CN105040995A - 埋件快速调平安装装置 - Google Patents
埋件快速调平安装装置 Download PDFInfo
- Publication number
- CN105040995A CN105040995A CN201510396426.8A CN201510396426A CN105040995A CN 105040995 A CN105040995 A CN 105040995A CN 201510396426 A CN201510396426 A CN 201510396426A CN 105040995 A CN105040995 A CN 105040995A
- Authority
- CN
- China
- Prior art keywords
- supporting
- adjusting sleeve
- elevation
- levelling
- embedded parts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Revetment (AREA)
- Foundations (AREA)
Abstract
埋件快速调平安装装置,包括若干个用于支撑支托杆的调平机构,调平机构由支撑固定管、调向活套、固定底座、丝杆、标高和水准调节套管、水平支托环组成;固定底座固定于支撑固定管之上;调向活套置于支撑固定管上固定底座的上部,且可沿支撑固定管自由转动;调向活套的侧面与丝杆固接,标高和水准调节套管通过置于其内壁的螺纹套设于丝杆之上,用于支撑支托杆的水平支托环固接于标高和水准调节套管之上。本发明的埋件快速调平安装装置,提高了埋件安装质量和安装效率,降低了施工成本,降低了对作业人员的技能要求,改善了作业环境,节能降耗,符合绿色施工要求。
Description
技术领域
本发明涉及钢筋中埋件的安装方式改进技术领域,具体是涉及一种埋件快速调平安装装置。
背景技术
目前,埋件人员主要靠人工在混凝土结构中钢筋骨架中安装,通过人工敲打,撬杠,焊接等,效率不高,施工精准度不高。
发明内容
针对现有技术中存在的技术问题,本发明的目的在于提供一种可实现快速调平标高调整的埋件快速调平安装装置。
为了实现上述目的,本发明所采用的技术方案为:一种埋件快速调平安装装置,包括若干个用于支撑支托杆的调平机构,所述调平机构由支撑固定管、调向活套、固定底座、丝杆、标高和水准调节套管、水平支托环组成;固定底座固定于支撑固定管之上;调向活套置于支撑固定管上固定底座的上部,且可沿支撑固定管自由转动;调向活套的侧面与丝杆固接,标高和水准调节套管通过置于其内壁的螺纹套设于丝杆之上,用于支撑支托杆的水平支托环固接于标高和水准调节套管之上。
本发明的埋件快速调平安装装置,其有益效果表现在:
1)、本发明提供埋件快速调平和安装方案,通过三支或多点确定水准面,通过丝杆调整高度,实现轻便调整精准度。
2)、本发明的埋件快速调平安装装置,提高了埋件安装质量和安装效率,降低了施工成本,降低了对作业人员的技能要求,改善了作业环境,节能降耗,符合绿色施工要求。
3)、可利用快速调平和安装装置,实现快速调平标高调整,利用装置的固定实现埋件锚固筋与钢筋骨架的焊接固定,固定后,调节丝杆高度,实现快速拆卸装置。
附图说明
图1为本发明的埋件快速调平安装装置的结构示意图。
图2为调平机构的结构示意图。
具体实施方式
为进一步描述本发明的埋件快速调平安装装置,下面结合附图对其作进一步详细说明。
图1和2示出了一种埋件快速调平安装装置,包括3个呈三角形布置的用于支撑支托杆7的调平机构,所述调平机构由支撑固定管1、调向活套2、固定底座3、丝杆4、标高和水准调节套管5、水平支托环6组成;固定底座3固定于支撑固定管1之上;调向活套2置于支撑固定管1上固定底座3的上部,且可沿支撑固定管1自由转动;调向活套2的侧面与丝杆4固接,标高和水准调节套管5通过置于其内壁的螺纹套设于丝杆4之上,用于支撑支托杆7的水平支托环6固接于标高和水准调节套管5之上。
通过支撑固定管1套在纵向钢筋上,或支撑于平台上,在支撑固定管1上焊接固定底座3,固定底座3上套一个可转动360度的调向活套2,在调向活套2上焊接全长丝杆4,丝杆4上套以配套的标高和水准调节套管5,标高和水准调节套管5上焊接水平支托环6(水平支托环6上搁置支托杆7,支托杆7截面尺寸一致),通过调节丝杆4方向实现支托杆7放置(调向活套2沿支撑固定管1旋转,即可实现支托杆7放置),然后转动调节套管5以实现标高和水平度的快速调整,然后放置埋件,焊接固定到钢筋骨架上。安装完成后,降低调节套管5高度,取下支托杆7,再取下其余装置。
以上内容仅仅是对本发明的构思所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的构思或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。
Claims (1)
1.一种埋件快速调平安装装置,其特征在于:包括若干个用于支撑支托杆(7)的调平机构,所述调平机构由支撑固定管(1)、调向活套(2)、固定底座(3)、丝杆(4)、标高和水准调节套管(5)、水平支托环(6)组成;固定底座(3)固定于支撑固定管(1)之上;调向活套(2)置于支撑固定管(1)上固定底座(3)的上部,且可沿支撑固定管(1)自由转动;调向活套(2)的侧面与丝杆(4)固接,标高和水准调节套管(5)通过置于其内壁的螺纹套设于丝杆(4)之上,用于支撑支托杆(7)的水平支托环(6)固接于标高和水准调节套管(5)之上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510396426.8A CN105040995B (zh) | 2015-07-08 | 2015-07-08 | 埋件快速调平安装装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510396426.8A CN105040995B (zh) | 2015-07-08 | 2015-07-08 | 埋件快速调平安装装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105040995A true CN105040995A (zh) | 2015-11-11 |
CN105040995B CN105040995B (zh) | 2017-03-15 |
Family
ID=54447936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510396426.8A Active CN105040995B (zh) | 2015-07-08 | 2015-07-08 | 埋件快速调平安装装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105040995B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007186923A (ja) * | 2006-01-13 | 2007-07-26 | Kayaba System Machinery Kk | 建て入れ調整装置 |
CN202073323U (zh) * | 2011-05-25 | 2011-12-14 | 中冶建工集团有限公司 | 调整预埋件安装水平度的支撑架 |
CN203034818U (zh) * | 2013-01-21 | 2013-07-03 | 山西省电力公司送变电工程公司 | 可调式埋件安装专用卡具 |
CN204252284U (zh) * | 2014-11-21 | 2015-04-08 | 中冶天工集团有限公司 | 预埋件加固装置 |
-
2015
- 2015-07-08 CN CN201510396426.8A patent/CN105040995B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007186923A (ja) * | 2006-01-13 | 2007-07-26 | Kayaba System Machinery Kk | 建て入れ調整装置 |
CN202073323U (zh) * | 2011-05-25 | 2011-12-14 | 中冶建工集团有限公司 | 调整预埋件安装水平度的支撑架 |
CN203034818U (zh) * | 2013-01-21 | 2013-07-03 | 山西省电力公司送变电工程公司 | 可调式埋件安装专用卡具 |
CN204252284U (zh) * | 2014-11-21 | 2015-04-08 | 中冶天工集团有限公司 | 预埋件加固装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105040995B (zh) | 2017-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2011253650A1 (en) | Installing method for anchor cage and installing method for industrial equipment | |
CN103352476B (zh) | 大型螺栓高精度预埋施工方法 | |
CN105347245A (zh) | 一种蜗轮丝杠式风管安装提升装置 | |
JP2017031584A (ja) | 鉄筋支持具およびインバートコンクリート用鉄筋の設置方法 | |
CN105507612A (zh) | 一种高层建筑剪力墙混凝土置换用液压支撑方法 | |
CN105040995A (zh) | 埋件快速调平安装装置 | |
CN104033166B (zh) | 一种隧道衬砌台车的门架系统 | |
CN106193591A (zh) | 一种铝合金模板楼板支撑快速拆装机构 | |
CN206289864U (zh) | 群体短柱安装临时支撑装置 | |
JP6045741B1 (ja) | 太陽電池パネル施工方法 | |
CN105089262A (zh) | 一种全钢结构工具式脚手架 | |
CN210392523U (zh) | 输送机机头固定装置 | |
CN208633584U (zh) | 一种附墙式预制顶板安装支撑架体 | |
CN203867164U (zh) | 一种带有定位钢管的悬挑型脚手架结构 | |
CN202544394U (zh) | 早拆模板体系 | |
KR101393726B1 (ko) | 운반 및 설치가 가능한 시스템 서포트 | |
CN203071217U (zh) | 一种天线支架 | |
CN202745351U (zh) | 一种贝雷架支撑结构 | |
CN202571649U (zh) | 一种钢管组焊装置机架 | |
CN105089293A (zh) | 用于大型网架结构施工的支撑装置 | |
CN209277564U (zh) | 一种钢筋笼现场施工作业平台 | |
CN102628319A (zh) | 早拆模板体系 | |
CN204531468U (zh) | 一种用于大型网架结构施工的支撑装置 | |
CN214659244U (zh) | 一种套筒内法兰连接自立式烟囱 | |
CN218208128U (zh) | 一种管廊内给排水管道布设支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |