的施工方法
CN103835290A (zh) 一种适用于海相软土的桩基础构造及其设计方法
CN214738005U (zh) 一种长螺旋喷射扩大头桩
CN218405392U (zh) 基于承载力提升的混凝土桩构造
CN217027074U (zh) 一种全长黏结预应力锚杆
CN217500224U (zh) 提高桩基承载力的注浆装置
CN219060055U (zh) 一种用于预制实心桩的桩端联合挤密注浆系统
CN114457833B (zh) 一种在珊瑚砂上可强化的桩基结构及方法
CN1048781C (zh) 一种灌注桩的强化施工工艺
CN217556914U (zh) 一种预应力桩加载装置
CN201809766U (zh) 预应力混凝土管桩锚筋与端板的连接节点
CN213476947U (zh) 一种基岩地质的新型杯口基础结构

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication