CN105040724A CN201510393700.6A CN201510393700A CN105040724A CN 105040724 A CN105040724 A CN 105040724A CN 201510393700 A CN201510393700 A CN 201510393700A CN 105040724 A CN105040724 A CN 105040724A
Authority
CN
China
Prior art keywords
concrete dam
dam joint
concrete
basis
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510393700.6A
Other languages
Chinese (zh)
Other versions
CN105040724B (en
Inventor
扈晓雯
郑鹏翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201510393700.6A priority Critical patent/CN105040724B/en
Publication of CN105040724A publication Critical patent/CN105040724A/en
Application granted granted Critical
Publication of CN105040724B publication Critical patent/CN105040724B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to a treatment method for poor concrete dam joint foundations. The treatment method for the poor concrete dam joint foundations does not affect operation of railways or highways and meets the requirements of water-power engineering junction layouts. The treatment method aims at achieving the foundation strength and the seepage-proofing purpose of a concrete dam joint under poor geological conditions, guaranteeing operation safety of the highways in the flood season, reducing slope excavation, reducing waste slag fields, facilitating water and soil conservation and saving engineering investment. According to the technical scheme, the concrete dam joint is arranged on one side of a highway and comprises the concrete dam joint foundation I adjacent to the highway and the adjacent concrete dam joint foundation II; after the concrete dam joint foundation I is excavated, steep slopes are formed, plain concrete 20 cm in thickness needs to be sprayed to the steep slopes for slope fixation, it is found that a foundation weak intercalated layer is arranged below the concrete dam joint foundation I during construction with the attitude of rock slowly inclines to the downstream, and the inclination angle ranges from 20 degrees to 35 degrees. The treatment method is suitable for hydraulic and hydroelectric engineering.

Description

A kind of processing method of the bad basis of concrete dam joint
Technical field
The present invention relates to a kind of processing method of the bad basis of concrete dam joint, be applicable to Hydraulic and Hydro-Power Engineering.
Background technology
Hydroelectric project hinge requires higher to dam body foundation carrying and antiseepage, dam joint structure basis preferably can be located on basement rock, but run into bank and have sliding mass, artificial slag, rubble clay, when joint basis, dam has the complex foundation conditions such as weak interbed to be close to again railway or highway, side slope and dam joint foundation excavation are extremely restricted even cannot construct.Plain tract is built this problem of water conservancy and hydropower multi-purpose project very outstanding, flood season, the danger of temporary construction was just large especially, in order to ensure side slope not unstability, usually first rush construction and railway or highway adjacent concrete dam joint, to alleviate, dam joint foundation excavation difficulty is large, the construction period cuts off highway affects the difficulties such as traffic, but adjacent foundation can be brought not yet to excavate, the risk that geological conditions is not quite clear, thus affect dam foundation bearing capacity and anti-seepage effect.
Summary of the invention
The technical problem to be solved in the present invention is: for above-mentioned Problems existing, there is provided a kind of and neither affect the processing method that Rail Highway ran, met again the bad basis of concrete dam joint of hydroelectric project project playout, be intended to the underlying strength and the antiseepage problem that solve poor geology Under Concrete dam joint, ensure road travel safety in flood season, reduce slope excavation, reduce waste place, be conducive to water and soil conservation, cost saving.
The technical solution adopted in the present invention is: a kind of processing method of the bad basis of concrete dam joint, described concrete dam joint arrangement is in the side of highway, comprise No. I concrete dam joint basis of next-door neighbour's highway and No. II adjacent concrete dam joint basis, it is characterized in that the treatment step of this concrete dam joint is as follows:
A, carry out Gong Lu Cheongju slope and be close to the local excavation on No. I concrete dam joint basis of highway, the soil property formed afterwards at excavation is risen steeply in side slope and is sprayed the thick plain concrete of 20cm;
B, build No. I concrete dam joint basis, after concrete reaches and builds the length of time, carry out the excavation on No. II concrete dam joint basis, disclose the ground weak intercalated layer under No. I concrete dam joint basis, this interlayer occurrence slow tendency downstream, inclination angle is 20 ~ 35 °;
C, within the scope of No. I concrete dam joint basal perimeter, lay shot hole, draw the clay digging out ground weak intercalated layer after small pit goaf controlled blasting, and arrange trapezoidal sand drift outward in the laying scope of shot hole;
D, to drawing the ground weak intercalated layer back filled foundation concrete plug after digging process, build No. II concrete dam joint basis, curtain grouting in foundation of dam is carried out, until below basic relative water resisting layer in No. I concrete dam joint basis and No. II concrete dam joint basis.
The foundation plane width on described No. I concrete dam joint basis and No. II concrete dam joint basis is respectively 10-20m.
The invention has the beneficial effects as follows: when the present invention is to the construction and excavation process of concrete dam joint, neither affect Rail Highway and run, meet the requirement of hydroelectric project project playout again, and dam foundation treatment is simple; After disclosing unfavorable geological condition after adjacent dam body foundation excavation, by small pit goaf static blasting, draw and dig ground weak intercalated layer, fill concrete plugs and changes, foundation grout curtain, can be effectively addressed, meet dam joint basis carrying and antiseepage requirement, ensured road travel safety in flood season, decrease slope excavation, reduce waste place, be conducive to water and soil conservation, cost saving; The present invention is bad to solution next-door neighbour joint basis, highway dam, adjacent building basement rock utilizes the face discrepancy in elevation large, and flood season, Upon Slope Stability required high, and the construction period ensures that the benefit of the technical barriers such as the coast is clear requirement is obvious.
Accompanying drawing explanation
Fig. 1 is plan view of the present invention.
Fig. 2 is A-A view of the present invention.
Fig. 3 is B-B view of the present invention.
Fig. 4 is C-C view of the present invention.
Detailed description of the invention
The present embodiment is a kind of processing method of the bad basis of concrete dam joint, this concrete dam joint arrangement is in the side of highway 1, comprise No. I concrete dam joint basis 4 and adjacent No. II concrete dam joint basis 5 of next-door neighbour's highway 1, define side slope 2 of rising steeply after the excavation of No. I concrete dam joint basis 4,20cm thick plain concrete 3 Gu Po should be sprayed rising steeply in side slope 2.Construction midway finds that No. I concrete dam joint basis 4 has the ground weak intercalated layer 7 that attitude of rocks delays tendency downstream, inclination angle is 20 ~ 35 ° below, and therefore need continuing construction after this ground weak intercalated layer replacement Treatment again, concrete operation step is as follows:
1, as shown in Figure 1 and Figure 2, the local excavation on the Cheongju slope of first carrying out highway 1 and No. I concrete dam joint basis 4 being close to highway, the soil property formed afterwards at excavation is risen steeply and side slope 2 sprays the thick plain concrete of 20cm 3 is protected;
2, as shown in Figure 3, build No. I concrete dam joint basis 4, after concrete reaches and builds the length of time, carry out the excavation on No. II concrete dam joint basis 5, at this moment disclose No. I concrete dam joint basis 4 and have ground weak intercalated layer 7 below, the occurrence slow tendency downstream of this ground weak intercalated layer, inclination angle is 20 ~ 35 °;
3, as shown in Figure 4, shot hole (comprising pipe laying and explosive) 8 is laid in No. I concrete dam joint basis 4 periphery certain limits, adopt the method for small pit goaf controlled blasting to carry out explosion, the clay of explosion groundwork weak intercalated layer 7 is drawn and digs process; Can arrange outward trapezoidal sand drift 9 in the laying scope of shot hole 8 before explosion, after observation explosion, sand drift shape conversion situation, detection static blasting vibrating effect, namely detect explosion to the impact on built No. I concrete dam joint basis 4;
4, as shown in Figure 4, to drawing the ground weak intercalated layer 7 back filled foundation concrete plug 10 after digging process, build No. II concrete dam joint basis 5, curtain grouting in foundation of dam 6 is carried out, until joint basis, dam is positioned at below water barrier respectively on No. I concrete dam joint basis 4 and No. II concrete dam joint basis 5.
In the present embodiment, the foundation plane width on No. I concrete dam joint basis 4 and No. II concrete dam joint basis 5 is respectively 10m.

Claims (2)

1. the processing method on the bad basis of concrete dam joint, described concrete dam joint arrangement is in the side of highway (1), comprise No. I concrete dam joint basis (4) and adjacent No. II concrete dam joint basis (5) of next-door neighbour's highway (1), it is characterized in that the treatment step of this concrete dam joint is as follows:
A, carry out Gong Lu Cheongju slope and be close to the local excavation of No. I concrete dam joint basis (4) of highway, the soil property formed afterwards at excavation is risen steeply the thick plain concrete (3) of side slope (2) upper spray 20cm;
B, build No. I concrete dam joint basis (4), after concrete reaches and builds the length of time, carry out the excavation of No. II concrete dam joint basis (5), disclose the ground weak intercalated layer (7) under No. I concrete dam joint basis (4), this interlayer occurrence slow tendency downstream, inclination angle is 20 ~ 35 °;
C, laying shot hole (8) in No. I concrete dam joint basis (4) peripheral extent, draw the clay digging out ground weak intercalated layer (7) after small pit goaf controlled blasting, and arrange trapezoidal sand drift (9) outward in the laying scope of shot hole (8);
D, to drawing ground weak intercalated layer (7) the back filled foundation concrete plug (10) after digging process, build No. II concrete dam joint basis (5), No. I concrete dam joint basis (4) and No. II concrete dam joint basis (5) carry out curtain grouting in foundation of dam (6), until below basic relative water resisting layer.
2. the processing method on a kind of bad basis of concrete dam joint according to claim 1, is characterized in that: the foundation plane width of described No. I concrete dam joint basis (4) and No. II concrete dam joint basis (5) is respectively 10-20m.
CN201510393700.6A 2015-07-02 2015-07-02 A kind of bad basic processing method of concrete dam joint Active CN105040724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510393700.6A CN105040724B (en) 2015-07-02 2015-07-02 A kind of bad basic processing method of concrete dam joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510393700.6A CN105040724B (en) 2015-07-02 2015-07-02 A kind of bad basic processing method of concrete dam joint

Publications (2)

Publication Number Publication Date
CN105040724A true CN105040724A (en) 2015-11-11
CN105040724B CN105040724B (en) 2017-03-01

Family

ID=54447670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510393700.6A Active CN105040724B (en) 2015-07-02 2015-07-02 A kind of bad basic processing method of concrete dam joint

Country Status (1)

Country Link
CN (1) CN105040724B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020068118A (en) * 2001-02-20 2002-08-27 (주)한석엔지니어링건축사사무소 Protecting Structure of Concrete Caisson
CN200978430Y (en) * 2006-12-07 2007-11-21 中国水电顾问集团华东勘测设计研究院 Concrete dam joint structure
CN101603299A (en) * 2009-07-02 2009-12-16 中国水电顾问集团华东勘测设计研究院 A kind of broken line type dam joint structure and job practices thereof
CN201433386Y (en) * 2009-07-02 2010-03-31 中国水电顾问集团华东勘测设计研究院 Broken-line type dam joint structure
CN102619196A (en) * 2012-04-18 2012-08-01 中国水电顾问集团中南勘测设计研究院 Connector of concrete dam and earth dam in coastal wide river valley region

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020068118A (en) * 2001-02-20 2002-08-27 (주)한석엔지니어링건축사사무소 Protecting Structure of Concrete Caisson
CN200978430Y (en) * 2006-12-07 2007-11-21 中国水电顾问集团华东勘测设计研究院 Concrete dam joint structure
CN101603299A (en) * 2009-07-02 2009-12-16 中国水电顾问集团华东勘测设计研究院 A kind of broken line type dam joint structure and job practices thereof
CN201433386Y (en) * 2009-07-02 2010-03-31 中国水电顾问集团华东勘测设计研究院 Broken-line type dam joint structure
CN102619196A (en) * 2012-04-18 2012-08-01 中国水电顾问集团中南勘测设计研究院 Connector of concrete dam and earth dam in coastal wide river valley region

Also Published As

Publication number Publication date
CN105040724B (en) 2017-03-01

Similar Documents

Publication Publication Date Title
CN101806226B (en) Mined out space dam-type filling method
WO2020248596A1 (en) Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method
CN105464056A (en) Anti-seepage structure capable of adapting to settlement of earth and rockfill dam
CN202416263U (en) Concrete faced rockfill dam compounded with gravity dam
CN203729306U (en) Anti-slide pile and soil retaining plate supporting structure
CN109610481A (en) A kind of supporting improvement construction method for tunnel portal concordant strong-weathered rock matter high gradient slope
CN114134877B (en) Treatment method for mining ground cracks of shallow coal seam in hilly and hilly areas of peaked landform
CN201635745U (en) Ribbed-arch multi-arch tunnel
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN207228038U (en) The countermeasure system of large-scale Dumping Sites in a kind of debris flow gully
CN203547763U (en) High backfilling anti-sliding open cut tunnel structure
CN103132487A (en) Method of reducing horizontal displacement of concrete faced rockfill dam and concrete faced rockfill dam
CN203347799U (en) Shield tunneling machine capable of achieving three-dimensional grouting
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method
CN202416325U (en) Shallow foundation pit space enclosing structure
CN105040724A (en) Treatment method for poor concrete dam joint foundations
CN205116201U (en) Open caisson construction equipment
CN212388474U (en) A concrete gravity dam for precipitous river valley topography
CN210049276U (en) Soil slope retaining wall system structure
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN209099304U (en) A kind of hydraulic engineering protection river levee
CN208266895U (en) Cofferdam is built in returning for seabed tunnel point storehouse construction
CN207159948U (en) Mud-rock flow blocking dam
CN206800435U (en) A kind of chiasma type suspended deck structure vertically developed long and narrow solution cavity and pushed
CN205013010U (en) Pass through pyroclastic flow stratum face sealing wall for tunnel construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant