CN202073323U - 调整预埋件安装水平度的支撑架 - Google Patents

调整预埋件安装水平度的支撑架 Download PDF

Info

Publication number
CN202073323U
CN202073323U CN 201120169692 CN201120169692U CN202073323U CN 202073323 U CN202073323 U CN 202073323U CN 201120169692 CN201120169692 CN 201120169692 CN 201120169692 U CN201120169692 U CN 201120169692U CN 202073323 U CN202073323 U CN 202073323U
Authority
CN
China
Prior art keywords
rotating sleeve
turning set
vertical rod
montant
supporting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120169692
Other languages
English (en)
Inventor
李万军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN 201120169692 priority Critical patent/CN202073323U/zh
Application granted granted Critical
Publication of CN202073323U publication Critical patent/CN202073323U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型提供了一种调整预埋件安装水平度的支撑架,包括底座,其特征在于:在底座的左、右两端分别设置左竖杆和右竖杆,在左竖杆和右竖杆上分别设置有左转动套和右转动套,左转动套和右转动套分别与左竖杆和右竖杆螺纹配合而上下升降;在左转动套和右转动套之间,设置横向支撑杆,横向支撑杆的两端分别设置或连接在左转动套和右转动套上。本实用新型的支撑架,有效提高安装施工效率,缩短工期,提高市场竞争力;采用现场(工地)常用材料,利用工地的某些边角余料制作成安装用的支撑架,而不采用昂贵的仪器和设备,便于现场的施工操作,同时能降低施工成本;能方便、灵活调整槽钢上表面左右两端的相对高度,以使其水平度满足工艺要求。

Description

调整预埋件安装水平度的支撑架
技术领域
本实用新型涉及一种建筑地平面埋设预埋件的安装、校正和调平用的支撑架,具体为一种调整预埋件安装水平度的支撑架。
背景技术
    在建筑施工中,尤其是大型的工业厂房中面对高精度预埋件的安装一直是令广大施工技术人员比较头疼的问题,其技术难点集中在预埋件的校正与调平工序,还有就是后工序中的预埋件保护。该种结构的地平面(大型厂房),首先是长、宽尺寸非常大,有上千至几千、乃至上万平方米,需要埋设多种预埋件,其数量上百吨至几百吨,要求预埋件之间的高度差非常小,预埋件的尺寸精度和位置精度很高(水平度要求很高),常规的施工埋设方式进展缓慢、效率低、工期长,而且不容易达到要求的尺寸精度和位置精度,另外就是施工成本较高。在安装、校正和调平过程中,需要一种能方便、灵活调整其水平度的支撑架,尤其是调整槽钢上表面左右两端、每一端的左右两侧的相对高度,以使其水平度满足工艺要求。但,现有技术的支撑架,不能方便、灵活调整其水平度,施工效率低、耗费人工,影响工期。
发明内容
     本实用新型针对现有技术在调平预埋件施工中存在的调整水平度不方便、效率低、工期长、不容易达到要求等不足,提供一种能有效缩短工期、提高安装施工效率、调整方便灵活、降低施工成本的调整预埋件安装水平度的支撑架。
本实用新型的技术方案:调整预埋件安装水平度的支撑架,包括底座,其特征在于:在底座的左、右两端分别设置左竖杆和右竖杆,在左竖杆和右竖杆上分别设置有左转动套和右转动套,左转动套和右转动套分别与左竖杆和右竖杆螺纹配合而上下升降;在左转动套和右转动套之间,设置横向支撑杆,横向支撑杆的两端分别设置或连接在左转动套和右转动套上。
进一步的特征是:在横向支撑杆的两端设置左套筒和右套筒,左套筒和右套筒分别套入左竖杆和右竖杆上,再支撑在左转动套和右转动套上,左转动套和/或右转动套转动时就能带动左套筒和/或右套筒升降。
本实用新型调整预埋件安装水平度的支撑架,相对于现有技术,具有如下特点:
1、有效提高安装施工效率,缩短工期,提高市场竞争力。
2、采用现场(工地)常用材料,利用工地的某些边角余料制作成安装用的支撑架,而不采用昂贵的仪器和设备,便于现场的施工操作,同时能降低施工成本。
3、能方便、灵活调整槽钢上表面左右两端、每一端的左右两侧的相对高度,以使其水平度满足工艺要求。
附图说明
图1是本实用新型的支撑架结构示意图。
具体实施方式
    如图1中,本实用新型调整预埋件安装水平度的支撑架,包括底座1,在底座1的两端设置有两根竖杆,即左端的左竖杆2和右端的右竖杆3,在左竖杆2和右竖杆3上分别设置有左转动套4和右转动套5,左转动套4和右转动套5分别与左竖杆2和右竖杆3螺纹配合,左转动套4和右转动套5转动时分别在左竖杆2和右竖杆3上升降。在左转动套4和右转动套5之间,设置横向支撑杆6,横向支撑杆6的两端分别设置或连接在左转动套4和右转动套5上,图中在横向支撑杆6的两端设置左套筒7和右套筒8,左套筒7和右套筒8分别套入左竖杆2和右竖杆3上,再支撑在左转动套4和右转动套5上,左转动套4和/或右转动套5转动时就能带动左套筒7和/或右套筒8升降,带动横向支撑杆6相应升降,就能调节放置在横向支撑杆6上的待安装槽钢上表面四个角的水平位置,以调整四个角的水平度达到工艺要求。
本实用新型的支撑架,其组成部件,如底座1、左竖杆2、右竖杆3、左转动套4、右转动套5、横向支撑杆6等,都采用安装现场的边角余料制得,本身成本很低。
    施工时,将槽钢支撑在至少两个本实用新型的支撑架的支撑杆上,所述的支撑杆的两端能相对支撑架在一定范围内升降,以调节槽钢上表面左右两端、每一端的左右两侧的高度;槽钢的水平度以槽钢上表面的四个角的水平度来衡量,如果其四个角的水平度都在工艺要求的范围内,则整个槽钢的水平度就符合要求;调整其水平度比较方便、灵活。

Claims (2)

1.调整预埋件安装水平度的支撑架,包括底座(1),在底座(1)的两端设置有左竖杆(2)和右竖杆(3),在左竖杆(2)和右竖杆(3)上分别设置有左转动套(4)和右转动套(5),左转动套(4)和右转动套(5)分别与左竖杆(2)和右竖杆(3)螺纹配合而升降;在左转动套(4)和右转动套(5)之间,设置横向支撑杆(6),横向支撑杆(6)的两端分别设置或连接在左转动套(4)和右转动套(5)上。
2.根据权利要求1所述调整预埋件安装水平度的支撑架,其特征在于:在横向支撑杆(6)的两端设置左套筒(7)和右套筒(8),左套筒(7)和右套筒(8)分别套入左竖杆(2)和右竖杆(3)上,再支撑在左转动套(4)和右转动套(5)上,左转动套(4)和/或右转动套(5)转动时就能带动左套筒(7)和/或右套筒(8)升降。
CN 201120169692 2011-05-25 2011-05-25 调整预埋件安装水平度的支撑架 Expired - Fee Related CN202073323U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120169692 CN202073323U (zh) 2011-05-25 2011-05-25 调整预埋件安装水平度的支撑架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120169692 CN202073323U (zh) 2011-05-25 2011-05-25 调整预埋件安装水平度的支撑架

Publications (1)

Publication Number Publication Date
CN202073323U true CN202073323U (zh) 2011-12-14

Family

ID=45111429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120169692 Expired - Fee Related CN202073323U (zh) 2011-05-25 2011-05-25 调整预埋件安装水平度的支撑架

Country Status (1)

