CN106480877A CN201510534540.2A CN201510534540A CN106480877A CN 106480877 A CN106480877 A CN 106480877A CN 201510534540 A CN201510534540 A CN 201510534540A CN 106480877 A CN106480877 A CN 106480877A
Authority
CN
China
Prior art keywords
pile
pipe
stake
making method
fluidised form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510534540.2A
Other languages
English (en)
Inventor
毕建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510534540.2A priority Critical patent/CN106480877A/zh
Publication of CN106480877A publication Critical patent/CN106480877A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明提供了沉管压灌复合桩的成桩方法,是用内击或静压方式下沉桩管成孔、泵送流态胶结料后插入预制桩成桩,其桩端、桩侧的承载力均较高、穿透能力较强、操作较简单、不堵管、工效较高、节约材料、对桩机的拔管能力要求较低,具有较好的技术、经济和社会效益。

Description

沉管压灌复合桩的成桩方法
技术领域
本发明涉及沉管压灌复合桩的成桩方法,属于桩基础施工技术领域。
背景技术
灌注与预制结合而成的复合桩,与单一的灌注桩或预制桩相比,有其独特的优势:与灌注桩相比,没有缩颈、夹泥、断桩等质量问题;与预制桩相比,桩身无损伤,质量好。因此,复合桩的市场占有率越来越高,但也存在着桩端承载力较低等问题。
如申请号为200510009711.6的“钻孔预制复合桩”专利提供的成桩方法,是用长螺旋钻孔、泵送水泥浆同时提钻、插入预制带肋混凝土桩成桩,除了桩端承载力较低外,这种桩的水泥浆浪费较大。
申请号为201110172486.3的“沉管灌注桩全过程施工方法及其专用装置”、申请号为201110394473.0的“沉管压灌桩全过程施工用组合桩管及其使用方法”和申请号为201210531962.0的“沉管压灌桩的做桩方法和专用装置及应用”等专利提供的沉管压灌桩的成桩方法,是用内击或静压桩管成孔、压灌混凝土后插入钢筋笼成桩,桩端承载力较高,一般要用高强混凝土,操作难度较大、易堵管、工效较低、浪费较大,还由于拔管力较大,对桩机的拔管要求也较高。
发明内容
为解决上述问题,本发明提供了沉管压灌复合桩的成桩方法,基本思路是借鉴沉管压灌桩的成桩方法,改泵送混凝土为泵送流态胶结料,然后插入预制桩。
其优选施工步骤如下:
1. 将内击或静压沉管压灌桩使用的桩管,对位压在桩点位置的垫板或桩尖上;
2. 内击或静压桩管到位后,通过桩管上的灌注管向桩孔压力泵送流态胶结料,同时用泵送压力上顶桩管,必要时用桩机配合拔管;
3. 顶管及拔管到位后,将预制桩插入桩孔流态胶结料中,同时,可用置于桩孔与预制桩间的胶管回收多余的流态胶结料,成桩。
桩管可不设排气。
流态胶结料可用水泥浆、水泥砂浆或细石混凝土等。
有益效果
本发明提供的沉管压灌复合桩的成桩方法,用内击或静压方式下沉桩管,具有沉管压灌桩的桩端承载力较高、穿透能力较强等优点;压力泵送流态胶结料,挤压桩周土或向桩周土渗透,可提供较高的桩侧承载力,解决压灌高强混凝土操作难度较大、易堵管、工效较低等问题;回收流态胶结料,可节省材料、降低成本;利用泵送流态胶结料的压力上顶桩管,可降低拔管力,降低对桩机的拔管要求——实施例中,泵送水泥浆后的拔管力约150吨,如果是现有沉管压灌桩,泵送混凝土时的拔管力超过300吨,高出一倍以上。
具体实施方式中的桩,如果用钻孔预制复合桩,一方面其桩端承载力低得多,另一方面,由于桩孔顺钻杆的螺旋叶片方向向上是开口的,所以,泵送水泥浆的压力也不高,水泥浆对桩周土的挤压、渗透效果也差很多,要达到相同承载力,桩长就要长,超过20m,较本发明提供的沉管压灌复合桩多用66%,水泥浆多用、浪费超过40%,特别是要用长螺旋钻在中风化泥岩中成孔深度近9m,设备能力要求很高、难度很大、成本很高、工期很长。
因此,本发明提供的沉管压灌复合桩的成桩方法,具有较好的技术、经济和社会效益。
具体实施方式
场地土自上而下的土层情况:约1m厚的杂填土,约2m厚软塑-可塑状态的粉质粘土,约5m厚稍密、中密至密实状态的细砂、中砂,约1m厚的全风化泥岩,约2m厚的强风化泥岩,以下为中风化泥岩。
内击方式沉管,桩管的主管为直径580mm的无缝钢管,灌注管、护管为直径70mm的无缝钢管,内锤重10吨;流态胶结料用C20水泥浆,预制桩为直径500mm 的SC桩,桩长12m,持力层为中风化泥岩,设计要求桩的极限承载力不低于1100吨。
施工步骤及情况如下:
1. 桩管对位压在桩点位置的垫板上;
2. 内击沉管,落距0.5-2.5m,最后10击贯入度不超过20mm时停锤,沉管深度约12m;
3. 以桩管底端最大压力5MPa泵送水泥浆,顶管及拔管至地面后,插入SC桩;同时用一根直径50mm的胶管,泵吸回收多余的水泥浆,结束。
桩机最大拔管力约200吨。
经检测,桩的极限承载力为1200吨,满足要求。

Claims (1)

1.沉管压灌复合桩的成桩方法,其优选施工步骤如下:
1.1 将内击或静压沉管压灌桩使用的桩管,对位压在桩点位置的垫板或桩尖上;
1.2 内击或静压桩管到位后,通过桩管上的灌注管向桩孔压力泵送流态胶结料,同时用泵送压力上顶桩管,必要时用桩机配合拔管;
1.3 顶管及拔管到位后,将预制桩插入桩孔流态胶结料中,同时,可用置于桩孔与预制桩间的胶管回收多余的流态胶结料,成桩。
CN201510534540.2A 2015-08-28 2015-08-28 沉管压灌复合桩的成桩方法 Pending CN106480877A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510534540.2A CN106480877A (zh) 2015-08-28 2015-08-28 沉管压灌复合桩的成桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510534540.2A CN106480877A (zh) 2015-08-28 2015-08-28 沉管压灌复合桩的成桩方法

Publications (1)

Publication Number Publication Date
CN106480877A true CN106480877A (zh) 2017-03-08

Family

ID=58234219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510534540.2A Pending CN106480877A (zh) 2015-08-28 2015-08-28 沉管压灌复合桩的成桩方法

Country Status (1)

Country Link
CN (1) CN106480877A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612094A (zh) * 2018-04-27 2018-10-02 毕建东 沉管植桩的方法
CN108797585A (zh) * 2018-05-23 2018-11-13 毕建宏 沉管植桩的方法和装置及其使用方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (zh) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 灌注-预制复合桩的成桩方法
CN1414186A (zh) * 2002-05-10 2003-04-30 贾燎 套桩的成桩及设计方法
CN101298772A (zh) * 2008-07-02 2008-11-05 齐庆国 静压沉管扩底混凝土桩的施工方法
CN103161155A (zh) * 2011-12-19 2013-06-19 毕建东 沉管压灌桩专用桩机及其使用方法和应用
CN104404947A (zh) * 2014-11-20 2015-03-11 张红 一种复合桩的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (zh) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 灌注-预制复合桩的成桩方法
CN1414186A (zh) * 2002-05-10 2003-04-30 贾燎 套桩的成桩及设计方法
CN101298772A (zh) * 2008-07-02 2008-11-05 齐庆国 静压沉管扩底混凝土桩的施工方法
CN103161155A (zh) * 2011-12-19 2013-06-19 毕建东 沉管压灌桩专用桩机及其使用方法和应用
CN104404947A (zh) * 2014-11-20 2015-03-11 张红 一种复合桩的施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612094A (zh) * 2018-04-27 2018-10-02 毕建东 沉管植桩的方法
CN108797585A (zh) * 2018-05-23 2018-11-13 毕建宏 沉管植桩的方法和装置及其使用方法

Similar Documents

Publication Publication Date Title
CN105780763B (zh) 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法
CN103184734B (zh) 一种植入注浆组合桩的施工方法
CN204112308U (zh) 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置
CN102011399B (zh) 一种基于phc桩的多重高喷扩底桩施工方法
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN105714773A (zh) 一种地基处理方法
CN100532733C (zh) 在卵石层、砂层中施工的沉管灌注桩施工方法
CN104005404A (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN105672307A (zh) 一种扩底组合端承桩基础
CN203213101U (zh) 一种植入注浆组合桩
CN105297710A (zh) 一种高喷水泥土螺旋钻挤、扩孔钢筋混凝土灌注组合桩及制作方法
CN105507336A (zh) 一种利用降水井形成复合地基的方法
CN108842761A (zh) 钻孔导引预制桩后压浆技术
CN106480877A (zh) 沉管压灌复合桩的成桩方法
CN104005416A (zh) 一种用于高陡边坡素填土反压条件下大直径孔桩塌孔的处理方法
CN106120714A (zh) 一种提高空心桩承载力的装置及其使用方法
CN205188933U (zh) 一种利用降水井形成的复合地基
CN205501998U (zh) 一种扩底组合端承桩基础
CN102031778B (zh) 用于季节性冻土地区的螺旋桩
CN205100208U (zh) 一种高喷水泥土螺旋钻挤、扩孔钢筋混凝土灌注桩组合桩
CN108049804A (zh) 松散地层非开挖原位换填螺旋钻进方法
RU129522U1 (ru) Инъекционная свая для слабых глинистых грунтов
CN106939596A (zh) 一种现浇竹节型泥浆护壁灌注桩
CN102409668A (zh) 钻孔灌注桩及其膨胀挤密施工方法
CN102979088A (zh) 一种地基处理用的罐桩及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170308