CN102628319A - 早拆模板体系 - Google Patents

早拆模板体系 Download PDF

Info

Publication number
CN102628319A
CN102628319A CN201210130024XA CN201210130024A CN102628319A CN 102628319 A CN102628319 A CN 102628319A CN 201210130024X A CN201210130024X A CN 201210130024XA CN 201210130024 A CN201210130024 A CN 201210130024A CN 102628319 A CN102628319 A CN 102628319A
Authority
CN
China
Prior art keywords
support
nut
early
vertical rod
formwork system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210130024XA
Other languages
English (en)
Inventor
孙兴香
苏源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd
Original Assignee
NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd filed Critical NANTONG HAIZHOU CONSTRUCTION GROUP CO Ltd
Priority to CN201210130024XA priority Critical patent/CN102628319A/zh
Publication of CN102628319A publication Critical patent/CN102628319A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

早拆模板体系,包括立杆支架及横杆支架,立杆支架包括调节支架及立杆,横杆支架安装于调节支架,调节支架可移动地安装于立杆。本发明早拆模板体系的调节支架可移动地安装于立杆,通过移动调节支架来调整立杆支架及横杆支架,方便施工。

Description

早拆模板体系
技术领域
本发明涉及一种建筑施工中使用的混凝土模板体系,尤其是楼板模板早拆体系。
背景技术
目前,建筑领域所采用的模板早拆体系主要由碗扣式脚手架、早拆柱头、可调节底座、主梁、次梁及模板搭设而成。碗扣式脚手架包括立杆、横杆、斜杆等多种构件。立杆顶端需安装早拆柱头,底端需安装调节底座,支撑高度的调节需通过调节底座和早拆柱头来进行,施工不方便。
发明内容
鉴于以上内容,有必要提供一种方便施工的早拆模板体系。
根据本发明的一个方面,提供的早拆模板体系,包括立杆支架及横杆支架,立杆支架包括调节支架及立杆,横杆支架安装于调节支架,调节支架可移动地安装于立杆。
在一些实施例中,调节支架包括螺杆及位置可调整地安装于螺杆的第一螺母,螺杆包括第一端及第一端相对的第二端,立杆设有收容孔,螺杆的第二端穿入收容孔,第一螺母抵顶立杆。
在一些实施例中,调节支架还包括位置可调整地安装于螺杆的第二螺母及套设于螺杆的槽钢支架,第一螺母及第二螺母位于槽钢支架的一侧,槽钢支架抵顶第二螺母,横杆支架固定于槽钢支架。
在一些实施例中,调节支架还包括用于设置第一木方的托架,槽钢支架位于第二螺母与托架之间。
在一些实施例中,托架包括固定于螺杆第一端以设置第一木方的钢板及用于固定第一木方的固定件。
在一些实施例中,固定件为铁钉,钢板设有通孔,固定件穿过通孔固定于第一木方。
在一些实施例中,第一螺母包括抵接立杆的本体及位于本体两侧的把手。
在一些实施例中,第二螺母包括抵顶槽钢支架的本体及位于本体两侧的把手。
本发明早拆模板体系的调节支架可移动地安装于立杆,通过移动调节支架来调整立杆支架及横杆支架,方便施工。
附图说明
图1为本发明早拆模板体系一实施方式的施工状态示意图;
图2为图1中调节支架部分示意图。
具体实施方式
下面结合附图及具体实施例对本发明作进一步的详细描述说明。
请参照图1及图2,本发明早拆模板体系一实施方式包括多个立杆支架20及多个横杆支架100(图1中仅显示一个立杆支架20和两个横杆支架100之间的装配关系)。
立杆支架20包括调节支架30及立杆40。调节支架30包括螺杆32、固定于螺杆32的托架34、套设于螺杆32的槽钢支架36、可调节地安装于螺杆32的第一螺母37及可调节地安装于螺杆32的第二螺母38。螺杆32包括第一端320及与第一端320相对的第二端322。托架34包括固定于螺杆32第一端320的钢板340及固定件342。钢板340设有通孔344以供固定件342穿设。槽钢支架36设有供螺杆32穿设的通孔360。第一螺母37及第二螺母38位于槽钢支架36远离托架34的一侧,且第二螺母38靠近槽钢支架36。第一螺母37包括本体370及设置于本体370两侧的把手372。第二螺母38包括本体380及设置于本体380两侧的把手382。把手372及382便于在施工时调节第一螺母37及第二螺母38。通孔360的内径小于第二螺母38的本体380的外径,在立杆支架20垂直放置时,槽钢支架36抵顶第二螺母38的本体380,以使槽钢支架36固定。立杆40呈圆柱状,沿着轴线方向设有收容孔42。螺杆32的第二端322穿入立杆40的收容孔42内,以使螺杆32收容于立杆40的收容孔42内,第一螺母37的本体370抵接立杆40,以使调节支架30安装于立杆40。通过调整第一螺母37使得调节支架30可移动地收容于立杆40。本实施方式中,固定件342为铁钉。
横杆支架100由横杆及主龙骨构成。横杆支架100的两侧可固定于槽钢支架36内,以使得横杆支架100设置于立杆支架20。
在施工时,调节支架30的钢板340设置第一木方200,固定件342穿过通孔344固定于第一木方200,以使第一木方200固定于调节支架40。调节第一螺母37,使螺杆32在立杆40内移动,当第一木方200的上表面与所浇筑的楼板300的底部的标高平齐时,停止调整第一螺母37,第一螺母37的本体370抵接立杆40,调节支架30安装于立杆40。将横杆支架100固定于立杆支架20的槽钢支架36内,使横杆支架100设置于立杆支架20。横杆支架100上设置第二木方400,然后在第二木方400上放置多层板500。调节第二螺母38,第二螺母38的本体380带动槽钢支架36移动,从而使槽钢支架36带动横杆支架100移动,当多层板500的上表面与第一木方100的上表面平齐时,停止调节第二螺母38,槽钢支架36抵接第二螺母38的本体380,槽钢支架36固定,从而使横杆支架100固定于立杆支架20。此时早拆模板体系安装施工完毕。在楼板300浇筑后,调节第一螺母37及第二螺母38,使螺杆32下移,同时使槽钢支架36带动横杆支架100下移,然后拆掉第一木方200、第二木方400及多层板500。
本发明早拆模板体系通过调节立杆支架20的第一螺母37及第二螺母38以调节立杆支架20及横杆支架100的高度,达到施工要求,方便施工。

Claims (8)

1.早拆模板体系,其特征在于,包括立杆支架(20)及横杆支架(100),所述立杆支架(20)包括调节支架(30)及立杆(40),所述横杆支架(100)安装于所述调节支架(30),所述调节支架(30)可移动地安装于立杆(40)。
2.根据权利要求1所述的早拆模板体系,其特征在于,所述调节支架(30)包括螺杆(32)及位置可调整地安装于所述螺杆(32)的第一螺母(37),所述螺杆(32)包括第一端(320)及所述第一端(320)相对的第二端(322),所述立杆(40)设有收容孔(42),所述螺杆(32)的第二端穿入所述收容孔(42),所述第一螺母(37)抵顶所述立杆(40)。
3.根据权利要求2所述的早拆模板体系,其特征在于,所述调节支架(30)还包括位置可调整地安装于所述螺杆(32)的第二螺母(38)及套设于所述螺杆(32)的槽钢支架(36),所述第一螺母(37)及所述第二螺母(38)位于所述槽钢支架(36)的一侧,所述槽钢支架(36)抵顶所述第二螺母(38),所述横杆支架(100)固定于所述槽钢支架(36)。
4.根据权利要求3所述的早拆模板体系,其特征在于,所述调节支架(30)还包括用于设置第一木方(200)的托架(34),所述槽钢支架(36)位于所述第二螺母(38)与所述托架(34)之间。
5.根据权利要求4所述的早拆模板体系,其特征在于,所述托架(34)包括固定于所述螺杆(32)第一端(320)以设置所述第一木方(200)的钢板(340)及用于固定所述第一木方(200)的固定件(342)。
6.根据权利要求5所述的早拆模板体系,其特征在于,所述固定件(342)为铁钉,所述钢板(340)设有通孔(344),所述固定件(342)穿过通孔(344)固定于所述第一木方(100)。
7.根据权利要求2所述的早拆模板体系,其特征在于,所述第一螺母(37)包括抵接所述立杆(40)的本体(370)及位于所述本体(370)两侧的把手(372)。
8.根据权利要求3所述的早拆模板体系,其特征在于,所述第二螺母(38)包括抵顶所述槽钢支架(36)的本体(380)及位于所述本体(380)两侧的把手(382)。
CN201210130024XA 2012-04-27 2012-04-27 早拆模板体系 Pending CN102628319A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210130024XA CN102628319A (zh) 2012-04-27 2012-04-27 早拆模板体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210130024XA CN102628319A (zh) 2012-04-27 2012-04-27 早拆模板体系

Publications (1)

Publication Number Publication Date
CN102628319A true CN102628319A (zh) 2012-08-08

Family

ID=46586693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210130024XA Pending CN102628319A (zh) 2012-04-27 2012-04-27 早拆模板体系

Country Status (1)

Country Link
CN (1) CN102628319A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963505A (zh) * 2015-06-12 2015-10-07 朱卫 早拆模板
CN105019648A (zh) * 2014-04-24 2015-11-04 湖南金峰金属构件有限公司 一种承插型键槽式建筑模板早拆装置

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10038659A1 (de) * 2000-08-08 2002-02-21 Peri Gmbh Vorrichtung zum Abstützen von Schalungen sowie Spindelrahmen für eine derartige Vorrichtung
CN1526906A (zh) * 2003-09-19 2004-09-08 马宝兴 建筑模板早拆托顶装置
CN201050194Y (zh) * 2007-06-01 2008-04-23 林光明 可调式拆模支撑架
CN201671356U (zh) * 2010-04-24 2010-12-15 林光明 早拆模支撑系统
CN201730352U (zh) * 2010-07-07 2011-02-02 葛雪华 一种建筑支架
CN102121314A (zh) * 2010-12-31 2011-07-13 李万山 一种梁板模板早拆的施工方法
CN102418415A (zh) * 2010-09-28 2012-04-18 杨峰 小板跨现浇梁密肋楼板早拆模板支模体系
CN202544394U (zh) * 2012-04-27 2012-11-21 南通海洲建设集团有限公司 早拆模板体系

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10038659A1 (de) * 2000-08-08 2002-02-21 Peri Gmbh Vorrichtung zum Abstützen von Schalungen sowie Spindelrahmen für eine derartige Vorrichtung
CN1526906A (zh) * 2003-09-19 2004-09-08 马宝兴 建筑模板早拆托顶装置
CN201050194Y (zh) * 2007-06-01 2008-04-23 林光明 可调式拆模支撑架
CN201671356U (zh) * 2010-04-24 2010-12-15 林光明 早拆模支撑系统
CN201730352U (zh) * 2010-07-07 2011-02-02 葛雪华 一种建筑支架
CN102418415A (zh) * 2010-09-28 2012-04-18 杨峰 小板跨现浇梁密肋楼板早拆模板支模体系
CN102121314A (zh) * 2010-12-31 2011-07-13 李万山 一种梁板模板早拆的施工方法
CN202544394U (zh) * 2012-04-27 2012-11-21 南通海洲建设集团有限公司 早拆模板体系

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019648A (zh) * 2014-04-24 2015-11-04 湖南金峰金属构件有限公司 一种承插型键槽式建筑模板早拆装置
CN104963505A (zh) * 2015-06-12 2015-10-07 朱卫 早拆模板

Similar Documents

Publication Publication Date Title
CN104755681B (zh) 面板支撑托架
CN202731297U (zh) 一种可调梁模板支撑顶托架装置
CN107448689A (zh) 一种横向管道的吊装支架
CN203626251U (zh) 双层混凝土墙模板支撑结构
CN204899947U (zh) 地铁站模板台车
CN103306208A (zh) 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法
CA2651150A1 (en) Flush joist seat
JP2010043468A (ja) アンカーボルトセット装置及び基礎の施工方法
CN201896365U (zh) 混凝土表面的平板预埋件安装固定装置
KR101691525B1 (ko) 레고형 대차 동바리
CN103967273A (zh) 楼板浇筑用混凝土模板支撑装置
JP2017529467A (ja) 橋梁のための作業用プラットホームを支持するための足場
CN202544394U (zh) 早拆模板体系
CN205243006U (zh) 一种侧模支撑顶托
CN203175052U (zh) 建筑楼板梁板施工用标平器
CN102628319A (zh) 早拆模板体系
CN105114102B (zh) 地铁站模板台车
CN106193591A (zh) 一种铝合金模板楼板支撑快速拆装机构
CN203347249U (zh) 应用于钢柱安装的垂直度调节装置
CN102127971A (zh) 可调节找平凳及用找平凳控制楼板厚度的方法
CN104963505A (zh) 早拆模板
CN102950452A (zh) 一种自动扶梯桁架调节机构
CN203547151U (zh) 一种地面找平工具
CN202194392U (zh) 一种楼板厚度控制装置
CN205243068U (zh) 用于楼面模板的支撑装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Xingchun

Inventor after: Su Yuan

Inventor before: Sun Xingxiang

Inventor before: Su Yuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN XINGXIANG SU YUAN TO: SUN XINGCHUN SU YUAN

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120808