Country Link
CN (1) CN202073323U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102589763A (zh) * 2012-01-30 2012-07-18 山东科技大学 一种充填体性能在线监测系统
CN103321436A (zh) * 2013-07-10 2013-09-25 成都市第八建筑工程公司 建筑砖砌体上线盒预安装施工方法及其预安装支架
CN104032969A (zh) * 2014-06-27 2014-09-10 中建三局集团有限公司 一种隔震支座预埋板精确定位及过程调控装置
CN104654101A (zh) * 2015-03-13 2015-05-27 姚红惠 多功能台灯
CN104895319A (zh) * 2015-05-11 2015-09-09 中国十七冶集团有限公司 现浇混凝土剪力墙、框架柱模板的安装标高的定位装置
CN105040995A (zh) * 2015-07-08 2015-11-11 中国十七冶集团有限公司 埋件快速调平安装装置
CN114538609A (zh) * 2022-01-25 2022-05-27 百奥兰(浙江)水务技术有限公司 一种反硝化深床滤池结构及其池底二次浇筑施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102589763A (zh) * 2012-01-30 2012-07-18 山东科技大学 一种充填体性能在线监测系统
CN102589763B (zh) * 2012-01-30 2013-08-21 山东科技大学 一种充填体性能在线监测系统
CN103321436A (zh) * 2013-07-10 2013-09-25 成都市第八建筑工程公司 建筑砖砌体上线盒预安装施工方法及其预安装支架
CN104032969A (zh) * 2014-06-27 2014-09-10 中建三局集团有限公司 一种隔震支座预埋板精确定位及过程调控装置
CN104654101A (zh) * 2015-03-13 2015-05-27 姚红惠 多功能台灯
CN104654101B (zh) * 2015-03-13 2017-01-11 姚红惠 多功能台灯
CN104895319A (zh) * 2015-05-11 2015-09-09 中国十七冶集团有限公司 现浇混凝土剪力墙、框架柱模板的安装标高的定位装置
CN105040995A (zh) * 2015-07-08 2015-11-11 中国十七冶集团有限公司 埋件快速调平安装装置
CN114538609A (zh) * 2022-01-25 2022-05-27 百奥兰(浙江)水务技术有限公司 一种反硝化深床滤池结构及其池底二次浇筑施工方法

Similar Documents

Publication Publication Date Title
CN202073323U (zh) 调整预埋件安装水平度的支撑架
CN203783165U (zh) 预埋件多方位精确调节装置
CN203603586U (zh) 设备支柱调节装置
CN102287058B (zh) 大平面高精度预埋件安装和调平方法
CN203188234U (zh) 大型设备预埋地脚螺栓群的定位夹具
CN103352476B (zh) 大型螺栓高精度预埋施工方法
CN204608819U (zh) 一种用于风力发电机的调平装置
CN101837916A (zh) 电梯上曳引机机架水平度的调节装置
CN204298830U (zh) 基于地下基坑内格构柱平面及高程调控装置
CN204920244U (zh) 大跨度钢结构分段吊装的支撑结构
CN101871258B (zh) 卫生墙瓷砖快速精确粘贴器具及留空排砖灌浆粘贴方法
CN204850483U (zh) 固定支撑装置
CN204386190U (zh) 建筑工地网架调平专用支座
CN204019070U (zh) 井架组装用组合钢架
CN202081659U (zh) 砌墙机的安平支架
CN107470820A (zh) 反装组焊工装
CN203715117U (zh) 快速安装的塔吊
CN202559702U (zh) 一种移动式可调可固定操作平台
CN204258089U (zh) 一种基于方形和弓形拼接板的易于定位的配电柜组件
CN204243544U (zh) 一种基于扇形拼接板的易于定位的配电柜组件
CN204243542U (zh) 一种基于方形和弓形拼接板的易于定位的配电柜组件
CN204243541U (zh) 一种基于三角形和弓形拼接板的易于定位的配电柜组件
CN204258060U (zh) 一种基于方形和三角形拼接板的易于定位的配电柜组件
CN204243547U (zh) 一种基于方形和三角形拼接板的配电柜组件
CN105040991B (zh) 大跨度钢结构分段吊装的支撑结构及支撑方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111214

Termination date: 20140525